SH&E INTERNAL AUDIT
Pilot Programme – Intital Review
NYLEX WATER SOLUTIONS
Nylex Water Solutions – Ingleburn NSW
3B Williamson Road, Ingleburn 2565
GREG LAZZARO
31th
March 2005
FINAL
PAGE 0 OF 9
Activity No SE-001
Date 31/3/05
Surveillance Audit
Site: Nylex Water Solutions, Ingleburn
Site Address: 3B Williamson Rd, Ingleburn
New South Wales, Australia
Standards: Safety, Health & Environment Initial Review
Scope of Audit: Occupational Health and Safety Management System & Environment
Management system “initial compliance review” for the manufacturing
site and processes employed in the manufacture of a range of moulded
tanks and accessories. The audit will also focus on functional
compliance areas requiring improvement.
Prepared By: Greg Lazzaro
COMMERCIAL- IN – CONFIDENCE
The contents of this report must not be disclosed to a third party without the agreement of Nylex Limited
FINAL
PAGE 0 OF 9
Introduction
Nylex Head Office conducted an audit of Nylex Water Solutions, 31th March 2005.
The purpose of this audit report is to summarise the degree of compliance with relevant criteria, as
defined on the cover page of this report, based on the evidence obtained during the review of Nylex
Water Solutions.
Audits are carried out within the requirements of Occupational Health and Safety Management
Systems requirements appropriate to a business and also observations related to site inspections.
Executive Overview
The Ingleburn Water Solutions Facility is located in a well established light industrial area about 44km SW of
Sydney. The factory was established in late 2004 and the site was previously tenanted by a company that
recycled copper from the electrical industry (Resource Recycling Technologies).
The site at Ingleburn is made up of two factory areas which has been spilt into production and fit out areas.
The site has currently 5 employees and all employees have a can do attitude and very conscious of safe
working practices. It is however, a site that requires a systematic approach towards complying with
occupational, Health & Safety requirements from a basic perspective at least for the short term. Areas of
improvement are with site induction protocols, emergency management and evacuation systems, compliance
with Nylex Limited standards and a general blending in towards the way in which we expect to eventually run.
It must be said that the site leadership has taken the initial safety issues as a priority and whilst much work
can be done, the ingredients exist for quite a practical and safety focused operation.
The site has a number of machines that will require a more focused risk assessment process and the ability
for the site to improve its machine and operator interface. Task based duties will also be required to be
examined to ensure that there is a consistency in good practices within all the Water Solutions business. The
involvement with Pakenham site is also a very beneficial in the initial setup of systems but again there needs
to be more attention focused in this area before the standard operating practices are set.
The machine guarding issue will be rolled out across the business with Pakenham being the lead as its focus
is more prominent on these areas of Safety. It has been discussed that these methods will then be passed
over to the other water businesses.
The site has scope for improvements but, at this early stage, the site manager has a can do focus and
demonstrates that the requirements for implementing the safe and practical and complaint operation whilst
extracting information from the other Nylex Water Solutions businesses.
The Audit Team Comprised:
• Leader: Greg Lazzaro
Nylex Water Solutions Site Representative : Barry Lewis
FINAL
PAGE 0 OF 9
Many aspects of the original lease requirements have not been done.
The concrete pad to the rear of the premises is one of these and
requires to be done as the uneven ground will cause difficulty in the
stability of the forklifts on site.
The tank storage areas are organised so that there is minimal isle ways
and also obscured vision. It would be recommended that all persons
including truck and delivery drivers, wear fluorescent jackets whilst on
site. Although this is done there are no visible indicators or signage to
reflect this.
Some of the machines are in various stages of serviceability with the
rotational rock & roll open flame machine located in the annexure of the
main building. This was found to have faulty bearing arrangement and
other units will be retrofitted in order to ensure that the coupling is
suitable for ongoing operation.
FINAL
PAGE 0 OF 9
Access platform for the “Rotoline”
oven has no fall protection gate or
chain making the platform
vulnerable to persons falling if
they were to lose footing. This
platform should be retrofitted to
ensure that a gate or restraint
chain is present.
Utilities pipe rack should be painted or taped yellow to ensure that there
is no striking the rack with a ladder or other equipment. It ensure that
the walkway has this more highlighted
Machine segregation is most effective around the enclosed oven at the
site. This was seen to be a very good safety initiative and should be
duplicated around other machinery.
Gas trains should have appropriate certification and ongoing
maintenance checks as per the requirements of the appropriate codes.
Systems should be in place to ensure that the PM program is
established and put into practice.
Plant lighting is adequate in most areas. Improvements in housekeeping
would be an opportunity for improvement within the business. The way
in which the site deals with this will roll out once there is more of a
system based approach introduced. At the moment, this will be
controlled by site leadership. Segregation could also be done with an
extensive line marking system. This will ensure a traffic management
program exists.
FINAL
PAGE 0 OF 9
