SlideShare a Scribd company logo
1 of 13
Download to read offline
sid 1 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
Stockholm, 12.02.2010 (2016)
TomaszNajder (Ph.D Civ. Eng.) - Part5
Personalia Date of birth: 1951-08-30
Address: Movägen 3, SE-133 36 Saltsjöbaden (Sweden)
Tel: 0046 (8) 717 57 14, fax: 0046 (8) 717 60 42, mobile: 0046 (0)704 217 012
E-mail: tomasz.najder@hotmail.com
Legal status: married, 2 children (adults).
Experience
Since 07/2005 Najder Engineering®
Stockholm
Senior Consultantwithin family company.
Activities as Senior Consultant for ISAM KABBANI & PARTNERS FOR CONSTRUCTION AND
MAINTENANCE
12/2008 –11/2009 for the project: UNDERPASS REPAIRS AT INTESECTION OF KING FAHD ROAD AND
PRINCE MOHAMMED BIN FAHD ROAD – DAMMAM (Saudi Arabia)
Client: KINGDOM OF SAUDI ARABIA – MINISTRY OF MUNICIPAL AND RURAL AFFAIRS,
MUNICIPALITY OF DAMAM – DEVELOPMENT AND PROJECTS DIRECTORATE
Tunnel Prime Contractor for concrete repairs: SINOPEC INTERNATIONAL PETROLEUM SERVICE
CORPORATION (China)
Tunnel Sub-contractor for concrete repairs (grouting): ISAM KABBANI & PARTNERS FOR
CONSTRUCTION AND MAINTENANCE (Jeddah – Saudi Arabia)
Work programme:
- The tunnel (underpass) repairs, commenced in April 2009, finished in February 2010.
Scope of work according to:
THE SUB-CONTRACT AGREEMENT
BETWEEN
SINOPEC INTERNATIONAL PETROLEUM SERVICE CORPORATION
(SAUDI BRANCH)
AND
ISAM KABBANI & PARTNERS FOR CONSTRUCTION AND MAINTENANCE
IN REGARDS TO
IMPROVEMENT OF INTERSECTION ALONG KING FAHED DAMMAM ROAD INTERSECTION
sid 2 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
“The Works to be carried out under this Subcontract shall include the following as stated in the Project Specification
(as per enclosed Annexure I), Project Drawings (as per enclosed Annexure II), Bill of Quantities (as per enclosed
Annexure III), and latest version of Sub-Contractor’s technical proposal as submitted to the Contractor and
Consultant, considered complimentary to each other.
1.1. Preparation and submittal of all technical documents describing the Works which include but are not
limited to detailed shop drawings, material technical data sheets, method statements.
1.2. Preparation of a structural inspection plan for the evaluation of the main structure frame of the Underpass.
Inspection shall concern top surface of bottom foundation slab and cold joints between original floor slab
and vertical walls.
1.3. Execution of all inspection works as described in inspection plan.
1.4. Preparation and submittal of inspection findings report and recommendation for further inspection
techniques if needed.
Additional assessment services not included in initial plan shall be considered as supplementary works not
covered by this Sub-Contract and shall require approval from all parties (Contractor, Consultant and
Owner) upon Sub-Contractor’s commercial and technical submittal.
Execution of repair works and remedial waterproofing shall begin after the submittal of inspection findings,
final review of technical details and revised material selection (if revision is needed).
1.5. Execution of repair works and treatment for all expansion joints in walls and raft through:
1.5.1. Injecting curtain grouting material as needed, treating possible anomalies and temporarily stop water
leakage.
1.5.2. Building up a permanent system for treatment of water leakage along with all required accessories
(i.e. sealing tape).
1.5.3. Preparation of expansion joints of walls is not included and is to be carried out by the Contractor
whereby joints must be opened over entire length and cleared of all foreign materials and debris until
a minimum depth of 20-30 cm.
Edges are also to be cleaned by the Contractor by use of high pressure water jet.
1.6. Execution of crack repair works through walls, tie rod holes and at top surface of existing bottom
foundation slab as follows:
1.6.1. All leaking/active cracks shall be injected with appropriate material according to the level of moisture
and crack parameters.
1.6.2. All non-leaking/inactive cracks shall be prepared and filled with plugging cementitious material.
1.6.3. Insertion of vapor phase inhibitor material through walls in order to protect reinforcement bars from
excessive corrosion.
1.7. Treatment of leaks at bottom longitudinal construction joints by installing water bars and post-injection
