Extreme engineering
– part 1
IX-2009
(Part 00 EE, PP 2007, animation+p/r : 2010.02.15)
ready
1
Copyright notice
Unauthorised copying of this presentation as
whole or in parts in any form or by any means,
electronic, photocopying, recording
or otherwise, without prior written permision
is prohibited.
• NAJDER engineering® is a consulting company as well as a specialist
contractor within civil and foundation engineering.
• We are preparing technical concepts, design projects, analyses and performing
jobs as a subcontractor.
• Tomasz Najder joined in the period of 1974-1976 Skånska Cementgjuteriet
(today Skanska AB) as a member of Supervising Team on the project “Second
Dry Dock in Gdynia Shipyard”.
• 1983-2002 Tomasz Najder gained his experiences in Stabilator AB (daughter
company in Skanska Group) as site manager, project manager and internal
consultant (”trouble-shooter”), 1990-1995 as Production Manager (Stabilator
AB- International Division in Poland),1995-2001 in Polish-Swedish company
Stabilator Sp. z o.o. (Skanska Group) as Vice President and Executive Manager.
• Anna Elżbieta Najder (wife) owned 1991-2002 Polish company Polibeton Sp. o.o.
and now Swedish Najder engineering® since 1997 (until 2005 operating as
Polimark International) – operating globally.
• Anna Monika Najder (daughter) together with Tomasz Najder (as the President
of the Board and Executive Manager) owned 2002-2009 Polish Najder
engineering® operating in Poland.
• Family Najder is working within mining, tunneling and civil engineering since
six generations.
Family and company history in civil engineering
2
ready
33
Tomasz Najder Ph.D Civ. Eng.
Born 1951 in Gdańsk (Danzig) in Poland.
1974 M.Sc. Civ. Eng. at Technical University in Gdańsk / Poland.
1980 Doctors thesis within geotechnical engineering at Technical University in Gdańsk.
Since 1982 in Sweden.
Employed in Skanska 1983-2002 as Site Manager, Contract Manager, Internal Consultant (”trouble-shooter”).
1995-2001 Vice President- Executive Manager of Stabilator Poland.
Since 2002 Senior Consultant within family company Najder Engineering® in Stockholm.
Last tunnelling activities:
1993-1994 in Skanska AB /Stabilator AB as Grouting Expert for Breiđalsheiđi and Botnsheiđi Road Project in Ísafjörður on
Iceland - 9km D&B.
2006-2008 Senior Grouting Engineer for VIJV Clients Site representative for Kárahnjúkar Hydroelectric Project on Iceland
(representative for SWECO International AB) - 72km D&B, TBM.
2007-2009 Senior Grouting Consultant for Metrostav a.s., á útlibú á Islandi at Héðinsfjarðargöng Project Iceland - 11km
D&B.
2008-2009 Senior Grouting Consultant for Norconsult SA in Greater Istanbul Water Supply Project Stage II Melen System
– 3.5 km TBM.
ready
44
• Foundation engineering and soil investigations.
• Reinforcement of existing foundations (underpinning) of
industrial buildings, housing estates and ancient monuments
(piling, anchors, injections).
• Rock stability and soil improvement (deep mixing method,
high/low-pressure injection, lime-cement columns).
• Stabilization of slopes and embankments (geogrids, soil
