WASTED POTENTIAL
North South University
Name- M.M. Junaid Alam
Email - jalam565@gmail.com
Mobile - 01624958100
Student id– 1711861030
Name- Zahid Alam Shovon
Email – zaidandzaid89@gmail.com
Mobile – 01716398907
Student id – 1712361630
Name- Mahdi Mohammad Mehrab
Email - mahdimohammadmehrab@gmail.com
Mobile – 01973206295
Student id – 1711659030
Name- Ashfaqul Haque Chowdhury
Email 96ashfaq@gmail.com
Mobile – 01791652383
Student id – 1712337620
1
Case Analysis
The biggest strength of Darshana Mill is the manpower of the mill. The employees are loyal and
expert. The turnover is low which shows employees like working here. But in spite of that the
mill is suffering from various problems with low outputs. The bottleneck of all these problems is
the machines. As a manager Shahriar Rahman has to come up with a positioning to improve-
output, profitability and quality.
1. Problem Identification:
Going through the situation of the mill following problems can be listed-
 Grade Change for machine #6
 Breaks for machine #5
 Insufficient Output
 Inefficient Scheduling
 Outdated machines.
Doing further analysis, outdated machines and insufficient scheduling can be blamed for most of
the problems.
2. Identification of Decision Criteria and Allocation of Weights:
Based on the objectives the alternatives will be decided on certain criteria which are listed
below and they are weighted according to their importance.
3. Developing and Analyzing Alternatives:
i. Computerization: Integrate and Coordinate the workforce in Darshana Mill by installing
a computerized machine control system.
Strength: Easier grade change, less wastage of time and resources, & higher efficiency,
profitability, flexibility, quality, consistency & output (65TPD).
Weakness: High capital investment( $15 million) & employee turnover, maintenance
issues
Criteria Weights
Output 10
Profitability 9
Capital Investment 8
Flexibility 7
Quality 7
Efficiency 6
Employee Turnover 5
2
Net Present Value:
Year Cash Outflow($) Cash Inflow($) Present Value($)
0 15,000,000 0 -15,000,000
1 0 7,391,250 (W) -7,608,750
2 0 7,391,250 -217,500
3 0 7,391,250 +7,173,750
(W) = Number of TPD * average contribution per ton * 365
Payback Period= 2years + 217,500*365/7,391,250 days
= 2years & 11days
ii. Coordination between Adamjee and Darshana Mills: The two mills can coordinate and
integrate the production process and reduce the amount of grade change required. The
desired output can be distributed among the two mills according to the type of grades
required so that each mill produces similar types of grades only.
Strength: Easier grade change, less wastage of time and resources, & higher efficiency,
profitability, quality & output & no capital investment.
Weakness: the effects would be minimal, outputs may not rise sufficiently.
iii. Purchase Machine: The machines were the bottleneck in the production as every other
part of the mill could run at least 200 TPD more than the machines could produce. So
Exon Papers limited can purchase a new bleach board machine with a capacity of 200
TPD. This would cost roughly $20 million. Additional cost would be incurred to make
space for the machine to run. Estimated cost of renting a factory space would be $2
million per year. This way bleach board production of the new machine can be
coordinated and integrated with machine #6. This would also raise the production of
bleach boards which is a more profitable product.
Strength: Grade change minimized, less wastage of time and resources, & higher
efficiency, profitability, flexibility, quality & output( 200TPD).
Weakness: High capital investment( $22 million), Fixed cost increased
Net Present Value:
Year Cash Outflow($) Cash Inflow($) Present Value($)
0 20,000,000 0 -20,000,000
1 2,000,000 25,550,000 (W) + 3550,000
(W) = 200TPD * $350 average contribution per ton * 365
Payback Period= 20,000,000*365/(25,550,000-2,000,000)= 310 days
iv. Integrated Decentralized System: The operations will be decentralized and the
employees at the Darshana mill will have the authority to make decisions regarding
scheduling and running of the machines. The mill scheduler and the production planner in
