Waste-To-Energy Plants – Public Private Partnership
Singapore
0
Loh Ah Tuan
Consultant
Keppel Seghers Engineering Singapore Pte Ltd
Former Dy CEO/Director-General
National Environment Agency, Singapore
Member
Expert Panel,
Centre for Liveable Cities, Singapore
June 2016
Singapore
• Island State
• Area : 718 sq km
• Population : > 5 million
• No Natural Resources
• Hot and Humid Weather
Copyright © Centre for Liveable Cities 1
Singapore - 1950s & 1960s
A country plagued with challenges of industrialization and urbanization
Singapore – Solid Waste Management
1970 – 2000
• Solid waste grew at 8%-10% per annum
• 1970 - 1,200 tons/day
• 2000 - 7,700 tons/day
> 7-fold increase
• This is not sustainable, as no more land is available before the turn of century
• Need to reduce waste growth
• More effective policies, strategies and programs
• Use of technologies and innovations
2000 – 2015
• Solid waste generation stabilized at ~ 7,700 tons/day
Technology
Early 1970s
To reduce waste growth, Singapore considered the following technologies:
• Mass burn incineration
• Composting
• Baling
• Others
Decided on mass burn incineration
• 90% waste volume reduction
• electricity generation
• bottom ash and fly-ash recycling
• scrap metal recovery
WTE Plant
Mass-Burn Technology
5
Flue Gas Cleaning
WTE Process
Waste
reception
Incineration &
Electricity Generation
6
7
 Hopper guides waste into furnace
 Feeding grate ensures a dosed feeding of the waste to the grate
 Combustion grate functions as support for horizontal combustion processes
a)
b)
c)d)
Furnace
Steam Boiler designed to optimize electricity generation
The boiler
a) Vertical, three-pass radiant section with
membrane walls
b) Convection section with one horizontal flue gas
passage with vertically placed boiler bank
tubes
Steam Boiler designed to optimize electricity
generation
8
Pollutant
HCl
SOx
HF
PCDD/F
HM
Cd + Tl
Hg
dust
NOx
CO
Flue Gas
Semi Wet
Reactor
Fabric Filter
Lime milk
Water
Active Carbon
180 -
240°C
140°C
Flue Gas Treatment
Meets International Emission Standards
WTE Plants
Singapore
10
Incineration (Waste-To-Energy) Plants In Singapore
• 1979 - First WTE (Waste-To-Energy) plant built in Singapore
• Designed and constructed by the private sector
• Government operated the plant for 30 years
• Plant was decommissioned in 2009
• 3 more WTE plants were built in Singapore
• Also designed and constructed by the private sector
• Government operate the 3 plants, which are still in use
• For the 4 WTE plants, all financing, design and operational risks were borne by Government
• Capital-intensive nature of constructing and operating WTE plants
• Need to ensure reliable incineration services
• 5th WTE Plant
• Replace the first WTE plant
• Develop by private sector using PPP (Public-Private-Partnership) model with a concession to
operate plant for 25 years
Ulu Pandan
(NEA)
Tuas
(NEA)
Senoko
(Keppel Seghers)
Tuas South
(NEA)
5th WTE Plant
(Keppel Seghers)
1979 1986 1992 2000 2009
1,100 tons/day 1,700 tons/day 2,400 tons/day 3,000 tons/day 800 tons/day
5th WTE Plant
o Decision to develop 5th WTE plant using PPP model
• To liberalize incineration industry in Singapore, having
successfully
 built and operated 4 WTE plants
 privatized waste collection service in 1999
• Inject competition into waste incineration sector to increase
efficiency
• Develop environment engineering industry by transferring
expertise residing in the Government to private sector
5th WTE Plant
o 2001 - Open tender called for development of 5th WTE plant
• Developers to undertake financial, design and demand risks
• Tender not well received by the market
• Only one non-compliant bid submitted
o Reasons
• Developers unable to bear the demand risks owing to
• uncertain waste growth; and
