DELHI SKILL AND ENTREPRENEURSHIP UNIVERSITY
(Aryabhatt DSEU Ashok Vihar Campus)
Hospital Building Construction
Under Guidance of
PWD Engineer
Department of Civil Engineering
Smt. Riniyo Nani
(Senior lecturer)
Mr. Vagish kumar
H.O.D (Civil Engg)
CERTIFICATE
This is certify that the practical training work entitled “
Construction of Hospital Building” BY “Swadeshi Civil
Infrastructure Pvt Ltd” (SCIPL) which is being submitted by Sourav
(10521417), Vivek kumar (10521476), Yash (10521417), Vivek
kumar(10521477), in partial fulfillments of the requirements for
the award of Diploma in Civil Engineering at Aryabhatt DSEU
Ashok Vihar Campus, GT karnal road, Delhi-110033 is a record
of the student’s own work carried out in this form under my
supervision and guidance.
Mr. Vagish kumar
H.O.D (Civil Engg)
Smt. Riniyo Nani
(Senior lecturer)
We are immensely grateful to Sh. Vagish Kumar, Smt Riniyo
Nani, for their meticulous guidance and Constance
encouragement at all stages of practical training work.
We grateful indebted to Mr. Amarjeet ( Assistant Executive
Engineer PWD) and Mr. Ankit (third party Quality Engineer) who
helped us.
We are thankful to our parents and our friends for the support
they extended us during entire duration of practical Industrial
Training.
Sourav (10521417
Vivek kumar (10621476)
Yash (10521416
Vivek kumar (10521477)
Contents
About the Hospital Building
D-wall
Foundations
Composite structure
Fire paint
Bolted Connection
Parts of Bolted connection
Scaffolding
Masonry work
AAC block
C&D Block
Our Proposed site is located at Lok nayak
hospital near Delhi gate metro station Delhi-
110054.
The total area of Building spanning is about
84,840 sq metres.
The building has two tower which have target
of total floor is 22, in on each tower.
This building is proposed to have total
number of Beds to be available is 1500.
This building is composite structure of Mild
Steel and RCC (Reinforced Cement Concrete).
D-wall is known as Diaphragm wall, it is designed to retain soils
during the construction of underground structure.
It helps to control the movement of ground during construction.
It is intended to take up high vertical loads from above ground
structures.
It is play important role in Active earth pressure as well as in passive
earth pressure.
The lower and very important part of any structure is foundations.
And after doing soil testing depend upon bearing capacity of soil
Engineer decide to construct Raft foundation.
Raft foundations also known as Mat foundations, it is a type of
combined footing that covers the entire area and supports all the
wall and columns.
This foundations is use because soil on that location is found to be
sandy , clay, silt and hard stone.
This structure is made up with RCC
(Reinforced Cement concrete) and
Mild Steel. Thatswhy also known
composite structure.
RCC is good in taking Compressive
as well as Tensile Stress But also in
Shear Stress thatswhy it is built
End to end of building, and middle
structure is of MS.
Engineer decides this to built
building as soon as possible. And
reduce time of delay, Because Mild
steel structure can be early as
compare to RCC structure.
Mild steel cannot be come into contact of moisture, water, and fire.
 To prevent corrosion and fire damaged, a layer is provide on beam
and column of mild steel, fire resistance material is used.
This material is very costly and become hard after drying. It is apply
like a paint with the help of compressor machine. Which is apply this
paint with high pressure.
Column and beam is connected by bolted joint. This joint are many
advantage such as :-
•They can easy to install, inspect, and maintain.
•They also allow for flexibility and adjustability in design and erection.
•Skill labourer not mandatory.
•Grade of this Nutt and bolt is 10.9s
•Due to high grade of bolt, this connection is strong, durable etc.
Parts of Bolted connection
A bolt is a metal rod for fastenings objects together it consist of :-
•Thread of outer side
•Head on its top
•Nut
•Washer
This complete nut bolt connection called HDFG (High Strength
Friction Grip).
Inner dia of nutt is known as Nominal dia
Where Bolt dia is known as Crest dia.
Scaffolding, also called scaffold or stagging, use for to do masonry work,
Brick work, Plastering etc.
There are different type of scaffolding depend upon material which type of
work such as Aluminium scaffolding, Bamboo scaffolding, Trestle scaffolding
etc.
Aluminium Scaffolding were used at out site project.
Vertical rod of scaffolding known as PROP.
Whereas horizontal is known as LEDGER
Prop and ledger is tied using a clip.
MASONRY WORK
For partition work three type of brick use such as :-
First class brick
AAC block
CND block
First Class Brick
This brick is used in this project for HALF BRICK wall
And for ONE BRICK wall.
We know that two type of bond use such as English bond
and Flemish bond.
But mostly English bond were used.
AAC BLOCK
AAC stand for Autoclaved Aerated concrete.
This is widely use in this building due to following
advantages:-
•Lightweight
•Precast
•Foam concrete
•No need to curing
C&D waste Block
•C&D waste (construction and Demolition waste) block is made up
of wood ,steel, concrete, gypsum, plaster, metal etc.
•This block is used to reduce construction waste to safe our
environment.
•Their size is large than Brick. So more volume is cover in width and
heght.
…….To be continued.

