SlideShare a Scribd company logo
1 of 4
CURRICULUM VITAE
Venkateswarlu Seelam
101, Susheel apt,
Block no. A 454/907,
Holy Family school Rd.,
Lalchakki Chowk,
Ulhasnagar -421004. Mobile – 9665958498
Thane Dist. {Mumbai}
E-mail:seelamvenkateswarlu1@gmail.com
 Education - S.S.C + Diploma in Elec. Eng.
 Last Position held - Sr. Section Engineer(EMU)
 Name of Zonal Rly. - Central Railway
 Experience - Worked in Rolling stock (EMU) in carshed kurla,
Central Railway since March 1980 to March
2014
 Number of Years of Experience in various activities –
 Sept 2014 to till date: Joined as consultant in LOUIS BERGER
CONSULTING PVT.LTD in MMRDA MONORAIL PROJECT (SANT GADGE
MAHARAJ CHOWK-WADALA DEPOT-CHEMBUR) Mono rail Unique type
of Rail service it is alternative to the bus service .The train having tires,
Power is fed to the mono rail through the rails installed at the centre of
the Beam on both sides keeping air space free .For diverting train from
one beam to another beam separate type of beam switches are installed.
 Work Assigned:
 To keep close watch on maintenance schedules to reduce the failures.
 Performance monitoring of services under commercial operation.
 Customer care/passenger Convenience items and train service operations.
 Monitoring of inspection work.
 Witnessing the tests coordination with the Contractor SCOMI.
 2012 – March 2014 as a section in charge looking after AC – DC Siemens
rakes Pantograph maintenance of M/s Stone India Ltd. and M/s Schunk
Metal & Carbon (India) Ltd. Make pantographs.
 Work Assigned: In Central Railway OHE conversion works were going on
from DC to AC without any interruption of services. While these works were
going on lot of PANTOGRAPHS ENTANGLEMENTS took place. Without
any inputs of new pantographs all damaged pantographs got repaired and
maintained the services. Pantograph pans are fitted with copper strips as
wearing material. These strips were wearing fast during monsoon due to
lubricant getting washed out while raining. Taken care to get the lubricant
applied by arranging the trains in shed during day and night.
 2009 to 2011 as a section in charge looking after AC – DC Siemens rakes
with air suspension bogies maintenance.
 Work Assigned: Central railway received 60 rakes of 12 car coaches from
ICF CHENNAI with Siemens IGBT technology and the bogies of AIR
SUSPENSION. The Rakes Commissioned and offered for trials by RDSO.
Lot of modifications done on stainless steel pressure pipes to avoid failures
on account of loss of air pressure during service of these trains. These
coaches were side bearer loaded on bolster. These side bearers have given
lot of failures due poor strengthening of its walls, all these failures were
arrested and advised to designer.
 2005to 2008 as a section in charge looking after Elec. & Mechanical works
in DC EMUs.
 Work Assigned: Section in-charge of inspection shop in which weekly,
fortnightly inspections were carried out. Surprise checks were carried out to
get the quality work from my staff and supervisors during schedule
inspections. I was always maintaining the rakes more reliable and
availability for service. I personally taking care of wheels maintenance to
not to cause any derailments because of wheels defects.
 1998 to 2004 as a senior supervisor looking after Drawbar maintenance
and Ultra Sonic testing of axles.
 Work Assigned: In Central railway there was a case of axle breakage at
outside of wheel disc. Since that incidence EMU rake is offered once in
every 6months for Ultrasonic testing of axles. After testing axle boxes
old grease sent for laboratory to find out any material contents of bearing in
grease. EMU coaches were coupled by ESCORTS semi-permanent couplers
to get the formation of 12car formation. These couplers maintenance was
taken care to not to give any failures like breakage, uncoupling during
service.
 1987 to 1997 as a senior supervisor looking after wheel mounted disc
brakes maintenance.
 Work Assigned: CENTRAL RAILWAY introduced 5 EMU trains fitted with
Disc Brakes FIRST PROJECT IN INDIAN RAILWAYS supplied by M/S
Brakes India Ltd. Chennai. These trains Trials and commissioning
successfully done and maintained to make them reliable in service.
 March 1980 to 1987 as a senior supervisor to look after schedule
maintenance of EMU rakes on Mumbai Division Central Railway.
 Work Assigned: Central Railway Mumbai division suburban services are
Life Line of Mumbai. Availability and Reliability of these services is most
important factor in Mumbai suburban section. Close monitoring of
maintenance activities Electrical and Mechanical side including wheels and
braking system made the trains available and reliable in service.
Training Undergone –
1. One month programme in Brakes India Ltd. Chennai on wheel
mounted Disc brakes.
2. 5 days training programme in Germany and Switzerland.
Awards –
1. 1996 won the GM’s award.
2. 2007 won the DRM’s award.
Name - Venkateswarlu Seelam
Mobile no. - 9665958498
Email ID - seelamvenkateswarlu1@gmail.com
Date of Birth - 12/03/1954
Languages Known - English, Hindi, Marathi & Telugu
Nationality - Indian
I, the undersigned certify that the above information given by me is true to the
best of my knowledge.
(Venkateswarlu Seelam)
Retd. Sr. Section Engineer
Dt. 8.8.2015

