Overview of West Coast distribution strategy
A strategic analysis was undertaken to examine the most cost effective methods of servicing
the WA market..
Various scenarios were examined in detail including full 3PL (full outsourcing of local
warehousing and delivery) through to direct delivery ex Melbourne.
The option chosen is a combination of these based on delivering
• The required “Next Day” service level for fasteners and some fabric products
• Cost effective distribution of plastic and other products directly from Melbourne
Features include:
• A small footprint of product (568 sku’s) still held in WA in an outsourced “3PL”
environment.
• Direct shipping of other orders weekly from Melbourne
The service will be split into two distinct categories we shall call the “locally held stock
lines (3PL)” & “break bulk” ex Melbourne.
4
How will WA now work?
Local WA held product overview.
• 586 Lines held locally in 3PL provider.
• These lines are primarily Ajax & Senco, with some film and fabric products.
• Service will be via next day delivery after placement of orders. Cut-off will be at 2.00pm WA local time.
• Provider will have limited access to our SAP platform & be able to print out orders on a local printer.
• Provider will have access to check stocks, print orders & other necessary transactions. Provider will
have no access to any other plant & or data.
• Orders that are placed for items that are locally held & have lines held in Melbourne will be split into
two distinct orders either manually or via a SAP driven trigger.
• All EDI based customers such as Bunning will be fulfilled ex Melbourne.
• All customers that have specific delivery requirement will be catered for by provider as per current
arrangements.
• Date for this change will be effective Monday 13th
October 2009
5
How will WA now work?
Melbourne held product service overview
• EDI based customers will be serviced Ex Melbourne for all orders
• All current customers will have access to all lines in the Melbourne DC.
• Primary Shipping day will be Thursday ex week for delivery in full the next Monday. Cut-off times for
this service will be COB each Wednesday.
• Product will be shipped during the week depending on volumes & transport schedules.
• Service will be by rail via the option named “break bulk”
• Orders will be picked & packed in Melbourne & consolidated into a large single delivery then
distributed to the customers at the WA end.
• All orders will have the full compliment of paperwork currently provided.
• Senco spares & other small items currently service by air bags will continue.
• Melbourne warehouse operation will be responsible for the same level of communication currently
provided by the staff in WA. This includes to local 3PL operation as well as the Melbourne portion.
• Current distribution management will have full control & responsibility over the WA 3PL operation
6
How will WA now work?
Service offer detail
WA based 3PL stocked lines.
 586 Lines of fastener based products help in WA.
 All WA customers have the ability to order these lines.
 Current - system set customer MOQ’s still apply.
 Orders placed before 1.pm (LT) delivered next day.
 Somerton distribution team to manage WA operation
 Provider to submit activity & delivery (DIFOT) KPI’s.
 Somerton team to view order queue daily to ensure
compliance
Melbourne based stocked lines.
 All remaining Consumer products available to WA
Base customers.
 Orders will be picked & shipped weekly.
 Cut-off times for orders will be Wednesday buy COB
Melbourne time
 Orders will be shipped each Thursday morning for
delivery by the following Tuesday.
 Shipments will consist of direct to customer deliveries
& STO’s into 3PL operation
 Somerton distribution team to manage all activity
KPI’s relating to this activity
 Provider to submit delivery (DIFOT) KPI’s at the
Delivery level.
** Changes can be made subject to review & capability**
7
How will WA now work?
Fulfilment offer detail
WA based 3PL stocked lines.
 3PL based lines to be replenished by STO process
 Only “A” & “B” class lines from fasteners to be
held at local 3PL operation
 Safety stock levels to be set at 4 weeks for “A” class
6 weeks for “B” class items
 STO’s to be shipped weekly along with customer
orders.
 All STO’s to be shipped with a week of creation