More Related Content

Similar to INDL PPT 1.pptx

Speedy construction presentation
Speedy construction presentationSpeedy construction presentation
Speedy construction presentationsomitra bhardwaj
 
Ishfaq Rashid.pptx
Ishfaq Rashid.pptxIshfaq Rashid.pptx
Ishfaq Rashid.pptxlovish34
 
Site visit report
Site visit reportSite visit report
Site visit reportDoreen Yeo
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxLokeswarSaha1
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSOUMYA KHANDELWAL
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxVinayak247538
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise BuildingsPrasad Thanthratey
 
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES
REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES Saleh Ahmed
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdfRijuDasgupta
 
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...IJERA Editor
 

Similar to INDL PPT 1.pptx (20)

Speedy construction presentation
Speedy construction presentationSpeedy construction presentation
Speedy construction presentation
 
Wall materials
Wall materialsWall materials
Wall materials
 
Ishfaq Rashid.pptx
Ishfaq Rashid.pptxIshfaq Rashid.pptx
Ishfaq Rashid.pptx
 
Site visit report
Site visit reportSite visit report
Site visit report
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
Shinchan presentation.pptx
Shinchan presentation.pptxShinchan presentation.pptx
Shinchan presentation.pptx
 
Ct report
Ct reportCt report
Ct report
 
Ct report
Ct reportCt report
Ct report
 
Ct report
Ct reportCt report
Ct report
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
 
Mod. 1.pptx
Mod. 1.pptxMod. 1.pptx
Mod. 1.pptx
 
Suraj presentation.pptx
Suraj presentation.pptxSuraj presentation.pptx
Suraj presentation.pptx
 
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES
REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
 
Shear Wall
Shear WallShear Wall
Shear Wall
 
Prestressing ppt
Prestressing pptPrestressing ppt
Prestressing ppt
 
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...
 

More from YashSolanki372360

part 2.pptx iijj.bnjjhhhihjuubhghoihhjhhuggghj
part 2.pptx iijj.bnjjhhhihjuubhghoihhjhhuggghjpart 2.pptx iijj.bnjjhhhihjuubhghoihhjhhuggghj
part 2.pptx iijj.bnjjhhhihjuubhghoihhjhhuggghjYashSolanki372360
 
UPCOMING THRUSDAY.pptx7hbyby. T t t t t t vtv
UPCOMING THRUSDAY.pptx7hbyby. T t t t t t vtvUPCOMING THRUSDAY.pptx7hbyby. T t t t t t vtv
UPCOMING THRUSDAY.pptx7hbyby. T t t t t t vtvYashSolanki372360
 
Presentation (1).pptxiv7f7f8f7fcuxucucuf8g8g7f7f7fuof8l8do6d69d86d86d96do6f8o7
Presentation (1).pptxiv7f7f8f7fcuxucucuf8g8g7f7f7fuof8l8do6d69d86d86d96do6f8o7Presentation (1).pptxiv7f7f8f7fcuxucucuf8g8g7f7f7fuof8l8do6d69d86d86d96do6f8o7
Presentation (1).pptxiv7f7f8f7fcuxucucuf8g8g7f7f7fuof8l8do6d69d86d86d96do6f8o7YashSolanki372360
 