• waste stream for plant not guaranteed
Factors are crucial with high capital outlay for WTE plants
o No award of tender
5th WTE Plant
o A study of the industry structure was commissioned, taking into consideration lessons from
failed tender
o Outcome of study
• Adopt DBOO (Design, Build, Own, Operate) scheme with full ‘take-or-pay’ approach
• Government to enter into ‘take-or-pay’ agreement with developer to buy 100% of
incineration capacity at a price determined through the tender
• Government to bear demand risks by giving operator full capacity payment,
regardless of the actual utilization rate of the plant
To address market’s concerns and allow private sector to bid more competitively
o Provision of incineration services are safeguarded through an Incineration Services
Agreement
• Technical requirements
• Service Performance standards
• Commercial terms & conditions
• Others
5th WTE Plant
o 2005 - Tender for 5th WTE plant was recalled with
• ‘take-or-pay’ approach
• a concession of operating plant for 25 years
o Tender attracted good response from market
• Nov 2005 - Keppel Seghers awarded the tender
• 2009 – Keppel Seghers commenced commercial operation of
5th WTE Plant
• Keppel Seghers has been operating the plant without any
major incidents
Singapore WTE Plants
Currently, 4 WTE plants handling all incinerable waste collected
• 2 WTE plants owned and operated by Keppel Seghers, a
Singapore private company handling about 50% of
incinerable waste collected daily in Singapore
• 2 WTE plants operated by National Environment Agency
(NEA)
Public Private Partnership (PPP)
WTE Projects
17
18
Public Private Partnership (PPP)
PPP - A long-term public & private sector partner
relationship to deliver public services
• Make optimal use of public and private sectors’ expertise,
resources and innovation
• more value for money public services
• meet public needs effectively and efficiently
• Shift risks to private sector
• Public sector focus on acquiring services at most cost-
effective basis
195
• Government buys services for incineration of waste
• ‘Take-or-Pay’ payment structure with guaranteed
waste amount, to make the project bankable
Project
Structure
• Long term contract : 20 - 25 years
• Private sector provides both equity and debt
financing
Project
Financing
Key Features
205
• Measurable Performance Outcomes
• Available Incineration Capacity
• Contracted unit of electricity export
• Ash quality and flue gas to meet standards
• Plant service level : EHS, turnaround time, etc
Measurable
Performance
• Penalty for non-conformanceNon-
Conformance
Key Features
Key Agreements
o Incineration Services Agreement (ISA)
• Government to enter into a long-term ‘take-or-pay’ ISA with a Special Purpose
Company (SPC) set up by the developer to purchase 100% of capacity
 Government to collect gate fee to finance and pay SPC
 Government to mandate electricity is exported to electricity grid
 SPC to deliver services based on
 tendered/agreed price
 technical, commercial, legal terms and conditions
 service performance standards
 SPC to comply with environmental regulations
o Power Purchase Agreement (PPA)
• Export of electricity to grid
• Technical, commercial and legal terms & conditions
o Tripartite Agreement (TA)
• Financier may step in and take over WTE plant when SPC is in default
• Government may step in and take over if SPC is unable to render service due to an
insolvency event
Special Purpose
Company (SPC)Equity Provider
Shareholder
Agreement
Financier
Financing
Agreement
EPC
Contractor
O&M
Contractor
Power Off-taker
EPC Contract O&M Contract Power Purchase Agreement
Lease
Agreement
Tripartite
Agreement
Government
Incineration
Services
Agreement
22
Typical PPP Structure for WTE Project
Thank You
23

