Introduction:
At 25/05/2016, we have made site visit to inspect Fire Alarm and Firefighting
Systems for "EASTERN WATER TOWER AL MAALAM" at Al Khobar City Cornish Rood.
And we found that the Project consists of two buildings: Main Building (The Tower),
and Pump Station. The Tower contains main four floors _Basement, Ground floor,
Restaurant floor, and View Deck floor_ and a service floor at the top called Machine
floor. The Pump Station contains of two building, Generators building, and Pumps
building which consists of Operators offices and Pump Station.
The existing Fire Fighting System for main buildings consists of: Pipes,
Sprinklers, Fire Hose Cabinets, Fire Hydrants, and Dry Powder Extinguishers, But no
fire pumps were found! And for Electric rooms we found CO2 Fire Suppression
System "Kidde" for each. For BMS room there is FM200 Fire Suppression System. The
Fire Alarm System consists of Addressable Fire Alarm Control Panel "Simplex",
Smoke Detectors, Heat Detectors, Manual Call Points, and Electronic Sounders.
During the visit we inspected every reachable element of the existing
firefighting and fire alarm system. In the following pages we will explain facts,
solutions, and suggestions.
ͤ͟͠͞
4
Facts:
1. Fire Fighting System Condition:
Pipes, Sprinklers, Fire Hose Cabinets, Fire Hydrants, Dry Powder
Extinguishers, Pumps, CO2 Fire Suppression System, and FM200 Fire
Suppression System.
• Pipes: (Visual inspect, no pressure test were made yet)
o Painting: Very Good,
o Welds: Very Good,
o Supporting: Very Good.
o Riser: Poor (we couldn't find riser connecting all floors)
• Sprinklers: " Concealed pendent"
o Condition: Good
o Level: most of points are not at the finished Ceiling Level yet,
o Completeness: All Sprinkles heads at GF leak the cover plates,
• Sprinklers: "Upright"
o Condition: Good
o Completeness: Good,
• Sprinkler Head without Drop
Pipe and Cover Plate
• Sprinkler Head at restaurant
level
ͤ͟͠͞
5
• Fire Hose Cabinets: (recessed 1.5" hose reel)
o Condition: Very Good,
o Completeness: Good except One Cabinet.
• Fire Hydrants:
o Condition: Good
o Completeness: Good, But it's recommended to install Cabinet
contains 2.5" hose and recommended accessories.
• Fire Extinguishers:
o Condition: Not Good (some need refilling),
o Completeness: Not Good (Some Areas are not covered)
• Pressure Gage at red level
• Fire Hydrant at Pump Station.
• FHC missing all Elements
ͤ͟͠͞
6
• Pumps:
o No fire Pumps were found at site: also it's stated that there are
pumps in layout "YC-EWT-M-603 Maintenance Floor Fire
Fighting System", but we couldn't find it!
o There are three zones of firefighting; two are connected to
water lines (1.Ground and Base floors, 2. Pump station) and
the third we couldn't find the source of water for it.
• Water Source for GF and Basement
• Water Source for Pump Station
• Riser for Upper Floor
ͤ͟͠͞
7
• CO2 Fire Suppression System:*
o Condition: Not Good (Panels and extinguishing elements were
not stored in right way),
o Completeness: Not Good (Rooms are not isolated correctly,
Gas will leeks and will not isolate the fire).
• Panels detect fire directly
and starts countdown to
release Gas
• Solenoid Valves were not
kept away of dust and they
are not reliable now.
• Sounders Condition • Rooms are not firmly Isolated
* CO2 is a deadly Gas. If gas extinguished by fault in the presence of Humans, it might
cause them death.
ͤ͟͠͞
8
2. Fire Alarm System Condition:
Pipes, Wires, Detectors, Panels.
• Pipes:
o Condition: Good,
o Completeness: Not Completed yet and PVC pipes are used at
some areas out of wall.
• Wires:
o Condition: Not Bad,
o Completeness: Not Completed and at some areas unshielded
cables.
• Detectors:
o Condition: Not Bad, but some detectors were kept uncovered,
o Completeness: Not Completed.
• Panels:
o There are two panels One for Main Building and One for Pump
Station.
o Condition:
• PVC Piping & Unshielded Cables
ͤ͟͠͞
9
The Tower's Panel we couldn't check due to power
down and batteries absence.
Pump Station Panel is in a good condition but some
detectors detect false fire and need maintenance.
• Panel for Tower open and no batteries.
• Panel for pump station is complete and kept
closed, but detects false fire.
ͤ͟͠͞
10
3. Emergency Exits:
• Restaurant & View Deck:
o For upper levels there are two stairs in good condition leading
to ground floor,
o There are four elevators, but only one was working and not
working well.
• Ground Floor:
o There are enough exits to use at emergency
• Basement:
o There are two emergency exits were found,
• Exit sign at restaurant.
ͤ͟͠͞
11
Recommendations:
Fire Fighting System:
1. All Life Safety Systems must be a stand-alone system. So that, source of water
must be Independent and separated and pumped from special fire pumps.
2. Source of water for upper floors is a mystery for now and must be checked
firmly.
3. All Fire Extinguishers shall be checked.
4. Missing Fire Hose cabinet shall be completed.
5. CO2 Systems are not reliable now and if released might cause death to
maintenance team if exist there. We recommend that all CO2 suppression
systems to be renewed.
6. Electric rooms shall not contain wide gas leakage opens.
Fire Alarm System:
1. All areas must be covered with detection devices.
2. All PVC pipes out of wall must be replaced with EMT pipes.
3. All unshielded cables must be replaced with shielded cables.
4. Panel for Tower shall be checked before completing all points to decide if will
work or not. If not you can think of another type of fire alarm more flexible.
Emergency Exits:
1. Emergency lights shall be ensured along the way to safety.
‫ﻟﻠﻤﻘﺎوﻻت‬ ‫اﻟﺤﺎﺿﺮ‬ ‫وﺋﺎم‬ ‫ﻣﺆﺳﺴﺔ‬
Weam AL Hader Contracting Est.
Weam AL Hader
Fire Fighting & Plumping & HVAC
Plumbing
About Us
‫ﻟﻠﻤﻘﺎوﻻت‬ ‫اﻟﺤﺎﺿﺮ‬ ‫وﺋﺎم‬ ‫ﻣﺆﺳﺴﺔ‬
Weam AL Hader Contracting Est.
We implant trust seeds in every land we step on,
and we know it will grow holding our name
"Weam Al Hader”
About US 1
Introduction
Introduction
About Us
Weam Al Hader is considered a unique model for the implementation of Engineering
and Business Development in the Electromechanical and telecommunications sector.
Where we began to build a solid core capable of dealing with all types of
electromechanical projects, where we have contributed our part to participate in the
aspirations and orientations of the Custodian of theTwo Holy Mosques government
for the construction and the renaissance of the Kingdom of Saudi Arabia, where the
expansion greater attention stage began to keep pace with development and
acceleration of urban Kingdom.
Introduction
About US 2
‫ﻣﻘﺪﻣﺔ‬
‫ﻣﺠﺎل‬ ‫ﻓﻰ‬ ‫اﻻﻋﻤﺎل‬ ‫ﻟﺘﻄﻮﻳﺮ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫ﻟﺒﺪاﻳﻪ‬ ‫ﻣﺘﻔﺮد‬ ‫ﻛﻤﺜﺎل‬ ‫اﻟﺤﺎﺿﺮ‬ ‫وﺋﺎم‬ ‫ﺗﻌﺘﺒﺮ‬
‫ﻣﻊ‬ ‫اﻟﺘﻌﺎﻣﻞ‬ ‫ﻋﻠﻰ‬ ‫ﻗﺎدر‬ ‫ﻗﻮى‬ ‫اﺳﺎس‬ ‫ﺑﻌﻤﻞ‬ ‫ﺑﺪاﻧﺎ‬ ‫ﺣﻴﺚ‬ ‫واﻻﺗﺼﺎﻻت‬ ‫اﻻﻟﻜﺘﺮوﻣﻴﻜﺎﻧﻴﻜﺎ‬
‫ﻓﻰ‬ ‫ﻟﻠﻤﺸﺎرﻛﻪ‬ ‫ﻟﻨﺎ‬ ‫ﺑﺠﺰء‬ ‫ﺷﺎرﻛﻨﺎ‬ ‫ﺣﻴﺚ‬ ‫اﻻﻟﻜﺘﺮوﻣﻴﻜﺎﻧﻴﻜﺎ‬ ‫اﻟﻤﺸﺎرﻳﻊ‬ ‫اﻧﻮاع‬ ‫ﺟﻤﻴﻊ‬
‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﻪ‬ ‫اﺣﻴﺎء‬ ‫واﻋﺎده‬ ‫اﻟﺤﺮﻣﻴﻦ‬ ‫ﻟﺨﺎدم‬ ‫اﻟﺘﻌﺮﻳﻔﻴﻪ‬ ‫اﻻﺟﺘﻤﺎﻋﺎت‬
Weam Mission
‫ﻣﻬﻤﺘﻨﺎ‬
About Us
We seek harmony in the present, to provide high-quality fire-fighting and the
expansion of activity solutions our customers access to this we aim to offer the
highest quality products and services for the full satisfaction of the client
‫ﻋﻤﻼؤﻧﺎ‬ ‫ﻧﺸﺎط‬ ‫وﺗﻮﺳﻴﻊ‬ ‫اﻟﺤﺮاﺋﻖ‬ ‫ﻟﻤﻜﺎﻓﺤﺔ‬ ‫اﻟﺠﻮده‬ ‫ﻓﺎﺋﻘﻪ‬ ‫ﺣﻠﻮل‬ ‫ﻟﺘﻮﻓﻴﺮ‬ ‫اﻟﺤﺎﺿﺮ‬ ‫ﺋﺎم‬ ‫ﻓﻰ‬ ‫ﻧﺴﻌﻰ‬
‫اﻟﺮﺿﺎء‬ ‫اﺟﻞ‬ ‫ﻣﻦ‬ ‫وﺧﺪﻣﺎت‬ ‫ﻣﻨﺘﺠﺎت‬ ‫ﺟﻮدة‬ ‫ﻣﻦ‬ ‫ﻣﺴﺘﻮى‬ ‫اﻋﻠﻰ‬ ‫ﺗﻘﺪﻳﻢ‬ ‫اﻟﻰ‬ ‫ﻧﻬﺪف‬ ‫ﻓﺎﻧﻨﺎ‬ ‫ﻟﻬﺬا‬ ‫وﺻﻮﻻ‬
‫ﻟﻠﻌﻤﻴﻞ‬ ‫اﻟﻜﺎﻣﻞ‬
Weam Vission
‫رؤﻳﺘﻨﺎ‬
Our vision is to be the first choice for the customer in the field of fire fighting and
alarm. We have a wide range of services and products in the introductions for
technical support services to help our customers choose the optimal system for
them in the fight against the dangers of fire
‫ﻟﺪﻳﻨﺎ‬ ‫ﻓﻨﺤﻦ‬ ‫واﻻﻧﺬار‬ ‫اﻟﺤﺮاﺋﻖ‬ ‫ﻣﻜﺎﻓﺤﺔ‬ ‫ﻣﺠﺎل‬ ‫ﻓﻰ‬ ‫ﻟﻠﻌﻤﻴﻞ‬ ‫اﻻول‬ ‫اﻟﺨﻴﺎر‬ ‫ﻧﻜﻮن‬ ‫ﺑﺎن‬ ‫رؤﻳﺘﻨﺎ‬ ‫ﺗﺘﻤﺜﻞ‬
‫ﻟﻤﺴﺎﻋﺪه‬ ‫اﻟﻔﻨﻰ‬ ‫اﻟﺪﻋﻢ‬ ‫ﺧﺪﻣﺎت‬ ‫ﻣﻘﺪﻣﺎﺗﻬﺎ‬ ‫ﻓﻰ‬ ‫واﻟﻤﻨﺘﺠﺎت‬ ‫اﻟﺨﺪﻣﺎت‬ ‫ﻣﻦ‬ ‫ﻛﺒﻴﺮه‬ ‫ﻣﺠﻤﻮﻋﻪ‬
‫اﻟﺤﺮﻳﻖ‬ ‫اﺧﻄﺎر‬ ‫ﻣﻜﺎﻓﺤﺔ‬ ‫ﻓﻰ‬ ‫ﻟﻬﻢ‬ ‫اﻻﻣﺜﻞ‬ ‫اﻟﻨﻈﺎم‬ ‫اﺧﺘﻴﺎر‬ ‫ﻋﻠﻰ‬ ‫ﻋﻤﻼؤﻧﺎ‬
Introduction
About US 3
Management Structure
Document
Office
General Manager
Operation Manager Sales Department Financial Manager
Installation
Teams
Stores
Procurement
Office
Technical
Office
4
Business Unit Structur
HVACFire
Fighing
Plumbing
Electro-
Mechanics
5
WaterBasedSystems
GasBasedSystems
KitchenhoodSystems
FoamBasedSystems
ConventionalSystems
FireAlarmSystem
Fire Fighing Systems
Scope of Work
6
Our Projects 7
Our Projects 8
List of Project
SN LocaionMain ContractorProject
InviroTech
Soliman Al QasoumyAl Shaaf Water Desalinaion plant
Medical Stores for Gizan Military Hospital
Five Guys Restaurant
Bish Water Desalinaion plant
Nihaz Show Rooms and Offices
Naional Gaurds Stores, B7 & B5
Commercial and residenial buildings
Binban Camp
Industrial Ciies Admin Building
Al-Kharj industrial city Department
Al Fanar Cables Stoke Yards
Riyadh Commercial Room
Soliman Al Qasoumy
Blue Print Me
Al Rawaf
Senior Professionals
OCEETEE
OCEETEE
Jado
Jado
Jado
Economic Homes
Abu Arish, Gizan
Abha
Bish, Gizan
Al Khobar
Jadwa
United for Contracing
Saleh Bin Manea Saleh
Al Ma’zar Jail
Plaza In Palace, Kitchen
Abdalah Ibrahim Bin Awad
Omar Abdalah Omar Almeakl
Ali Al Khinizan
MEP
Riyadh
Riyadh
Riyadh
Riyadh
Riyadh
Riyadh
Riyadh
Riyadh
Fire Fighing
Fire Fighing
Fire Fighing
Abdalah Bin awad El Awad
Abdalh Naser Abdalah Albeshry
Monira Abdalah Ali
Fire Alarm
Riyadh
2nd Industrial City
Binban, Riyadh
Riyadh
Dalam, Al-Kharj
Riyadh
Riyadh
Riyadh
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
List of Project 9
List of Project
SN LocaionStatueProject
Fire Fighing
Fire FighingMohamed Mazid Eobaid
Soliman Bin Saleh Ibrahim
Abdulaziz Mousa Alotaiq
Al Laifa Factory
Saudi Pipes Factory
Fire Fighing
Fire Alarm
Riyadh
Riyadh
Riyadh
Dereya
Fire Fighing
Al Shola Schools
Alex Airport
Fire Fighing Maintenance
Riyadh
Riyadh
Fire Fighing
Dubai Ports, Ain Sokhna Seaport Fire Alarm
Alexandria Egypt
Ain Sokhna Egypt
HVAC & Fire FighingKempinski Hotel Cairo Egypt
21
22
23
24
List of Project 10
info@weamcont.com
www.weamcont.com
ScanMe
+ 966 54 227 5153
+ 966 54 144 2844
KSA Riyadh 11422
P.O.Box :5254
‫ﻟﻠﻤﻘﺎوﻻت‬ ‫اﻟﺤﺎﺿﺮ‬ ‫وﺋﺎم‬ ‫ﻣﺆﺳﺴﺔ‬
Weam AL Hader Contracting Est.