YASH KI PPT.pptx kenejej4m4j4h4j4j4h4nn4h3n
YASH KI PPT.pptx kenejej4m4j4h4j4j4h4nn4h3nYASH KI PPT.pptx kenejej4m4j4h4j4j4h4nn4h3n
YASH KI PPT.pptx kenejej4m4j4h4j4j4h4nn4h3nYashSolanki372360
 
yash solanki mind mapping.pptx
yash solanki mind mapping.pptxyash solanki mind mapping.pptx
yash solanki mind mapping.pptxYashSolanki372360
 
Waste Management 3 YASH.pptx
Waste Management 3 YASH.pptxWaste Management 3 YASH.pptx
Waste Management 3 YASH.pptxYashSolanki372360
 

More from YashSolanki372360 (7)

part 2.pptx iijj.bnjjhhhihjuubhghoihhjhhuggghj
part 2.pptx iijj.bnjjhhhihjuubhghoihhjhhuggghjpart 2.pptx iijj.bnjjhhhihjuubhghoihhjhhuggghj
part 2.pptx iijj.bnjjhhhihjuubhghoihhjhhuggghj
 
UPCOMING THRUSDAY.pptx7hbyby. T t t t t t vtv
UPCOMING THRUSDAY.pptx7hbyby. T t t t t t vtvUPCOMING THRUSDAY.pptx7hbyby. T t t t t t vtv
UPCOMING THRUSDAY.pptx7hbyby. T t t t t t vtv
 
Presentation (1).pptxiv7f7f8f7fcuxucucuf8g8g7f7f7fuof8l8do6d69d86d86d96do6f8o7
Presentation (1).pptxiv7f7f8f7fcuxucucuf8g8g7f7f7fuof8l8do6d69d86d86d96do6f8o7Presentation (1).pptxiv7f7f8f7fcuxucucuf8g8g7f7f7fuof8l8do6d69d86d86d96do6f8o7
Presentation (1).pptxiv7f7f8f7fcuxucucuf8g8g7f7f7fuof8l8do6d69d86d86d96do6f8o7
 
YASH KI PPT.pptx kenejej4m4j4h4j4j4h4nn4h3n
YASH KI PPT.pptx kenejej4m4j4h4j4j4h4nn4h3nYASH KI PPT.pptx kenejej4m4j4h4j4j4h4nn4h3n
YASH KI PPT.pptx kenejej4m4j4h4j4j4h4nn4h3n
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
yash solanki mind mapping.pptx
yash solanki mind mapping.pptxyash solanki mind mapping.pptx
yash solanki mind mapping.pptx
 
Waste Management 3 YASH.pptx
Waste Management 3 YASH.pptxWaste Management 3 YASH.pptx
Waste Management 3 YASH.pptx
 

Recently uploaded

Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Open Access Research Paper
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
Unit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfUnit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfRajjnish1
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact AssessmentTesfahunTesema
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhidelih Escorts
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRjennyeacort
 
Call Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any TimeCall Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any Timedelhimodelshub1
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样umasea
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdfsrivastavaakshat51
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxTesfahunTesema
 
AI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxAI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxNeoV2
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一z xss
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...Aqsa Yasmin
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionrgxv72jrgc
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawnitinraj1000000
 

Recently uploaded (20)

Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
Unit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfUnit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdf
 
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact Assessment
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
 
Call Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any TimeCall Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any Time
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptx
 
AI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxAI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptx
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollution
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental law
 