the corporate headquarter will collaborate more. The production planner will not be
changed so frequently and not until his/her assistant is trained enough to take his/her
3
position. Grade changes will be minimized. This would also increase the quality of the
products and output of the machines.
Profits lost due to grade change per year:
=Average number of grade change per month * number of months * average cost of a
grade change * average contribution per ton for machine #6
=38 * 12 * 17.3 tons * $350 = $ 2,761,080
Strengths: Better scheduling, better quality, higher output, no capital investment, grade
change minimized, wastage of time and resources minimized, higher efficiency,
empowering employee, more efficient decision making.
Weakness: Effects would be minimal.
v. Production-focused Scheduling process: The scheduling system will be changed from
customer-focused to production-focused to optimize the production runs and ensure the
betterment of the machines. Last minute changes and orders will not be considered and the
mill scheduler will receive the planned overall monthly schedule a week earlier. The
machines would run better and depreciate less as grade changes will be minimized.
Strength: Better scheduling, better quality, higher output, no capital investment, grade
change minimized, wastage of time and resources minimized, higher efficiency, machines’
lifespan increased.
Weakness: Effects would be minimal, lose customers, less revenues.
Analysis of the Alternatives(multiplied by criteria weight):
Criteria Computerization Coordination
between
Adamjee and
Darshana
Purchase
Machine
Integrated
Decentralized
System
Production-
focused Scheduling
process
Output (10) 10 * 8= 80 10 * 4= 40 10* 10=
100
10 * 5= 50 10 * 6= 60
Profitability
(9)
9 * 8= 72 9 * 6= 54 9 * 9= 81 9 * 6= 54 9 * 5= 45
Capital
Investment
(8)
8 * 7= 56 8 * 10= 80 8 * 6= 48 8 * 10= 80 8 * 10= 80
Flexibility(7) 7 * 8= 56 7 * 6= 42 7 * 6= 42 7 * 7= 49 7 * 5= 35
Quality(7) 7 * 8= 56 7 * 7= 49 7 * 7= 49 7 * 6= 42 7 * 8= 56
Efficiency(6) 6 * 9= 54 6 * 7= 42 6 * 7= 42 6 * 8= 48 6 * 7= 42
Employee
Turnover(5)
5 * 4= 20 5 * 8= 40 5 * 10= 50 5 * 9= 45 5 * 9= 45
Total Score 394 347 460 368 363
4
4. Recommendation of the best alternative:
Purchase Machine: If major capital expenditure is approved, according to the decision matrix
purchasing new machines will result in most effective and immediate result in better output,
quality and profitability. This would resolve the issue of production deficiency and help the
company to grow and expand its market share. This would also result in more revenues in the
future which would contribute in making more capital investments in the future.
5. Recommendation if Major Capital Expenditure is not Approved:
Integrated Decentralized system: Ignoring the best alternative, Integrated Decentralized
system is only 26 points behind in the decision matrix. This is a huge plus point as it requires
zero capital investment. This system only involves changing the internal management
process and by doing so it can well proves to be profitable for the company. This would
ensure smooth production run which would result in higher quality product and longer life
span of the machines thus saving the company some valuable cash which can otherwise be
invested for the betterment of the Mill.
Conclusion
Over the years the machines of the Darshana mill has let the company down. However, with
purchasing a new machine or introducing Integrated Decentralized System the company can
overcome the basic issues and move towards prosperity. Along with the loyal and experienced
employees, the Darshana mill has a great potential to grow in this thriving industry. Therefore a
major capital investment wouldn’t let the company down and the Integrated Decentralized
System would make the day to day operations run smoother making the corporate headquarter
satisfied.
394
347
460
368 363
0
50
100
150
200
250
300
350
400
450
500
Computerization Coordination
between
Adamjee and
Darshana
Purchase
Machine
Integrated
Decentralized
System
Production-
focused
Scheduling
process
Scores of the Alternative