Protection of gas pipelines should be considered where the risk of
striking or impact is likely. In areas where forklift or pallets will be used,
the gas trains should be protected from mechanical damage.
The forklift gas bottle storage is currently not compliant. Bottles should
be stored in an appropriate area, which is segregated form trafficable
areas and chained. This will ensure that the minor storage requirements
for DG regulations are met.
Warehouse area where product fit out is done has dusty environment.
Housekeeping could be more effective in this area.
The installed pallet racking has no foot protection, which could lead to
striking, and potentially racking could become unstable. It is
recommended that the racking have footing protection installed.
There is a rather large mould stored alongside the racking limiting the
access to the restrooms located behind where the mould is stored. It
seems that this is not the appropriate place for this mould given that the
congestion in the area.
FINAL
PAGE 0 OF 9
The general gardening around the site is not satisfactory and will impinge
on various aspects of the site systems. Air conditioning systems currently
run the risk of becoming in effective unless garden growth is controlled.
Natural Gas supply installed by Nylex Limited. Awareness of gas isolation
and emergency scenario’s should be made aware to all personnel in the
gas of a major gas leak or fire. Inclusion in the site induction programs is
required.
The systems are lacking, as the operation is fairly new. Emergency
planning and evacuation programs should be set up and also
management systems for the operation including what is expected from
employees in terms of PPE, SH&E reporting, process of managing
Occupational Health issues and a variety of systemic programs that
would need to be rolled out. Operational based systems such as work
order and permits for various types of work and contractor induction
process would also be required.
An overall transition to the Safety Framework would also be
recommended so that there is consistency with the Nylex Limited
business standards and systems.
Environmental bunding is used well but as inventory increases, a focus
on proper storage of DG should be implemented. DG cupboard should be
used if storing flammable liquids. The site would need to follow the
Environmental Minimum standards to get an appreciation of would be
required as the site expands its workload.
SUMMARY OF AUDIT
ACTIONS LISTING PAGE 0 OF 2
ACTION NUMBER ACTION Person Responsible Due Date
1 NWI-1/S 001 The concrete pad to the rear of the premises has uneven ground will cause
difficulty in the stability of the forklifts on site. This should be addressed by the
landlord.
2 NWI-1/S 002 All persons including truck and delivery drivers should wear fluorescent
jackets whilst on site. There are no visible indicators or signage to reflect this.
3 NWI-1/S 003 Examine the serviceability with the rotational rock & roll open flame machine
as one was found to have faulty bearing arrangement and other units to be
retrofitted in order to ensure that the coupling is suitable for ongoing
operation.
4 NWI-1/S 004 Access platform for the “Rotoline” oven has no fall protection gate or chain
making the platform vulnerable to persons falling if they were to lose footing.
This platform should be retrofitted to ensure that a gate or restraint chain is
present.
5 NWI-1/S 005 Utilities pipe rack should be painted or taped yellow to ensure that there is no
striking the rack with a ladder or other equipment.
7 NWI-1/S 006 Gas trains should have appropriate certification and ongoing maintenance
checks as per the requirements of the appropriate codes. Systems should be
in place to ensure that the PM program is established and put into practice.
8 NWI-1/S 007 Protection of gas pipelines should be considered where the risk of striking or
impact is likely. In areas where forklift or pallets will be used, the gas trains
should be protected from mechanical damage.
9 NWI-1/S 008 The forklift gas bottle storage is currently not compliant. Bottles should be
stored in an appropriate area, which is segregated form trafficable areas and
chained. This will ensure that the minor storage requirements for DG
regulations are met.
10 NWI-1/S 009 Warehouse area where product fit out is done has dusty environment.
Housekeeping could be more effective in this area.
11 NWI-1/S 010 The installed pallet racking has no footing protection, which could lead to
striking, and potentially racking could become unstable. It is recommended
that the racking have footing protection installed.
SUMMARY OF AUDIT
ACTIONS LISTING PAGE 0 OF 2
12 NWI-1/S 011 There is a rather large mould stored alongside the racking limiting the access
to the restrooms located behind where the mould is stored. It seems that this
is not the appropriate place for this mould given that the congestion in the
area.
13 NWI-1/S 012 The general gardening around the site is not satisfactory and will impinge on
various aspects of the site systems. This should be addressed in a timely
fashion.
14 NWI-1/S 013 Personnel should be made aware of Natural Gas supply control valve set at
the front of the premises in the event of a major gas leak or fire. Inclusion in
the site induction programs is required for gas isolation and emergency
scenario’s.
15 NWI-1/S 014 Suggested implementation of a site safety manual which has key criteria for
dealing with SH&E basics, eg induction, PPE, scope of work safety and
contractor management. This should be followed by more formal systems of
SOP‘s.
16 NWI-1/S 015 An overall transition to the Safety Framework would also be recommended so
that there is consistency with the Nylex Limited business standards and
systems.
NWI Nylex Water Ingleburn 001 Rec./ Obs. Number
1 Audit Number S Safety Item
E Environmental Item

