SlideShare a Scribd company logo
1 of 16
Download to read offline
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
Vision :- VPMS shall be most trusted organization in terms of providing
complied, value engineered, customized and noteworthy solutions through
application of professional wisdom, Logic, knowledge and experience.
Emphasis shall be given for long term, enduring, and mutually beneficial
solutions.
VPMS shall not engage, share, recommend, align and participate in any
unethical working systems / solutions which are not complying with the
technical requirements as per the best engineering practices. Each member of
the VPMS family or external consultants engaged by VPMS for delivery of
services shall strictly comply with the ethical workings and professional wisdom
and ensure that the best construction, supervision and design engineering
solutions are provided to the clients without compromise.
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
Mission:- VPMS is destined to grow adhering strictly create customer delight
by providing the complied and sustainable solutions and shall be trustworthy in
all actions, acts, communication, presentation and dialogue irrespective of
whether pre-engagement meetings/ deliberations get converted into
opportunities or otherwise.
The Vision statement shall be exhibited in every aspect of verbal and written
communications and no compromise shall be done on the professional ethics,
wisdom and solutions that do not comply with the technical requirements, best
construction practices and provisions as per applicable manuals and code
provisions. Emphasis shall be on mutually, beneficial, sustainable and long
term solutions for engagement without compromise.
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
About the owner:- Mr. Vinay Mangrulkar has been instrumental in creation of
VPMS as a medium to provide the technical support, guidance and engineering
assistance to growing construction companies who cannot sustain the
engagement of full-fledged planning and monitoring department considering
the size of the company and expectations of the project they have associated.
He is a graduate in civil engineering from Osmania university and passed with
distinction in 1988.
As a quest for application post engineering, he served small construction
companies for understanding drawings and converting them on the ground
with all the construction practices and sequences in place.
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
About the owner:- He served Konkan Railway Corporation Limited post this
short period association with small construction companies and had exposure
of finalizing alignment, quantity estimation, rate analysis , method statements,
item description, assistance in creation, floating and award of contracts, getting
work done from consultants, contracting companies in the areas of high
embankments, deep cuttings, lined and unlined tunnels of varied lengths, ROBs
and RUBs, major bridges with PSC girders and with other sleek designs, minor
bridges like arch bridges, slab culverts, siphon culverts , box culverts and RCC
pipe culverts, station building and quarters, track linking of LWRs, etc.
He has also taken lead for completion of major bridges departmentally when
the original contractor had abandoned the works. Post completing the track
linking he had served the best construction company in India.
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
About the owner:- He has served Larsen and Toubro –ECC Division for a
decade and had the exposure of serving in projects related to:
 Construction of 500 TPD paper plant with WTP, ETP, internal roads and staff
quarters
 Construction of regional rural water supply scheme with design, execution
and commissioning for three districts in Maharashtra and in Goa
 Strengthening of two lane with flexible pavement and new construction of
two lane with rigid portion for 28 KM of NH4 in Satara district of
Maharashtra having major and minor bridges, flyovers, vehicular, bullock
cart and pedestrian underpasses besides the earthwork, granular works,
bituminous and concrete pavements, junction developments and toll plaza.
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
About the owner:-
 Execution of 400 KV transmission line from Satna to Hatta in Madhya
Pradesh
He has served the premier organization in various capacities and roles. To sum
up the exposure to Project management facets like estimation, analysis of
rates, planning, billing, monitoring, review, corrective actions, claims and
disputes, creation of quality and safety manuals , QAPs, etc.
He has served the premier organization Hindustan Construction Company and
its allied companies for construction, development and operation of a smart
city from the initiation stage for more than a decade. He had exposure to
 Concept plan development from the reputed Town Planner HOK for
proposed smart hill station
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
About the owner:-
 Assistance in creating the complete development plan as per priority and
understanding the construction and revenue model
 Assistance in creating the business plan for a financial year and co
ordination with the Town planning and land departments
 Providing survey and geotechnical investigation reports for facilitating
design of the infrastructure facilities like dams, water and waste water plant
and conveyance system, access and internal roads, residential and
commercial facilities , etc.
 Co ordination with the consultants and design team to seek details as per
approved business models for financial years and providing all inputs as one
point contact
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
About the owner:-
 Seeking estimation of quantities, method statements, quality and safety
manuals, participating in deciding strategy for award of works, monitoring,
controlling and operations of city
 Providing estimation and analysis of rates to facilitate award of works as
per priorities
 Getting the project works done by engagement with suppliers, contracting
companies , departmental facilities provided from the team and review of
the project deliverables on weekly rests
 Development of entire infrastructure facilities, residential and commercial,
tourism hospitality and leisure facilities and engagement of agencies for
operation of the facility for the city management.
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
About the owner:-
In the process of evolution or birth of first private smart city in India, he had
exposure to
 Town planning and development
 Setting priorities of development of city
 Internal and external co ordination for design and drawings to create
facilities as per business model and revenue model
 Delivering the infrastructure facilities ahead of time for access and
development of residential, commercial facilities
 Understanding requirement of the buyers and facilitating the sales and
handing over teams for creating robust facilities
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
About the owner:-
 Assisting in reviews and action plans for monitoring, reviews and corrective
actions to top management during monthly reviews
 Facilitating for smooth transition and operation of the various facilities for
city management.
 Representing as senior management representative for all stake holders
who have participated in construction of the first smart city.
Post stoppage of the project works due to financial setbacks to the developer,
decided to support the small engineering company to migrate to ERP modeling
and controlling projects through system serving for a small tenure till
implementation as Chief Operating Officer.
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
About the owner:-
As a commitment to the profession, engagement for teaching to post graduate
students of construction management in
 Value Engineering and Analysis
 Risk identification, Analysis and Mitigation, Risk scores and how Risk
management is important for project Management
 Special Projects like construction of Konkan Railway, Construction of major
bridges and flyovers, environmental impact and assessment for evolution of
new cities, Construction of National Highways by BOT, EPC and Hybrid
Annuity methods through PPP
 Requirement of technical and soft skills for absorption in the industry for
various segments like roads, bridges, dams, Real Estate, consulting, etc.
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
About the owner:-
Served Premier consulting company TCE for a small stint to understand the
proficiency and skill requirement for carrying out the consulting engineering
works
Engaged with few developing companies as freelancer for rendering them
engineering services for project supervision and monitoring as Technical Advisor.
Providing project supervision services to construction company in EPC Mode for
strategizing, monitoring, reviewing progress, providing reports for action plan,
contract correspondence, design reviews and optimization, quantity variations
between actual and as per contract, etc.
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
About the owner:-
As a need for serving in senior management:
 Undertook the course of PGDBA in Finance and Operations ( Three years
course in correspondence module )
 Sought membership as Fellow Institution of Engineers
 Sought membership as Chartered Valuer from The Indian institute of
Valuers, India
 Member, Indian Road Congress.
 Underwent extensive training in soft skills, leadership development
programmes and management development programmes while serving
premier institutions in different roles and capacities.
VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
VPMS :- Way Forward
VPMS has a freelancing agreement with structural and highway designers for any
design requirements for engagement
VPMS also has arrangement in place for entire project supervision of any type of
project for main roles like project manager, contract manager, quality manager,
safety engineer, Planning and Billing manager to cater the need of project
management to avoid permanent engagement of these roles by growing
companies which cannot afford the services for full time basis.
VPMS encourages the academic institutions to grab the opportunity for
engagement of lectures on subjects of their choice for the benefit of students who
are about to pass out from the institution for joining the industry.