reinforcement, drainage, geotextiles).
• Sealing of existing embankments, dams, dikes and waste
deposits. Flood defense.
• Biological engineering, gabion constructions.
• Leakage and moisture counteraction (insulations, drainages,
sealing injections, dilatation repair) in concrete and brickworks
structures.
Field of activity
ready
55
ready
TNA systems for micropiling and anchoring
- probably the most strongest solution in the world (?)
ready
6
Micropile TNA Ø= 0.20 m
- drilled version.
Ultimate bearing capacity ca. 120 ton
TNA micropiles inside the cellar of the castle
The Malbork Castle in Poland – build in XII century as Marienburg Schloss,
- the largest brick construction in the world
Slope instability just after disaster
ready
7
Slope stabilization close to Gniew Castle (Poland)
Slope stabilisation with TITAN ground anchors and micropiles
- the example of complicated slope protection
TITAN micropiles
longitudinal concrete beam
ready
8
Slope restoration at it’s top
- drilling and grouting of TITAN anchors
coast line ~ year 1500
~ 1800 m
1998
ready
9
Slope stabilization of the Trzęsacz church ruin (Poland) at the Baltic See coast
- probably the most sofisticated coast- and slope protection in the world (?)
1870
1010
ready1870 19371970
Concept of protection
1998
Church and coast line 2008
11
Sikfors Sweden, 1987- 1988 , the largest sink shaft in the world.
Diameter 20m, weight 2.000T
ready
1212
ready
13
Reubilding and underpinning
of industrial buildings
ready
14
ready
City Tunnel in Hälsingborg (Sweden)
- tunneling and underpinning in
urban areas
1515
Location of the projects on Iceland
Breiđalsheiđi and Botnsheiđi Project 1993-1994; the huge inflow
Kárahnjúkar Hydropower Project 2006-2008; the longest tunnel system in the world
- performed in probably most dangerous and complicated rock conditions in tunneling history
Héðinsfjarðargöng Project 2007-2009; the huge inflow
ready
16
Ísafjörður - Iceland
The tunnels of Breiđalsheiđi and Botnsheiđi
Breiđaldalur tunnel shortly after huge water inflow
Water inflow ~ 1-2m3/sec
ready
17
Water pressure ~ approx. 60 bars
Water inflow ~ 50 l/sec/hole
Water temperature ca. +20ºC
Inserting of mechanical packers in high water pressure conditions
Face after final grouting
ready
18
• Diversion Tunnels at dam 2.4 km (Kar 14)
• Headrace Tunnel 53.0 km (Kar 14)
• Grouting galleries at dam 0.5 km (Kar 14)
• Cable tunnel 1.0 km
• Hraun Diversion 2.0 km
• Grjótá Diversion 1.75 km
• Adit 1 1.4 km (Kar 14)
• Adit 2 2.7 km (Kar 14)
• Adit 3 2.8 km (Kar 14)
• Surge Tunnel 1.7 km (Kar 14)
• Drainage Tunnel 0.7 km (Kar 14)
• Penstocks 0.82 km (2x)
• Access to Powerhouse 1.0 km
• Tailrace Tunnel 1.3 km
Total Tunnel Length: 73.0 km (D&B=10 km, TBM=63 km)
ready
18Kárahnjúkar Hydropower Project 2006-2008
19
ready
20
ready
21
ready
22
ready
Thank You for Your attention!
– welcome to Part 2
Ph.D Civ. Eng. Tomasz Najder
Senior Consultant
Movägen 3, 133 36 Saltsjöbaden - Sweden
Tel: 0046 (0)8 717 5714 Fax: 0046 (0)8 717 6042
Mobil: 0046 (0)704 217 012
E-mail: tomasz.najder@hotmail.com
Org. no: 490911 – 2148
ready
23

