SlideShare a Scribd company logo
1 of 60
Download to read offline
Discovering NPI using
Fusion Lifecycle
Rodney Coffey – Razorleaf Corporation
Scott Stortz – Synergis Technologies
Your Session Leader
Rodney Coffey
Manager – PLM, Razorleaf Corporation
• 10+ years Supporting the Autodesk Manufacturing Channel
• Extensive Experience with Autodesk PLM 360 Services including Enterprise
Implementation & Integration
• His team has been partnered with Autodesk Consulting and Partners alike to
provide customers with PLM and Integration services since 2011
Your Session Leader
Scott Stortz
PLM Application Consultant, Synergis
• 20+ years engineering experience in a variety of manufacturing companies
• Led successful PLM implementation prior to joining Synergis
• Discover how to use Autodesk Fusion Lifecycle to capture diverse
business processes
• Learn how to manage your product development processes among
all departments within your organization
• Learn how to implement Autodesk Fusion Lifecycle and how to
integrate with other business systems
Class Summary
Lessons
Learned
Use ItBuild ItMap it
Fusion
Lifecycle
& NPI
Session Agenda
Why Autodesk Fusion Lifecycle
• Limited IT Support
• Low Cost of Entry
• Easy to Administer, support
• Secure with Limited
infrastructure
• Cloud Based
• Administration & End User
Experience
• Configurability
• Broad Application to Business
Cases
• Ability to integrate to other
business systems
• Cost of Ownership
Common Customer Issues Fusion Lifecycle 360
Why Autodesk Fusion Lifecycle
• Improvement #1: Have key suppliers directly involved in Change Notice
process.
• Roadblocks:
• Needed VPN access and active directory account
• Purchase additional licenses
• Impact:
• Continued to use email to loop in the suppliers
• Changes were not executed by supplier
• How Fusion Lifecycle provides this improvement
• All apps included
• Cloud based - no VPN required, no active directory account needed
• 3rd party licenses are free (for enterprise level customers)
Fusion Lifecycle Advantage
Why Autodesk Fusion Lifecycle
• Improvement #2: Small, incremental improvements to forms and fields
(changing fields, rearranging forms)
• Roadblocks:
• Complex administration and configuration
• Consulting fees
• Impact:
• Stifled user engagement
• How Fusion Lifecycle provides this improvement
• Administration and configuration functionality much more simple
Fusion Lifecycle Advantage
Why Autodesk Fusion Lifecycle
• Improvement #3: Equipment Calibration (or Field Service Report, or RMA)
process.
• Roadblocks:
• No out of the box functionality
• Very complex to create workflows, forms, and fields
• Impact:
• Continued to use Excel, and paper based processes that were known
to be inefficient
• How Fusion Lifecycle provides this improvement
• Autodesk created an app just for this. Awesome.
• Fusion Lifecycle’s ease of use makes it realistic to implement.
Fusion Lifecycle Advantage
Why Autodesk Fusion Lifecycle
• Improvement #4: New Product Costing.
• Roadblocks:
• ERP remained master for financial information
• Integration was too complex
• Impact
• Continued process of a data dump into Excel spreadsheet
• BOM and costing information became less accurate as the project
evolved
• How Fusion Lifecycle provides this improvement
• Fusion Lifecycle’s integration capabilities are much simpler – not only to
setup, but also to maintain.
• Rodney has a presentation from 3-4 in the Berks room
Fusion Lifecycle Advantage
Companies have many different methods that are not scalable or
providing the desired results
• Email, Spreadsheets, Network Drives, SharePoint
With scattered information and a lack of control people are
uninformed of:
• Change - when, where, and why it took place
• Where to find documentation, reports, product information
Why PLM for NPI
Lessons
Learned
Use ItBuild ItMap it
Fusion
Lifecycle
& NPI
Session Agenda
Building the Right Team for the Job
&
Identifying a Process that will get results
People & Process
Build the Right Team for the Job
The Iterative Design Process
Map, Build It, Use It …. Build it, Use ….