More Related Content

Similar to Project Management Services at affordable price (20)

MANISH KUMAR GUPTA CV
MANISH KUMAR GUPTA CVMANISH KUMAR GUPTA CV
MANISH KUMAR GUPTA CV
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015
 
Jois Lakshmipathy - CV
Jois Lakshmipathy - CVJois Lakshmipathy - CV
Jois Lakshmipathy - CV
 
RESUME MODIFIED 05 JUNE 2016 (1)
RESUME MODIFIED 05 JUNE  2016 (1)RESUME MODIFIED 05 JUNE  2016 (1)
RESUME MODIFIED 05 JUNE 2016 (1)
 
RESUME MODIFIED 05 JUNE 2016 (1)
RESUME MODIFIED 05 JUNE  2016 (1)RESUME MODIFIED 05 JUNE  2016 (1)
RESUME MODIFIED 05 JUNE 2016 (1)
 
Resume - R1.Docx
Resume - R1.DocxResume - R1.Docx
Resume - R1.Docx
 
Henry CV
Henry CVHenry CV
Henry CV
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
CURRICULUM_VITAE_recent.PDF
CURRICULUM_VITAE_recent.PDFCURRICULUM_VITAE_recent.PDF
CURRICULUM_VITAE_recent.PDF
 
Albuhaisi, osama cipm-2016
Albuhaisi, osama   cipm-2016Albuhaisi, osama   cipm-2016
Albuhaisi, osama cipm-2016
 
QS - CV
QS - CVQS - CV
QS - CV
 
CGV - Corporate Presentation 2016
CGV - Corporate Presentation 2016CGV - Corporate Presentation 2016
CGV - Corporate Presentation 2016
 