More Related Content

What's hot

Hrm assignment
Hrm assignmentHrm assignment
Hrm assignmentsmumbahelp
 
Methods of wage payment
Methods of wage paymentMethods of wage payment
Methods of wage paymentpooja singhal
 
Commit to Becoming an Outstanding Organization
Commit to Becoming an Outstanding OrganizationCommit to Becoming an Outstanding Organization
Commit to Becoming an Outstanding OrganizationTKMG, Inc.
 
Factor affecting Employee Productivity in TVS Sons and limitied
Factor affecting Employee Productivity in TVS Sons and limitiedFactor affecting Employee Productivity in TVS Sons and limitied
Factor affecting Employee Productivity in TVS Sons and limitiedSlide Dragon
 
BE mechanical engineer with 9.7 years experience in production
BE mechanical engineer with 9.7 years experience in productionBE mechanical engineer with 9.7 years experience in production
BE mechanical engineer with 9.7 years experience in productionJaga deesh
 
Lean in Troubled Times
Lean in Troubled TimesLean in Troubled Times
Lean in Troubled TimesRamesh Victor
 
Just in time of harley davidson
Just in time of harley davidsonJust in time of harley davidson
Just in time of harley davidsonRaniPoojaSingh
 
Group1 crisis management
Group1 crisis managementGroup1 crisis management
Group1 crisis managementPrerana Rawat
 
Introduction To Continuous Improvement Process PowerPoint Presentation Slides
Introduction To Continuous Improvement Process PowerPoint Presentation SlidesIntroduction To Continuous Improvement Process PowerPoint Presentation Slides
Introduction To Continuous Improvement Process PowerPoint Presentation SlidesSlideTeam
 
Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingTimothy Wooi
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study ChallengeNikhil Kejriwal
 
Kaizen in manufacturing industry
Kaizen in manufacturing industryKaizen in manufacturing industry
Kaizen in manufacturing industryAmberSaleem8
 
Operational Performance Management PowerPoint Presentation Slides
Operational Performance Management PowerPoint Presentation Slides Operational Performance Management PowerPoint Presentation Slides
Operational Performance Management PowerPoint Presentation Slides SlideTeam
 
Business Operational Excellence Strategy PowerPoint Presentation Slides
Business Operational Excellence Strategy PowerPoint Presentation Slides Business Operational Excellence Strategy PowerPoint Presentation Slides
Business Operational Excellence Strategy PowerPoint Presentation Slides SlideTeam
 
Cathy Johnson - CPG Event - 10th November 2010 - The Knowledgeable Buyer
Cathy Johnson - CPG Event - 10th November 2010 - The Knowledgeable Buyer Cathy Johnson - CPG Event - 10th November 2010 - The Knowledgeable Buyer
Cathy Johnson - CPG Event - 10th November 2010 - The Knowledgeable Buyer Institute of Consulting
 
Creating a Continuous Improvement Culture
Creating a Continuous Improvement CultureCreating a Continuous Improvement Culture
Creating a Continuous Improvement CultureTKMG, Inc.
 

What's hot (20)

Hrm assignment
Hrm assignmentHrm assignment
Hrm assignment
 
Yogesh Sharma
Yogesh SharmaYogesh Sharma
Yogesh Sharma
 
Methods of wage payment
Methods of wage paymentMethods of wage payment
Methods of wage payment
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
Commit to Becoming an Outstanding Organization
Commit to Becoming an Outstanding OrganizationCommit to Becoming an Outstanding Organization
Commit to Becoming an Outstanding Organization
 
Factor affecting Employee Productivity in TVS Sons and limitied
Factor affecting Employee Productivity in TVS Sons and limitiedFactor affecting Employee Productivity in TVS Sons and limitied
Factor affecting Employee Productivity in TVS Sons and limitied
 
BE mechanical engineer with 9.7 years experience in production
BE mechanical engineer with 9.7 years experience in productionBE mechanical engineer with 9.7 years experience in production
BE mechanical engineer with 9.7 years experience in production
 
INCENTIVES
INCENTIVESINCENTIVES
INCENTIVES
 
Lean in Troubled Times
Lean in Troubled TimesLean in Troubled Times
Lean in Troubled Times
 
Just in time of harley davidson
Just in time of harley davidsonJust in time of harley davidson
Just in time of harley davidson
 
Group1 crisis management
Group1 crisis managementGroup1 crisis management
Group1 crisis management
 
Introduction To Continuous Improvement Process PowerPoint Presentation Slides
Introduction To Continuous Improvement Process PowerPoint Presentation SlidesIntroduction To Continuous Improvement Process PowerPoint Presentation Slides
Introduction To Continuous Improvement Process PowerPoint Presentation Slides
 
Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in Manufacturing
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study Challenge
 
Kaizen in manufacturing industry
Kaizen in manufacturing industryKaizen in manufacturing industry
Kaizen in manufacturing industry
 
Operational Performance Management PowerPoint Presentation Slides
Operational Performance Management PowerPoint Presentation Slides Operational Performance Management PowerPoint Presentation Slides
Operational Performance Management PowerPoint Presentation Slides
 
