Project Details
Project Review: Number 3. 6 November 2008
Project Name: Consumer Division: Managing the Transition Process to a New Outsourced Distribution Network.
Project Objective: Closure and outsourcing of four consumer group warehouses in Australia and New Zealand by December 2008.
Project Plan Version: 1.5 Updated 28 October 2008
Nylex Project Sponsor: Dave Armstrong (DA)
Nylex Project Manager: Tom Evans (TE)
Meta: Peter Molony (PM), Nick Prescott (NP)
Weekly Report Contents
Section A Project Plan, Timings Milestones and Comments Consulting Days
Elapsed 21 up till 31st October 2008
Section B
Summary Comments
Delivery Project remains one week behind. Planned completion date is by week ending 12 Dec 2008
Milestones Met Major milestones met this week are:
Proposals received from 3Pls
Clarification of responses with 3 PLs
Key Issues "To be" inventory profile awaiting sales progressing - non critical at this stage.
3PL freight responses have not demonstrated an in depth understanding of task resulting in potentially higher costs than present.
This is expected to improve as they understand the task. Top help this focus initaly on warehousing and then get then to requte freight costs.
Informing staff is underway.
Mainfreight has indicated concerns on a December implementation for Brisbane.
Toll have not complted warehouse submissio.Only have Auckland. Awaiting their final site visits.
SECTION A Project Plan, Timings, Milestones & Comments
Activity Who Due Date Result Comment
1.0 Project Establishment
1.1 Project Briefing - outline scope & timing for plan development TE, PM, NP 3/10/2008 Met
1.2 Establish Project - program, plan, methodology, data specification & team agreed TE, PM, NP 7/10/2008 Met
1.3 Information Collection - Establish "As Is" & "To Be" Task, Resources & Financial TE, PM 8/10/2008 Met
1.4 Validate raw data for use in model PM 9/10/2008 Met
1.5 Visit Somerton for physical reference TE, PM, NP 7/10/2008 Met
2.0 Establish "To Be" Inventory Profiles
2.1 Develop "To Be" Inventory Profile for each location. PM 13/10/2008 Met
2.2 Review "To Be" Inventory Profile with Sales Team for each location. TE, PM, Nylex Sales 24/10/2008 Not Met Sitting with national sales
2.3 Agree "To Be" Inventory Profile for each location. Nylex 24/10/2008 Not Met Currently not critical but we will need their position by 7 November at latest.
3.0 Develop "As Is" Baseline Existing Distribution Network
3.1 Describe distribution channels - Production Facilities, Distribution Network, Regional TE, PM 7/10/2008 Met
3.2 Map existing product and information flows PM 9/10/2008 Met
3.3 Model existing logistics task PM 10/10/2008 Met
3.4 Describe existing outcomes/issues - time, service, KPI's, 3PL contracts, info, quality, etc. PM 13/10/2008 Met
3.5 Review & agree as representative description of existing operations TE, PM 14/10/2008 Met
4.0 Develop "To Be" Description of Proposed Distribution Network
4.1 Describe "To Be" Distribution Network PM 15/10/2008 Met
4.2 Describe "To Be" Logistics Task PM 16/10/2008 Met
4.3 Review & agree future distribution model TE,PM 16/10/2008 Met
4.4 Develop Key Operating Principles & Rules for "To Be" Network TE,PM 16/10/2008 Met
5.0 Outsourcing Strategy & Process
5.1 Purchasing Strategy TE, PM,NP 16/10/2008 Met
5.2 Develop Proposal Request Document PM, NP 17/10/2008 Met
5.3 Approve Proposal Request Document TE 17/10/2008 Met
5.4 Issue Documents to 3PL's PM 17/10/2008 Met
5.5 Proposal Preparation 3PLs 31/10/2008 Met awaiting some further detail from Toll
5.6 Develop Assessment Template PM, NP 21/10/2008 Met
6.0 3PL Responses
6.1 Receive Proposals for each Element - by Location & for Freight PM 31/10/2008 Met
6.2 Clarify Issues/Responses TE, PM 5/11/2008 Met
6.3 Develop Cost Comparison for Assessment PM 6/11/2008 Largely Met
6.4 Assess Against Template PM, NP 7/11/2008
6.5 Review/Comment TE, PM, NP 7/11/2008
7.0 Develop Total Cost Model
7.1 3PL Cost Structures PM 10/11/2008
7.2 Warehousing - Townsville PM 10/11/2008
7.3 Warehousing - Brisbane PM 12/11/2008
7.4 Warehousing - NZ PM 12/11/2008
7.5 International Freight PM 13/11/2008
7.6 Domestic Freight PM 13/11/2008
7.7 NZ Freight PM 13/11/2008
7.8 Ongoing Client Costs - Systems, Assets, etc. PM 10/11/2008
7.9 Identify Once Off Costs - Transition Costs - Inventory, Assets, etc. PM 12/11/2008
7.10 Sensitivity to Volume Var - Scalability PM 13/11/2008
7.11 Complete Cost Model PM 14/11/2008
7.12 Review/Comment TE, PM, NP 14/11/2008
8.0 Resource Issues
8.1 Inform Staff of Outsourcing Process TE 10/11/2008 Largely Met underway all ready
8.2 Address Property Leases - Internal TE, PM 21/10/2008 Met
Address Property Leases - 3 PL PM 18/11/2008
8.3 Address Equipment Commitments - Internal TE, PM 22/10/2008 Met
Address Equipment Commitments - 3 PL PM 19/11/2008
8.4 Establish SAP Capability for 3PL - Internal TE, PM 23/10/2008 Met
Establish SAP Capability for 3PL PM 20/11/2008
8.5 Staff Redundancies - Internal TE, 24/10/2008 Met
Staff Redundancies - Internal/3PL TE, PM 21/11/2008
9.0 Negotiations
9.1 Assess Fit & Cost TE, PM, NP 14/11/2008
9.2 "Best Offer on the Table" TE, PM 17/11/2008
9.3 Clarify Issues Outstanding TE. PM 18/11/2008
9.4 Negotiate Cost/Service TE, PM 19/11/2008
9.5 Review/Revise Contract TE, PM 20/11/2008
9.6 Prepare Final Draft TE, PM, NP 21/11/2008
9.7 Agree Contract - Nylex/3PL TE, Nylex 21/11/2008
10.0 Implementation Plan
10.1 Relocate Inventory According to Inventory Profile at each location TE, PM 21/11/2008
10.2 Transition Warehouses to 3PL - Townsville TE, PM, 3PL 21/11/2008
Transition Warehouses to 3PL - Brisbane TE, PM, 3PL 28/11/2008
Transition Warehouses to 3PL - NZ TE, PM, 3PL 5/12/2008
10.3 Transition Freight Task to 3PL - Domestic TE, PM, 3PL 21/11/2008
Transition Freight Task to 3PL - International TE, PM, 3PL 21/11/2008
Transition Freight Task to 3PL -NZ TE, PM, 3PL 5/12/2008
10.4 Establish Operational KPI's, Reporting & Review of 3PL TE, PM 5/12/2008 Latest, earlier for earlier outsourced elements
10.5 Relocate Miscellaneous Equipment, Documents & Items TE, PM, 3PL 21/11/2008
11.0 Project Assessment
11.1 Assess outcomes against project goals TE, PM, NP 12/12/2008
Trying to save  Nylex...............Weeklyreporting 6 nov 2008