MY PROFILE
MY PROFILEMY PROFILE
MY PROFILE
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Lukas CV
Lukas CVLukas CV
Lukas CV
 
Resume
ResumeResume
Resume
 
BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)
 
CV
CVCV
CV
 
CV
CVCV
CV
 
CV
CVCV
CV
 

Recently uploaded

Presentation on cross cultural negotiations.
Presentation on cross cultural negotiations.Presentation on cross cultural negotiations.
Presentation on cross cultural negotiations.sumayyasubhana321
 
What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...AbhishekSharma823325
 
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...YourLegal Accounting
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwadimosmejiaslendon
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...yulianti213969
 
First Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCFirst Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCTammy Jackson
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© رnafizanafzal
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...ssuserf63bd7
 
Chapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a TreasuryChapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a TreasurySarunChhetri1
 
The Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and UncertaintyThe Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and Uncertaintycapivisgroup
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingYourLegal Accounting
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...Khaled Al Awadi
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...CIO Look Magazine
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证ogawka
 

Recently uploaded (20)

Presentation on cross cultural negotiations.
Presentation on cross cultural negotiations.Presentation on cross cultural negotiations.
Presentation on cross cultural negotiations.
 
What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...
 
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
 
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di DepokObat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
 
First Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCFirst Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLC
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
 
Chapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a TreasuryChapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a Treasury
 
Obat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di Bandung
Obat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di BandungObat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di Bandung
Obat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di Bandung
 
The Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and UncertaintyThe Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and Uncertainty
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic Accounting
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
 