More Related Content

Similar to 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide show

CV Tomasz Najder Part 1 2009.09.15 2016
CV Tomasz Najder Part 1 2009.09.15 2016CV Tomasz Najder Part 1 2009.09.15 2016
CV Tomasz Najder Part 1 2009.09.15 2016
Tomasz Najder
 
Curriculum Vitae Jens Classen 2015_01_e
Curriculum Vitae Jens Classen 2015_01_eCurriculum Vitae Jens Classen 2015_01_e
Curriculum Vitae Jens Classen 2015_01_e
Jens Classen
 
CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016
Skare Sigbjørn
 
CV Tomasz Najder Part 6 2016.01.17 2016
CV Tomasz Najder Part 6 2016.01.17 2016CV Tomasz Najder Part 6 2016.01.17 2016
CV Tomasz Najder Part 6 2016.01.17 2016
Tomasz Najder
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
Muhammad Hegazy
 
Bjorn Johann Bjornsson_2014CV
Bjorn Johann Bjornsson_2014CVBjorn Johann Bjornsson_2014CV
Bjorn Johann Bjornsson_2014CV
Bjorn Bjornsson
 
Iceland Hedinsfjordur Tunnel 2010 page 22
Iceland Hedinsfjordur Tunnel 2010 page 22Iceland Hedinsfjordur Tunnel 2010 page 22
Iceland Hedinsfjordur Tunnel 2010 page 22
Tomasz Najder
 

Similar to 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide show (20)

CV Tomasz Najder Part 1 2009.09.15 2016
CV Tomasz Najder Part 1 2009.09.15 2016CV Tomasz Najder Part 1 2009.09.15 2016
CV Tomasz Najder Part 1 2009.09.15 2016
 
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
 
CV Richard Furuhovde
CV Richard FuruhovdeCV Richard Furuhovde
CV Richard Furuhovde
 
Curriculum Vitae Jens Classen 2015_01_e
Curriculum Vitae Jens Classen 2015_01_eCurriculum Vitae Jens Classen 2015_01_e
Curriculum Vitae Jens Classen 2015_01_e
 
CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016
 
CV Tomasz Najder Part 6 2016.01.17 2016
CV Tomasz Najder Part 6 2016.01.17 2016CV Tomasz Najder Part 6 2016.01.17 2016
CV Tomasz Najder Part 6 2016.01.17 2016
 
(B)CV_RK_2016_UK
(B)CV_RK_2016_UK(B)CV_RK_2016_UK
(B)CV_RK_2016_UK
 
E profiil references
E profiil referencesE profiil references
E profiil references
 
HeikkiläCV201602
HeikkiläCV201602HeikkiläCV201602
HeikkiläCV201602
 
Anese brochure
Anese brochure Anese brochure
Anese brochure
 
Typical challenges in tunnelling
Typical challenges in tunnellingTypical challenges in tunnelling
Typical challenges in tunnelling
 
PROJECTS index updated
PROJECTS index updatedPROJECTS index updated
PROJECTS index updated
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 
Ing PJV
Ing PJVIng PJV
Ing PJV
 
Bjorn Johann Bjornsson_2014CV
Bjorn Johann Bjornsson_2014CVBjorn Johann Bjornsson_2014CV
Bjorn Johann Bjornsson_2014CV
 
C.V for M.ZAKI
C.V  for M.ZAKIC.V  for M.ZAKI
C.V for M.ZAKI
 
LARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ART
LARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ARTLARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ART
LARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ART
 
Newbiggin_02
Newbiggin_02Newbiggin_02
Newbiggin_02
 
art gallery case study
art gallery case studyart gallery case study
art gallery case study
 
Iceland Hedinsfjordur Tunnel 2010 page 22
Iceland Hedinsfjordur Tunnel 2010 page 22Iceland Hedinsfjordur Tunnel 2010 page 22
Iceland Hedinsfjordur Tunnel 2010 page 22
 

More from Tomasz Najder

ö New Orleans 2012 draft paper 2011.01.27
ö New Orleans 2012 draft paper 2011.01.27ö New Orleans 2012 draft paper 2011.01.27
ö New Orleans 2012 draft paper 2011.01.27
Tomasz Najder
 
Najder Eng. CV Tomasz Najder Part 3 2009.06.07 pdf.
Najder Eng. CV Tomasz Najder Part 3 2009.06.07 pdf.Najder Eng. CV Tomasz Najder Part 3 2009.06.07 pdf.
Najder Eng. CV Tomasz Najder Part 3 2009.06.07 pdf.
Tomasz Najder
 
CV Gallery rev. 2013.04.30 compr.
CV Gallery rev. 2013.04.30 compr.CV Gallery rev. 2013.04.30 compr.
CV Gallery rev. 2013.04.30 compr.
Tomasz Najder
 
