SlideShare a Scribd company logo
1 of 5
HARI KARAN SINGH
Village +post office Semari kalan
Dist Gonda U.P- pin -271402
MOBILE : +91-9643717971 / 7827375722
E-MAIL: singhharikaran@gmail.com
CAREER OBJECTIVE
• Seeking a responsible and challenging position in a growth oriented progressive organization
that allows me to nurture skills in the field of civil engineering. I want to work with an
organization where I can significantly contribute to the overall success of the organization
and ensure opportunities for my career growth.
• PERSONALPROFILE
• Disciplined, punctual and hardworking,
• High levels of determination & perseverance with effortless problem solving skills.
• Friendly, pro-active and confident with good communication skills.
WORKING EXPERIENCE
• Worked with-Supervisor civil dept in M/S Marshal Engineering Mumbai.( Sep 2001 to
Aug 2005).
• Worked with- Tunnel Foreman civil dept in M/S Patel Engineering Ltd in N.F Railway BG
conversion Tunnel Project; NC Hills Assam (Sep 2005 to Dec 2009).
• Worked With-Foreman Civil dept in M/S Gammon India Ltd in Well-sinking Bridge Cum
Road Project Dibrugarh Assam(Jan 2010 to Aug 2010)
• Worked with-Tunnel Foreman Civil dept in M/S ABCI Infrustructor Pvt-Ltd .BG
coversion NF Railway Tunnel Project NC Hills Assam (Sep 2010 toFeb 2011)
•
Worked with- Sr. Foreman Tunnel Civil Dept in M/S Pratibha group Ltd.
Drinking Water Supply TBM Tunnel Project; Brihan Mumbai Carporation.
(Feb 2011 to May 2012)
. Worked With- Tunnel Officer Civil Dept in M/S FEMC-Pratibha Group Ltd JV.
Kalka Ji Launching Shaft Neharu Place New Delhi DMRC-CC23
(May 2014 to Feb 2015)
• Presently working as a Tunnel Engineer in HCC (Hindustan Construction Co.)-
SAMSUNG Joint Venture- DMRC (Delhi Metro Rail Corporation) for phase III
underground downlink between Dabri-Mor to Dashratpuri underground link using EPB –
TBM (Earth Pressure Balance -Tunnel Boring Machine).
Organization:HCC SAMSUNG JV CC34 PHASE III, NEW
DELHI,
INDIA
Duration : 26st Feb 2015 to Till Date
Designation : Tunnel Engineer (TBM)
Project : TBM. Bored Tunneling works for Delhi Metro Rail Project,
Delhi
Project Description : Project Value: 883 Cr.
Length of Sections: 1.4 km & 1.25 km(stretching from dabri mor
station to palam station via dashratpuri station)
Total Length of TBM Tunnel: 6.9 km
Equipment Detail : TBM -
EPB HERRENKNECHT (S496 &
S495),
EPB TERRATEC (S36 & S37)
ExcavationDiameter - 6610 mm
Finishing Diameter - 5800 mm
Nature of Work / Responsibilities:
• Handling tunnel independently & controlling all tunnel activity.
• Select key position according to TBM alignment.
• To ensure proper functioning of TBM by operator.
• Optimal utilization of materials and man power at site.
• Client handling and preparing DPR, MPR ,Material Requisition related to tunnel