More Related Content

What's hot

Fire Prevention Measures for High Rise Buildings
Fire Prevention Measures for High Rise BuildingsFire Prevention Measures for High Rise Buildings
Fire Prevention Measures for High Rise BuildingsRanjeet Kumar
 
Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Anil Kumar R
 
H.V.A.C building service in b.arch ciriculam
H.V.A.C building service in  b.arch ciriculamH.V.A.C building service in  b.arch ciriculam
H.V.A.C building service in b.arch ciriculamKethees Waran
 
Fire guidelines by nbc part 1
Fire guidelines by nbc part 1Fire guidelines by nbc part 1
Fire guidelines by nbc part 1R821992
 
Site visit report
Site visit reportSite visit report
Site visit reportJıa Yıı
 
Fire Hydrant System/Sprinkler System Fire Fighting Systems Fire Hydrant Syst...
Fire Hydrant System/Sprinkler System Fire Fighting Systems  Fire Hydrant Syst...Fire Hydrant System/Sprinkler System Fire Fighting Systems  Fire Hydrant Syst...
Fire Hydrant System/Sprinkler System Fire Fighting Systems Fire Hydrant Syst...RajyogFireServicesPv
 
Classification of Buildings as per National Building Code of India (NBC) 2016
Classification of Buildings as per National Building Code of India (NBC) 2016Classification of Buildings as per National Building Code of India (NBC) 2016
Classification of Buildings as per National Building Code of India (NBC) 2016Rohan Dasgupta
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRSAbhishek Mewada
 
Fire fighting system in buildings
Fire fighting system  in buildingsFire fighting system  in buildings
Fire fighting system in buildingsHetvi Trada
 
modular coordination
modular coordinationmodular coordination
modular coordinationShailja km
 
01-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018
01-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 201801-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018
01-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018Faculty of fine arts -Cairo. Egypt.
 
Deisgn of Fire Escapes
Deisgn of Fire EscapesDeisgn of Fire Escapes
Deisgn of Fire EscapesIshan Garg
 
Fire hydrant system
Fire hydrant systemFire hydrant system
Fire hydrant systemFarahNaz96
 
Building Services II Presentation Slides
Building Services II Presentation SlidesBuilding Services II Presentation Slides
Building Services II Presentation Slidesashleyyeap
 

What's hot (20)

Fire Prevention Measures for High Rise Buildings
Fire Prevention Measures for High Rise BuildingsFire Prevention Measures for High Rise Buildings
Fire Prevention Measures for High Rise Buildings
 
Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016
 
H.V.A.C building service in b.arch ciriculam
H.V.A.C building service in  b.arch ciriculamH.V.A.C building service in  b.arch ciriculam
H.V.A.C building service in b.arch ciriculam
 
Sprinkler system.
Sprinkler system.Sprinkler system.
Sprinkler system.
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
Nbc hvac ppt
Nbc hvac pptNbc hvac ppt
Nbc hvac ppt
 
Fire guidelines by nbc part 1
Fire guidelines by nbc part 1Fire guidelines by nbc part 1
Fire guidelines by nbc part 1
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Fire Hydrant System/Sprinkler System Fire Fighting Systems Fire Hydrant Syst...
Fire Hydrant System/Sprinkler System Fire Fighting Systems  Fire Hydrant Syst...Fire Hydrant System/Sprinkler System Fire Fighting Systems  Fire Hydrant Syst...
Fire Hydrant System/Sprinkler System Fire Fighting Systems Fire Hydrant Syst...
 
Classification of Buildings as per National Building Code of India (NBC) 2016
Classification of Buildings as per National Building Code of India (NBC) 2016Classification of Buildings as per National Building Code of India (NBC) 2016
Classification of Buildings as per National Building Code of India (NBC) 2016
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRS
 
Fire fighting system in buildings
Fire fighting system  in buildingsFire fighting system  in buildings
Fire fighting system in buildings
 
modular coordination
modular coordinationmodular coordination
modular coordination
 
01-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018
01-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 201801-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018
01-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018
 
Deisgn of Fire Escapes
Deisgn of Fire EscapesDeisgn of Fire Escapes
Deisgn of Fire Escapes
 
Fire hydrant system
Fire hydrant systemFire hydrant system
Fire hydrant system
 
Building Services II Presentation Slides
Building Services II Presentation SlidesBuilding Services II Presentation Slides
Building Services II Presentation Slides
 
Fire protection
Fire protectionFire protection
Fire protection
 
Refuse chute
Refuse chuteRefuse chute
Refuse chute
 
NATIONAL BUILDING CODE- SP7
NATIONAL BUILDING CODE- SP7NATIONAL BUILDING CODE- SP7
NATIONAL BUILDING CODE- SP7
 

Viewers also liked

Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction siteUmair Ali
 
Field Visit Management
Field Visit ManagementField Visit Management
Field Visit ManagementHasan Raihan
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Final Year Project on Fire Fighting systems
Final Year Project on Fire Fighting systemsFinal Year Project on Fire Fighting systems
Final Year Project on Fire Fighting systemsNaqash Kazmi
 
Audit Checklist for Information Systems
Audit Checklist for Information SystemsAudit Checklist for Information Systems
Audit Checklist for Information SystemsAhmad Tariq Bhatti
 

Viewers also liked (6)

Site visit report
Site visit reportSite visit report
Site visit report
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction site
 
Field Visit Management
Field Visit ManagementField Visit Management
Field Visit Management
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Final Year Project on Fire Fighting systems
Final Year Project on Fire Fighting systemsFinal Year Project on Fire Fighting systems
Final Year Project on Fire Fighting systems
 