INDL PPT 1.pptx

  • 1. DELHI SKILL AND ENTREPRENEURSHIP UNIVERSITY (Aryabhatt DSEU Ashok Vihar Campus) Hospital Building Construction Under Guidance of PWD Engineer Department of Civil Engineering Smt. Riniyo Nani (Senior lecturer) Mr. Vagish kumar H.O.D (Civil Engg)
  • 2. CERTIFICATE This is certify that the practical training work entitled “ Construction of Hospital Building” BY “Swadeshi Civil Infrastructure Pvt Ltd” (SCIPL) which is being submitted by Sourav (10521417), Vivek kumar (10521476), Yash (10521417), Vivek kumar(10521477), in partial fulfillments of the requirements for the award of Diploma in Civil Engineering at Aryabhatt DSEU Ashok Vihar Campus, GT karnal road, Delhi-110033 is a record of the student’s own work carried out in this form under my supervision and guidance. Mr. Vagish kumar H.O.D (Civil Engg) Smt. Riniyo Nani (Senior lecturer)
  • 3. We are immensely grateful to Sh. Vagish Kumar, Smt Riniyo Nani, for their meticulous guidance and Constance encouragement at all stages of practical training work. We grateful indebted to Mr. Amarjeet ( Assistant Executive Engineer PWD) and Mr. Ankit (third party Quality Engineer) who helped us. We are thankful to our parents and our friends for the support they extended us during entire duration of practical Industrial Training. Sourav (10521417 Vivek kumar (10621476) Yash (10521416 Vivek kumar (10521477)
  • 4. Contents About the Hospital Building D-wall Foundations Composite structure Fire paint Bolted Connection Parts of Bolted connection Scaffolding Masonry work AAC block C&D Block
  • 5. Our Proposed site is located at Lok nayak hospital near Delhi gate metro station Delhi- 110054. The total area of Building spanning is about 84,840 sq metres. The building has two tower which have target of total floor is 22, in on each tower. This building is proposed to have total number of Beds to be available is 1500. This building is composite structure of Mild Steel and RCC (Reinforced Cement Concrete).
  • 6. D-wall is known as Diaphragm wall, it is designed to retain soils during the construction of underground structure. It helps to control the movement of ground during construction. It is intended to take up high vertical loads from above ground structures. It is play important role in Active earth pressure as well as in passive earth pressure.
  • 7. The lower and very important part of any structure is foundations. And after doing soil testing depend upon bearing capacity of soil Engineer decide to construct Raft foundation. Raft foundations also known as Mat foundations, it is a type of combined footing that covers the entire area and supports all the wall and columns. This foundations is use because soil on that location is found to be sandy , clay, silt and hard stone.
  • 8. This structure is made up with RCC (Reinforced Cement concrete) and Mild Steel. Thatswhy also known composite structure. RCC is good in taking Compressive as well as Tensile Stress But also in Shear Stress thatswhy it is built End to end of building, and middle structure is of MS. Engineer decides this to built building as soon as possible. And reduce time of delay, Because Mild steel structure can be early as compare to RCC structure.
  • 9. Mild steel cannot be come into contact of moisture, water, and fire.  To prevent corrosion and fire damaged, a layer is provide on beam and column of mild steel, fire resistance material is used. This material is very costly and become hard after drying. It is apply like a paint with the help of compressor machine. Which is apply this paint with high pressure.
  • 10. Column and beam is connected by bolted joint. This joint are many advantage such as :- •They can easy to install, inspect, and maintain. •They also allow for flexibility and adjustability in design and erection. •Skill labourer not mandatory. •Grade of this Nutt and bolt is 10.9s •Due to high grade of bolt, this connection is strong, durable etc.
  • 11. Parts of Bolted connection A bolt is a metal rod for fastenings objects together it consist of :- •Thread of outer side •Head on its top •Nut •Washer This complete nut bolt connection called HDFG (High Strength Friction Grip). Inner dia of nutt is known as Nominal dia Where Bolt dia is known as Crest dia.
  • 12. Scaffolding, also called scaffold or stagging, use for to do masonry work, Brick work, Plastering etc. There are different type of scaffolding depend upon material which type of work such as Aluminium scaffolding, Bamboo scaffolding, Trestle scaffolding etc. Aluminium Scaffolding were used at out site project. Vertical rod of scaffolding known as PROP. Whereas horizontal is known as LEDGER Prop and ledger is tied using a clip.
  • 13. MASONRY WORK For partition work three type of brick use such as :- First class brick AAC block CND block First Class Brick This brick is used in this project for HALF BRICK wall And for ONE BRICK wall. We know that two type of bond use such as English bond and Flemish bond. But mostly English bond were used.
  • 14. AAC BLOCK AAC stand for Autoclaved Aerated concrete. This is widely use in this building due to following advantages:- •Lightweight •Precast •Foam concrete •No need to curing
  • 15. C&D waste Block •C&D waste (construction and Demolition waste) block is made up of wood ,steel, concrete, gypsum, plaster, metal etc. •This block is used to reduce construction waste to safe our environment. •Their size is large than Brick. So more volume is cover in width and heght.