** Order creation cycle to be timed with shipping**
 Supply to use sales generated forecast along with
historical sales data to determine stock levels.
 Supply team to manage KPI’s that relate to stock
outs & forecasting accuracy.
 Somerton team to manage KPI’s relating to STO
delivery performance.
Melbourne based stocked lines.
 All remaining stock lines to be held at Somerton
All “C” class fasteners & all GH&L ABC’s
 Somerton safety stock levels will be adjusted to incorporate
WA demand
 WA based sales forecasts will be built into the stock holding
& Somerton stock purchasing requirements.
 DC based sales & large volume sales of any products
can be shipped direct to WA for substantial orders that
meet the efficiency “criteria”**
 Supply team to manage KPI’s to ensure WA order fulfilment
failures due to stock outs & forecasting accuracy.
** Efficiency criteria is for large orders of stock from suppliers that
can be efficiently configured into a delivery.
**Example full containers of Esky that equal 1 or 2 customer
orders
8
WA distribution flowchart
“How will it work”
9
Why is Nylex undertaking this change?
This has been brought about by the need to change the way we operate, so that we can continue to be a viable provider of high-quality
warehousing and distribution services.
The cost of carrying inventory in multiple sites ties up valuable financial resources and prevents the business from undertaking other
activities with that cash. This change will allow us to better plan our inventory and ensure it can be sourced to meet customer demand.
Transport from the East is unreliable?
We have developed a transport model which will allow us to deliver in a predictable and cost-efficient window each week.
We have also built a plan for delays and derailments which will ensure our customer orders are delivered by road as a fall back position
with the same weekly timeline for all plastic products.
Is everything going to be delivered from Somerton?
Fasteners will continue to be warehoused and delivered from a third party provider in Perth.
All plastic products will be delivered from a central warehouse in Melbourne.
Is this the result of poor performance in Western Australia?
No absolutely not. This is the result of a strategic review of the Nylex business and identification of more efficient ways to spend
shareholder funds.
Why is this happening now?
Nylex is undergoing financial stress due to a number of factors. It is imperative that changes are made to continue to do business with our
customers and find ways to create savings at every opportunity.
QUESTIONS & ANSWERS
10
QUESTIONS & ANSWERS
What will be the impact on our customers?
Our customers should not experience any differences in the fulfillment of fasteners, with a small change occurring in the plastics
business
to weekly ordering and weekly delivery.
The key change for customers will be the timing of placing orders each week for plastic products to ensure they meet the timeline for rail
deliveries.
What do we say if customers ask what is going on?
We can tell customers that Nylex has reviewed its supply chain and fulfillment structure and found opportunities to do business more
efficiently.
With our primary obligation to create shareholder value, we are working to deliver or improve upon customer delivery expectations and
ensure we do so profitability.
11
All current SAP based transactions will show order status in SAP for both the local 3PL option & Melbourne fulfilment
models.
• Transaction “ZVLO6N” will show current order status in sap for all WA orders. Plant 09 for Melb based orders & Plant 45
for WA based orders out of 3PL provider that are currently at pick slip & not invoiced.
• Please note list below has all required delivery dates & customer information
KPI & Data measurement Nylex
performance data
12
Excel based delivery reports will be available weekly with all deliveries measured inclusive of TRUE DIFOT.
Pickup, transit times & actual delivery date/time information will be included for each WA delivery.
**please note this is sample data from historical STO deliveries & for sample purposes only**
KPI & Data measurement Carrier & 3PL
delivery performance
Conclusion
The Nylex distribution team is committed to customer
service in all aspects
• Communication
• Information
• Co-operation
• Cost effectiveness
• Performance
• Customer satisfaction
13