sealing system.
1.8. Submittal of recommended waterproofing admixture ratios for mix composition for 1 M3
(one cubic meter)
of fresh compacted concrete for Consultant’s approval.
1.9. Supply, place and supervision of waterproofing admixture in new mass concrete at approved rate currently
estimated at 7Kg/M3
for 350Kg of cement per M3
.
Application of envelope system whereby 63% of total concrete mass shall contain aforementioned
admixture ensuring slab protection from all directions and water-tightness.
sid 3 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
1.10. Preparation and waterproofing treatment of floor and wall surfaces through application of cementitious
slurry coating.
1.11. Design, engineering, supply, installation and initialization of a long term monitoring system to be used by
Owner for observing overall structural behavior of the Underpass and detecting any anomalies or failures
for duration no less than two years and not exceeding five years.
Initialization of system and training of Owner’s staffs on system operation.
Providing Owner with continuous technical support during lifetime of system.
Part of aforementioned system shall be installed at the beginning of the Works in order to monitor the
structural behavior of the Underpass during the project”.
Grouting activities:
The short list of grouting activities for repairs:
1. Sealing of transverse expansion joints in the bottom slab.
2. Filling of cavities under the bottom slab in combination with point 1 (optionally).
3. Sealing of construction joints (horizontal and vertical) in the bottom slab.
4. Sealing of expansion joints in the cantilever walls.
5. Sealing of construction joints between new bottom (top) slab and cantilever walls and leaking horizontal
construction joints within cantilever walls.
6. Sealing of vertical cracks in the lower bottom slab and in cantilever walls.
7. Re-grouting of injection hoses (optionally – as completion to points 1, 3, 4, and 5).
sid 4 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
Method Statement - grouting of construction joints:
- This Method Statement concerned the choice of grouting method and materials for grouting to eliminate the water
leakages in the construction joints within concrete bottom slab and cantilever walls.
Method Statement – grouting of expansion joints:
- This Method Statement concerned the choice of grouting method and materials for grouting to eliminate the water
leakages in the expansion joints within concrete bottom slab and cantilever walls.
Method Statement - grouting for sealing cracks:
- This Method Statement concerned the choice of grouting method and materials for grouting to eliminate the water
leakages in the cracks of concrete bottom slab and cantilever walls.
Method Statement - grouting for soil improvement by undersealing:
- This Method Statement concerned the choice of grouting methods and materials for undersealing grouting (grouting
in the soil to increase Relative Density (Dr) (%) in the silty-sandy layer just under the reinforced concrete slab).
sid 5 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
Description of the project:
General cross section
sid 6 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
Measurement and Warning System proposed
Location of piezometers proposed
sid 7 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
Drilling for expansion joints proposed
sid 8 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
Position of swelling bars proposed
sid 9 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
Pictures from the site:
sid 10 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
sid 11 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
sid 12 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
sid 13 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
References:
1. Wassim A. Mahfouz, Product Development Manager,
KABBANI CONSTRUCTION GROUP – Product Development Manager
Tel: 0 +966 (2) 627 8450 (Saudi Arabia)
2. Chadi Y. Said, Bridge Managment System Senior Engineer,
KABBANI CONSTRUCTION GROUP – Infrastructure Managment Solution
Tel: 0 +966 (2) 627 8181 (Saudi Arabia)
3. Tariq A. Klahaf, Bridge Sales & Marketing Manager,
KABBANI CONSTRUCTION GROUP – Industrial Insulation & Cladding Services
Tel: 0 +966 (2) 857 0034 (Saudi Arabia)
Ph.D Civ. Eng. Tomasz Najder