More Related Content

What's hot

Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerVaibhav Paydelwar
 
Auxiliary power consumption reduction
Auxiliary power consumption reductionAuxiliary power consumption reduction
Auxiliary power consumption reductionAmit jangra
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVIKASH BAGHEL
 
Thermal Power Plant Simulator Hands-on Malfunctions
Thermal Power Plant Simulator Hands-on MalfunctionsThermal Power Plant Simulator Hands-on Malfunctions
Thermal Power Plant Simulator Hands-on MalfunctionsManohar Tatwawadi
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsSHIVAJI CHOUDHURY
 
Dry Type Transformer
Dry  Type TransformerDry  Type Transformer
Dry Type TransformerSmit Shah
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsManohar Tatwawadi
 
Ball & tube mill
Ball & tube millBall & tube mill
Ball & tube millStudy Hub
 
Gas turbine power plant
Gas turbine power plantGas turbine power plant
Gas turbine power plantAntarDutta2
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plantra m
 
Thermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of EnergyThermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of EnergyJayant Suthar
 
Economiser & air preheater
Economiser & air preheaterEconomiser & air preheater
Economiser & air preheaterdishti7
 
STEAM TURBINES AND ITS GOVERNINGS
STEAM TURBINES AND ITS GOVERNINGSSTEAM TURBINES AND ITS GOVERNINGS
STEAM TURBINES AND ITS GOVERNINGSAkhil Krishnan G
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentationShahzaib Hussain
 
THERMAL POWER PLANT
THERMAL POWER PLANTTHERMAL POWER PLANT
THERMAL POWER PLANTCyber4Tech
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Jigyasa Singh
 

What's hot (20)

Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
Auxiliary power consumption reduction
Auxiliary power consumption reductionAuxiliary power consumption reduction
Auxiliary power consumption reduction
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBA
 
Power Plant Operations.pdf
Power Plant Operations.pdfPower Plant Operations.pdf
Power Plant Operations.pdf
 
Thermal Power Plant Simulator Hands-on Malfunctions
Thermal Power Plant Simulator Hands-on MalfunctionsThermal Power Plant Simulator Hands-on Malfunctions
Thermal Power Plant Simulator Hands-on Malfunctions
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plants
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
Dry Type Transformer
Dry  Type TransformerDry  Type Transformer
Dry Type Transformer
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / Mills
 
hindalco power
hindalco powerhindalco power
hindalco power
 
Ball & tube mill
Ball & tube millBall & tube mill
Ball & tube mill
 
Gas turbine power plant
Gas turbine power plantGas turbine power plant
Gas turbine power plant
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plant
 
Thermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of EnergyThermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of Energy
 
Economiser & air preheater
Economiser & air preheaterEconomiser & air preheater
Economiser & air preheater
 
STEAM TURBINES AND ITS GOVERNINGS
STEAM TURBINES AND ITS GOVERNINGSSTEAM TURBINES AND ITS GOVERNINGS
STEAM TURBINES AND ITS GOVERNINGS
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentation
 
Boilers
BoilersBoilers
Boilers
 
THERMAL POWER PLANT
THERMAL POWER PLANTTHERMAL POWER PLANT
THERMAL POWER PLANT
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)
 

Similar to Waste-to-energy plants - public private partnership Singapore

Complete Solution for Biogas Power Plant
Complete Solution for Biogas Power PlantComplete Solution for Biogas Power Plant
Complete Solution for Biogas Power PlantWindri Aji Brata
 
Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...ACX
 
Natural group corporate profile 2013
Natural group corporate profile 2013Natural group corporate profile 2013
Natural group corporate profile 2013Ritesh Pothan
 
Solarsense presentation moorhouse community solar lcsw business breakfast 190515
Solarsense presentation moorhouse community solar lcsw business breakfast 190515Solarsense presentation moorhouse community solar lcsw business breakfast 190515
Solarsense presentation moorhouse community solar lcsw business breakfast 190515The Future Economy Network
 
Ebi may 2015 overview sg b1
Ebi may 2015 overview sg b1Ebi may 2015 overview sg b1
Ebi may 2015 overview sg b1frankjoh
 