Ashu_Rastogi
Ashu_RastogiAshu_Rastogi
Ashu_Rastogi
 
Business Operational Excellence Strategy PowerPoint Presentation Slides
Business Operational Excellence Strategy PowerPoint Presentation Slides Business Operational Excellence Strategy PowerPoint Presentation Slides
Business Operational Excellence Strategy PowerPoint Presentation Slides
 
Cathy Johnson - CPG Event - 10th November 2010 - The Knowledgeable Buyer
Cathy Johnson - CPG Event - 10th November 2010 - The Knowledgeable Buyer Cathy Johnson - CPG Event - 10th November 2010 - The Knowledgeable Buyer
Cathy Johnson - CPG Event - 10th November 2010 - The Knowledgeable Buyer
 
Creating a Continuous Improvement Culture
Creating a Continuous Improvement CultureCreating a Continuous Improvement Culture
Creating a Continuous Improvement Culture
 

Similar to Case Study on Darshana Mill | Wasted Potential

Submission of mba spring 2012
Submission of mba spring 2012Submission of mba spring 2012
Submission of mba spring 2012Shraddha Singh
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going leanbwu.nl
 
Chapter 3 JIT, Value Added and Waste .docx
Chapter 3 JIT, Value Added and Waste            .docxChapter 3 JIT, Value Added and Waste            .docx
Chapter 3 JIT, Value Added and Waste .docxadkinspaige22
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with examplebhanutomar
 
Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivityANSHUL AHUJA
 
How Arrowsmith Engineering saved £300,000 per year
How Arrowsmith Engineering saved £300,000 per yearHow Arrowsmith Engineering saved £300,000 per year
How Arrowsmith Engineering saved £300,000 per yearGlyn Jenks
 
How gilt implemented a successful labor management system ops summit 2013
How gilt implemented a successful labor management system ops summit 2013How gilt implemented a successful labor management system ops summit 2013
How gilt implemented a successful labor management system ops summit 2013Steve Johnson
 
Operational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerOperational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerAnirban Mazumdar
 
Building A Goal Aligned Enterprise Public
Building A Goal Aligned Enterprise   PublicBuilding A Goal Aligned Enterprise   Public
Building A Goal Aligned Enterprise Publicgregflay
 
Achieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMSAchieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMSeMaint Enterprises
 
IMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEIMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEDrBiz Arikrishnan
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and servicesgerlyn bonus
 
Six Sigma- Define & Measure_Sudhanshu.pdf
Six Sigma- Define & Measure_Sudhanshu.pdfSix Sigma- Define & Measure_Sudhanshu.pdf
Six Sigma- Define & Measure_Sudhanshu.pdfSudhanshuMittal20
 
Maintenance Reliability_2015
Maintenance Reliability_2015Maintenance Reliability_2015
Maintenance Reliability_2015Ron McGary
 
Betsol Introduction- 2017
Betsol Introduction- 2017Betsol Introduction- 2017
Betsol Introduction- 2017BETSOL
 
160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing OrganizationMax Krug
 
Competitiveness, strategy, productivity
Competitiveness, strategy, productivityCompetitiveness, strategy, productivity
Competitiveness, strategy, productivityDr. Abdulfatah Salem
 

Similar to Case Study on Darshana Mill | Wasted Potential (20)

Submission of mba spring 2012
Submission of mba spring 2012Submission of mba spring 2012
Submission of mba spring 2012
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going lean
 
Chapter 3 JIT, Value Added and Waste .docx
Chapter 3 JIT, Value Added and Waste            .docxChapter 3 JIT, Value Added and Waste            .docx
Chapter 3 JIT, Value Added and Waste .docx
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivity
 
Chapter 06
Chapter 06Chapter 06
Chapter 06
 
How Arrowsmith Engineering saved £300,000 per year
How Arrowsmith Engineering saved £300,000 per yearHow Arrowsmith Engineering saved £300,000 per year
How Arrowsmith Engineering saved £300,000 per year
 
Asq int lss
Asq int lssAsq int lss
Asq int lss
 
How gilt implemented a successful labor management system ops summit 2013
How gilt implemented a successful labor management system ops summit 2013How gilt implemented a successful labor management system ops summit 2013
How gilt implemented a successful labor management system ops summit 2013
 
Operational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerOperational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturer
 