More Related Content

Viewers also liked

Fighting In Bed Coopetition In The Life Sciences Industry
Fighting In Bed   Coopetition In The Life Sciences IndustryFighting In Bed   Coopetition In The Life Sciences Industry
Fighting In Bed Coopetition In The Life Sciences IndustryJeff Livingstone
 
Resume vikas kamboj
Resume vikas kambojResume vikas kamboj
Resume vikas kambojvikas kamboj
 
Common Challenges & Best Practices for TDD on iOS
Common Challenges & Best Practices for TDD on iOSCommon Challenges & Best Practices for TDD on iOS
Common Challenges & Best Practices for TDD on iOSDerek Lee Boire
 
Mi trabajo en la web 2.0
Mi trabajo en la web 2.0Mi trabajo en la web 2.0
Mi trabajo en la web 2.0Marian Calvo
 
Laser & its applications
Laser & its applicationsLaser & its applications
Laser & its applicationsTaral Soliya
 
Nine tests of organisation design
Nine tests of organisation designNine tests of organisation design
Nine tests of organisation designNirvik Mitter
 
Presentation on taal volcano preparedness activities
Presentation on taal volcano preparedness activitiesPresentation on taal volcano preparedness activities
Presentation on taal volcano preparedness activitiesTanggol Kalikasan
 

Viewers also liked (11)

Fighting In Bed Coopetition In The Life Sciences Industry
Fighting In Bed   Coopetition In The Life Sciences IndustryFighting In Bed   Coopetition In The Life Sciences Industry
Fighting In Bed Coopetition In The Life Sciences Industry
 
Resume vikas kamboj
Resume vikas kambojResume vikas kamboj
Resume vikas kamboj
 
Libros gigantes
Libros gigantesLibros gigantes
Libros gigantes
 
Cinco ejercicios sobre el Renacimiento
Cinco ejercicios sobre el RenacimientoCinco ejercicios sobre el Renacimiento
Cinco ejercicios sobre el Renacimiento
 
BLDC Motors
BLDC MotorsBLDC Motors
BLDC Motors
 
Common Challenges & Best Practices for TDD on iOS
Common Challenges & Best Practices for TDD on iOSCommon Challenges & Best Practices for TDD on iOS
Common Challenges & Best Practices for TDD on iOS
 
Mi trabajo en la web 2.0
Mi trabajo en la web 2.0Mi trabajo en la web 2.0
Mi trabajo en la web 2.0
 
Laser & its applications
Laser & its applicationsLaser & its applications
Laser & its applications
 
Nine tests of organisation design
Nine tests of organisation designNine tests of organisation design
Nine tests of organisation design
 
Presentation on taal volcano preparedness activities
Presentation on taal volcano preparedness activitiesPresentation on taal volcano preparedness activities
Presentation on taal volcano preparedness activities
 
FACTORS AFFECTING CAPITAL STRUCTURE
FACTORS AFFECTING CAPITAL STRUCTUREFACTORS AFFECTING CAPITAL STRUCTURE
FACTORS AFFECTING CAPITAL STRUCTURE
 

Similar to CV Tomasz Najder Part 5 2010.02.12 2016

CV Tomasz Najder Part 1 2009.09.15 2016
CV Tomasz Najder Part 1 2009.09.15 2016CV Tomasz Najder Part 1 2009.09.15 2016
CV Tomasz Najder Part 1 2009.09.15 2016Tomasz Najder
 
CV Gallery rev. 2013.04.30 compr.
CV Gallery rev. 2013.04.30 compr.CV Gallery rev. 2013.04.30 compr.
CV Gallery rev. 2013.04.30 compr.Tomasz Najder
 
Ppt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SitePpt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SiteAlok Mishra
 
Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion jointakash yadav
 
Technical data sheet alta
Technical data sheet altaTechnical data sheet alta
Technical data sheet altaGiulio Zanelli
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015Ahmed Yehia
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCCRakshita Raghunath
 
Updated CV-Issam
Updated CV-IssamUpdated CV-Issam
Updated CV-Issamissam agha
 
CV Pete Mcelwee 2016
CV Pete Mcelwee 2016CV Pete Mcelwee 2016
CV Pete Mcelwee 2016peter mcelwee
 
Cv english bartilotti-16-01-2017
Cv english bartilotti-16-01-2017Cv english bartilotti-16-01-2017
Cv english bartilotti-16-01-2017Manuel Bartilotti
 

Similar to CV Tomasz Najder Part 5 2010.02.12 2016 (20)

CV Tomasz Najder Part 1 2009.09.15 2016
CV Tomasz Najder Part 1 2009.09.15 2016CV Tomasz Najder Part 1 2009.09.15 2016
CV Tomasz Najder Part 1 2009.09.15 2016
 
CV Gallery rev. 2013.04.30 compr.
CV Gallery rev. 2013.04.30 compr.CV Gallery rev. 2013.04.30 compr.
CV Gallery rev. 2013.04.30 compr.
 
