This document is a drawing for an additional project pondasi female toilet located in Karawang Timur, West Java. It was designed by PT. Ciawenindo Mitra Perkasa for PT. Yangtze Optics Indonesia. The drawing shows the floor plan, details of foundations P-1 and P-2, including reinforcement bar positions and specifications. Foundation tops are at elevations of +0.60m and +0.20m, and equipment loads are 2.5T and 1.0T respectively.
1. PT. YANGTZE OPTICS INDONESIA ( YOI )
PROJECT : ADDITIONAL PROJECT
DRAWING : PONDASI FEMALE TOILET
LOCATION : KARAWANG TIMUR - JAWA BARAT
DESIGN BY : PT. CIAWENINDO MITRA PERKASA
3. H
1 2
1250 1300 850 500
650
300
700
300
200
300
150
950
1300
350
1 2
400
1900
1500
6700
1700
3200
2700
500
1500
8600
7100 1500
1000
2000
3000
H
400
400
P-1
P-1
P-1
P-2
Equipment load 2.5T 设备荷载2.5T
Elevation of foundation top is +0.60m 基础顶标高+0.50m
P-1
P-2
Equipment load 1.0T 设备荷载1.0T
Elevation of foundation top is +0.20m 基础顶标高+0.20m
ZOOMING AREA-1
无比例
PT. YANGTZE OPTICS INDONESIA (YOI)
KARAWANG TIMUR - JAWA BARAT
PT. CIAWENINDO MITRA PERKASA
03
02
4. D13 - 150
D13 - 150
D13
-
150
D13
-
150
300
1300
DETAIL P-1
无比例
POTONGAN A-A
无比例
A
A
500
1300
B
B
D13 - 150
D13
-
150
DETAIL P-2
无比例
200
POTONGAN B-B
无比例
50
#D13 - 150
D13 - 400
锚入新老混凝土中各150mm Anchor into the new and old concrete 150mm each
沿基础边两排布置 Arrange in two rows along the edge of the foundation
#D13 - 150
+500
±0.000
+200
±0.000
500
50
150
150
1300
1300
原有钢筋混凝土结构地坪 Existing concrete structure floor
表面凿毛后冲洗干净 Rinse the surface after chiseling
D13 - 400
锚入新老混凝土中各150mm Anchor into the new and old concrete 150mm each
沿基础边两排布置 Arrange in two rows along the edge of the foundation
原有钢筋混凝土结构地坪 Existing concrete structure floor
表面凿毛后冲洗干净 Rinse the surface after chiseling
150
150
#D13 - 150
2 D13
1300
44
213
44
300
400 406 44
406
44
1300
44
413
44
500
POSISI STEK BESI P-1
无比例
POSISI STEK BESI P-2
无比例
400 406 44
406
44
PT. YANGTZE OPTICS INDONESIA (YOI)
KARAWANG TIMUR - JAWA BARAT
PT. CIAWENINDO MITRA PERKASA
03
03