Building A Goal Aligned Enterprise Public
Building A Goal Aligned Enterprise   PublicBuilding A Goal Aligned Enterprise   Public
Building A Goal Aligned Enterprise Public
 
Achieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMSAchieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMS
 
IMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEIMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCE
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
Six Sigma- Define & Measure_Sudhanshu.pdf
Six Sigma- Define & Measure_Sudhanshu.pdfSix Sigma- Define & Measure_Sudhanshu.pdf
Six Sigma- Define & Measure_Sudhanshu.pdf
 
Maintenance Reliability_2015
Maintenance Reliability_2015Maintenance Reliability_2015
Maintenance Reliability_2015
 
Betsol Introduction- 2017
Betsol Introduction- 2017Betsol Introduction- 2017
Betsol Introduction- 2017
 
160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization
 
Competitiveness, strategy, productivity
Competitiveness, strategy, productivityCompetitiveness, strategy, productivity
Competitiveness, strategy, productivity
 

More from Zahid Shovon

Cholo: A Ride Sharing App Case | Lock, Stock & Barrel
Cholo: A Ride Sharing App Case | Lock, Stock & BarrelCholo: A Ride Sharing App Case | Lock, Stock & Barrel
Cholo: A Ride Sharing App Case | Lock, Stock & BarrelZahid Shovon
 
Public Urination- Social Awareness Campaign | Lock, Stock & Barrel
Public Urination- Social Awareness Campaign | Lock, Stock & BarrelPublic Urination- Social Awareness Campaign | Lock, Stock & Barrel
Public Urination- Social Awareness Campaign | Lock, Stock & BarrelZahid Shovon
 
Mr Coffee- Brand Ideation
Mr Coffee- Brand Ideation Mr Coffee- Brand Ideation
Mr Coffee- Brand Ideation Zahid Shovon
 
Crescent Brand Rebranding | Cash Cows
Crescent Brand Rebranding | Cash CowsCrescent Brand Rebranding | Cash Cows
Crescent Brand Rebranding | Cash CowsZahid Shovon
 
Creatives for Otobi
Creatives for OtobiCreatives for Otobi
Creatives for OtobiZahid Shovon
 
Otobi Marketing Strategy | Cash Cows
Otobi Marketing Strategy | Cash CowsOtobi Marketing Strategy | Cash Cows
Otobi Marketing Strategy | Cash CowsZahid Shovon
 
Book Memories- A digital Marketing Project | Cash Cows
Book Memories- A digital Marketing Project | Cash CowsBook Memories- A digital Marketing Project | Cash Cows
Book Memories- A digital Marketing Project | Cash CowsZahid Shovon
 
Ethical Report on Bangladesh Tannery- Cash Cows
Ethical Report on Bangladesh Tannery- Cash CowsEthical Report on Bangladesh Tannery- Cash Cows
Ethical Report on Bangladesh Tannery- Cash CowsZahid Shovon
 
Lunch Club Case- Lion's Den
Lunch Club Case- Lion's DenLunch Club Case- Lion's Den
Lunch Club Case- Lion's DenZahid Shovon
 
Cash Cows - Search Marketing
Cash Cows - Search MarketingCash Cows - Search Marketing
Cash Cows - Search MarketingZahid Shovon
 

More from Zahid Shovon (10)

Cholo: A Ride Sharing App Case | Lock, Stock & Barrel
Cholo: A Ride Sharing App Case | Lock, Stock & BarrelCholo: A Ride Sharing App Case | Lock, Stock & Barrel
Cholo: A Ride Sharing App Case | Lock, Stock & Barrel
 
Public Urination- Social Awareness Campaign | Lock, Stock & Barrel
Public Urination- Social Awareness Campaign | Lock, Stock & BarrelPublic Urination- Social Awareness Campaign | Lock, Stock & Barrel
Public Urination- Social Awareness Campaign | Lock, Stock & Barrel
 
Mr Coffee- Brand Ideation
Mr Coffee- Brand Ideation Mr Coffee- Brand Ideation
Mr Coffee- Brand Ideation
 
Crescent Brand Rebranding | Cash Cows
Crescent Brand Rebranding | Cash CowsCrescent Brand Rebranding | Cash Cows
Crescent Brand Rebranding | Cash Cows
 