More Related Content

What's hot (19)

Jaga CV
Jaga CVJaga CV
Jaga CV
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
 
Samy.J - resume
Samy.J - resumeSamy.J - resume
Samy.J - resume
 
CV Partha
CV ParthaCV Partha
CV Partha
 
ZAFAR IQBAL
ZAFAR IQBALZAFAR IQBAL
ZAFAR IQBAL
 
AMJATH BIO-DATA(2)
AMJATH BIO-DATA(2)AMJATH BIO-DATA(2)
AMJATH BIO-DATA(2)
 
mark amt resume
mark  amt resumemark  amt resume
mark amt resume
 
RESUME
RESUMERESUME
RESUME
 
CV Aircraft Structures Technician
CV Aircraft Structures TechnicianCV Aircraft Structures Technician
CV Aircraft Structures Technician
 
senior mechanic original cv
senior mechanic original cvsenior mechanic original cv
senior mechanic original cv
 
Mohamad Rizal resume
Mohamad Rizal resumeMohamad Rizal resume
Mohamad Rizal resume
 
Job Description of a Locomotive Engineer
Job Description of a Locomotive EngineerJob Description of a Locomotive Engineer
Job Description of a Locomotive Engineer
 
Summer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsSummer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) Students
 
cody mccauley's resume
cody mccauley's resumecody mccauley's resume
cody mccauley's resume
 
Inplant training tnstc
Inplant training tnstc Inplant training tnstc
Inplant training tnstc
 
Document
DocumentDocument
Document
 
Muhammad Mujieb CV
Muhammad Mujieb CVMuhammad Mujieb CV
Muhammad Mujieb CV
 
SREEJITH [CV] -2016
SREEJITH [CV] -2016SREEJITH [CV] -2016
SREEJITH [CV] -2016
 
Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015
 

Viewers also liked

Sap ap-user-training-tutorial
Sap ap-user-training-tutorialSap ap-user-training-tutorial
Sap ap-user-training-tutorialCELRIZ02
 
I B.Tech (R09) Regular and Supplementary Results May 2012
I B.Tech (R09) Regular and Supplementary Results May 2012I B.Tech (R09) Regular and Supplementary Results May 2012
I B.Tech (R09) Regular and Supplementary Results May 2012SISTKEXAMSECTION
 
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...VARIGONDA GOPI
 
CRISIS MIGRATION: A NEW ROLE TRADE UNION?
CRISIS MIGRATION: A NEW ROLE TRADE UNION? CRISIS MIGRATION: A NEW ROLE TRADE UNION?
CRISIS MIGRATION: A NEW ROLE TRADE UNION? Eric Gyllenhaal
 
gebiedsdossier Heelsumse Beek en Wolfhezer Beek
gebiedsdossier Heelsumse Beek en Wolfhezer Beekgebiedsdossier Heelsumse Beek en Wolfhezer Beek
gebiedsdossier Heelsumse Beek en Wolfhezer BeekMarieke Brouwer-te Molder
 
Pat Milliken Ford
Pat Milliken FordPat Milliken Ford
Pat Milliken FordNick Oliver
 