Audit Checklist for Information Systems
Audit Checklist for Information SystemsAudit Checklist for Information Systems
Audit Checklist for Information Systems
 

Similar to Site visit report

Fuel terminal decommission
Fuel terminal decommissionFuel terminal decommission
Fuel terminal decommissionJen Patterson
 
Cov company presentation 2018
Cov company presentation 2018Cov company presentation 2018
Cov company presentation 2018nayeem7265840
 
Aberdeen Presentation
Aberdeen PresentationAberdeen Presentation
Aberdeen PresentationGeorge Duncan
 
NERM Applications & Testing (PTY) Ltd - Brochure
NERM Applications & Testing (PTY) Ltd - Brochure NERM Applications & Testing (PTY) Ltd - Brochure
NERM Applications & Testing (PTY) Ltd - Brochure Anthony Erasmus
 
G & M Tex Brochure
G & M Tex Brochure G & M Tex Brochure
G & M Tex Brochure gmtex
 
Elmas Company Presentation rev1
Elmas Company Presentation rev1Elmas Company Presentation rev1
Elmas Company Presentation rev1Prasad B
 
site visit presentation
site visit presentationsite visit presentation
site visit presentationDominic Egan
 
Al Noor Projects & Engineering Trading LLC Company profile
 Al Noor Projects & Engineering Trading LLC Company profile Al Noor Projects & Engineering Trading LLC Company profile
Al Noor Projects & Engineering Trading LLC Company profileSajith Solomon
 
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerTrust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerVijayEngineeringandM1
 
Corporate portfolio 2015
Corporate portfolio 2015Corporate portfolio 2015
Corporate portfolio 2015Bhairav Joshi
 
CHEVON Heat Exchangers Brochure Servicing, Repair & New Fab-1
CHEVON Heat Exchangers Brochure Servicing, Repair & New Fab-1CHEVON Heat Exchangers Brochure Servicing, Repair & New Fab-1
CHEVON Heat Exchangers Brochure Servicing, Repair & New Fab-1Tham Foo kay
 
S lab 2014 eeco2 tel - presentation
S lab 2014 eeco2 tel - presentationS lab 2014 eeco2 tel - presentation
S lab 2014 eeco2 tel - presentationEECO2
 
Improving reliability thru automation projects r4
Improving reliability thru automation projects r4Improving reliability thru automation projects r4
Improving reliability thru automation projects r4Omer Haluk Yılmaz
 
Ambiance Technology Introduction Letter
Ambiance Technology Introduction LetterAmbiance Technology Introduction Letter
Ambiance Technology Introduction Letterhasan al kadi
 

Similar to Site visit report (20)

Presentation final1
Presentation final1Presentation final1
Presentation final1
 
Fuel terminal decommission
Fuel terminal decommissionFuel terminal decommission
Fuel terminal decommission
 
Cov company presentation 2018
Cov company presentation 2018Cov company presentation 2018
Cov company presentation 2018
 
Aberdeen Presentation
Aberdeen PresentationAberdeen Presentation
Aberdeen Presentation
 
NERM Applications & Testing (PTY) Ltd - Brochure
NERM Applications & Testing (PTY) Ltd - Brochure NERM Applications & Testing (PTY) Ltd - Brochure
NERM Applications & Testing (PTY) Ltd - Brochure
 
G & M Tex Brochure
G & M Tex Brochure G & M Tex Brochure
G & M Tex Brochure
 
mv-brochure-english
mv-brochure-englishmv-brochure-english
mv-brochure-english
 
Nu flow sales presentation
Nu flow sales presentationNu flow sales presentation
Nu flow sales presentation
 
Elmas Company Presentation rev1
Elmas Company Presentation rev1Elmas Company Presentation rev1
Elmas Company Presentation rev1
 
site visit presentation
site visit presentationsite visit presentation
site visit presentation
 
Al Noor Projects & Engineering Trading LLC Company profile
 Al Noor Projects & Engineering Trading LLC Company profile Al Noor Projects & Engineering Trading LLC Company profile
Al Noor Projects & Engineering Trading LLC Company profile
 
servotech-brochure
servotech-brochureservotech-brochure
servotech-brochure
 
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerTrust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
 
Corporate portfolio 2015
Corporate portfolio 2015Corporate portfolio 2015
Corporate portfolio 2015
 
CHEVON Heat Exchangers Brochure Servicing, Repair & New Fab-1
CHEVON Heat Exchangers Brochure Servicing, Repair & New Fab-1CHEVON Heat Exchangers Brochure Servicing, Repair & New Fab-1
CHEVON Heat Exchangers Brochure Servicing, Repair & New Fab-1
 
S lab 2014 eeco2 tel - presentation
S lab 2014 eeco2 tel - presentationS lab 2014 eeco2 tel - presentation
S lab 2014 eeco2 tel - presentation
 
Ferroalloy Submerged Arc Furnace - Hani Tech.pdf
Ferroalloy Submerged Arc Furnace - Hani Tech.pdfFerroalloy Submerged Arc Furnace - Hani Tech.pdf
Ferroalloy Submerged Arc Furnace - Hani Tech.pdf
 
Ferroalloy Submerged Arc Furnace - Hani Tech.pdf
Ferroalloy Submerged Arc Furnace - Hani Tech.pdfFerroalloy Submerged Arc Furnace - Hani Tech.pdf
Ferroalloy Submerged Arc Furnace - Hani Tech.pdf
 