Creatives for Otobi
Creatives for OtobiCreatives for Otobi
Creatives for Otobi
 
Otobi Marketing Strategy | Cash Cows
Otobi Marketing Strategy | Cash CowsOtobi Marketing Strategy | Cash Cows
Otobi Marketing Strategy | Cash Cows
 
Book Memories- A digital Marketing Project | Cash Cows
Book Memories- A digital Marketing Project | Cash CowsBook Memories- A digital Marketing Project | Cash Cows
Book Memories- A digital Marketing Project | Cash Cows
 
Ethical Report on Bangladesh Tannery- Cash Cows
Ethical Report on Bangladesh Tannery- Cash CowsEthical Report on Bangladesh Tannery- Cash Cows
Ethical Report on Bangladesh Tannery- Cash Cows
 
Lunch Club Case- Lion's Den
Lunch Club Case- Lion's DenLunch Club Case- Lion's Den
Lunch Club Case- Lion's Den
 
Cash Cows - Search Marketing
Cash Cows - Search MarketingCash Cows - Search Marketing
Cash Cows - Search Marketing
 

Recently uploaded

Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 

Recently uploaded (20)

Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 

Case Study on Darshana Mill | Wasted Potential

  • 1. WASTED POTENTIAL North South University Name- M.M. Junaid Alam Email - jalam565@gmail.com Mobile - 01624958100 Student id– 1711861030 Name- Zahid Alam Shovon Email – zaidandzaid89@gmail.com Mobile – 01716398907 Student id – 1712361630 Name- Mahdi Mohammad Mehrab Email - mahdimohammadmehrab@gmail.com Mobile – 01973206295 Student id – 1711659030 Name- Ashfaqul Haque Chowdhury Email 96ashfaq@gmail.com Mobile – 01791652383 Student id – 1712337620
  • 2. 1 Case Analysis The biggest strength of Darshana Mill is the manpower of the mill. The employees are loyal and expert. The turnover is low which shows employees like working here. But in spite of that the mill is suffering from various problems with low outputs. The bottleneck of all these problems is the machines. As a manager Shahriar Rahman has to come up with a positioning to improve- output, profitability and quality. 1. Problem Identification: Going through the situation of the mill following problems can be listed-  Grade Change for machine #6  Breaks for machine #5  Insufficient Output  Inefficient Scheduling  Outdated machines. Doing further analysis, outdated machines and insufficient scheduling can be blamed for most of the problems. 2. Identification of Decision Criteria and Allocation of Weights: Based on the objectives the alternatives will be decided on certain criteria which are listed below and they are weighted according to their importance. 3. Developing and Analyzing Alternatives: i. Computerization: Integrate and Coordinate the workforce in Darshana Mill by installing a computerized machine control system. Strength: Easier grade change, less wastage of time and resources, & higher efficiency, profitability, flexibility, quality, consistency & output (65TPD). Weakness: High capital investment( $15 million) & employee turnover, maintenance issues Criteria Weights Output 10 Profitability 9 Capital Investment 8 Flexibility 7 Quality 7 Efficiency 6 Employee Turnover 5
  • 3. 2 Net Present Value: Year Cash Outflow($) Cash Inflow($) Present Value($) 0 15,000,000 0 -15,000,000 1 0 7,391,250 (W) -7,608,750 2 0 7,391,250 -217,500 3 0 7,391,250 +7,173,750 (W) = Number of TPD * average contribution per ton * 365 Payback Period= 2years + 217,500*365/7,391,250 days = 2years & 11days ii. Coordination between Adamjee and Darshana Mills: The two mills can coordinate and integrate the production process and reduce the amount of grade change required. The desired output can be distributed among the two mills according to the type of grades required so that each mill produces similar types of grades only. Strength: Easier grade change, less wastage of time and resources, & higher efficiency, profitability, quality & output & no capital investment. Weakness: the effects would be minimal, outputs may not rise sufficiently. iii. Purchase Machine: The machines were the bottleneck in the production as every other part of the mill could run at least 200 TPD more than the machines could produce. So Exon Papers limited can purchase a new bleach board machine with a capacity of 200 TPD. This would cost roughly $20 million. Additional cost would be incurred to make space for the machine to run. Estimated cost of renting a factory space would be $2 million per year. This way bleach board production of the new machine can be coordinated and integrated with machine #6. This would also raise the production of bleach boards which is a more profitable product. Strength: Grade change minimized, less wastage of time and resources, & higher efficiency, profitability, flexibility, quality & output( 200TPD). Weakness: High capital