Project Management Services at affordable price

  • 1. VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
  • 2. VINDEE PROJECT MANAGEMENT SERVICES (VPMS)
  • 3. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) Vision :- VPMS shall be most trusted organization in terms of providing complied, value engineered, customized and noteworthy solutions through application of professional wisdom, Logic, knowledge and experience. Emphasis shall be given for long term, enduring, and mutually beneficial solutions. VPMS shall not engage, share, recommend, align and participate in any unethical working systems / solutions which are not complying with the technical requirements as per the best engineering practices. Each member of the VPMS family or external consultants engaged by VPMS for delivery of services shall strictly comply with the ethical workings and professional wisdom and ensure that the best construction, supervision and design engineering solutions are provided to the clients without compromise.
  • 4. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) Mission:- VPMS is destined to grow adhering strictly create customer delight by providing the complied and sustainable solutions and shall be trustworthy in all actions, acts, communication, presentation and dialogue irrespective of whether pre-engagement meetings/ deliberations get converted into opportunities or otherwise. The Vision statement shall be exhibited in every aspect of verbal and written communications and no compromise shall be done on the professional ethics, wisdom and solutions that do not comply with the technical requirements, best construction practices and provisions as per applicable manuals and code provisions. Emphasis shall be on mutually, beneficial, sustainable and long term solutions for engagement without compromise.
  • 5. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) About the owner:- Mr. Vinay Mangrulkar has been instrumental in creation of VPMS as a medium to provide the technical support, guidance and engineering assistance to growing construction companies who cannot sustain the engagement of full-fledged planning and monitoring department considering the size of the company and expectations of the project they have associated. He is a graduate in civil engineering from Osmania university and passed with distinction in 1988. As a quest for application post engineering, he served small construction companies for understanding drawings and converting them on the ground with all the construction practices and sequences in place.
  • 6. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) About the owner:- He served Konkan Railway Corporation Limited post this short period association with small construction companies and had exposure of finalizing alignment, quantity estimation, rate analysis , method statements, item description, assistance in creation, floating and award of contracts, getting work done from consultants, contracting companies in the areas of high embankments, deep cuttings, lined and unlined tunnels of varied lengths, ROBs and RUBs, major bridges with PSC girders and with other sleek designs, minor bridges like arch bridges, slab culverts, siphon culverts , box culverts and RCC pipe culverts, station building and quarters, track linking of LWRs, etc. He has also taken lead for completion of major bridges departmentally when the original contractor had abandoned the works. Post completing the track linking he had served the best construction company in India.
  • 7. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) About the owner:- He has served Larsen and Toubro –ECC Division for a decade and had the exposure of serving in projects related to:  Construction of 500 TPD paper plant with WTP, ETP, internal roads and staff quarters  Construction of regional rural water supply scheme with design, execution and commissioning for three districts in Maharashtra and in Goa  Strengthening of two lane with flexible pavement and new construction of two lane with rigid portion for 28 KM of NH4 in Satara district of Maharashtra having major and minor bridges, flyovers, vehicular, bullock cart and pedestrian underpasses besides the earthwork, granular works, bituminous and concrete pavements, junction developments and toll plaza.
  • 8. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) About the owner:-  Execution of 400 KV transmission line from Satna to Hatta in Madhya Pradesh He has served the premier organization in various capacities and roles. To sum up the exposure to Project management facets like estimation, analysis of rates, planning, billing, monitoring, review, corrective actions, claims and disputes, creation of quality and safety manuals , QAPs, etc. He has served the premier organization Hindustan Construction Company and its allied companies for construction, development and operation of a smart city from the initiation stage for more than a decade. He had exposure to  Concept plan development from the reputed Town Planner HOK for proposed smart hill station
  • 9. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) About the owner:-  Assistance in creating the complete development plan as per priority and understanding the construction and revenue model  Assistance in creating the business plan for a financial year and co ordination with the Town planning and land departments  Providing survey and geotechnical investigation reports for facilitating design of the infrastructure facilities like dams, water and waste water plant and conveyance system, access and internal roads, residential and commercial facilities , etc.  Co ordination with the consultants and design team to seek details as per approved business models for financial years and providing all inputs as one point contact
  • 10. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) About the owner:-  Seeking estimation of quantities, method statements, quality and safety manuals, participating in deciding strategy for award of works, monitoring, controlling and operations of city  Providing estimation and analysis of rates to facilitate award of works as per priorities  Getting the project works done by engagement with suppliers, contracting companies , departmental facilities provided from the team and review of the project deliverables on weekly rests  Development of entire infrastructure facilities, residential and commercial, tourism hospitality and leisure facilities and engagement of agencies for operation of the facility for the city management.
  • 11. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) About the owner:- In the process of evolution or birth of first private smart city in India, he had exposure to  Town planning and development  Setting priorities of development of city  Internal and external co ordination for design and drawings to create facilities as per business model and revenue model  Delivering the infrastructure facilities ahead of time for access and development of residential, commercial facilities  Understanding requirement of the buyers and facilitating the sales and handing over teams for creating robust facilities
  • 12. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) About the owner:-  Assisting in reviews and action plans for monitoring, reviews and corrective actions to top management during monthly reviews  Facilitating for smooth transition and operation of the various facilities for city management.  Representing as senior management representative for all stake holders who have participated in construction of the first smart city. Post stoppage of the project works due to financial setbacks to the developer, decided to support the small engineering company to migrate to ERP modeling and controlling projects through system serving for a small tenure till implementation as Chief Operating Officer.
  • 13. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) About the owner:- As a commitment to the profession, engagement for teaching to post graduate students of construction management in  Value Engineering and Analysis  Risk identification, Analysis and Mitigation, Risk scores and how Risk management is important for project Management  Special Projects like construction of Konkan Railway, Construction of major bridges and flyovers, environmental impact and assessment for evolution of new cities, Construction of National Highways by BOT, EPC and Hybrid Annuity methods through PPP  Requirement of technical and soft skills for absorption in the industry for various segments like roads, bridges, dams, Real Estate, consulting, etc.
  • 14. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) About the owner:- Served Premier consulting company TCE for a small stint to understand the proficiency and skill requirement for carrying out the consulting engineering works Engaged with few developing companies as freelancer for rendering them engineering services for project supervision and monitoring as Technical Advisor. Providing project supervision services to construction company in EPC Mode for strategizing, monitoring, reviewing progress, providing reports for action plan, contract correspondence, design reviews and optimization, quantity variations between actual and as per contract, etc.
  • 15. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) About the owner:- As a need for serving in senior management:  Undertook the course of PGDBA in Finance and Operations ( Three years course in correspondence module )  Sought membership as Fellow Institution of Engineers  Sought membership as Chartered Valuer from The Indian institute of Valuers, India  Member, Indian Road Congress.  Underwent extensive training in soft skills, leadership development programmes and management development programmes while serving premier institutions in different roles and capacities.
  • 16. VINDEE PROJECT MANAGEMENT SERVICES (VPMS) VPMS :- Way Forward VPMS has a freelancing agreement with structural and highway designers for any design requirements for engagement VPMS also has arrangement in place for entire project supervision of any type of project for main roles like project manager, contract manager, quality manager, safety engineer, Planning and Billing manager to cater the need of project management to avoid permanent engagement of these roles by growing companies which cannot afford the services for full time basis. VPMS encourages the academic institutions to grab the opportunity for engagement of lectures on subjects of their choice for the benefit of students who are about to pass out from the institution for joining the industry.