Improving reliability thru automation projects r4
Improving reliability thru automation projects r4Improving reliability thru automation projects r4
Improving reliability thru automation projects r4
 
Ambiance Technology Introduction Letter
Ambiance Technology Introduction LetterAmbiance Technology Introduction Letter
Ambiance Technology Introduction Letter
 

Recently uploaded

Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 

Recently uploaded (20)

Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 

Site visit report

  • 1. ͤ͟͠͞ 1 WEAM AL-HADER CONTRACTING ESTABLISHMENT Project: EASTERN WATER TOWER AL MAALAM Location: Al Khobar Client: MINISTRY OF WATER Hany Hakim +966 54 227 5153
  • 2. ͤ͟͠͞ 2 TABLE OF CONTENTS Project : EASTERN WATER TOWER AL MAALAM Location : Al Khobar Client : MINISTRY OF WATER Item Title 1 Introduction 2 Facts 3 Recommendations 4 Company Profile
  • 3. ͤ͟͠͞ 3 Introduction: At 25/05/2016, we have made site visit to inspect Fire Alarm and Firefighting Systems for "EASTERN WATER TOWER AL MAALAM" at Al Khobar City Cornish Rood. And we found that the Project consists of two buildings: Main Building (The Tower), and Pump Station. The Tower contains main four floors _Basement, Ground floor, Restaurant floor, and View Deck floor_ and a service floor at the top called Machine floor. The Pump Station contains of two building, Generators building, and Pumps building which consists of Operators offices and Pump Station. The existing Fire Fighting System for main buildings consists of: Pipes, Sprinklers, Fire Hose Cabinets, Fire Hydrants, and Dry Powder Extinguishers, But no fire pumps were found! And for Electric rooms we found CO2 Fire Suppression System "Kidde" for each. For BMS room there is FM200 Fire Suppression System. The Fire Alarm System consists of Addressable Fire Alarm Control Panel "Simplex", Smoke Detectors, Heat Detectors, Manual Call Points, and Electronic Sounders. During the visit we inspected every reachable element of the existing firefighting and fire alarm system. In the following pages we will explain facts, solutions, and suggestions.
  • 4. ͤ͟͠͞ 4 Facts: 1. Fire Fighting System Condition: Pipes, Sprinklers, Fire Hose Cabinets, Fire Hydrants, Dry Powder Extinguishers, Pumps, CO2 Fire Suppression System, and FM200 Fire Suppression System. • Pipes: (Visual inspect, no pressure test were made yet) o Painting: Very Good, o Welds: Very Good, o Supporting: Very Good. o Riser: Poor (we couldn't find riser connecting all floors) • Sprinklers: " Concealed pendent" o Condition: Good o Level: most of points are not at the finished Ceiling Level yet, o Completeness: All Sprinkles heads at GF leak the cover plates, • Sprinklers: "Upright" o Condition: Good o Completeness: Good, • Sprinkler Head without Drop Pipe and Cover Plate • Sprinkler Head at restaurant level
  • 5. ͤ͟͠͞ 5 • Fire Hose Cabinets: (recessed 1.5" hose reel) o Condition: Very Good, o Completeness: Good except One Cabinet. • Fire Hydrants: o Condition: Good o Completeness: Good, But it's recommended to install Cabinet contains 2.5" hose and recommended accessories. • Fire Extinguishers: o Condition: Not Good (some need refilling), o Completeness: Not Good (Some Areas are not covered) • Pressure Gage at red level • Fire Hydrant at Pump Station. • FHC missing all Elements
  • 6. ͤ͟͠͞ 6 • Pumps: o No fire Pumps were found at site: also it's stated that there are pumps in layout "YC-EWT-M-603 Maintenance Floor Fire Fighting System", but we couldn't find it! o There are three zones of firefighting; two are connected to water lines (1.Ground and Base floors, 2. Pump station) and the third we couldn't find the source of water for it. • Water Source for GF and Basement • Water Source for Pump Station • Riser for Upper Floor