öö Contribution to loading test procedure of ground anchors
öö Contribution to loading test procedure of ground anchorsöö Contribution to loading test procedure of ground anchors
öö Contribution to loading test procedure of ground anchors
Tomasz Najder
 
Najder Engineering AB T-bana repairs 2016.03.22 compr.
Najder Engineering AB T-bana repairs 2016.03.22 compr.Najder Engineering AB T-bana repairs 2016.03.22 compr.
Najder Engineering AB T-bana repairs 2016.03.22 compr.
Tomasz Najder
 
Najder Engineering Södra Länken - grouting for repairs 2014.11.01
Najder Engineering Södra Länken - grouting for repairs 2014.11.01Najder Engineering Södra Länken - grouting for repairs 2014.11.01
Najder Engineering Södra Länken - grouting for repairs 2014.11.01
Tomasz Najder
 
0 SWECO PP-TNa Report Grouting TH3
0 SWECO PP-TNa Report Grouting TH30 SWECO PP-TNa Report Grouting TH3
0 SWECO PP-TNa Report Grouting TH3
Tomasz Najder
 
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)
Tomasz Najder
 
0 Iceland - pictures from the tunnels 2010.01.09
0 Iceland - pictures from the tunnels 2010.01.090 Iceland - pictures from the tunnels 2010.01.09
0 Iceland - pictures from the tunnels 2010.01.09
Tomasz Najder
 
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right
Tomasz Najder
 
CV Tomasz Najder Part 2 2009.09.17 2016
CV Tomasz Najder Part 2 2009.09.17 2016CV Tomasz Najder Part 2 2009.09.17 2016
CV Tomasz Najder Part 2 2009.09.17 2016
Tomasz Najder
 
CV Tomasz Najder Part 3 2009.06.07 2016
CV Tomasz Najder Part 3 2009.06.07 2016CV Tomasz Najder Part 3 2009.06.07 2016
CV Tomasz Najder Part 3 2009.06.07 2016
Tomasz Najder
 
CV Tomasz Najder Part 5 2010.02.12 2016
CV Tomasz Najder Part 5 2010.02.12 2016CV Tomasz Najder Part 5 2010.02.12 2016
CV Tomasz Najder Part 5 2010.02.12 2016
Tomasz Najder
 
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
Tomasz Najder
 

More from Tomasz Najder (15)

ö New Orleans 2012 draft paper 2011.01.27
ö New Orleans 2012 draft paper 2011.01.27ö New Orleans 2012 draft paper 2011.01.27
ö New Orleans 2012 draft paper 2011.01.27
 
Najder Eng. CV Tomasz Najder Part 3 2009.06.07 pdf.
Najder Eng. CV Tomasz Najder Part 3 2009.06.07 pdf.Najder Eng. CV Tomasz Najder Part 3 2009.06.07 pdf.
Najder Eng. CV Tomasz Najder Part 3 2009.06.07 pdf.
 
CV Gallery rev. 2013.04.30 compr.
CV Gallery rev. 2013.04.30 compr.CV Gallery rev. 2013.04.30 compr.
CV Gallery rev. 2013.04.30 compr.
 
öö Contribution to loading test procedure of ground anchors
öö Contribution to loading test procedure of ground anchorsöö Contribution to loading test procedure of ground anchors
öö Contribution to loading test procedure of ground anchors
 
Najder Engineering AB T-bana repairs 2016.03.22 compr.
Najder Engineering AB T-bana repairs 2016.03.22 compr.Najder Engineering AB T-bana repairs 2016.03.22 compr.
Najder Engineering AB T-bana repairs 2016.03.22 compr.
 