Ebi may 2015 overview sg b
Ebi may 2015 overview sg bEbi may 2015 overview sg b
Ebi may 2015 overview sg bfrankjoh
 
EPC in the Irish Prison Service
EPC in the Irish Prison ServiceEPC in the Irish Prison Service
EPC in the Irish Prison ServiceCodema
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsGeorges Seil, PhD
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsGeorges Seil, PhD
 
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...The Business Council of Mongolia
 
Singapore Experience in Water Financing
Singapore Experience in Water FinancingSingapore Experience in Water Financing
Singapore Experience in Water FinancingGWP SOUTHEAST ASIA
 
Eco Match - MCPC Conference- Craig
Eco Match - MCPC Conference- CraigEco Match - MCPC Conference- Craig
Eco Match - MCPC Conference- Craig7391456
 
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, KenyaB4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, KenyaIceland Geothermal
 
DORSET RENEWABLE INDUSTRIES - COMMUNITY UPDATE 2014
DORSET RENEWABLE INDUSTRIES - COMMUNITY UPDATE 2014DORSET RENEWABLE INDUSTRIES - COMMUNITY UPDATE 2014
DORSET RENEWABLE INDUSTRIES - COMMUNITY UPDATE 2014sgiblett
 
A3 - Financing geothermal development: Decreasing equity requirements
A3 - Financing geothermal development: Decreasing equity requirements A3 - Financing geothermal development: Decreasing equity requirements
A3 - Financing geothermal development: Decreasing equity requirements Iceland Geothermal
 

Similar to Waste-to-energy plants - public private partnership Singapore (20)

Wave hub presentation to APM SWWE branch 18 05 16
Wave hub presentation to APM SWWE branch 18 05 16Wave hub presentation to APM SWWE branch 18 05 16
Wave hub presentation to APM SWWE branch 18 05 16
 
Complete Solution for Biogas Power Plant
Complete Solution for Biogas Power PlantComplete Solution for Biogas Power Plant
Complete Solution for Biogas Power Plant
 
Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...
 
Natural group corporate profile 2013
Natural group corporate profile 2013Natural group corporate profile 2013
Natural group corporate profile 2013
 
Solarsense presentation moorhouse community solar lcsw business breakfast 190515
Solarsense presentation moorhouse community solar lcsw business breakfast 190515Solarsense presentation moorhouse community solar lcsw business breakfast 190515
Solarsense presentation moorhouse community solar lcsw business breakfast 190515
 
Ebi may 2015 overview sg b1
Ebi may 2015 overview sg b1Ebi may 2015 overview sg b1
Ebi may 2015 overview sg b1
 
Ebi may 2015 overview sg b
Ebi may 2015 overview sg bEbi may 2015 overview sg b
Ebi may 2015 overview sg b
 
EPC in the Irish Prison Service
EPC in the Irish Prison ServiceEPC in the Irish Prison Service
EPC in the Irish Prison Service
 
IWT presentation
IWT presentationIWT presentation
IWT presentation
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systems
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systems
 
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
 
New alan kiff
New alan kiffNew alan kiff
New alan kiff
 
Singapore Experience in Water Financing
Singapore Experience in Water FinancingSingapore Experience in Water Financing
Singapore Experience in Water Financing
 
GREEN INDUSTRY.pptx
GREEN INDUSTRY.pptxGREEN INDUSTRY.pptx
GREEN INDUSTRY.pptx
 
Eco Match - MCPC Conference- Craig
Eco Match - MCPC Conference- CraigEco Match - MCPC Conference- Craig
Eco Match - MCPC Conference- Craig
 
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, KenyaB4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
 
DORSET RENEWABLE INDUSTRIES - COMMUNITY UPDATE 2014
DORSET RENEWABLE INDUSTRIES - COMMUNITY UPDATE 2014DORSET RENEWABLE INDUSTRIES - COMMUNITY UPDATE 2014
DORSET RENEWABLE INDUSTRIES - COMMUNITY UPDATE 2014
 