  • 7. ͤ͟͠͞ 7 • CO2 Fire Suppression System:* o Condition: Not Good (Panels and extinguishing elements were not stored in right way), o Completeness: Not Good (Rooms are not isolated correctly, Gas will leeks and will not isolate the fire). • Panels detect fire directly and starts countdown to release Gas • Solenoid Valves were not kept away of dust and they are not reliable now. • Sounders Condition • Rooms are not firmly Isolated * CO2 is a deadly Gas. If gas extinguished by fault in the presence of Humans, it might cause them death.
  • 8. ͤ͟͠͞ 8 2. Fire Alarm System Condition: Pipes, Wires, Detectors, Panels. • Pipes: o Condition: Good, o Completeness: Not Completed yet and PVC pipes are used at some areas out of wall. • Wires: o Condition: Not Bad, o Completeness: Not Completed and at some areas unshielded cables. • Detectors: o Condition: Not Bad, but some detectors were kept uncovered, o Completeness: Not Completed. • Panels: o There are two panels One for Main Building and One for Pump Station. o Condition: • PVC Piping & Unshielded Cables
  • 9. ͤ͟͠͞ 9 The Tower's Panel we couldn't check due to power down and batteries absence. Pump Station Panel is in a good condition but some detectors detect false fire and need maintenance. • Panel for Tower open and no batteries. • Panel for pump station is complete and kept closed, but detects false fire.
  • 10. ͤ͟͠͞ 10 3. Emergency Exits: • Restaurant & View Deck: o For upper levels there are two stairs in good condition leading to ground floor, o There are four elevators, but only one was working and not working well. • Ground Floor: o There are enough exits to use at emergency • Basement: o There are two emergency exits were found, • Exit sign at restaurant.
  • 11. ͤ͟͠͞ 11 Recommendations: Fire Fighting System: 1. All Life Safety Systems must be a stand-alone system. So that, source of water must be Independent and separated and pumped from special fire pumps. 2. Source of water for upper floors is a mystery for now and must be checked firmly. 3. All Fire Extinguishers shall be checked. 4. Missing Fire Hose cabinet shall be completed. 5. CO2 Systems are not reliable now and if released might cause death to maintenance team if exist there. We recommend that all CO2 suppression systems to be renewed. 6. Electric rooms shall not contain wide gas leakage opens. Fire Alarm System: 1. All areas must be covered with detection devices. 2. All PVC pipes out of wall must be replaced with EMT pipes. 3. All unshielded cables must be replaced with shielded cables. 4. Panel for Tower shall be checked before completing all points to decide if will work or not. If not you can think of another type of fire alarm more flexible. Emergency Exits: 1. Emergency lights shall be ensured along the way to safety.
  • 12. ‫ﻟﻠﻤﻘﺎوﻻت‬ ‫اﻟﺤﺎﺿﺮ‬ ‫وﺋﺎم‬ ‫ﻣﺆﺳﺴﺔ‬ Weam AL Hader Contracting Est. Weam AL Hader Fire Fighting & Plumping & HVAC
  • 13. Plumbing About Us ‫ﻟﻠﻤﻘﺎوﻻت‬ ‫اﻟﺤﺎﺿﺮ‬ ‫وﺋﺎم‬ ‫ﻣﺆﺳﺴﺔ‬ Weam AL Hader Contracting Est. We implant trust seeds in every land we step on, and we know it will grow holding our name "Weam Al Hader” About US 1