Datasheet Fluke 8508A. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 8508A. Hubungi PT. Siwali Swantika 021-45850618Datasheet Fluke 8508A. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 8508A. Hubungi PT. Siwali Swantika 021-45850618PT. Siwali Swantika
 
2014 template concept
2014 template concept2014 template concept
2014 template conceptNick Oliver
 
Cmsd percuma updated
Cmsd percuma updatedCmsd percuma updated
Cmsd percuma updatediiza hass
 
Datasheet Fluke 572-2. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 572-2. Hubungi PT. Siwali Swantika 021-45850618Datasheet Fluke 572-2. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 572-2. Hubungi PT. Siwali Swantika 021-45850618PT. Siwali Swantika
 
IAQF report_Cornell Team
IAQF report_Cornell TeamIAQF report_Cornell Team
IAQF report_Cornell TeamJin Li
 
Alyssa Elaine Smith Curriculum Vita 2015
Alyssa Elaine Smith Curriculum Vita 2015Alyssa Elaine Smith Curriculum Vita 2015
Alyssa Elaine Smith Curriculum Vita 2015Alyssa Smith
 
Datasheet Fluke 1750. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 1750. Hubungi PT. Siwali Swantika 021-45850618Datasheet Fluke 1750. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 1750. Hubungi PT. Siwali Swantika 021-45850618PT. Siwali Swantika
 
HR Tech Advisor #SHRM15 Videos
HR Tech Advisor #SHRM15 Videos HR Tech Advisor #SHRM15 Videos
HR Tech Advisor #SHRM15 Videos HR Tech Advisor
 
OLC Handout Digital Tools to Support Literacy Teacher Learning and Collaboration
OLC Handout Digital Tools to Support Literacy Teacher Learning and CollaborationOLC Handout Digital Tools to Support Literacy Teacher Learning and Collaboration
OLC Handout Digital Tools to Support Literacy Teacher Learning and CollaborationAfinitoLiteracy
 

Viewers also liked (20)

Sap ap-user-training-tutorial
Sap ap-user-training-tutorialSap ap-user-training-tutorial
Sap ap-user-training-tutorial
 
I B.Tech (R09) Regular and Supplementary Results May 2012
I B.Tech (R09) Regular and Supplementary Results May 2012I B.Tech (R09) Regular and Supplementary Results May 2012
I B.Tech (R09) Regular and Supplementary Results May 2012
 
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
 
CRISIS MIGRATION: A NEW ROLE TRADE UNION?
CRISIS MIGRATION: A NEW ROLE TRADE UNION? CRISIS MIGRATION: A NEW ROLE TRADE UNION?
CRISIS MIGRATION: A NEW ROLE TRADE UNION?
 
gebiedsdossier Heelsumse Beek en Wolfhezer Beek
gebiedsdossier Heelsumse Beek en Wolfhezer Beekgebiedsdossier Heelsumse Beek en Wolfhezer Beek
gebiedsdossier Heelsumse Beek en Wolfhezer Beek
 
Pat Milliken Ford
Pat Milliken FordPat Milliken Ford
Pat Milliken Ford
 
Computer basic
Computer basicComputer basic
Computer basic
 
Datasheet Fluke 8508A. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 8508A. Hubungi PT. Siwali Swantika 021-45850618Datasheet Fluke 8508A. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 8508A. Hubungi PT. Siwali Swantika 021-45850618
 
2014 template concept
2014 template concept2014 template concept
2014 template concept
 
Cmsd percuma updated
Cmsd percuma updatedCmsd percuma updated
Cmsd percuma updated
 
Datasheet Fluke 572-2. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 572-2. Hubungi PT. Siwali Swantika 021-45850618Datasheet Fluke 572-2. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 572-2. Hubungi PT. Siwali Swantika 021-45850618
 
digitalart2
digitalart2digitalart2
digitalart2
 
IAQF report_Cornell Team
IAQF report_Cornell TeamIAQF report_Cornell Team
IAQF report_Cornell Team
 
VISHAL AGGARWAL Update
VISHAL AGGARWAL UpdateVISHAL AGGARWAL Update
VISHAL AGGARWAL Update
 