More Related Content

What's hot (19)

Resume Shahid
Resume ShahidResume Shahid
Resume Shahid
 
Trevor CV 2016
Trevor CV 2016Trevor CV 2016
Trevor CV 2016
 
Facilities Maintenance Technician
Facilities Maintenance TechnicianFacilities Maintenance Technician
Facilities Maintenance Technician
 
Arkos _ Compressor Maintenance
Arkos _ Compressor MaintenanceArkos _ Compressor Maintenance
Arkos _ Compressor Maintenance
 
Paul Woodland CV
Paul Woodland CVPaul Woodland CV
Paul Woodland CV
 
afri-cv
afri-cvafri-cv
afri-cv
 
Resume_ScottAReese
Resume_ScottAReeseResume_ScottAReese
Resume_ScottAReese
 
Texas oil refinary explosion
Texas oil refinary explosionTexas oil refinary explosion
Texas oil refinary explosion
 
Sappington Resume 2016
Sappington Resume 2016Sappington Resume 2016
Sappington Resume 2016
 
Senior Water Treatment Plant Operator
Senior Water Treatment Plant Operator Senior Water Treatment Plant Operator
Senior Water Treatment Plant Operator
 
vivek curricullum vitae
vivek curricullum vitaevivek curricullum vitae
vivek curricullum vitae
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resume
 
Omega SOQ 11.2014
Omega SOQ 11.2014Omega SOQ 11.2014
Omega SOQ 11.2014
 
D. Summary of work experience at Merisol (SASOL)
D. Summary of work experience at Merisol (SASOL)D. Summary of work experience at Merisol (SASOL)
D. Summary of work experience at Merisol (SASOL)
 
ElanCVdocx
ElanCVdocxElanCVdocx
ElanCVdocx
 
CV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P JoyCV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P Joy
 
resume
resume resume
resume
 
20150709 - Americas Industrial Services
20150709 - Americas Industrial Services20150709 - Americas Industrial Services
20150709 - Americas Industrial Services
 
Andy Peterkin CV
Andy Peterkin CVAndy Peterkin CV
Andy Peterkin CV
 

Viewers also liked

Fulfillment group oct 08
Fulfillment group oct 08Fulfillment group oct 08
Fulfillment group oct 08
Tom Evans
 
Water outsource data dot piont
Water outsource data dot piontWater outsource data dot piont
Water outsource data dot piont
Tom Evans
 