Ppt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SitePpt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction Site
 
Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion joint
 
Husam CV updated (1)
Husam CV updated (1)Husam CV updated (1)
Husam CV updated (1)
 
Technical data sheet alta
Technical data sheet altaTechnical data sheet alta
Technical data sheet alta
 
VGCE Profile Jan 2016
VGCE Profile Jan 2016VGCE Profile Jan 2016
VGCE Profile Jan 2016
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
 
Jacobus ref, letter
Jacobus ref, letterJacobus ref, letter
Jacobus ref, letter
 
Tin's cv
Tin's cvTin's cv
Tin's cv
 
Grrenhouse rumania
Grrenhouse rumaniaGrrenhouse rumania
Grrenhouse rumania
 
Updated CV-Issam
Updated CV-IssamUpdated CV-Issam
Updated CV-Issam
 
CV Pete Mcelwee 2016
CV Pete Mcelwee 2016CV Pete Mcelwee 2016
CV Pete Mcelwee 2016
 
Tes p-122.08-r0
Tes p-122.08-r0Tes p-122.08-r0
Tes p-122.08-r0
 
Cv english bartilotti-16-01-2017
Cv english bartilotti-16-01-2017Cv english bartilotti-16-01-2017
Cv english bartilotti-16-01-2017
 
Anese brochure
Anese brochure Anese brochure
Anese brochure
 
Cv ad-gb-97
Cv ad-gb-97Cv ad-gb-97
Cv ad-gb-97
 
WebCruiter
WebCruiterWebCruiter
WebCruiter
 

More from Tomasz Najder

ö New Orleans 2012 draft paper 2011.01.27
ö New Orleans 2012 draft paper 2011.01.27ö New Orleans 2012 draft paper 2011.01.27
ö New Orleans 2012 draft paper 2011.01.27Tomasz Najder
 
Paper Aachen- Najder engineering 2008.04.17
Paper Aachen- Najder engineering 2008.04.17Paper Aachen- Najder engineering 2008.04.17
Paper Aachen- Najder engineering 2008.04.17Tomasz Najder
 
öö Contribution to loading test procedure of ground anchors
öö Contribution to loading test procedure of ground anchorsöö Contribution to loading test procedure of ground anchors
öö Contribution to loading test procedure of ground anchorsTomasz Najder
 
Najder Engineering AB T-bana repairs 2016.03.22 compr.
Najder Engineering AB T-bana repairs 2016.03.22 compr.Najder Engineering AB T-bana repairs 2016.03.22 compr.
Najder Engineering AB T-bana repairs 2016.03.22 compr.Tomasz Najder
 
0 SWECO PP-TNa Report Grouting TH3
0 SWECO PP-TNa Report Grouting TH30 SWECO PP-TNa Report Grouting TH3
0 SWECO PP-TNa Report Grouting TH3Tomasz Najder
 
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)Tomasz Najder
 
0 Iceland - pictures from the tunnels 2010.01.09
0 Iceland - pictures from the tunnels 2010.01.090 Iceland - pictures from the tunnels 2010.01.09
0 Iceland - pictures from the tunnels 2010.01.09Tomasz Najder
 
Iceland Hedinsfjordur Tunnel 2010 page 22
Iceland Hedinsfjordur Tunnel 2010 page 22Iceland Hedinsfjordur Tunnel 2010 page 22
Iceland Hedinsfjordur Tunnel 2010 page 22Tomasz Najder
 
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the rightTomasz Najder
 
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide showTomasz Najder
 
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide show0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide showTomasz Najder
 

More from Tomasz Najder (12)

ö New Orleans 2012 draft paper 2011.01.27
ö New Orleans 2012 draft paper 2011.01.27ö New Orleans 2012 draft paper 2011.01.27
ö New Orleans 2012 draft paper 2011.01.27
 
Paper Aachen- Najder engineering 2008.04.17
Paper Aachen- Najder engineering 2008.04.17Paper Aachen- Najder engineering 2008.04.17
Paper Aachen- Najder engineering 2008.04.17
 
öö Contribution to loading test procedure of ground anchors
öö Contribution to loading test procedure of ground anchorsöö Contribution to loading test procedure of ground anchors
öö Contribution to loading test procedure of ground anchors
 
Najder Engineering AB T-bana repairs 2016.03.22 compr.
Najder Engineering AB T-bana repairs 2016.03.22 compr.Najder Engineering AB T-bana repairs 2016.03.22 compr.
Najder Engineering AB T-bana repairs 2016.03.22 compr.
 