More Related Content

Viewers also liked

P d national dist mngr
P d national dist mngrP d national dist mngr
P d national dist mngrTom Evans
 
M2L Final Presentation
M2L Final PresentationM2L Final Presentation
M2L Final PresentationDylan Maher
 
Decima edición
Decima ediciónDecima edición
Decima ediciónbody&health
 
Nz distribution changes
Nz  distribution changesNz  distribution changes
Nz distribution changesTom Evans
 
Nylex water presentation 31 08-07
Nylex water presentation 31 08-07Nylex water presentation 31 08-07
Nylex water presentation 31 08-07Tom Evans
 
Daniel.keifer.unit1.ip.pp
Daniel.keifer.unit1.ip.ppDaniel.keifer.unit1.ip.pp
Daniel.keifer.unit1.ip.ppDKeifer00
 
Fulfillment group oct 08
Fulfillment group oct 08Fulfillment group oct 08
Fulfillment group oct 08Tom Evans
 
Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06Tom Evans
 
Delivery service offer user guide v1.0
Delivery service offer user guide v1.0Delivery service offer user guide v1.0
Delivery service offer user guide v1.0Tom Evans
 
Nylex consumer rfp
Nylex consumer   rfpNylex consumer   rfp
Nylex consumer rfpTom Evans
 
14a Edición Noviembre/Diciembre 2016
14a Edición Noviembre/Diciembre 201614a Edición Noviembre/Diciembre 2016
14a Edición Noviembre/Diciembre 2016body&health
 