Achievements:
Successful breakthrough of 2 tunnel , one having 1000 rings and the ot with 882 rings.
Receiveda shield on the behalf of HSJV in regards to the completion of tunneling between
Janakpuri and Palam
Cross Passage:
Construction of 16 cross-passages in a stretch of tunnels between Vikashpuri station to
palam station(13 cross passages of 9.9 metre and 3 cross passages of length 26.6m,16.6m and
14.8m respectively).
Nature of Work / Responsiblities :
• Handling cross passage independently & controlling all peripheral activity
• Optimize utilization of materials and manpower at site.
• Ensuring proper erection of temporary support frame
• Ensuring proper and safe excavation, ,proper alignment of lattice girder ,wire
mesh followed by proper shotcreting for the same.
• Ensuring proper reinforcement fixing and concreting for the collar junction ,overt
lining and invert lining.
• Ensuring proper erection of steel lintel and jamb for the cross passage doorway.
• Ensuring proper coordination with the surveyors.
• Ensuring grouting and fore-polling with (outer ring cutting machine) for varying
soil strata and in necessary situation.
• Client handling and preparing, checklists, DPR, MPR and Checklists.
ACHIEVEMENTS:
Completion of 15 cross-passages till date
Working on cross-passage with the length of 26.6 metres in the tunnel
between Vikas puri station and Palam station.
ACADEMIC CHRONICLE:
Degree University/Board Institute Year Of
Completion
Percentage
/CGPA
Grade
(Diploma in Civil
Engineering)
I A S E
University,
Rajasthan India
I A S E
University
Civil
Engineering
Department
•
• 2015
71.9% First Class
Graduation(B.A)
Awadh university
Faiza bad u.p india
Nandini
nagar
mahavidyalay
nabab ganj
Gonda(u.p)
India
2011
PERSONAL INFORMATION
Date Of Birth 15 th April 1980
Nationality Indian (Hindu)
Marital Status married
Languages Known English, Hindi,
Passort Details Passport no-G2059088; Place of Issue-
Lucknow,Date of Issue-28-3-
2007;Date of Ixpiry-27-3-2017
DECLARATION:
I hereby declare that all the above information’s are true and correct to the best of my
knowledge.
Date :
Place : NEW DELHI NAME : Hari Karan Singh

More Related Content

Viewers also liked

Introduction to Natural Language Processing
Introduction to Natural Language ProcessingIntroduction to Natural Language Processing
Introduction to Natural Language ProcessingDaniel Acheson
 
Evaluating eParticipation sophistication of Regional Authorities websites: Th...
Evaluating eParticipation sophistication of Regional Authorities websites: Th...Evaluating eParticipation sophistication of Regional Authorities websites: Th...
Evaluating eParticipation sophistication of Regional Authorities websites: Th...Efthimios Tambouris
 
การขยายตัวของธุรกิจหอพักและผลกระทบที่มีต่อชุมชนบริเวณใกล้เคียง
การขยายตัวของธุรกิจหอพักและผลกระทบที่มีต่อชุมชนบริเวณใกล้เคียงการขยายตัวของธุรกิจหอพักและผลกระทบที่มีต่อชุมชนบริเวณใกล้เคียง
การขยายตัวของธุรกิจหอพักและผลกระทบที่มีต่อชุมชนบริเวณใกล้เคียงPichamon Sudecha
 
plncn ddctc rgmntd
plncn ddctc rgmntdplncn ddctc rgmntd
plncn ddctc rgmntddiplocaldoc
 
Jefferies 5.11.16 v final pdf
Jefferies 5.11.16 v final pdfJefferies 5.11.16 v final pdf
Jefferies 5.11.16 v final pdfInstructure
 
Mejor guia de Regalos Modaclub 2016
Mejor guia de Regalos Modaclub 2016Mejor guia de Regalos Modaclub 2016
Mejor guia de Regalos Modaclub 2016Ph Multimarcas
 
Luís de góngora
Luís de góngoraLuís de góngora
Luís de góngoraSéneca
 

Viewers also liked (11)

NAI_visualspec
NAI_visualspecNAI_visualspec
NAI_visualspec
 
Cómo ser un jedi developer
Cómo ser un jedi developerCómo ser un jedi developer
Cómo ser un jedi developer
 
Introduction to Natural Language Processing
Introduction to Natural Language ProcessingIntroduction to Natural Language Processing
Introduction to Natural Language Processing
 
Phrasal verbs
Phrasal verbsPhrasal verbs
Phrasal verbs
 
Evaluating eParticipation sophistication of Regional Authorities websites: Th...
Evaluating eParticipation sophistication of Regional Authorities websites: Th...Evaluating eParticipation sophistication of Regional Authorities websites: Th...
Evaluating eParticipation sophistication of Regional Authorities websites: Th...
 