• Conference Room Pilots (CRP)
• User Acceptance Testing (UAT)
Map It Build It Use It
CRPUAT
Why Fusion Lifecycle works with the Iterative Design Process
• Quickly build and show the foundation of the processes
• Easily change and iterate the design and process
• Facilitate functional design meetings
• Helps capture many requirements in real time
Fusion LC & the Iterative Design Process
Identifying your NPI Needs
People & Process
Identifying the key business applications that apply to NPI
Identifying NPI Needs: Business Solutions
Product Management
• Items & BOMS
• Project Management
• Task Management & Validation
Change Management
• Change Requests
• Change Orders
Supplier Management
• Business Audit
Document Management
• Revision Controlled Documents
• Non-Revision Controlled Documents
Identifying the key business system integration that apply to NPI
Often times business systems already in place are part of the overall
NPI process and must be considered for integration to Fusion
Lifecycle in order to complete the NPI process
Common Use Cases: Items & BOMs, Suppliers, Customers, etc.
Identifying NPI Needs: Integration
The number one goal:
• Bring data and processes together in a single, easily consumed process
Identifying NPI Needs: Data
Mapping out the Solution
Map It
Key to Mapping:
• Identify what “NPI” means to your business
• Identify the individual business applications
• Workspace Architecture
Mapping It: Business Apps
Change ManagementBOM Management
Document ManagementNPI / Product Management
Keys to building out a solid solution
• Each piece (Workspace) is part of a bigger solution
• Processes need to hold each department, party accountable
• Information will come from numerous systems
• Facilitate a long Product Lifecycle (12 months or more)
Mapping It: Workspaces
Change Orders
Items & BOMs
DocumentsProducts
Documents - Rev
Doc Change Order
PD - Sales
PD - Engineering
PD - Manufacturing
Product Management I & B Management
Change Management
Doc Management
Mapping It: Relationships
Change Orders
Items & BOMs
Documents
Products
Documents - Rev
Doc Change Order
PD - Sales
PD - Engineering
PD - Manufacturing
PD – Name your
Department
Lessons
Learned
Use ItBuild ItMap it
Fusion
Lifecycle
& NPI
Session Agenda
Build It: Workspace Architecture
Change Orders
Items & BOMs
Documents
Products
Documents - Rev
Doc Change Order
PD - Sales
PD - Engineering
PD - Manufacturing
Begin by building the individual workspaces in Fusion Lifecycle
Then choose the functional areas of a Fusion Lifecycle workspace that
are applicable:
Build It: Workspace Functionality
Item Details AttachmentsWorkflow
Bill Of Materials
Change Log
MilestonesGrid Relationships
Building It: Document Management
Build It
Document management workspaces are used to capture important
revision controlled and non revision controlled data
• Documents Rev: Specifications, Data Sheets, Quality Procedures, Work
Instructions
• Documents: Product Photos, Marketing, Scanned Communication
Document Management
Documents
Documents - Rev Doc Change Order
Supporting Workspaces
Document Type
Document Sequencers
Document Management: Documents
Item Details AttachmentsRelationships
Change Log
Document Management: Documents - Rev
AttachmentsRelationshipsItem Details
Change Log
Workflow
• This workspace with setup with
the proper permissions allow the
administrators to show only the
pertinent information to end
users, vendors
Document Management: Document CO
AttachmentsRelationshipsItem Details
Change Log
Workflow
Managed Items
• Only released data is available for consumption across vendors, and
end users
• Revision control allows companies to comply with important
industry standards like ISO,
• Pre-defined document types and numbering creates consistency
across documents
• Multiple document libraries allow better access control
Document Management: Business Benefits
Building It: Product Management / NPI
Build It
Product management workspaces are used to capture important
product data and drive the process of taking a product through its
complete lifecycle
• Documents Rev: Specifications, Data Sheets, Quality Procedures, Work
Instructions
• Documents: Product Photos, Marketing, Scanned Communication
Product Management
Supporting Workspaces
NPI Templates
Products
PD - Sales PD - Engineering PD - Manufacturing
Product Management
Item Details AttachmentsRelationships
Change Log Workflow Bill Of Materials Milestones
Grid
Pre-Created items
Clearly defined product leads
Requirements
Product Management: Workflow
Product Setup
Phase 1: Concept
Phase 1: DRB
Phase 2: Design
Phase 3: Realize
Phase 4: Service
Obsolete
Phase 2: DRB
Phase 3: DRB
Obsolete: DRB
Product Management workflows vary from customer to customer but
most follow some sort of phase gate process
Product Management: Workflow
Approvals for design reviews, or even customer reviews ensure that the
process is followed and all parties involved in the process are held
accountable.