More Related Content

Viewers also liked

Nylex consumer rfp
Nylex consumer   rfpNylex consumer   rfp
Nylex consumer rfpTom Evans
 
8va Edición b&h
8va Edición b&h8va Edición b&h
8va Edición b&hbody&health
 
Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06Tom Evans
 
Bill Burns-resume (2016)
Bill Burns-resume (2016)Bill Burns-resume (2016)
Bill Burns-resume (2016)wburns2015
 
P d national dist mngr
P d national dist mngrP d national dist mngr
P d national dist mngrTom Evans
 
P d national dist mngr
P d national dist mngrP d national dist mngr
P d national dist mngrTom Evans
 
Nylex water presentation 31 08-07
Nylex water presentation 31 08-07Nylex water presentation 31 08-07
Nylex water presentation 31 08-07Tom Evans
 
SAP WMS install Somerton NYLEX_Operational_Support
SAP WMS install Somerton NYLEX_Operational_SupportSAP WMS install Somerton NYLEX_Operational_Support
SAP WMS install Somerton NYLEX_Operational_SupportTom Evans
 
Trying to save Nylex...............Weeklyreporting 6 nov 2008
Trying to save  Nylex...............Weeklyreporting 6 nov 2008Trying to save  Nylex...............Weeklyreporting 6 nov 2008
Trying to save Nylex...............Weeklyreporting 6 nov 2008Tom Evans
 
Enero febrero 2016
Enero febrero 2016Enero febrero 2016
Enero febrero 2016body&health
 
Fulfillment group oct 08
Fulfillment group oct 08Fulfillment group oct 08
Fulfillment group oct 08Tom Evans
 
Delivery service offer user guide v1.0
Delivery service offer user guide v1.0Delivery service offer user guide v1.0
Delivery service offer user guide v1.0Tom Evans
 
Nz distribution changes
Nz  distribution changesNz  distribution changes
Nz distribution changesTom Evans
 
Nylex consumer rfp
Nylex consumer   rfpNylex consumer   rfp
Nylex consumer rfpTom Evans
 
14a Edición Noviembre/Diciembre 2016
14a Edición Noviembre/Diciembre 201614a Edición Noviembre/Diciembre 2016
14a Edición Noviembre/Diciembre 2016body&health
 

Viewers also liked (15)

Nylex consumer rfp
Nylex consumer   rfpNylex consumer   rfp
Nylex consumer rfp
 
8va Edición b&h
8va Edición b&h8va Edición b&h
8va Edición b&h
 
Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06
 
Bill Burns-resume (2016)
Bill Burns-resume (2016)Bill Burns-resume (2016)
Bill Burns-resume (2016)
 
P d national dist mngr
P d national dist mngrP d national dist mngr
P d national dist mngr
 
P d national dist mngr
P d national dist mngrP d national dist mngr
P d national dist mngr
 
Nylex water presentation 31 08-07
Nylex water presentation 31 08-07Nylex water presentation 31 08-07
Nylex water presentation 31 08-07
 
SAP WMS install Somerton NYLEX_Operational_Support
SAP WMS install Somerton NYLEX_Operational_SupportSAP WMS install Somerton NYLEX_Operational_Support
SAP WMS install Somerton NYLEX_Operational_Support
 
Trying to save Nylex...............Weeklyreporting 6 nov 2008
Trying to save  Nylex...............Weeklyreporting 6 nov 2008Trying to save  Nylex...............Weeklyreporting 6 nov 2008
Trying to save Nylex...............Weeklyreporting 6 nov 2008
 
Enero febrero 2016
Enero febrero 2016Enero febrero 2016
Enero febrero 2016
 
Fulfillment group oct 08
Fulfillment group oct 08Fulfillment group oct 08
Fulfillment group oct 08
 
Delivery service offer user guide v1.0
Delivery service offer user guide v1.0Delivery service offer user guide v1.0
Delivery service offer user guide v1.0
 
Nz distribution changes
Nz  distribution changesNz  distribution changes
Nz distribution changes
 
Nylex consumer rfp
Nylex consumer   rfpNylex consumer   rfp
Nylex consumer rfp
 
14a Edición Noviembre/Diciembre 2016
14a Edición Noviembre/Diciembre 201614a Edición Noviembre/Diciembre 2016
14a Edición Noviembre/Diciembre 2016
 

Similar to West distribution changes

Invest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journeyInvest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journeyInvest Northern Ireland
 
KMW KSF140010010
KMW KSF140010010KMW KSF140010010
KMW KSF140010010savomir
 
a03ccb1f-3c68-415d-bb0b-6003e5f1388b-161127202040.pdf
a03ccb1f-3c68-415d-bb0b-6003e5f1388b-161127202040.pdfa03ccb1f-3c68-415d-bb0b-6003e5f1388b-161127202040.pdf
a03ccb1f-3c68-415d-bb0b-6003e5f1388b-161127202040.pdfIbrahimTahir9
 