TNa diplomas
TNa diplomasTNa diplomas
TNa diplomas
 
Najder Engineering Södra Länken - grouting for repairs 2014.11.01
Najder Engineering Södra Länken - grouting for repairs 2014.11.01Najder Engineering Södra Länken - grouting for repairs 2014.11.01
Najder Engineering Södra Länken - grouting for repairs 2014.11.01
 
0 SWECO PP-TNa Report Grouting TH3
0 SWECO PP-TNa Report Grouting TH30 SWECO PP-TNa Report Grouting TH3
0 SWECO PP-TNa Report Grouting TH3
 
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)
 
0 Iceland - pictures from the tunnels 2010.01.09
0 Iceland - pictures from the tunnels 2010.01.090 Iceland - pictures from the tunnels 2010.01.09
0 Iceland - pictures from the tunnels 2010.01.09
 
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right
0 Iceland An Icelandic struggle (Metrostav) - page 18 to the right
 
CV Tomasz Najder Part 2 2009.09.17 2016
CV Tomasz Najder Part 2 2009.09.17 2016CV Tomasz Najder Part 2 2009.09.17 2016
CV Tomasz Najder Part 2 2009.09.17 2016
 
CV Tomasz Najder Part 3 2009.06.07 2016
CV Tomasz Najder Part 3 2009.06.07 2016CV Tomasz Najder Part 3 2009.06.07 2016
CV Tomasz Najder Part 3 2009.06.07 2016
 
CV Tomasz Najder Part 5 2010.02.12 2016
CV Tomasz Najder Part 5 2010.02.12 2016CV Tomasz Najder Part 5 2010.02.12 2016
CV Tomasz Najder Part 5 2010.02.12 2016
 