Viewers also liked (11)

P d national dist mngr
P d national dist mngrP d national dist mngr
P d national dist mngr
 
M2L Final Presentation
M2L Final PresentationM2L Final Presentation
M2L Final Presentation
 
Decima edición
Decima ediciónDecima edición
Decima edición
 
Nz distribution changes
Nz  distribution changesNz  distribution changes
Nz distribution changes
 
Nylex water presentation 31 08-07
Nylex water presentation 31 08-07Nylex water presentation 31 08-07
Nylex water presentation 31 08-07
 
Daniel.keifer.unit1.ip.pp
Daniel.keifer.unit1.ip.ppDaniel.keifer.unit1.ip.pp
Daniel.keifer.unit1.ip.pp
 
Fulfillment group oct 08
Fulfillment group oct 08Fulfillment group oct 08
Fulfillment group oct 08
 
Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06
 
Delivery service offer user guide v1.0
Delivery service offer user guide v1.0Delivery service offer user guide v1.0
Delivery service offer user guide v1.0
 
Nylex consumer rfp
Nylex consumer   rfpNylex consumer   rfp
Nylex consumer rfp
 
14a Edición Noviembre/Diciembre 2016
14a Edición Noviembre/Diciembre 201614a Edición Noviembre/Diciembre 2016
14a Edición Noviembre/Diciembre 2016
 

Similar to Trying to save Nylex...............Weeklyreporting 6 nov 2008

Wa warehouse project status report
Wa warehouse project status reportWa warehouse project status report
Wa warehouse project status reportTom Evans
 
Wa warehouse project status report
Wa warehouse project status reportWa warehouse project status report
Wa warehouse project status reportTom Evans
 
Accelerating through Root Cause Analysis (05.03.2006).ppt
Accelerating through Root Cause Analysis (05.03.2006).pptAccelerating through Root Cause Analysis (05.03.2006).ppt
Accelerating through Root Cause Analysis (05.03.2006).pptokimi64
 
Traveline Conference 09
Traveline Conference 09Traveline Conference 09
Traveline Conference 09Traveline
 
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...Project Controls Expo
 
Optima direct post mortem 1
Optima direct post mortem 1 Optima direct post mortem 1
Optima direct post mortem 1 shelleyberg
 
Project Description The new computer-controlled convey.docx
Project Description The new computer-controlled convey.docxProject Description The new computer-controlled convey.docx
Project Description The new computer-controlled convey.docxbriancrawford30935
 
Capfy09 Presentation V12
Capfy09 Presentation V12Capfy09 Presentation V12
Capfy09 Presentation V12scottsbiz
 
Howe Street Basic Project Approach
Howe Street Basic Project ApproachHowe Street Basic Project Approach
Howe Street Basic Project ApproachJasonLhota1
 
Commissioning Plan Robert Thelander, Svenska kraftnät
Commissioning Plan Robert Thelander, Svenska kraftnät Commissioning Plan Robert Thelander, Svenska kraftnät
Commissioning Plan Robert Thelander, Svenska kraftnät Fingrid Oyj
 
CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017Charlemagne Celo
 
A Perspective On Project Management
A Perspective On Project ManagementA Perspective On Project Management
A Perspective On Project Managementguintato
 
Project management@ ppt doms
Project management@ ppt doms Project management@ ppt doms
Project management@ ppt doms Babasab Patil
 
Project management @ bec doms
Project management @ bec domsProject management @ bec doms
Project management @ bec domsBabasab Patil
 
Project management strategy – HTDS treatment plant
Project management strategy – HTDS treatment plantProject management strategy – HTDS treatment plant
Project management strategy – HTDS treatment plantSamir Dave
 

Similar to Trying to save Nylex...............Weeklyreporting 6 nov 2008 (20)

Kick Off Meeting Presentation
Kick Off Meeting PresentationKick Off Meeting Presentation
Kick Off Meeting Presentation
 
Wa warehouse project status report
Wa warehouse project status reportWa warehouse project status report
Wa warehouse project status report
 
Wa warehouse project status report
Wa warehouse project status reportWa warehouse project status report
Wa warehouse project status report
 
PMM_CV_Detailed_20150521
PMM_CV_Detailed_20150521PMM_CV_Detailed_20150521
PMM_CV_Detailed_20150521
 