ACME Case Study Description Jan 2016
ACME Case Study Description Jan 2016ACME Case Study Description Jan 2016
ACME Case Study Description Jan 2016Clint Hobbs
 
Cooper B-Line SB21CNEO
Cooper B-Line SB21CNEOCooper B-Line SB21CNEO
Cooper B-Line SB21CNEOsavomir
 
Leviton 40067-OBC
Leviton 40067-OBCLeviton 40067-OBC
Leviton 40067-OBCsavomir
 
ABMs Daily Key Things to Do at Work.pptx
ABMs Daily Key Things to Do at Work.pptxABMs Daily Key Things to Do at Work.pptx
ABMs Daily Key Things to Do at Work.pptxEngrYasirZulfiqar
 
Connections 2011-KGP Logistics 3 22 11
Connections 2011-KGP Logistics 3 22 11Connections 2011-KGP Logistics 3 22 11
Connections 2011-KGP Logistics 3 22 11Nicole Pemberton
 
Cooper B-Line SB2501
Cooper B-Line SB2501Cooper B-Line SB2501
Cooper B-Line SB2501savomir
 
Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16Courtney Morris
 
Smart Pathways KBLB251
Smart Pathways KBLB251Smart Pathways KBLB251
Smart Pathways KBLB251savomir
 
Appleton BLB-400NM
Appleton BLB-400NMAppleton BLB-400NM
Appleton BLB-400NMsavomir
 
Kraloy LB10
Kraloy LB10Kraloy LB10
Kraloy LB10savomir
 
Kaelus QBC0002F1V41
Kaelus QBC0002F1V41Kaelus QBC0002F1V41
Kaelus QBC0002F1V41savomir
 

Similar to West distribution changes (20)

Invest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journeyInvest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journey
 
William_Schambreel_cv1
William_Schambreel_cv1William_Schambreel_cv1
William_Schambreel_cv1
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 
KMW KSF140010010
KMW KSF140010010KMW KSF140010010
KMW KSF140010010
 
Falcon grocery model 2014
Falcon grocery model 2014Falcon grocery model 2014
Falcon grocery model 2014
 
a03ccb1f-3c68-415d-bb0b-6003e5f1388b-161127202040.pdf
a03ccb1f-3c68-415d-bb0b-6003e5f1388b-161127202040.pdfa03ccb1f-3c68-415d-bb0b-6003e5f1388b-161127202040.pdf
a03ccb1f-3c68-415d-bb0b-6003e5f1388b-161127202040.pdf
 
ACME Case Study Description Jan 2016
ACME Case Study Description Jan 2016ACME Case Study Description Jan 2016
ACME Case Study Description Jan 2016
 
Cooper B-Line SB21CNEO
Cooper B-Line SB21CNEOCooper B-Line SB21CNEO
Cooper B-Line SB21CNEO
 
Leviton 40067-OBC
Leviton 40067-OBCLeviton 40067-OBC
Leviton 40067-OBC
 
Michael Rigby CV 2
Michael Rigby CV 2Michael Rigby CV 2
Michael Rigby CV 2
 
online resume
online resumeonline resume
online resume
 
ABMs Daily Key Things to Do at Work.pptx
ABMs Daily Key Things to Do at Work.pptxABMs Daily Key Things to Do at Work.pptx
ABMs Daily Key Things to Do at Work.pptx
 
Connections 2011-KGP Logistics 3 22 11
Connections 2011-KGP Logistics 3 22 11Connections 2011-KGP Logistics 3 22 11
Connections 2011-KGP Logistics 3 22 11
 
Nicholas cannon resume
Nicholas cannon resume Nicholas cannon resume
Nicholas cannon resume
 
Cooper B-Line SB2501
Cooper B-Line SB2501Cooper B-Line SB2501
Cooper B-Line SB2501
 
Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16
 
Smart Pathways KBLB251
Smart Pathways KBLB251Smart Pathways KBLB251
Smart Pathways KBLB251
 
Appleton BLB-400NM
Appleton BLB-400NMAppleton BLB-400NM
Appleton BLB-400NM
 
Kraloy LB10
Kraloy LB10Kraloy LB10
Kraloy LB10
 
Kaelus QBC0002F1V41
Kaelus QBC0002F1V41Kaelus QBC0002F1V41
Kaelus QBC0002F1V41
 

More from Tom Evans

NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05Tom Evans
 
Nylex Water Solutions Ingleburn - Main Body
Nylex Water Solutions Ingleburn - Main BodyNylex Water Solutions Ingleburn - Main Body
Nylex Water Solutions Ingleburn - Main BodyTom Evans
 
RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3Tom Evans
 
Somerton Warehouse
Somerton WarehouseSomerton Warehouse
Somerton WarehouseTom Evans
 
Wa warehouse project status report
Wa warehouse project status reportWa warehouse project status report
Wa warehouse project status reportTom Evans
 
Packaged vehicle profile
Packaged vehicle profilePackaged vehicle profile
Packaged vehicle profileTom Evans
 
Nylex letterhead 08
Nylex letterhead 08Nylex letterhead 08
Nylex letterhead 08Tom Evans
 
New nylex power piont pres
New nylex power piont presNew nylex power piont pres
New nylex power piont presTom Evans
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfpTom Evans
 
Pg all sites period 4 f08
Pg all sites period 4 f08Pg all sites period 4 f08
Pg all sites period 4 f08Tom Evans
 
Nylex rfi international freight nylex
Nylex rfi international freight nylexNylex rfi international freight nylex
Nylex rfi international freight nylexTom Evans
 
Nylex rfi international freight draft
Nylex rfi international freight draftNylex rfi international freight draft
Nylex rfi international freight draftTom Evans
 
2 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.20052 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.2005Tom Evans
 
1 nylex cover letter
1 nylex cover letter1 nylex cover letter
1 nylex cover letterTom Evans
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfpTom Evans
 
Water outsource data dot piont
Water outsource data dot piontWater outsource data dot piont
Water outsource data dot piontTom Evans
 
Nylex water solutions key points briefing 13-09-07
Nylex water solutions   key points briefing 13-09-07Nylex water solutions   key points briefing 13-09-07
Nylex water solutions key points briefing 13-09-07Tom Evans
 
Nnw freight outsource model
Nnw   freight outsource modelNnw   freight outsource model
Nnw freight outsource modelTom Evans
 
One nylex org chart fulfilment
One nylex   org chart fulfilmentOne nylex   org chart fulfilment
One nylex org chart fulfilmentTom Evans
 

More from Tom Evans (19)

NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05
 
Nylex Water Solutions Ingleburn - Main Body
Nylex Water Solutions Ingleburn - Main BodyNylex Water Solutions Ingleburn - Main Body
Nylex Water Solutions Ingleburn - Main Body
 
RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3
 
Somerton Warehouse
Somerton WarehouseSomerton Warehouse
Somerton Warehouse
 
Wa warehouse project status report
Wa warehouse project status reportWa warehouse project status report
Wa warehouse project status report
 
Packaged vehicle profile
Packaged vehicle profilePackaged vehicle profile
Packaged vehicle profile
 
Nylex letterhead 08
Nylex letterhead 08Nylex letterhead 08
Nylex letterhead 08
 
New nylex power piont pres
New nylex power piont presNew nylex power piont pres
New nylex power piont pres
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfp
 
Pg all sites period 4 f08
Pg all sites period 4 f08Pg all sites period 4 f08
Pg all sites period 4 f08
 
Nylex rfi international freight nylex
Nylex rfi international freight nylexNylex rfi international freight nylex
Nylex rfi international freight nylex
 
Nylex rfi international freight draft
Nylex rfi international freight draftNylex rfi international freight draft
Nylex rfi international freight draft
 