Ilios Power Profile
Ilios Power ProfileIlios Power Profile
Ilios Power Profile
 
A3 - Financing geothermal development: Decreasing equity requirements
A3 - Financing geothermal development: Decreasing equity requirements A3 - Financing geothermal development: Decreasing equity requirements
A3 - Financing geothermal development: Decreasing equity requirements
 

Recently uploaded

(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…nishakur201
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at workChristina Parmionova
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 

Recently uploaded (20)

(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 

Waste-to-energy plants - public private partnership Singapore

  • 1. Waste-To-Energy Plants – Public Private Partnership Singapore 0 Loh Ah Tuan Consultant Keppel Seghers Engineering Singapore Pte Ltd Former Dy CEO/Director-General National Environment Agency, Singapore Member Expert Panel, Centre for Liveable Cities, Singapore June 2016
  • 2. Singapore • Island State • Area : 718 sq km • Population : > 5 million • No Natural Resources • Hot and Humid Weather Copyright © Centre for Liveable Cities 1
  • 3. Singapore - 1950s & 1960s A country plagued with challenges of industrialization and urbanization
  • 4. Singapore – Solid Waste Management 1970 – 2000 • Solid waste grew at 8%-10% per annum • 1970 - 1,200 tons/day • 2000 - 7,700 tons/day > 7-fold increase • This is not sustainable, as no more land is available before the turn of century • Need to reduce waste growth • More effective policies, strategies and programs • Use of technologies and innovations 2000 – 2015 • Solid waste generation stabilized at ~ 7,700 tons/day
  • 5. Technology Early 1970s To reduce waste growth, Singapore considered the following technologies: • Mass burn incineration • Composting • Baling • Others Decided on mass burn incineration • 90% waste volume reduction • electricity generation • bottom ash and fly-ash recycling • scrap metal recovery
  • 7. Flue Gas Cleaning WTE Process Waste reception Incineration & Electricity Generation 6
  • 8. 7  Hopper guides waste into furnace  Feeding grate ensures a dosed feeding of the waste to the grate  Combustion grate functions as support for horizontal combustion processes a) b) c)d) Furnace
  • 9. Steam Boiler designed to optimize electricity generation The boiler a) Vertical, three-pass radiant section with membrane walls b) Convection section with one horizontal flue gas passage with vertically placed boiler bank tubes Steam Boiler designed to optimize electricity generation 8
  • 10. Pollutant HCl SOx HF PCDD/F HM Cd + Tl Hg dust NOx CO Flue Gas Semi Wet Reactor Fabric Filter Lime milk Water Active Carbon 180 - 240°C 140°C Flue Gas Treatment Meets International Emission Standards
  • 12. Incineration (Waste-To-Energy) Plants In Singapore • 1979 - First WTE (Waste-To-Energy) plant built in Singapore • Designed and constructed by the private sector • Government operated the plant for 30 years • Plant was decommissioned in 2009 • 3 more WTE plants were built in Singapore • Also designed and constructed by the private sector • Government operate the 3 plants, which are still in use • For the 4 WTE plants, all financing, design and operational risks were borne by Government • Capital-intensive nature of constructing and operating WTE plants • Need to ensure reliable incineration services • 5th WTE Plant • Replace the first WTE plant • Develop by private sector using PPP (Public-Private-Partnership) model with a concession to operate plant for 25 years Ulu Pandan (NEA) Tuas (NEA) Senoko (Keppel Seghers) Tuas South (NEA) 5th WTE Plant (Keppel Seghers) 1979 1986 1992 2000 2009 1,100 tons/day 1,700 tons/day 2,400 tons/day 3,000 tons/day 800 tons/day
  • 13. 5th WTE Plant o Decision to develop 5th WTE plant using PPP model • To liberalize incineration industry in Singapore, having successfully  built and operated 4 WTE plants  privatized waste collection service in 1999 • Inject competition into waste incineration sector to increase efficiency • Develop environment engineering industry by transferring expertise residing in the Government to private sector