Accelerating through Root Cause Analysis (05.03.2006).ppt
Accelerating through Root Cause Analysis (05.03.2006).pptAccelerating through Root Cause Analysis (05.03.2006).ppt
Accelerating through Root Cause Analysis (05.03.2006).ppt
 
Project management
Project management Project management
Project management
 
Traveline Conference 09
Traveline Conference 09Traveline Conference 09
Traveline Conference 09
 
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
 
Optima direct post mortem 1
Optima direct post mortem 1 Optima direct post mortem 1
Optima direct post mortem 1
 
Reportingonline
ReportingonlineReportingonline
Reportingonline
 
Project Description The new computer-controlled convey.docx
Project Description The new computer-controlled convey.docxProject Description The new computer-controlled convey.docx
Project Description The new computer-controlled convey.docx
 
Capfy09 Presentation V12
Capfy09 Presentation V12Capfy09 Presentation V12
Capfy09 Presentation V12
 
Howe Street Basic Project Approach
Howe Street Basic Project ApproachHowe Street Basic Project Approach
Howe Street Basic Project Approach
 
Commissioning Plan Robert Thelander, Svenska kraftnät
Commissioning Plan Robert Thelander, Svenska kraftnät Commissioning Plan Robert Thelander, Svenska kraftnät
Commissioning Plan Robert Thelander, Svenska kraftnät
 
CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017
 
A Perspective On Project Management
A Perspective On Project ManagementA Perspective On Project Management
A Perspective On Project Management
 
Project management@ ppt doms
Project management@ ppt doms Project management@ ppt doms
Project management@ ppt doms
 
Project management @ bec doms
Project management @ bec domsProject management @ bec doms
Project management @ bec doms
 
Project management strategy – HTDS treatment plant
Project management strategy – HTDS treatment plantProject management strategy – HTDS treatment plant
Project management strategy – HTDS treatment plant
 
SLFC SMMK
SLFC SMMKSLFC SMMK
SLFC SMMK
 

More from Tom Evans

NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05Tom Evans
 
Nylex Water Solutions Ingleburn - Main Body
Nylex Water Solutions Ingleburn - Main BodyNylex Water Solutions Ingleburn - Main Body
Nylex Water Solutions Ingleburn - Main BodyTom Evans
 
RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3Tom Evans
 
Somerton Warehouse
Somerton WarehouseSomerton Warehouse
Somerton WarehouseTom Evans
 
Packaged vehicle profile
Packaged vehicle profilePackaged vehicle profile
Packaged vehicle profileTom Evans
 
Nylex letterhead 08
Nylex letterhead 08Nylex letterhead 08
Nylex letterhead 08Tom Evans
 
New nylex power piont pres
New nylex power piont presNew nylex power piont pres
New nylex power piont presTom Evans
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfpTom Evans
 
Pg all sites period 4 f08
Pg all sites period 4 f08Pg all sites period 4 f08
Pg all sites period 4 f08Tom Evans
 
Nylex rfi international freight nylex
Nylex rfi international freight nylexNylex rfi international freight nylex
Nylex rfi international freight nylexTom Evans
 
Nylex rfi international freight draft
Nylex rfi international freight draftNylex rfi international freight draft
Nylex rfi international freight draftTom Evans
 
2 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.20052 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.2005Tom Evans
 
1 nylex cover letter
1 nylex cover letter1 nylex cover letter
1 nylex cover letterTom Evans
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfpTom Evans
 
Water outsource data dot piont
Water outsource data dot piontWater outsource data dot piont
Water outsource data dot piontTom Evans
 
Nylex water solutions key points briefing 13-09-07
Nylex water solutions   key points briefing 13-09-07Nylex water solutions   key points briefing 13-09-07
Nylex water solutions key points briefing 13-09-07Tom Evans
 
Nnw freight outsource model
Nnw   freight outsource modelNnw   freight outsource model
Nnw freight outsource modelTom Evans
 
One nylex org chart fulfilment
One nylex   org chart fulfilmentOne nylex   org chart fulfilment
One nylex org chart fulfilmentTom Evans
 

More from Tom Evans (18)

NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05
 
Nylex Water Solutions Ingleburn - Main Body
Nylex Water Solutions Ingleburn - Main BodyNylex Water Solutions Ingleburn - Main Body
Nylex Water Solutions Ingleburn - Main Body
 
RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3
 
Somerton Warehouse
Somerton WarehouseSomerton Warehouse
Somerton Warehouse
 
Packaged vehicle profile
Packaged vehicle profilePackaged vehicle profile
Packaged vehicle profile
 