2 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.20052 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.2005
 
1 nylex cover letter
1 nylex cover letter1 nylex cover letter
1 nylex cover letter
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfp
 
Water outsource data dot piont
Water outsource data dot piontWater outsource data dot piont
Water outsource data dot piont
 
Nylex water solutions key points briefing 13-09-07
Nylex water solutions   key points briefing 13-09-07Nylex water solutions   key points briefing 13-09-07
Nylex water solutions key points briefing 13-09-07
 
Nnw freight outsource model
Nnw   freight outsource modelNnw   freight outsource model
Nnw freight outsource model
 
One nylex org chart fulfilment
One nylex   org chart fulfilmentOne nylex   org chart fulfilment
One nylex org chart fulfilment
 

West distribution changes

  • 2. 2 Content • Overview of changes: West Coast • Changes to service overview • How will it work now? • Questions & answers • Service delivery measurement and management • Conclusion
  • 3. 3 Overview of West Coast distribution strategy A strategic analysis was undertaken to examine the most cost effective methods of servicing the WA market.. Various scenarios were examined in detail including full 3PL (full outsourcing of local warehousing and delivery) through to direct delivery ex Melbourne. The option chosen is a combination of these based on delivering • The required “Next Day” service level for fasteners and some fabric products • Cost effective distribution of plastic and other products directly from Melbourne Features include: • A small footprint of product (568 sku’s) still held in WA in an outsourced “3PL” environment. • Direct shipping of other orders weekly from Melbourne The service will be split into two distinct categories we shall call the “locally held stock lines (3PL)” & “break bulk” ex Melbourne.
  • 4. 4 How will WA now work? Local WA held product overview. • 586 Lines held locally in 3PL provider. • These lines are primarily Ajax & Senco, with some film and fabric products. • Service will be via next day delivery after placement of orders. Cut-off will be at 2.00pm WA local time. • Provider will have limited access to our SAP platform & be able to print out orders on a local printer. • Provider will have access to check stocks, print orders & other necessary transactions. Provider will have no access to any other plant & or data. • Orders that are placed for items that are locally held & have lines held in Melbourne will be split into two distinct orders either manually or via a SAP driven trigger. • All EDI based customers such as Bunning will be fulfilled ex Melbourne. • All customers that have specific delivery requirement will be catered for by provider as per current arrangements. • Date for this change will be effective Monday 13th October 2009
  • 5. 5 How will WA now work? Melbourne held product service overview • EDI based customers will be serviced Ex Melbourne for all orders • All current customers will have access to all lines in the Melbourne DC. • Primary Shipping day will be Thursday ex week for delivery in full the next Monday. Cut-off times for this service will be COB each Wednesday. • Product will be shipped during the week depending on volumes & transport schedules. • Service will be by rail via the option named “break bulk” • Orders will be picked & packed in Melbourne & consolidated into a large single delivery then distributed to the customers at the WA end. • All orders will have the full compliment of paperwork currently provided. • Senco spares & other small items currently service by air bags will continue. • Melbourne warehouse operation will be responsible for the same level of communication currently provided by the staff in WA. This includes to local 3PL operation as well as the Melbourne portion. • Current distribution management will have full control & responsibility over the WA 3PL operation
  • 6. 6 How will WA now work? Service offer detail WA based 3PL stocked lines.  586 Lines of fastener based products help in WA.  All WA customers have the ability to order these lines.  Current - system set customer MOQ’s still apply.  Orders placed before 1.pm (LT) delivered next day.  Somerton distribution team to manage WA operation  Provider to submit activity & delivery (DIFOT) KPI’s.  Somerton team to view order queue daily to ensure compliance Melbourne based stocked lines.  All remaining Consumer products available to WA Base customers.  Orders will be picked & shipped weekly.  Cut-off times for orders will be Wednesday buy COB Melbourne time  Orders will be shipped each Thursday morning for delivery by the following Tuesday.  Shipments will consist of direct to customer deliveries & STO’s into 3PL operation  Somerton distribution team to manage all activity KPI’s relating to this activity  Provider to submit delivery (DIFOT) KPI’s at the Delivery level. ** Changes can be made subject to review & capability**