網站報告
網站報告網站報告
網站報告
 
Alyssa Elaine Smith Curriculum Vita 2015
Alyssa Elaine Smith Curriculum Vita 2015Alyssa Elaine Smith Curriculum Vita 2015
Alyssa Elaine Smith Curriculum Vita 2015
 
Datasheet Fluke 1750. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 1750. Hubungi PT. Siwali Swantika 021-45850618Datasheet Fluke 1750. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 1750. Hubungi PT. Siwali Swantika 021-45850618
 
網站報告
網站報告網站報告
網站報告
 
HR Tech Advisor #SHRM15 Videos
HR Tech Advisor #SHRM15 Videos HR Tech Advisor #SHRM15 Videos
HR Tech Advisor #SHRM15 Videos
 
OLC Handout Digital Tools to Support Literacy Teacher Learning and Collaboration
OLC Handout Digital Tools to Support Literacy Teacher Learning and CollaborationOLC Handout Digital Tools to Support Literacy Teacher Learning and Collaboration
OLC Handout Digital Tools to Support Literacy Teacher Learning and Collaboration
 

Similar to venkateswarlu Resume

TRAINING REPORT FULL
TRAINING REPORT FULLTRAINING REPORT FULL
TRAINING REPORT FULLanish malan
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway Mohammad Adnan
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship reportrahul waghmare
 
Maintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysMaintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysSwapnil Pawar
 
SANTOSH_NAIK_C.V.RST
SANTOSH_NAIK_C.V.RSTSANTOSH_NAIK_C.V.RST
SANTOSH_NAIK_C.V.RSTSantosh Naik
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailIRJET Journal
 
Indian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory ReportIndian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory ReportSameer Shah
 
IRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted StructureIRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted StructureIRJET Journal
 
Lucknow metro report
Lucknow metro reportLucknow metro report
Lucknow metro reportATUL SHUKLA
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET Journal
 

Similar to venkateswarlu Resume (20)

TRAINING REPORT FULL
TRAINING REPORT FULLTRAINING REPORT FULL
TRAINING REPORT FULL
 
RAILWAY REPORT @ 2019
RAILWAY REPORT @ 2019RAILWAY REPORT @ 2019
RAILWAY REPORT @ 2019
 
Rail Report 2017
Rail Report 2017Rail Report 2017
Rail Report 2017
 
DLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSIDLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSI
 
MAINTENANCE MANAGER
MAINTENANCE MANAGERMAINTENANCE MANAGER
MAINTENANCE MANAGER
 
hk cv update2016
hk cv update2016hk cv update2016
hk cv update2016
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
 
Rajeev Bhargava_Resume'
Rajeev Bhargava_Resume'Rajeev Bhargava_Resume'
Rajeev Bhargava_Resume'
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
 
Maintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysMaintenance and Manufacturing of Railways
Maintenance and Manufacturing of Railways
 
Possess more than 8
Possess more than 8Possess more than 8
Possess more than 8
 
WorkReport
WorkReportWorkReport
WorkReport
 
SANTOSH_NAIK_C.V.RST
SANTOSH_NAIK_C.V.RSTSANTOSH_NAIK_C.V.RST
SANTOSH_NAIK_C.V.RST
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 
Indian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory ReportIndian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory Report
 
sky bus
sky bussky bus
sky bus
 
IRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted StructureIRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted Structure
 
Lucknow metro report
Lucknow metro reportLucknow metro report
Lucknow metro report
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)
 