investment( $22 million), Fixed cost increased Net Present Value: Year Cash Outflow($) Cash Inflow($) Present Value($) 0 20,000,000 0 -20,000,000 1 2,000,000 25,550,000 (W) + 3550,000 (W) = 200TPD * $350 average contribution per ton * 365 Payback Period= 20,000,000*365/(25,550,000-2,000,000)= 310 days iv. Integrated Decentralized System: The operations will be decentralized and the employees at the Darshana mill will have the authority to make decisions regarding scheduling and running of the machines. The mill scheduler and the production planner in the corporate headquarter will collaborate more. The production planner will not be changed so frequently and not until his/her assistant is trained enough to take his/her
  • 4. 3 position. Grade changes will be minimized. This would also increase the quality of the products and output of the machines. Profits lost due to grade change per year: =Average number of grade change per month * number of months * average cost of a grade change * average contribution per ton for machine #6 =38 * 12 * 17.3 tons * $350 = $ 2,761,080 Strengths: Better scheduling, better quality, higher output, no capital investment, grade change minimized, wastage of time and resources minimized, higher efficiency, empowering employee, more efficient decision making. Weakness: Effects would be minimal. v. Production-focused Scheduling process: The scheduling system will be changed from customer-focused to production-focused to optimize the production runs and ensure the betterment of the machines. Last minute changes and orders will not be considered and the mill scheduler will receive the planned overall monthly schedule a week earlier. The machines would run better and depreciate less as grade changes will be minimized. Strength: Better scheduling, better quality, higher output, no capital investment, grade change minimized, wastage of time and resources minimized, higher efficiency, machines’ lifespan increased. Weakness: Effects would be minimal, lose customers, less revenues. Analysis of the Alternatives(multiplied by criteria weight): Criteria Computerization Coordination between Adamjee and Darshana Purchase Machine Integrated Decentralized System Production- focused Scheduling process Output (10) 10 * 8= 80 10 * 4= 40 10* 10= 100 10 * 5= 50 10 * 6= 60 Profitability (9) 9 * 8= 72 9 * 6= 54 9 * 9= 81 9 * 6= 54 9 * 5= 45 Capital Investment (8) 8 * 7= 56 8 * 10= 80 8 * 6= 48 8 * 10= 80 8 * 10= 80 Flexibility(7) 7 * 8= 56 7 * 6= 42 7 * 6= 42 7 * 7= 49 7 * 5= 35 Quality(7) 7 * 8= 56 7 * 7= 49 7 * 7= 49 7 * 6= 42 7 * 8= 56 Efficiency(6) 6 * 9= 54 6 * 7= 42 6 * 7= 42 6 * 8= 48 6 * 7= 42 Employee Turnover(5) 5 * 4= 20 5 * 8= 40 5 * 10= 50 5 * 9= 45 5 * 9= 45 Total Score 394 347 460 368 363
  • 5. 4 4. Recommendation of the best alternative: Purchase Machine: If major capital expenditure is approved, according to the decision matrix purchasing new machines will result in most effective and immediate result in better output, quality and profitability. This would resolve the issue of production deficiency and help the company to grow and expand its market share. This would also result in more revenues in the future which would contribute in making more capital investments in the future. 5. Recommendation if Major Capital Expenditure is not Approved: Integrated Decentralized system: Ignoring the best alternative, Integrated Decentralized system is only 26 points behind in the decision matrix. This is a huge plus point as it requires zero capital investment. This system only involves changing the internal management process and by doing so it can well proves to be profitable for the company. This would ensure smooth production run which would result in higher quality product and longer life span of the machines thus saving the company some valuable cash which can otherwise be invested for the betterment of the Mill. Conclusion Over the years the machines of the Darshana mill has let the company down. However, with purchasing a new machine or introducing Integrated Decentralized System the company can overcome the basic issues and move towards prosperity. Along with the loyal and experienced employees, the Darshana mill has a great potential to grow in this thriving industry. Therefore a major capital investment wouldn’t let the company down and the Integrated Decentralized System would make the day to day operations run smoother making the corporate headquarter satisfied. 394 347 460 368 363 0 50 100 150 200 250 300 350 400 450 500 Computerization Coordination between Adamjee and Darshana Purchase Machine Integrated Decentralized System Production- focused Scheduling process Scores of the Alternative