TNa diplomas
TNa diplomasTNa diplomas
TNa diplomas
 
0 SWECO PP-TNa Report Grouting TH3
0 SWECO PP-TNa Report Grouting TH30 SWECO PP-TNa Report Grouting TH3
0 SWECO PP-TNa Report Grouting TH3
 
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)
 
0 Iceland - pictures from the tunnels 2010.01.09
0 Iceland - pictures from the tunnels 2010.01.090 Iceland - pictures from the tunnels 2010.01.09
0 Iceland - pictures from the tunnels 2010.01.09
 
Iceland Hedinsfjordur Tunnel 2010 page 22
Iceland Hedinsfjordur Tunnel 2010 page 22Iceland Hedinsfjordur Tunnel 2010 page 22
Iceland Hedinsfjordur Tunnel 2010 page 22
 
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right
 
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
 
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide show0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide show
 

CV Tomasz Najder Part 5 2010.02.12 2016

  • 1. sid 1 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/ Stockholm, 12.02.2010 (2016) TomaszNajder (Ph.D Civ. Eng.) - Part5 Personalia Date of birth: 1951-08-30 Address: Movägen 3, SE-133 36 Saltsjöbaden (Sweden) Tel: 0046 (8) 717 57 14, fax: 0046 (8) 717 60 42, mobile: 0046 (0)704 217 012 E-mail: tomasz.najder@hotmail.com Legal status: married, 2 children (adults). Experience Since 07/2005 Najder Engineering® Stockholm Senior Consultantwithin family company. Activities as Senior Consultant for ISAM KABBANI & PARTNERS FOR CONSTRUCTION AND MAINTENANCE 12/2008 –11/2009 for the project: UNDERPASS REPAIRS AT INTESECTION OF KING FAHD ROAD AND PRINCE MOHAMMED BIN FAHD ROAD – DAMMAM (Saudi Arabia) Client: KINGDOM OF SAUDI ARABIA – MINISTRY OF MUNICIPAL AND RURAL AFFAIRS, MUNICIPALITY OF DAMAM – DEVELOPMENT AND PROJECTS DIRECTORATE Tunnel Prime Contractor for concrete repairs: SINOPEC INTERNATIONAL PETROLEUM SERVICE CORPORATION (China) Tunnel Sub-contractor for concrete repairs (grouting): ISAM KABBANI & PARTNERS FOR CONSTRUCTION AND MAINTENANCE (Jeddah – Saudi Arabia) Work programme: - The tunnel (underpass) repairs, commenced in April 2009, finished in February 2010. Scope of work according to: THE SUB-CONTRACT AGREEMENT BETWEEN SINOPEC INTERNATIONAL PETROLEUM SERVICE CORPORATION (SAUDI BRANCH) AND ISAM KABBANI & PARTNERS FOR CONSTRUCTION AND MAINTENANCE IN REGARDS TO IMPROVEMENT OF INTERSECTION ALONG KING FAHED DAMMAM ROAD INTERSECTION
  • 2. sid 2 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/ “The Works to be carried out under this Subcontract shall include the following as stated in the Project Specification (as per enclosed Annexure I), Project Drawings (as per enclosed Annexure II), Bill of Quantities (as per enclosed Annexure III), and latest version of Sub-Contractor’s technical proposal as submitted to the Contractor and Consultant, considered complimentary to each other. 1.1. Preparation and submittal of all technical documents describing the Works which include but are not limited to detailed shop drawings, material technical data sheets, method statements. 1.2. Preparation of a structural inspection plan for the evaluation of the main structure frame of the Underpass. Inspection shall concern top surface of bottom foundation slab and cold joints between original floor slab and vertical walls. 1.3. Execution of all inspection works as described in inspection plan. 1.4. Preparation and submittal of inspection findings report and recommendation for further inspection techniques if needed. Additional assessment services not included in initial plan shall be considered as supplementary works not covered by this Sub-Contract and shall require approval from all parties (Contractor, Consultant and Owner) upon Sub-Contractor’s commercial and technical submittal. Execution of repair works and remedial waterproofing shall begin after the submittal of inspection findings, final review of technical details and revised material selection (if revision is needed). 1.5. Execution of repair works and treatment for all expansion joints in walls and raft through: 1.5.1. Injecting curtain grouting material as needed, treating possible anomalies and temporarily stop water leakage. 1.5.2. Building up a permanent system for treatment of water leakage along with all required accessories (i.e. sealing tape). 1.5.3. Preparation of expansion joints of walls is not included and is to be carried out by the Contractor whereby joints must be opened over entire length and cleared of all foreign materials and debris until a minimum depth of 20-30 cm. Edges are also to be cleaned by the Contractor by use of high pressure water jet. 1.6. Execution of crack repair works through walls, tie rod holes and at top surface of existing bottom foundation slab as follows: 1.6.1. All leaking/active cracks shall be injected with appropriate material according to the level of moisture and crack parameters. 