venkateswarlu Resume

  • 1. CURRICULUM VITAE Venkateswarlu Seelam 101, Susheel apt, Block no. A 454/907, Holy Family school Rd., Lalchakki Chowk, Ulhasnagar -421004. Mobile – 9665958498 Thane Dist. {Mumbai} E-mail:seelamvenkateswarlu1@gmail.com  Education - S.S.C + Diploma in Elec. Eng.  Last Position held - Sr. Section Engineer(EMU)  Name of Zonal Rly. - Central Railway  Experience - Worked in Rolling stock (EMU) in carshed kurla, Central Railway since March 1980 to March 2014  Number of Years of Experience in various activities –  Sept 2014 to till date: Joined as consultant in LOUIS BERGER CONSULTING PVT.LTD in MMRDA MONORAIL PROJECT (SANT GADGE MAHARAJ CHOWK-WADALA DEPOT-CHEMBUR) Mono rail Unique type of Rail service it is alternative to the bus service .The train having tires, Power is fed to the mono rail through the rails installed at the centre of the Beam on both sides keeping air space free .For diverting train from one beam to another beam separate type of beam switches are installed.  Work Assigned:  To keep close watch on maintenance schedules to reduce the failures.  Performance monitoring of services under commercial operation.  Customer care/passenger Convenience items and train service operations.
  • 2.  Monitoring of inspection work.  Witnessing the tests coordination with the Contractor SCOMI.  2012 – March 2014 as a section in charge looking after AC – DC Siemens rakes Pantograph maintenance of M/s Stone India Ltd. and M/s Schunk Metal & Carbon (India) Ltd. Make pantographs.  Work Assigned: In Central Railway OHE conversion works were going on from DC to AC without any interruption of services. While these works were going on lot of PANTOGRAPHS ENTANGLEMENTS took place. Without any inputs of new pantographs all damaged pantographs got repaired and maintained the services. Pantograph pans are fitted with copper strips as wearing material. These strips were wearing fast during monsoon due to lubricant getting washed out while raining. Taken care to get the lubricant applied by arranging the trains in shed during day and night.  2009 to 2011 as a section in charge looking after AC – DC Siemens rakes with air suspension bogies maintenance.  Work Assigned: Central railway received 60 rakes of 12 car coaches from ICF CHENNAI with Siemens IGBT technology and the bogies of AIR SUSPENSION. The Rakes Commissioned and offered for trials by RDSO. Lot of modifications done on stainless steel pressure pipes to avoid failures on account of loss of air pressure during service of these trains. These coaches were side bearer loaded on bolster. These side bearers have given lot of failures due poor strengthening of its walls, all these failures were arrested and advised to designer.  2005to 2008 as a section in charge looking after Elec. & Mechanical works in DC EMUs.  Work Assigned: Section in-charge of inspection shop in which weekly, fortnightly inspections were carried out. Surprise checks were carried out to get the quality work from my staff and supervisors during schedule inspections. I was always maintaining the rakes more reliable and availability for service. I personally taking care of wheels maintenance to not to cause any derailments because of wheels defects.  1998 to 2004 as a senior supervisor looking after Drawbar maintenance and Ultra Sonic testing of axles.  Work Assigned: In Central railway there was a case of axle breakage at outside of wheel disc. Since that incidence EMU rake is offered once in every 6months for Ultrasonic testing of axles. After testing axle boxes old grease sent for laboratory to find out any material contents of bearing in grease. EMU coaches were coupled by ESCORTS semi-permanent couplers
  • 3. to get the formation of 12car formation. These couplers maintenance was taken care to not to give any failures like breakage, uncoupling during service.  1987 to 1997 as a senior supervisor looking after wheel mounted disc brakes maintenance.  Work Assigned: CENTRAL RAILWAY introduced 5 EMU trains fitted with Disc Brakes FIRST PROJECT IN INDIAN RAILWAYS supplied by M/S Brakes India Ltd. Chennai. These trains Trials and commissioning successfully done and maintained to make them reliable in service.  March 1980 to 1987 as a senior supervisor to look after schedule maintenance of EMU rakes on Mumbai Division Central Railway.  Work Assigned: Central Railway Mumbai division suburban services are Life Line of Mumbai. Availability and Reliability of these services is most important factor in Mumbai suburban section. Close monitoring of maintenance activities Electrical and Mechanical side including wheels and braking system made the trains available and reliable in service. Training Undergone – 1. One month programme in Brakes India Ltd. Chennai on wheel mounted Disc brakes. 2. 5 days training programme in Germany and Switzerland. Awards – 1. 1996 won the GM’s award. 2. 2007 won the DRM’s award. Name - Venkateswarlu Seelam Mobile no. - 9665958498 Email ID - seelamvenkateswarlu1@gmail.com Date of Birth - 12/03/1954 Languages Known - English, Hindi, Marathi & Telugu Nationality - Indian
  • 4. I, the undersigned certify that the above information given by me is true to the best of my knowledge. (Venkateswarlu Seelam) Retd. Sr. Section Engineer Dt. 8.8.2015