Nylex rfi international freight draft
Nylex rfi international freight draftNylex rfi international freight draft
Nylex rfi international freight draft
Tom Evans
 
Nylex rfi international freight nylex
Nylex rfi international freight nylexNylex rfi international freight nylex
Nylex rfi international freight nylex
Tom Evans
 
West distribution changes
West distribution changesWest distribution changes
West distribution changes
Tom Evans
 
New nylex power piont pres
New nylex power piont presNew nylex power piont pres
New nylex power piont pres
Tom Evans
 
Wa warehouse project status report
Wa warehouse project status reportWa warehouse project status report
Wa warehouse project status report
Tom Evans
 
Nylex water solutions key points briefing 13-09-07
Nylex water solutions   key points briefing 13-09-07Nylex water solutions   key points briefing 13-09-07
Nylex water solutions key points briefing 13-09-07
Tom Evans
 
New nylex power piont pres
New nylex power piont presNew nylex power piont pres
New nylex power piont pres
Tom Evans
 
Nnw freight outsource model
Nnw   freight outsource modelNnw   freight outsource model
Nnw freight outsource model
Tom Evans
 
Wa warehouse project status report
Wa warehouse project status reportWa warehouse project status report
Wa warehouse project status report
Tom Evans
 
RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3
Tom Evans
 
Nz distribution changes
Nz  distribution changesNz  distribution changes
Nz distribution changes
Tom Evans
 
John Stepper interview
John Stepper interviewJohn Stepper interview
John Stepper interview
Joanne Loudon
 
2 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.20052 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.2005
Tom Evans
 
One nylex org chart fulfilment
One nylex   org chart fulfilmentOne nylex   org chart fulfilment
One nylex org chart fulfilment
Tom Evans
 

Viewers also liked (17)

Fulfillment group oct 08
Fulfillment group oct 08Fulfillment group oct 08
Fulfillment group oct 08
 
Water outsource data dot piont
Water outsource data dot piontWater outsource data dot piont
Water outsource data dot piont
 
Nylex rfi international freight draft
Nylex rfi international freight draftNylex rfi international freight draft
Nylex rfi international freight draft
 
Nylex rfi international freight nylex
Nylex rfi international freight nylexNylex rfi international freight nylex
Nylex rfi international freight nylex
 
West distribution changes
West distribution changesWest distribution changes
West distribution changes
 
New nylex power piont pres
New nylex power piont presNew nylex power piont pres
New nylex power piont pres
 
Wa warehouse project status report
Wa warehouse project status reportWa warehouse project status report
Wa warehouse project status report
 
Nylex water solutions key points briefing 13-09-07
Nylex water solutions   key points briefing 13-09-07Nylex water solutions   key points briefing 13-09-07
Nylex water solutions key points briefing 13-09-07
 
New nylex power piont pres
New nylex power piont presNew nylex power piont pres
New nylex power piont pres
 
Nnw freight outsource model
Nnw   freight outsource modelNnw   freight outsource model
Nnw freight outsource model
 
Art + Technology
Art + TechnologyArt + Technology
Art + Technology
 
Wa warehouse project status report
Wa warehouse project status reportWa warehouse project status report
Wa warehouse project status report
 
RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3RFP-Nylex-QLD-Version 1.3
RFP-Nylex-QLD-Version 1.3
 
Nz distribution changes
Nz  distribution changesNz  distribution changes
Nz distribution changes
 
John Stepper interview
John Stepper interviewJohn Stepper interview
John Stepper interview
 
2 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.20052 outsourcing questionnaire-nylex.2005
2 outsourcing questionnaire-nylex.2005
 
One nylex org chart fulfilment
One nylex   org chart fulfilmentOne nylex   org chart fulfilment
One nylex org chart fulfilment
 

Similar to Nylex Water Solutions Ingleburn - Main Body

Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
George Ward
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
Petro Nomics
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
Petro Nomics
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdf
Vincent Bui
 

Similar to Nylex Water Solutions Ingleburn - Main Body (20)

Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
Bts whitepaper addressinglifesafetychallengesinindustrialsettings
Bts whitepaper  addressinglifesafetychallengesinindustrialsettingsBts whitepaper  addressinglifesafetychallengesinindustrialsettings
Bts whitepaper addressinglifesafetychallengesinindustrialsettings
 
WEN_Issue25_GMS_02
WEN_Issue25_GMS_02WEN_Issue25_GMS_02
WEN_Issue25_GMS_02
 
SHUTDOWN
SHUTDOWNSHUTDOWN
SHUTDOWN
 
4 FACILITY LAYOUT.ppt
4  FACILITY LAYOUT.ppt4  FACILITY LAYOUT.ppt
4 FACILITY LAYOUT.ppt
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
 
Clark c500 30 55 forklift service repair manual
Clark c500 30 55 forklift service repair manualClark c500 30 55 forklift service repair manual
Clark c500 30 55 forklift service repair manual
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
 
Clark c500 30 55 forklift service repair manual
Clark c500 30 55 forklift service repair manualClark c500 30 55 forklift service repair manual
Clark c500 30 55 forklift service repair manual
 
Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kiln
 
Operational discipline in practices - Build the safety culture
Operational discipline in practices - Build the safety cultureOperational discipline in practices - Build the safety culture
Operational discipline in practices - Build the safety culture
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
 
Chris Turner
Chris TurnerChris Turner
Chris Turner
 
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
 
Project hse plan kikeh spar
Project hse plan kikeh sparProject hse plan kikeh spar
Project hse plan kikeh spar
 
How to ensure good elevator in a building
How to ensure good elevator in a buildingHow to ensure good elevator in a building
How to ensure good elevator in a building
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
 
Rel maint-final
Rel maint-finalRel maint-final
Rel maint-final
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdf
 

More from Tom Evans

NZ Distribution Changes
NZ  Distribution ChangesNZ  Distribution Changes
NZ Distribution Changes
Tom Evans
 
Trying to save Nylex...............Weeklyreporting 6 nov 2008
Trying to save  Nylex...............Weeklyreporting 6 nov 2008Trying to save  Nylex...............Weeklyreporting 6 nov 2008
Trying to save Nylex...............Weeklyreporting 6 nov 2008
Tom Evans
 
NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05
Tom Evans
 
SAP WMS install Somerton NYLEX_Operational_Support
SAP WMS install Somerton NYLEX_Operational_SupportSAP WMS install Somerton NYLEX_Operational_Support
SAP WMS install Somerton NYLEX_Operational_Support
Tom Evans
 
Somerton Warehouse
Somerton WarehouseSomerton Warehouse
Somerton Warehouse
Tom Evans
 
West distribution changes
West distribution changesWest distribution changes
West distribution changes
Tom Evans
 
P d national dist mngr
P d national dist mngrP d national dist mngr
P d national dist mngr
Tom Evans
 
Packaged vehicle profile
Packaged vehicle profilePackaged vehicle profile
Packaged vehicle profile
Tom Evans
 
Nz distribution changes
Nz  distribution changesNz  distribution changes
Nz distribution changes
Tom Evans
 
Nylex letterhead 08
Nylex letterhead 08Nylex letterhead 08
Nylex letterhead 08
Tom Evans
 
Nylex consumer rfp
Nylex consumer   rfpNylex consumer   rfp
Nylex consumer rfp
Tom Evans
 
Fulfillment group oct 08
Fulfillment group oct 08Fulfillment group oct 08
Fulfillment group oct 08
Tom Evans
 
Delivery service offer user guide v1.0
Delivery service offer user guide v1.0Delivery service offer user guide v1.0
Delivery service offer user guide v1.0
Tom Evans
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfp
Tom Evans
 
Pg all sites period 4 f08
Pg all sites period 4 f08Pg all sites period 4 f08
Pg all sites period 4 f08
Tom Evans
 
Nylex consumer rfp
Nylex consumer   rfpNylex consumer   rfp
Nylex consumer rfp
Tom Evans
 
1 nylex cover letter
1 nylex cover letter1 nylex cover letter
1 nylex cover letter
Tom Evans
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfp
Tom Evans
 