1.6.2. All non-leaking/inactive cracks shall be prepared and filled with plugging cementitious material. 1.6.3. Insertion of vapor phase inhibitor material through walls in order to protect reinforcement bars from excessive corrosion. 1.7. Treatment of leaks at bottom longitudinal construction joints by installing water bars and post-injection sealing system. 1.8. Submittal of recommended waterproofing admixture ratios for mix composition for 1 M3 (one cubic meter) of fresh compacted concrete for Consultant’s approval. 1.9. Supply, place and supervision of waterproofing admixture in new mass concrete at approved rate currently estimated at 7Kg/M3 for 350Kg of cement per M3 . Application of envelope system whereby 63% of total concrete mass shall contain aforementioned admixture ensuring slab protection from all directions and water-tightness.
  • 3. sid 3 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/ 1.10. Preparation and waterproofing treatment of floor and wall surfaces through application of cementitious slurry coating. 1.11. Design, engineering, supply, installation and initialization of a long term monitoring system to be used by Owner for observing overall structural behavior of the Underpass and detecting any anomalies or failures for duration no less than two years and not exceeding five years. Initialization of system and training of Owner’s staffs on system operation. Providing Owner with continuous technical support during lifetime of system. Part of aforementioned system shall be installed at the beginning of the Works in order to monitor the structural behavior of the Underpass during the project”. Grouting activities: The short list of grouting activities for repairs: 1. Sealing of transverse expansion joints in the bottom slab. 2. Filling of cavities under the bottom slab in combination with point 1 (optionally). 3. Sealing of construction joints (horizontal and vertical) in the bottom slab. 4. Sealing of expansion joints in the cantilever walls. 5. Sealing of construction joints between new bottom (top) slab and cantilever walls and leaking horizontal construction joints within cantilever walls. 6. Sealing of vertical cracks in the lower bottom slab and in cantilever walls. 7. Re-grouting of injection hoses (optionally – as completion to points 1, 3, 4, and 5).
  • 4. sid 4 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/ Method Statement - grouting of construction joints: - This Method Statement concerned the choice of grouting method and materials for grouting to eliminate the water leakages in the construction joints within concrete bottom slab and cantilever walls. Method Statement – grouting of expansion joints: - This Method Statement concerned the choice of grouting method and materials for grouting to eliminate the water leakages in the expansion joints within concrete bottom slab and cantilever walls. Method Statement - grouting for sealing cracks: - This Method Statement concerned the choice of grouting method and materials for grouting to eliminate the water leakages in the cracks of concrete bottom slab and cantilever walls. Method Statement - grouting for soil improvement by undersealing: - This Method Statement concerned the choice of grouting methods and materials for undersealing grouting (grouting in the soil to increase Relative Density (Dr) (%) in the silty-sandy layer just under the reinforced concrete slab).
  • 5. sid 5 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/ Description of the project: General cross section
  • 6. sid 6 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/ Measurement and Warning System proposed Location of piezometers proposed
  • 7. sid 7 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/ Drilling for expansion joints proposed
  • 8. sid 8 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/ Position of swelling bars proposed
  • 9. sid 9 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/ Pictures from the site:
  • 10. sid 10 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
  • 11. sid 11 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
  • 12. sid 12 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
  • 13. sid 13 av 13 Najder engineering® Movägen 3; SE-133 36 Saltsjöbaden/Sweden Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012 Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/ References: 1. Wassim A. Mahfouz, Product Development Manager, KABBANI CONSTRUCTION GROUP – Product Development Manager Tel: 0 +966 (2) 627 8450 (Saudi Arabia) 2. Chadi Y. Said, Bridge Managment System Senior Engineer, KABBANI CONSTRUCTION GROUP – Infrastructure Managment Solution Tel: 0 +966 (2) 627 8181 (Saudi Arabia) 3. Tariq A. Klahaf, Bridge Sales & Marketing Manager, KABBANI CONSTRUCTION GROUP – Industrial Insulation & Cladding Services Tel: 0 +966 (2) 857 0034 (Saudi Arabia) Ph.D Civ. Eng. Tomasz Najder