การขยายตัวของธุรกิจหอพักและผลกระทบที่มีต่อชุมชนบริเวณใกล้เคียง
การขยายตัวของธุรกิจหอพักและผลกระทบที่มีต่อชุมชนบริเวณใกล้เคียงการขยายตัวของธุรกิจหอพักและผลกระทบที่มีต่อชุมชนบริเวณใกล้เคียง
การขยายตัวของธุรกิจหอพักและผลกระทบที่มีต่อชุมชนบริเวณใกล้เคียง
 
plncn ddctc rgmntd
plncn ddctc rgmntdplncn ddctc rgmntd
plncn ddctc rgmntd
 
Internet y derechos fundamentales
Internet y derechos fundamentalesInternet y derechos fundamentales
Internet y derechos fundamentales
 
Jefferies 5.11.16 v final pdf
Jefferies 5.11.16 v final pdfJefferies 5.11.16 v final pdf
Jefferies 5.11.16 v final pdf
 
Mejor guia de Regalos Modaclub 2016
Mejor guia de Regalos Modaclub 2016Mejor guia de Regalos Modaclub 2016
Mejor guia de Regalos Modaclub 2016
 
Luís de góngora
Luís de góngoraLuís de góngora
Luís de góngora
 

Similar to hk cv update2016

NEW CV AMIT NIRWAN
NEW CV AMIT NIRWANNEW CV AMIT NIRWAN
NEW CV AMIT NIRWAN0064 nirwan
 
cv asif shah
cv asif shahcv asif shah
cv asif shahasif shah
 
Industrial Training Report1
Industrial Training Report1Industrial Training Report1
Industrial Training Report1Er Naveen Kumar
 
SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16Santanu Datta
 
Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Chandan Singh
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
final resume Rakesh kumar
final resume Rakesh kumarfinal resume Rakesh kumar
final resume Rakesh kumarrakesh kumar
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer ResumeRavi Kumar
 

Similar to hk cv update2016 (20)

Tirlok
TirlokTirlok
Tirlok
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
resume frfcf murgi
resume frfcf murgiresume frfcf murgi
resume frfcf murgi
 
Cv Thenappan
Cv ThenappanCv Thenappan
Cv Thenappan
 
NEW CV AMIT NIRWAN
NEW CV AMIT NIRWANNEW CV AMIT NIRWAN
NEW CV AMIT NIRWAN
 
659193
659193659193
659193
 
kkbiodata 1.6.15
kkbiodata 1.6.15kkbiodata 1.6.15
kkbiodata 1.6.15
 
cv asif shah
cv asif shahcv asif shah
cv asif shah
 
Industrial Training Report1
Industrial Training Report1Industrial Training Report1
Industrial Training Report1
 
CSM_Profile
CSM_ProfileCSM_Profile
CSM_Profile
 
SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16
 
Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15
 
Khizer CV 2016
Khizer CV 2016Khizer CV 2016
Khizer CV 2016
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
RESUME New
RESUME NewRESUME New
RESUME New
 
final resume Rakesh kumar
final resume Rakesh kumarfinal resume Rakesh kumar
final resume Rakesh kumar
 
Resume
ResumeResume
Resume
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer Resume
 