Nylex letterhead 08
Nylex letterhead 08Nylex letterhead 08
Nylex letterhead 08
 
New nylex power piont pres
New nylex power piont presNew nylex power piont pres
New nylex power piont pres
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfp
 
Pg all sites period 4 f08
Pg all sites period 4 f08Pg all sites period 4 f08
Pg all sites period 4 f08
 
Nylex rfi international freight nylex
Nylex rfi international freight nylexNylex rfi international freight nylex
Nylex rfi international freight nylex
 
Nylex rfi international freight draft
Nylex rfi international freight draftNylex rfi international freight draft
Nylex rfi international freight draft
 
2 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.20052 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.2005
 
1 nylex cover letter
1 nylex cover letter1 nylex cover letter
1 nylex cover letter
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfp
 
Water outsource data dot piont
Water outsource data dot piontWater outsource data dot piont
Water outsource data dot piont
 
Nylex water solutions key points briefing 13-09-07
Nylex water solutions   key points briefing 13-09-07Nylex water solutions   key points briefing 13-09-07
Nylex water solutions key points briefing 13-09-07
 
Nnw freight outsource model
Nnw   freight outsource modelNnw   freight outsource model
Nnw freight outsource model
 
One nylex org chart fulfilment
One nylex   org chart fulfilmentOne nylex   org chart fulfilment
One nylex org chart fulfilment
 

