This presentation are taking about the major points for the main keys of quality to control the MEP Activities, which is so important to any starting of any project.
9. OR CAN BE LIKE THIS
THAT IS ACTUALLY AN AWESOME IDEA !
10. • To use approved stamped shop drawings only, controlled copy
or Uncontrolled copy signed from the QA/QC Department
SO, WHAT'S CORRECT?
STAMPED
Approved QA/QC Signature in
AutoCAD copy
11. DELIVERY OF MATERIAL
Once material delivered to the site. What steps must be taken?
1. How to receive it and handle it? 2. To be checked
3. Storage?
4. Shift the
material to the
Site
21. DO IT FIRST CORRECT…… HOW?
SAND OFF THE SAW
BURRS FOR A BETTER
FIT
MARK THE PIPE AND
FITTING FOR PRECISE
ORIENTATION
MARK THE CUTTING
AREA
SEAT THE TEETH INTO
THE PIPE
SAW THROUGH THE
PIPE FIRMLY
CLAMP THE PIPE INTO
PLACE WITH A VISE
22. FIX MISTAKES WITH A
COUPLING
PUSH AND TWIST FOR
LEAK-PROOF JOINTS
PUSH THE PIPES AND
KEEP 20 SEC.
WHAT NEXT?
TESTING OF THE PIPES
25. HOW TO DO GRAVITY TEST
After 4 hours
TO CHECK THE WATER LEVEL
26. MAIN PROBLEM IN ALL PROJECTS
SITE COORDINATION AND STAFF COORDINATION
27. HOW TO COORDINATE ON SITE ?
pre-start activity
meeting on site
Training for the Plan of
work
Help each other
Coordinate with other
services
Monitor the status of
the work together
Put the final touches
together