hk cv update2016

  • 1. HARI KARAN SINGH Village +post office Semari kalan Dist Gonda U.P- pin -271402 MOBILE : +91-9643717971 / 7827375722 E-MAIL: singhharikaran@gmail.com CAREER OBJECTIVE • Seeking a responsible and challenging position in a growth oriented progressive organization that allows me to nurture skills in the field of civil engineering. I want to work with an organization where I can significantly contribute to the overall success of the organization and ensure opportunities for my career growth. • PERSONALPROFILE • Disciplined, punctual and hardworking, • High levels of determination & perseverance with effortless problem solving skills. • Friendly, pro-active and confident with good communication skills. WORKING EXPERIENCE • Worked with-Supervisor civil dept in M/S Marshal Engineering Mumbai.( Sep 2001 to Aug 2005). • Worked with- Tunnel Foreman civil dept in M/S Patel Engineering Ltd in N.F Railway BG conversion Tunnel Project; NC Hills Assam (Sep 2005 to Dec 2009). • Worked With-Foreman Civil dept in M/S Gammon India Ltd in Well-sinking Bridge Cum Road Project Dibrugarh Assam(Jan 2010 to Aug 2010) • Worked with-Tunnel Foreman Civil dept in M/S ABCI Infrustructor Pvt-Ltd .BG coversion NF Railway Tunnel Project NC Hills Assam (Sep 2010 toFeb 2011)
  • 2. • Worked with- Sr. Foreman Tunnel Civil Dept in M/S Pratibha group Ltd. Drinking Water Supply TBM Tunnel Project; Brihan Mumbai Carporation. (Feb 2011 to May 2012) . Worked With- Tunnel Officer Civil Dept in M/S FEMC-Pratibha Group Ltd JV. Kalka Ji Launching Shaft Neharu Place New Delhi DMRC-CC23 (May 2014 to Feb 2015) • Presently working as a Tunnel Engineer in HCC (Hindustan Construction Co.)- SAMSUNG Joint Venture- DMRC (Delhi Metro Rail Corporation) for phase III underground downlink between Dabri-Mor to Dashratpuri underground link using EPB – TBM (Earth Pressure Balance -Tunnel Boring Machine). Organization:HCC SAMSUNG JV CC34 PHASE III, NEW DELHI, INDIA Duration : 26st Feb 2015 to Till Date Designation : Tunnel Engineer (TBM) Project : TBM. Bored Tunneling works for Delhi Metro Rail Project, Delhi Project Description : Project Value: 883 Cr. Length of Sections: 1.4 km & 1.25 km(stretching from dabri mor station to palam station via dashratpuri station) Total Length of TBM Tunnel: 6.9 km Equipment Detail : TBM - EPB HERRENKNECHT (S496 & S495), EPB TERRATEC (S36 & S37) ExcavationDiameter - 6610 mm Finishing Diameter - 5800 mm Nature of Work / Responsibilities: • Handling tunnel independently & controlling all tunnel activity.
  • 3. • Select key position according to TBM alignment. • To ensure proper functioning of TBM by operator. • Optimal utilization of materials and man power at site. • Client handling and preparing DPR, MPR ,Material Requisition related to tunnel  Achievements: Successful breakthrough of 2 tunnel , one having 1000 rings and the ot with 882 rings. Receiveda shield on the behalf of HSJV in regards to the completion of tunneling between Janakpuri and Palam Cross Passage: Construction of 16 cross-passages in a stretch of tunnels between Vikashpuri station to palam station(13 cross passages of 9.9 metre and 3 cross passages of length 26.6m,16.6m and 14.8m respectively). Nature of Work / Responsiblities : • Handling cross passage independently & controlling all peripheral activity • Optimize utilization of materials and manpower at site. • Ensuring proper erection of temporary support frame • Ensuring proper and safe excavation, ,proper alignment of lattice girder ,wire mesh followed by proper shotcreting for the same. • Ensuring proper reinforcement fixing and concreting for the collar junction ,overt lining and invert lining. • Ensuring proper erection of steel lintel and jamb for the cross passage doorway. • Ensuring proper coordination with the surveyors. • Ensuring grouting and fore-polling with (outer ring cutting machine) for varying soil strata and in necessary situation. • Client handling and preparing, checklists, DPR, MPR and Checklists. ACHIEVEMENTS: Completion of 15 cross-passages till date Working on cross-passage with the length of 26.6 metres in the tunnel between Vikas puri station and Palam station.
  • 4. ACADEMIC CHRONICLE: Degree University/Board Institute Year Of Completion Percentage /CGPA Grade (Diploma in Civil Engineering) I A S E University, Rajasthan India I A S E University Civil Engineering Department • • 2015 71.9% First Class Graduation(B.A) Awadh university Faiza bad u.p india Nandini nagar mahavidyalay nabab ganj Gonda(u.p) India 2011 PERSONAL INFORMATION Date Of Birth 15 th April 1980 Nationality Indian (Hindu) Marital Status married Languages Known English, Hindi, Passort Details Passport no-G2059088; Place of Issue- Lucknow,Date of Issue-28-3- 2007;Date of Ixpiry-27-3-2017
  • 5. DECLARATION: I hereby declare that all the above information’s are true and correct to the best of my knowledge. Date : Place : NEW DELHI NAME : Hari Karan Singh