This document contains contact information for the head office and branches of Adenco Electrical Engineering Contractors. It also confirms that Mr. JJ De Bruin was employed by Adenco as a meter auditor for Saldanha Bay Municipality from July 2012 to November 2013 to perform meter audits. The duties of the meter auditor position are described as entering installation information electronically, testing meters and distribution boards, checking for tampering, bypassing or safety issues, and updating as-built drawings.
1. Head Office:
BLACKHEATH:
8 Gooderson Road,
BLACKHEATH, 7581
480 KUILSRIVER, 7579
Tel: +27 (0)21 905 5707
Fax: +27 (0)21 905 5710
ELECTRICAL ENGINEERING
CONTRACTORS
Reg No. 2004/029978/07
Email: admin@adenco.co.za
KNYSNA:
25 Sandpiper Street
KNYSNA, 6570
3475, KNYSNA, 6570
Tel: +27 (0)44 382 2600
Fax: +27 (0)44 382 2600
VREDENBURG:
3 Skakel Street,
VREDENBURG, 7380
Tel: +27 (0)22 713 3124
Fax: +27 (0)22 713 3154
STANFORD:
34 De Kleine Street,
STANFORD, 7210
653, STANFORD, 7210
Tel: +27 (0)28 341 0434
Fax: +27 (0)28 341 0186
SPRINGBOK:
1 Pegmatiet Street,
SPRINGBOK, 8240
1103, SPRINGBOK, 8240
Tel: +27 (0)27 712 3471
Fax: +27 (0)27 712 3471
2013 – 09 - 19
I herby confirm that Mr JJ De Bruin (ID No. 660107 5002 088) was employed by Adenco as a
meter auditor for an estimated three year period as per contract tender Saldanha Bay
Municipality.
RE: Tender 20/12: Meter Audit to ensure correct installation of energy meters, distribution
board tariff breakers and geyser control units for the period 01 July 2012 and estimated
ending 27 November 2013(Contract Ended).
Audit Procedure Duties
-Enter information of the meter installation on the handheld unit as required.
-Simulate a trip pulse to the latch on the meter by entering the trip breaker token
-Test for supply in the distribution board, using a voltage detector.
-Check for tampering on the meter, physical damages or broken seals.
-Check and test all geyser control units.
-Check for tampering with the installation, cut wires or any changes of whatsoever nature.
-Check for bypassing and other signs of tampering and log information electronically, on site.
-Check and record the condition and safety of the installation.
-All information must be logged electronically on site onto the handheld computers.
-Use relevant test equipment to perform procedure.
-As-built drawings which will be provided must be updated and corrected where it is incorrect.
Please Contact our Vredenburg Branch for any further enquiries.
......................