  • 7. 7 How will WA now work? Fulfilment offer detail WA based 3PL stocked lines.  3PL based lines to be replenished by STO process  Only “A” & “B” class lines from fasteners to be held at local 3PL operation  Safety stock levels to be set at 4 weeks for “A” class 6 weeks for “B” class items  STO’s to be shipped weekly along with customer orders.  All STO’s to be shipped with a week of creation ** Order creation cycle to be timed with shipping**  Supply to use sales generated forecast along with historical sales data to determine stock levels.  Supply team to manage KPI’s that relate to stock outs & forecasting accuracy.  Somerton team to manage KPI’s relating to STO delivery performance. Melbourne based stocked lines.  All remaining stock lines to be held at Somerton All “C” class fasteners & all GH&L ABC’s  Somerton safety stock levels will be adjusted to incorporate WA demand  WA based sales forecasts will be built into the stock holding & Somerton stock purchasing requirements.  DC based sales & large volume sales of any products can be shipped direct to WA for substantial orders that meet the efficiency “criteria”**  Supply team to manage KPI’s to ensure WA order fulfilment failures due to stock outs & forecasting accuracy. ** Efficiency criteria is for large orders of stock from suppliers that can be efficiently configured into a delivery. **Example full containers of Esky that equal 1 or 2 customer orders
  • 9. 9 Why is Nylex undertaking this change? This has been brought about by the need to change the way we operate, so that we can continue to be a viable provider of high-quality warehousing and distribution services. The cost of carrying inventory in multiple sites ties up valuable financial resources and prevents the business from undertaking other activities with that cash. This change will allow us to better plan our inventory and ensure it can be sourced to meet customer demand. Transport from the East is unreliable? We have developed a transport model which will allow us to deliver in a predictable and cost-efficient window each week. We have also built a plan for delays and derailments which will ensure our customer orders are delivered by road as a fall back position with the same weekly timeline for all plastic products. Is everything going to be delivered from Somerton? Fasteners will continue to be warehoused and delivered from a third party provider in Perth. All plastic products will be delivered from a central warehouse in Melbourne. Is this the result of poor performance in Western Australia? No absolutely not. This is the result of a strategic review of the Nylex business and identification of more efficient ways to spend shareholder funds. Why is this happening now? Nylex is undergoing financial stress due to a number of factors. It is imperative that changes are made to continue to do business with our customers and find ways to create savings at every opportunity. QUESTIONS & ANSWERS
  • 10. 10 QUESTIONS & ANSWERS What will be the impact on our customers? Our customers should not experience any differences in the fulfillment of fasteners, with a small change occurring in the plastics business to weekly ordering and weekly delivery. The key change for customers will be the timing of placing orders each week for plastic products to ensure they meet the timeline for rail deliveries. What do we say if customers ask what is going on? We can tell customers that Nylex has reviewed its supply chain and fulfillment structure and found opportunities to do business more efficiently. With our primary obligation to create shareholder value, we are working to deliver or improve upon customer delivery expectations and ensure we do so profitability.
  • 11. 11 All current SAP based transactions will show order status in SAP for both the local 3PL option & Melbourne fulfilment models. • Transaction “ZVLO6N” will show current order status in sap for all WA orders. Plant 09 for Melb based orders & Plant 45 for WA based orders out of 3PL provider that are currently at pick slip & not invoiced. • Please note list below has all required delivery dates & customer information KPI & Data measurement Nylex performance data
  • 12. 12 Excel based delivery reports will be available weekly with all deliveries measured inclusive of TRUE DIFOT. Pickup, transit times & actual delivery date/time information will be included for each WA delivery. **please note this is sample data from historical STO deliveries & for sample purposes only** KPI & Data measurement Carrier & 3PL delivery performance
  • 13. Conclusion The Nylex distribution team is committed to customer service in all aspects • Communication • Information • Co-operation • Cost effectiveness • Performance • Customer satisfaction 13