  • 14. Introduction Introduction About Us Weam Al Hader is considered a unique model for the implementation of Engineering and Business Development in the Electromechanical and telecommunications sector. Where we began to build a solid core capable of dealing with all types of electromechanical projects, where we have contributed our part to participate in the aspirations and orientations of the Custodian of theTwo Holy Mosques government for the construction and the renaissance of the Kingdom of Saudi Arabia, where the expansion greater attention stage began to keep pace with development and acceleration of urban Kingdom. Introduction About US 2 ‫ﻣﻘﺪﻣﺔ‬ ‫ﻣﺠﺎل‬ ‫ﻓﻰ‬ ‫اﻻﻋﻤﺎل‬ ‫ﻟﺘﻄﻮﻳﺮ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫ﻟﺒﺪاﻳﻪ‬ ‫ﻣﺘﻔﺮد‬ ‫ﻛﻤﺜﺎل‬ ‫اﻟﺤﺎﺿﺮ‬ ‫وﺋﺎم‬ ‫ﺗﻌﺘﺒﺮ‬ ‫ﻣﻊ‬ ‫اﻟﺘﻌﺎﻣﻞ‬ ‫ﻋﻠﻰ‬ ‫ﻗﺎدر‬ ‫ﻗﻮى‬ ‫اﺳﺎس‬ ‫ﺑﻌﻤﻞ‬ ‫ﺑﺪاﻧﺎ‬ ‫ﺣﻴﺚ‬ ‫واﻻﺗﺼﺎﻻت‬ ‫اﻻﻟﻜﺘﺮوﻣﻴﻜﺎﻧﻴﻜﺎ‬ ‫ﻓﻰ‬ ‫ﻟﻠﻤﺸﺎرﻛﻪ‬ ‫ﻟﻨﺎ‬ ‫ﺑﺠﺰء‬ ‫ﺷﺎرﻛﻨﺎ‬ ‫ﺣﻴﺚ‬ ‫اﻻﻟﻜﺘﺮوﻣﻴﻜﺎﻧﻴﻜﺎ‬ ‫اﻟﻤﺸﺎرﻳﻊ‬ ‫اﻧﻮاع‬ ‫ﺟﻤﻴﻊ‬ ‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﻪ‬ ‫اﺣﻴﺎء‬ ‫واﻋﺎده‬ ‫اﻟﺤﺮﻣﻴﻦ‬ ‫ﻟﺨﺎدم‬ ‫اﻟﺘﻌﺮﻳﻔﻴﻪ‬ ‫اﻻﺟﺘﻤﺎﻋﺎت‬
  • 15. Weam Mission ‫ﻣﻬﻤﺘﻨﺎ‬ About Us We seek harmony in the present, to provide high-quality fire-fighting and the expansion of activity solutions our customers access to this we aim to offer the highest quality products and services for the full satisfaction of the client ‫ﻋﻤﻼؤﻧﺎ‬ ‫ﻧﺸﺎط‬ ‫وﺗﻮﺳﻴﻊ‬ ‫اﻟﺤﺮاﺋﻖ‬ ‫ﻟﻤﻜﺎﻓﺤﺔ‬ ‫اﻟﺠﻮده‬ ‫ﻓﺎﺋﻘﻪ‬ ‫ﺣﻠﻮل‬ ‫ﻟﺘﻮﻓﻴﺮ‬ ‫اﻟﺤﺎﺿﺮ‬ ‫ﺋﺎم‬ ‫ﻓﻰ‬ ‫ﻧﺴﻌﻰ‬ ‫اﻟﺮﺿﺎء‬ ‫اﺟﻞ‬ ‫ﻣﻦ‬ ‫وﺧﺪﻣﺎت‬ ‫ﻣﻨﺘﺠﺎت‬ ‫ﺟﻮدة‬ ‫ﻣﻦ‬ ‫ﻣﺴﺘﻮى‬ ‫اﻋﻠﻰ‬ ‫ﺗﻘﺪﻳﻢ‬ ‫اﻟﻰ‬ ‫ﻧﻬﺪف‬ ‫ﻓﺎﻧﻨﺎ‬ ‫ﻟﻬﺬا‬ ‫وﺻﻮﻻ‬ ‫ﻟﻠﻌﻤﻴﻞ‬ ‫اﻟﻜﺎﻣﻞ‬ Weam Vission ‫رؤﻳﺘﻨﺎ‬ Our vision is to be the first choice for the customer in the field of fire fighting and alarm. We have a wide range of services and products in the introductions for technical support services to help our customers choose the optimal system for them in the fight against the dangers of fire ‫ﻟﺪﻳﻨﺎ‬ ‫ﻓﻨﺤﻦ‬ ‫واﻻﻧﺬار‬ ‫اﻟﺤﺮاﺋﻖ‬ ‫ﻣﻜﺎﻓﺤﺔ‬ ‫ﻣﺠﺎل‬ ‫ﻓﻰ‬ ‫ﻟﻠﻌﻤﻴﻞ‬ ‫اﻻول‬ ‫اﻟﺨﻴﺎر‬ ‫ﻧﻜﻮن‬ ‫ﺑﺎن‬ ‫رؤﻳﺘﻨﺎ‬ ‫ﺗﺘﻤﺜﻞ‬ ‫ﻟﻤﺴﺎﻋﺪه‬ ‫اﻟﻔﻨﻰ‬ ‫اﻟﺪﻋﻢ‬ ‫ﺧﺪﻣﺎت‬ ‫ﻣﻘﺪﻣﺎﺗﻬﺎ‬ ‫ﻓﻰ‬ ‫واﻟﻤﻨﺘﺠﺎت‬ ‫اﻟﺨﺪﻣﺎت‬ ‫ﻣﻦ‬ ‫ﻛﺒﻴﺮه‬ ‫ﻣﺠﻤﻮﻋﻪ‬ ‫اﻟﺤﺮﻳﻖ‬ ‫اﺧﻄﺎر‬ ‫ﻣﻜﺎﻓﺤﺔ‬ ‫ﻓﻰ‬ ‫ﻟﻬﻢ‬ ‫اﻻﻣﺜﻞ‬ ‫اﻟﻨﻈﺎم‬ ‫اﺧﺘﻴﺎر‬ ‫ﻋﻠﻰ‬ ‫ﻋﻤﻼؤﻧﺎ‬ Introduction About US 3
  • 16. Management Structure Document Office General Manager Operation Manager Sales Department Financial Manager Installation Teams Stores Procurement Office Technical Office 4
  • 21. List of Project SN LocaionMain ContractorProject InviroTech Soliman Al QasoumyAl Shaaf Water Desalinaion plant Medical Stores for Gizan Military Hospital Five Guys Restaurant Bish Water Desalinaion plant Nihaz Show Rooms and Offices Naional Gaurds Stores, B7 & B5 Commercial and residenial buildings Binban Camp Industrial Ciies Admin Building Al-Kharj industrial city Department Al Fanar Cables Stoke Yards Riyadh Commercial Room Soliman Al Qasoumy Blue Print Me Al Rawaf Senior Professionals OCEETEE OCEETEE Jado Jado Jado Economic Homes Abu Arish, Gizan Abha Bish, Gizan Al Khobar Jadwa United for Contracing Saleh Bin Manea Saleh Al Ma’zar Jail Plaza In Palace, Kitchen Abdalah Ibrahim Bin Awad Omar Abdalah Omar Almeakl Ali Al Khinizan MEP Riyadh Riyadh Riyadh Riyadh Riyadh Riyadh Riyadh Riyadh Fire Fighing Fire Fighing Fire Fighing Abdalah Bin awad El Awad Abdalh Naser Abdalah Albeshry Monira Abdalah Ali Fire Alarm Riyadh 2nd Industrial City Binban, Riyadh Riyadh Dalam, Al-Kharj Riyadh Riyadh Riyadh 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 List of Project 9
  • 22. List of Project SN LocaionStatueProject Fire Fighing Fire FighingMohamed Mazid Eobaid Soliman Bin Saleh Ibrahim Abdulaziz Mousa Alotaiq Al Laifa Factory Saudi Pipes Factory Fire Fighing Fire Alarm Riyadh Riyadh Riyadh Dereya Fire Fighing Al Shola Schools Alex Airport Fire Fighing Maintenance Riyadh Riyadh Fire Fighing Dubai Ports, Ain Sokhna Seaport Fire Alarm Alexandria Egypt Ain Sokhna Egypt HVAC & Fire FighingKempinski Hotel Cairo Egypt 21 22 23 24 List of Project 10
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28. info@weamcont.com www.weamcont.com ScanMe + 966 54 227 5153 + 966 54 144 2844 KSA Riyadh 11422 P.O.Box :5254 ‫ﻟﻠﻤﻘﺎوﻻت‬ ‫اﻟﺤﺎﺿﺮ‬ ‫وﺋﺎم‬ ‫ﻣﺆﺳﺴﺔ‬ Weam AL Hader Contracting Est.