Nylex water presentation 31 08-07
Nylex water presentation 31 08-07Nylex water presentation 31 08-07
Nylex water presentation 31 08-07
Tom Evans
 
Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06
Tom Evans
 

More from Tom Evans (20)

NZ Distribution Changes
NZ  Distribution ChangesNZ  Distribution Changes
NZ Distribution Changes
 
Trying to save Nylex...............Weeklyreporting 6 nov 2008
Trying to save  Nylex...............Weeklyreporting 6 nov 2008Trying to save  Nylex...............Weeklyreporting 6 nov 2008
Trying to save Nylex...............Weeklyreporting 6 nov 2008
 
NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05NYLEX CONSUMER PRODUCTS MATRIX JAN 05
NYLEX CONSUMER PRODUCTS MATRIX JAN 05
 
SAP WMS install Somerton NYLEX_Operational_Support
SAP WMS install Somerton NYLEX_Operational_SupportSAP WMS install Somerton NYLEX_Operational_Support
SAP WMS install Somerton NYLEX_Operational_Support
 
Somerton Warehouse
Somerton WarehouseSomerton Warehouse
Somerton Warehouse
 
West distribution changes
West distribution changesWest distribution changes
West distribution changes
 
P d national dist mngr
P d national dist mngrP d national dist mngr
P d national dist mngr
 
Packaged vehicle profile
Packaged vehicle profilePackaged vehicle profile
Packaged vehicle profile
 
Nz distribution changes
Nz  distribution changesNz  distribution changes
Nz distribution changes
 
Nylex letterhead 08
Nylex letterhead 08Nylex letterhead 08
Nylex letterhead 08
 
Nylex consumer rfp
Nylex consumer   rfpNylex consumer   rfp
Nylex consumer rfp
 
Fulfillment group oct 08
Fulfillment group oct 08Fulfillment group oct 08
Fulfillment group oct 08
 
Delivery service offer user guide v1.0
Delivery service offer user guide v1.0Delivery service offer user guide v1.0
Delivery service offer user guide v1.0
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfp
 
Pg all sites period 4 f08
Pg all sites period 4 f08Pg all sites period 4 f08
Pg all sites period 4 f08
 
Nylex consumer rfp
Nylex consumer   rfpNylex consumer   rfp
Nylex consumer rfp
 
1 nylex cover letter
1 nylex cover letter1 nylex cover letter
1 nylex cover letter
 
~$Lex consumer rfp
~$Lex consumer   rfp~$Lex consumer   rfp
~$Lex consumer rfp
 
Nylex water presentation 31 08-07
Nylex water presentation 31 08-07Nylex water presentation 31 08-07
Nylex water presentation 31 08-07
 
Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06
 

Nylex Water Solutions Ingleburn - Main Body

  • 1. FINAL PAGE 0 OF 9 SH&E INTERNAL AUDIT Pilot Programme – Intital Review NYLEX WATER SOLUTIONS Nylex Water Solutions – Ingleburn NSW 3B Williamson Road, Ingleburn 2565 GREG LAZZARO 31th March 2005
  • 2. FINAL PAGE 0 OF 9 Activity No SE-001 Date 31/3/05 Surveillance Audit Site: Nylex Water Solutions, Ingleburn Site Address: 3B Williamson Rd, Ingleburn New South Wales, Australia Standards: Safety, Health & Environment Initial Review Scope of Audit: Occupational Health and Safety Management System & Environment Management system “initial compliance review” for the manufacturing site and processes employed in the manufacture of a range of moulded tanks and accessories. The audit will also focus on functional compliance areas requiring improvement. Prepared By: Greg Lazzaro COMMERCIAL- IN – CONFIDENCE The contents of this report must not be disclosed to a third party without the agreement of Nylex Limited
  • 3. FINAL PAGE 0 OF 9 Introduction Nylex Head Office conducted an audit of Nylex Water Solutions, 31th March 2005. The purpose of this audit report is to summarise the degree of compliance with relevant criteria, as defined on the cover page of this report, based on the evidence obtained during the review of Nylex Water Solutions. Audits are carried out within the requirements of Occupational Health and Safety Management Systems requirements appropriate to a business and also observations related to site inspections. Executive Overview The Ingleburn Water Solutions Facility is located in a well established light industrial area about 44km SW of Sydney. The factory was established in late 2004 and the site was previously tenanted by a company that recycled copper from the electrical industry (Resource Recycling Technologies). The site at Ingleburn is made up of two factory areas which has been spilt into production and fit out areas. The site has currently 5 employees and all employees have a can do attitude and very conscious of safe working practices. It is however, a site that requires a systematic approach towards complying with occupational, Health & Safety requirements from a basic perspective at least for the short term. Areas of improvement are with site induction protocols, emergency management and evacuation systems, compliance with Nylex Limited standards and a general blending in towards the way in which we expect to eventually run. It must be said that the site leadership has taken the initial safety issues as a priority and whilst much work can be done, the ingredients exist for quite a practical and safety focused operation. The site has a number of machines that will require a more focused risk assessment process and the ability for the site to improve its machine and operator interface. Task based duties will also be required to be examined to ensure that there is a consistency in good practices within all the Water Solutions business. The involvement with Pakenham site is also a very beneficial in the initial setup of systems but again there needs to be more attention focused in this area before the standard operating practices are set. The machine guarding issue will be rolled out across the business with Pakenham being the lead as its focus is more prominent on these areas of Safety. It has been discussed that these methods will then be passed over to the other water businesses. The site has scope for improvements but, at this early stage, the site manager has a can do focus and demonstrates that the requirements for implementing the safe and practical and complaint operation whilst extracting information from the other Nylex Water Solutions businesses. The Audit Team Comprised: • Leader: Greg Lazzaro Nylex Water Solutions Site Representative : Barry Lewis
  • 4. FINAL PAGE 0 OF 9 Many aspects of the original lease requirements have not been done. The concrete pad to the rear of the premises is one of these and requires to be done as the uneven ground will cause difficulty in the stability of the forklifts on site. The tank storage areas are organised so that there is minimal isle ways and also obscured vision. It would be recommended that all persons including truck and delivery drivers, wear fluorescent jackets whilst on site. Although this is done there are no visible indicators or signage to reflect this. Some of the machines are in various stages of serviceability with the rotational rock & roll open flame machine located in the annexure of the main building. This was found to have faulty bearing arrangement and other units will be retrofitted in order to ensure that the coupling is suitable for ongoing operation.
  • 5. FINAL PAGE 0 OF 9 Access platform for the “Rotoline” oven has no fall protection gate or chain making the platform vulnerable to persons falling if they were to lose footing. This platform should be retrofitted to ensure that a gate or restraint chain is present. Utilities pipe rack should be painted or taped yellow to ensure that there is no striking the rack with a ladder or other equipment. It ensure that the walkway has this more highlighted Machine segregation is most effective around the enclosed oven at the site. This was seen to be a very good safety initiative and should be duplicated around other machinery. Gas trains should have appropriate certification and ongoing maintenance checks as per the requirements of the appropriate codes. Systems should be in place to ensure that the PM program is established and put into practice. Plant lighting is adequate in most areas. Improvements in housekeeping would be an opportunity for improvement within the business. The way in which the site deals with this will roll out once there is more of a system based approach introduced. At the moment, this will be controlled by site leadership. Segregation could also be done with an extensive line marking system. This will ensure a traffic management program exists.