Trying to save Nylex...............Weeklyreporting 6 nov 2008

  • 1. Project Details Project Review: Number 3. 6 November 2008 Project Name: Consumer Division: Managing the Transition Process to a New Outsourced Distribution Network. Project Objective: Closure and outsourcing of four consumer group warehouses in Australia and New Zealand by December 2008. Project Plan Version: 1.5 Updated 28 October 2008 Nylex Project Sponsor: Dave Armstrong (DA) Nylex Project Manager: Tom Evans (TE) Meta: Peter Molony (PM), Nick Prescott (NP) Weekly Report Contents Section A Project Plan, Timings Milestones and Comments Consulting Days Elapsed 21 up till 31st October 2008 Section B Summary Comments Delivery Project remains one week behind. Planned completion date is by week ending 12 Dec 2008 Milestones Met Major milestones met this week are: Proposals received from 3Pls Clarification of responses with 3 PLs Key Issues "To be" inventory profile awaiting sales progressing - non critical at this stage. 3PL freight responses have not demonstrated an in depth understanding of task resulting in potentially higher costs than present. This is expected to improve as they understand the task. Top help this focus initaly on warehousing and then get then to requte freight costs. Informing staff is underway. Mainfreight has indicated concerns on a December implementation for Brisbane. Toll have not complted warehouse submissio.Only have Auckland. Awaiting their final site visits. SECTION A Project Plan, Timings, Milestones & Comments
  • 2. Activity Who Due Date Result Comment 1.0 Project Establishment 1.1 Project Briefing - outline scope & timing for plan development TE, PM, NP 3/10/2008 Met 1.2 Establish Project - program, plan, methodology, data specification & team agreed TE, PM, NP 7/10/2008 Met 1.3 Information Collection - Establish "As Is" & "To Be" Task, Resources & Financial TE, PM 8/10/2008 Met 1.4 Validate raw data for use in model PM 9/10/2008 Met 1.5 Visit Somerton for physical reference TE, PM, NP 7/10/2008 Met 2.0 Establish "To Be" Inventory Profiles 2.1 Develop "To Be" Inventory Profile for each location. PM 13/10/2008 Met 2.2 Review "To Be" Inventory Profile with Sales Team for each location. TE, PM, Nylex Sales 24/10/2008 Not Met Sitting with national sales 2.3 Agree "To Be" Inventory Profile for each location. Nylex 24/10/2008 Not Met Currently not critical but we will need their position by 7 November at latest. 3.0 Develop "As Is" Baseline Existing Distribution Network 3.1 Describe distribution channels - Production Facilities, Distribution Network, Regional TE, PM 7/10/2008 Met 3.2 Map existing product and information flows PM 9/10/2008 Met 3.3 Model existing logistics task PM 10/10/2008 Met 3.4 Describe existing outcomes/issues - time, service, KPI's, 3PL contracts, info, quality, etc. PM 13/10/2008 Met 3.5 Review & agree as representative description of existing operations TE, PM 14/10/2008 Met 4.0 Develop "To Be" Description of Proposed Distribution Network 4.1 Describe "To Be" Distribution Network PM 15/10/2008 Met 4.2 Describe "To Be" Logistics Task PM 16/10/2008 Met 4.3 Review & agree future distribution model TE,PM 16/10/2008 Met 4.4 Develop Key Operating Principles & Rules for "To Be" Network TE,PM 16/10/2008 Met 5.0 Outsourcing Strategy & Process 5.1 Purchasing Strategy TE, PM,NP 16/10/2008 Met 5.2 Develop Proposal Request Document PM, NP 17/10/2008 Met 5.3 Approve Proposal Request Document TE 17/10/2008 Met
  • 3. 5.4 Issue Documents to 3PL's PM 17/10/2008 Met 5.5 Proposal Preparation 3PLs 31/10/2008 Met awaiting some further detail from Toll 5.6 Develop Assessment Template PM, NP 21/10/2008 Met 6.0 3PL Responses 6.1 Receive Proposals for each Element - by Location & for Freight PM 31/10/2008 Met 6.2 Clarify Issues/Responses TE, PM 5/11/2008 Met 6.3 Develop Cost Comparison for Assessment PM 6/11/2008 Largely Met 6.4 Assess Against Template PM, NP 7/11/2008 6.5 Review/Comment TE, PM, NP 7/11/2008 7.0 Develop Total Cost Model 7.1 3PL Cost Structures PM 10/11/2008 7.2 Warehousing - Townsville PM 10/11/2008 7.3 Warehousing - Brisbane PM 12/11/2008 7.4 Warehousing - NZ PM 12/11/2008 7.5 International Freight PM 13/11/2008 7.6 Domestic Freight PM 13/11/2008 7.7 NZ Freight PM 13/11/2008 7.8 Ongoing Client Costs - Systems, Assets, etc. PM 10/11/2008 7.9 Identify Once Off Costs - Transition Costs - Inventory, Assets, etc. PM 12/11/2008 7.10 Sensitivity to Volume Var - Scalability PM 13/11/2008 7.11 Complete Cost Model PM 14/11/2008 7.12 Review/Comment TE, PM, NP 14/11/2008 8.0 Resource Issues 8.1 Inform Staff of Outsourcing Process TE 10/11/2008 Largely Met underway all ready 8.2 Address Property Leases - Internal TE, PM 21/10/2008 Met Address Property Leases - 3 PL PM 18/11/2008
  • 4. 8.3 Address Equipment Commitments - Internal TE, PM 22/10/2008 Met Address Equipment Commitments - 3 PL PM 19/11/2008 8.4 Establish SAP Capability for 3PL - Internal TE, PM 23/10/2008 Met Establish SAP Capability for 3PL PM 20/11/2008 8.5 Staff Redundancies - Internal TE, 24/10/2008 Met Staff Redundancies - Internal/3PL TE, PM 21/11/2008 9.0 Negotiations 9.1 Assess Fit & Cost TE, PM, NP 14/11/2008 9.2 "Best Offer on the Table" TE, PM 17/11/2008 9.3 Clarify Issues Outstanding TE. PM 18/11/2008 9.4 Negotiate Cost/Service TE, PM 19/11/2008 9.5 Review/Revise Contract TE, PM 20/11/2008 9.6 Prepare Final Draft TE, PM, NP 21/11/2008 9.7 Agree Contract - Nylex/3PL TE, Nylex 21/11/2008 10.0 Implementation Plan 10.1 Relocate Inventory According to Inventory Profile at each location TE, PM 21/11/2008 10.2 Transition Warehouses to 3PL - Townsville TE, PM, 3PL 21/11/2008 Transition Warehouses to 3PL - Brisbane TE, PM, 3PL 28/11/2008 Transition Warehouses to 3PL - NZ TE, PM, 3PL 5/12/2008 10.3 Transition Freight Task to 3PL - Domestic TE, PM, 3PL 21/11/2008 Transition Freight Task to 3PL - International TE, PM, 3PL 21/11/2008 Transition Freight Task to 3PL -NZ TE, PM, 3PL 5/12/2008 10.4 Establish Operational KPI's, Reporting & Review of 3PL TE, PM 5/12/2008 Latest, earlier for earlier outsourced elements 10.5 Relocate Miscellaneous Equipment, Documents & Items TE, PM, 3PL 21/11/2008 11.0 Project Assessment 11.1 Assess outcomes against project goals TE, PM, NP 12/12/2008