  • 14. 5th WTE Plant o 2001 - Open tender called for development of 5th WTE plant • Developers to undertake financial, design and demand risks • Tender not well received by the market • Only one non-compliant bid submitted o Reasons • Developers unable to bear the demand risks owing to • uncertain waste growth; and • waste stream for plant not guaranteed Factors are crucial with high capital outlay for WTE plants o No award of tender
  • 15. 5th WTE Plant o A study of the industry structure was commissioned, taking into consideration lessons from failed tender o Outcome of study • Adopt DBOO (Design, Build, Own, Operate) scheme with full ‘take-or-pay’ approach • Government to enter into ‘take-or-pay’ agreement with developer to buy 100% of incineration capacity at a price determined through the tender • Government to bear demand risks by giving operator full capacity payment, regardless of the actual utilization rate of the plant To address market’s concerns and allow private sector to bid more competitively o Provision of incineration services are safeguarded through an Incineration Services Agreement • Technical requirements • Service Performance standards • Commercial terms & conditions • Others
  • 16. 5th WTE Plant o 2005 - Tender for 5th WTE plant was recalled with • ‘take-or-pay’ approach • a concession of operating plant for 25 years o Tender attracted good response from market • Nov 2005 - Keppel Seghers awarded the tender • 2009 – Keppel Seghers commenced commercial operation of 5th WTE Plant • Keppel Seghers has been operating the plant without any major incidents
  • 17. Singapore WTE Plants Currently, 4 WTE plants handling all incinerable waste collected • 2 WTE plants owned and operated by Keppel Seghers, a Singapore private company handling about 50% of incinerable waste collected daily in Singapore • 2 WTE plants operated by National Environment Agency (NEA)
  • 18. Public Private Partnership (PPP) WTE Projects 17
  • 19. 18 Public Private Partnership (PPP) PPP - A long-term public & private sector partner relationship to deliver public services • Make optimal use of public and private sectors’ expertise, resources and innovation • more value for money public services • meet public needs effectively and efficiently • Shift risks to private sector • Public sector focus on acquiring services at most cost- effective basis
  • 20. 195 • Government buys services for incineration of waste • ‘Take-or-Pay’ payment structure with guaranteed waste amount, to make the project bankable Project Structure • Long term contract : 20 - 25 years • Private sector provides both equity and debt financing Project Financing Key Features
  • 21. 205 • Measurable Performance Outcomes • Available Incineration Capacity • Contracted unit of electricity export • Ash quality and flue gas to meet standards • Plant service level : EHS, turnaround time, etc Measurable Performance • Penalty for non-conformanceNon- Conformance Key Features
  • 22. Key Agreements o Incineration Services Agreement (ISA) • Government to enter into a long-term ‘take-or-pay’ ISA with a Special Purpose Company (SPC) set up by the developer to purchase 100% of capacity  Government to collect gate fee to finance and pay SPC  Government to mandate electricity is exported to electricity grid  SPC to deliver services based on  tendered/agreed price  technical, commercial, legal terms and conditions  service performance standards  SPC to comply with environmental regulations o Power Purchase Agreement (PPA) • Export of electricity to grid • Technical, commercial and legal terms & conditions o Tripartite Agreement (TA) • Financier may step in and take over WTE plant when SPC is in default • Government may step in and take over if SPC is unable to render service due to an insolvency event
  • 23. Special Purpose Company (SPC)Equity Provider Shareholder Agreement Financier Financing Agreement EPC Contractor O&M Contractor Power Off-taker EPC Contract O&M Contract Power Purchase Agreement Lease Agreement Tripartite Agreement Government Incineration Services Agreement 22 Typical PPP Structure for WTE Project