  • 6. FINAL PAGE 0 OF 9 Protection of gas pipelines should be considered where the risk of striking or impact is likely. In areas where forklift or pallets will be used, the gas trains should be protected from mechanical damage. The forklift gas bottle storage is currently not compliant. Bottles should be stored in an appropriate area, which is segregated form trafficable areas and chained. This will ensure that the minor storage requirements for DG regulations are met. Warehouse area where product fit out is done has dusty environment. Housekeeping could be more effective in this area. The installed pallet racking has no foot protection, which could lead to striking, and potentially racking could become unstable. It is recommended that the racking have footing protection installed. There is a rather large mould stored alongside the racking limiting the access to the restrooms located behind where the mould is stored. It seems that this is not the appropriate place for this mould given that the congestion in the area.
  • 7. FINAL PAGE 0 OF 9 The general gardening around the site is not satisfactory and will impinge on various aspects of the site systems. Air conditioning systems currently run the risk of becoming in effective unless garden growth is controlled. Natural Gas supply installed by Nylex Limited. Awareness of gas isolation and emergency scenario’s should be made aware to all personnel in the gas of a major gas leak or fire. Inclusion in the site induction programs is required. The systems are lacking, as the operation is fairly new. Emergency planning and evacuation programs should be set up and also management systems for the operation including what is expected from employees in terms of PPE, SH&E reporting, process of managing Occupational Health issues and a variety of systemic programs that would need to be rolled out. Operational based systems such as work order and permits for various types of work and contractor induction process would also be required. An overall transition to the Safety Framework would also be recommended so that there is consistency with the Nylex Limited business standards and systems. Environmental bunding is used well but as inventory increases, a focus on proper storage of DG should be implemented. DG cupboard should be used if storing flammable liquids. The site would need to follow the Environmental Minimum standards to get an appreciation of would be required as the site expands its workload.
  • 8. SUMMARY OF AUDIT ACTIONS LISTING PAGE 0 OF 2 ACTION NUMBER ACTION Person Responsible Due Date 1 NWI-1/S 001 The concrete pad to the rear of the premises has uneven ground will cause difficulty in the stability of the forklifts on site. This should be addressed by the landlord. 2 NWI-1/S 002 All persons including truck and delivery drivers should wear fluorescent jackets whilst on site. There are no visible indicators or signage to reflect this. 3 NWI-1/S 003 Examine the serviceability with the rotational rock & roll open flame machine as one was found to have faulty bearing arrangement and other units to be retrofitted in order to ensure that the coupling is suitable for ongoing operation. 4 NWI-1/S 004 Access platform for the “Rotoline” oven has no fall protection gate or chain making the platform vulnerable to persons falling if they were to lose footing. This platform should be retrofitted to ensure that a gate or restraint chain is present. 5 NWI-1/S 005 Utilities pipe rack should be painted or taped yellow to ensure that there is no striking the rack with a ladder or other equipment. 7 NWI-1/S 006 Gas trains should have appropriate certification and ongoing maintenance checks as per the requirements of the appropriate codes. Systems should be in place to ensure that the PM program is established and put into practice. 8 NWI-1/S 007 Protection of gas pipelines should be considered where the risk of striking or impact is likely. In areas where forklift or pallets will be used, the gas trains should be protected from mechanical damage. 9 NWI-1/S 008 The forklift gas bottle storage is currently not compliant. Bottles should be stored in an appropriate area, which is segregated form trafficable areas and chained. This will ensure that the minor storage requirements for DG regulations are met. 10 NWI-1/S 009 Warehouse area where product fit out is done has dusty environment. Housekeeping could be more effective in this area. 11 NWI-1/S 010 The installed pallet racking has no footing protection, which could lead to striking, and potentially racking could become unstable. It is recommended that the racking have footing protection installed.
  • 9. SUMMARY OF AUDIT ACTIONS LISTING PAGE 0 OF 2 12 NWI-1/S 011 There is a rather large mould stored alongside the racking limiting the access to the restrooms located behind where the mould is stored. It seems that this is not the appropriate place for this mould given that the congestion in the area. 13 NWI-1/S 012 The general gardening around the site is not satisfactory and will impinge on various aspects of the site systems. This should be addressed in a timely fashion. 14 NWI-1/S 013 Personnel should be made aware of Natural Gas supply control valve set at the front of the premises in the event of a major gas leak or fire. Inclusion in the site induction programs is required for gas isolation and emergency scenario’s. 15 NWI-1/S 014 Suggested implementation of a site safety manual which has key criteria for dealing with SH&E basics, eg induction, PPE, scope of work safety and contractor management. This should be followed by more formal systems of SOP‘s. 16 NWI-1/S 015 An overall transition to the Safety Framework would also be recommended so that there is consistency with the Nylex Limited business standards and systems. NWI Nylex Water Ingleburn 001 Rec./ Obs. Number 1 Audit Number S Safety Item E Environmental Item