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show
 

0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide show

  • 1. Extreme engineering – part 1 IX-2009 (Part 00 EE, PP 2007, animation+p/r : 2010.02.15) ready 1 Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited.
  • 2. • NAJDER engineering® is a consulting company as well as a specialist contractor within civil and foundation engineering. • We are preparing technical concepts, design projects, analyses and performing jobs as a subcontractor. • Tomasz Najder joined in the period of 1974-1976 Skånska Cementgjuteriet (today Skanska AB) as a member of Supervising Team on the project “Second Dry Dock in Gdynia Shipyard”. • 1983-2002 Tomasz Najder gained his experiences in Stabilator AB (daughter company in Skanska Group) as site manager, project manager and internal consultant (”trouble-shooter”), 1990-1995 as Production Manager (Stabilator AB- International Division in Poland),1995-2001 in Polish-Swedish company Stabilator Sp. z o.o. (Skanska Group) as Vice President and Executive Manager. • Anna Elżbieta Najder (wife) owned 1991-2002 Polish company Polibeton Sp. o.o. and now Swedish Najder engineering® since 1997 (until 2005 operating as Polimark International) – operating globally. • Anna Monika Najder (daughter) together with Tomasz Najder (as the President of the Board and Executive Manager) owned 2002-2009 Polish Najder engineering® operating in Poland. • Family Najder is working within mining, tunneling and civil engineering since six generations. Family and company history in civil engineering 2 ready
  • 3. 33 Tomasz Najder Ph.D Civ. Eng. Born 1951 in Gdańsk (Danzig) in Poland. 1974 M.Sc. Civ. Eng. at Technical University in Gdańsk / Poland. 1980 Doctors thesis within geotechnical engineering at Technical University in Gdańsk. Since 1982 in Sweden. Employed in Skanska 1983-2002 as Site Manager, Contract Manager, Internal Consultant (”trouble-shooter”). 1995-2001 Vice President- Executive Manager of Stabilator Poland. Since 2002 Senior Consultant within family company Najder Engineering® in Stockholm. Last tunnelling activities: 1993-1994 in Skanska AB /Stabilator AB as Grouting Expert for Breiđalsheiđi and Botnsheiđi Road Project in Ísafjörður on Iceland - 9km D&B. 2006-2008 Senior Grouting Engineer for VIJV Clients Site representative for Kárahnjúkar Hydroelectric Project on Iceland (representative for SWECO International AB) - 72km D&B, TBM. 2007-2009 Senior Grouting Consultant for Metrostav a.s., á útlibú á Islandi at Héðinsfjarðargöng Project Iceland - 11km D&B. 2008-2009 Senior Grouting Consultant for Norconsult SA in Greater Istanbul Water Supply Project Stage II Melen System – 3.5 km TBM. ready
  • 4. 44 • Foundation engineering and soil investigations. • Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections). • Rock stability and soil improvement (deep mixing method, high/low-pressure injection, lime-cement columns). • Stabilization of slopes and embankments (geogrids, soil reinforcement, drainage, geotextiles). • Sealing of existing embankments, dams, dikes and waste deposits. Flood defense. • Biological engineering, gabion constructions. • Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures. Field of activity ready
  • 5. 55 ready TNA systems for micropiling and anchoring - probably the most strongest solution in the world (?)
  • 6. ready 6 Micropile TNA Ø= 0.20 m - drilled version. Ultimate bearing capacity ca. 120 ton TNA micropiles inside the cellar of the castle The Malbork Castle in Poland – build in XII century as Marienburg Schloss, - the largest brick construction in the world
  • 7. Slope instability just after disaster ready 7 Slope stabilization close to Gniew Castle (Poland) Slope stabilisation with TITAN ground anchors and micropiles - the example of complicated slope protection
  • 8. TITAN micropiles longitudinal concrete beam ready 8 Slope restoration at it’s top - drilling and grouting of TITAN anchors
  • 9. coast line ~ year 1500 ~ 1800 m 1998 ready 9 Slope stabilization of the Trzęsacz church ruin (Poland) at the Baltic See coast - probably the most sofisticated coast- and slope protection in the world (?) 1870
  • 10. 1010 ready1870 19371970 Concept of protection 1998 Church and coast line 2008
  • 11. 11 Sikfors Sweden, 1987- 1988 , the largest sink shaft in the world. Diameter 20m, weight 2.000T ready
  • 13. 13 Reubilding and underpinning of industrial buildings ready
  • 14. 14 ready City Tunnel in Hälsingborg (Sweden) - tunneling and underpinning in urban areas
  • 15. 1515 Location of the projects on Iceland Breiđalsheiđi and Botnsheiđi Project 1993-1994; the huge inflow Kárahnjúkar Hydropower Project 2006-2008; the longest tunnel system in the world - performed in probably most dangerous and complicated rock conditions in tunneling history Héðinsfjarðargöng Project 2007-2009; the huge inflow ready
  • 16. 16 Ísafjörður - Iceland The tunnels of Breiđalsheiđi and Botnsheiđi Breiđaldalur tunnel shortly after huge water inflow Water inflow ~ 1-2m3/sec ready
  • 17. 17 Water pressure ~ approx. 60 bars Water inflow ~ 50 l/sec/hole Water temperature ca. +20ºC Inserting of mechanical packers in high water pressure conditions Face after final grouting ready
  • 18. 18 • Diversion Tunnels at dam 2.4 km (Kar 14) • Headrace Tunnel 53.0 km (Kar 14) • Grouting galleries at dam 0.5 km (Kar 14) • Cable tunnel 1.0 km • Hraun Diversion 2.0 km • Grjótá Diversion 1.75 km • Adit 1 1.4 km (Kar 14) • Adit 2 2.7 km (Kar 14) • Adit 3 2.8 km (Kar 14) • Surge Tunnel 1.7 km (Kar 14) • Drainage Tunnel 0.7 km (Kar 14) • Penstocks 0.82 km (2x) • Access to Powerhouse 1.0 km • Tailrace Tunnel 1.3 km Total Tunnel Length: 73.0 km (D&B=10 km, TBM=63 km) ready 18Kárahnjúkar Hydropower Project 2006-2008
  • 23. Thank You for Your attention! – welcome to Part 2 Ph.D Civ. Eng. Tomasz Najder Senior Consultant Movägen 3, 133 36 Saltsjöbaden - Sweden Tel: 0046 (0)8 717 5714 Fax: 0046 (0)8 717 6042 Mobil: 0046 (0)704 217 012 E-mail: tomasz.najder@hotmail.com Org. no: 490911 – 2148 ready 23