Workflow
Product Management: Task Management
During each phase there are tasks that need to be finished in order to
seek approval, and move on to the next phase. This allows product
owners to hold the team accountable, and insure deliverables are
complete, and on time.
Grid
Product Management: Automation
P1: Concept P2: Design P3: Realize P4: Service Obsolete
Goals of automating the process with scripting
• User Experience
• Overall Product Management process, and tasks should be connected
• Full Proof the process to drive the right activity to occur at the right time
• Ensure that the correct people are notified at the right time
Process Automation – Scripting and Business Logic
Product Management: Task Management
During each phase there are tasks that need to be finished in order to
seek approval, and move on to the next phase. This allows product
owners to hold the team accountable, and insure deliverables are
complete, and on time.
• Ensure that all Product Management tasks are completed before
moving to the next phase in the process
• Notifications, emails, and reports ensure completion of tasks are
timely and that managers can easily hold their teams accountable
• Automation simplifies the user experience and creates a fuller proof
process
• Phase gate reporting allows managers to know where to focus
resources and improvement initiatives
Product Management: Business Benefits
Building It: Items & BOMs
&
Change Management
Build It
The Items & BOMs workspace is where the items, bill of materials and
all their relationship and pertinent data reside.
• Relationships are built between these items and BOMs to the Products
workspace to tie everything together
• Some supporting documentation, CAD drawings, pdfs may be added to the
attachments tab of the item itself
Items BOMs & Change Management
Change OrdersItems & BOMs
Supporting Workspaces
I & B Classification
I & B Sequencers
Items BOMs
Item Details Attachments
Change Log Assoc. Workflow
Bill Of Materials Where Used
Change Management: Change Order
Item Details Attachments
Change Log Grid
Managed Items Workflow
Change Management: Change Order
Grid Workflow
• Manage all the Items & BOMs in a single repository
• Find where all Items are used
• Track Inventory of Items across different facilities
• Manage the Suppliers, and quotes provided for Items & BOMs
• Interconnect Product BOMs with the PLM process
• Tie BOM, and document data together
Items BOMs & Change Management
Building It: Integration
Build It
Integration:
• Items & BOMs
• Customers
• Suppliers
• Products
Product Management Integration:
Lessons
Learned
Use ItBuild ItMap it
Fusion
Lifecycle
& NPI
Session Agenda
Use it: Process to Successful Adoption
Core Team
Focus Groups
UAT
Training
Fusion Lifecycle used to manage training
• Dedicated training tenant
• Workspaces
• Training Courses (agenda, training material)
• Training (track who attended training)
• Training Item (create items, add attachments, move through workflow)
Training sessions
• Initial Roll-out: Multiple large sessions held at every site
• On-going: Self-paced training workspace for PLM basics
• Prerequisite for production tenant access
Use it: Training
Lessons
Learned
Use ItBuild ItMap it
Fusion
Lifecycle
& NPI
Session Agenda
Requirements for Mapping Phase
• Core Team + Subject Matter Experts
• PLM Software Matter Expert
The Know and No
• “Know” the scope of what you are building
• Don’t be afraid to say “No”
Have a third party document the requirements
• All parties confirm the requirements
• Avoid the “I said A, you heard B, then built C” scenario
Lessons Learned: Map It
Have an agreed upon plan
• Document the foundation
Workspace architecture and workflow first
• Automate later. Moving targets are hard to hit.
Integrate last when the workflow is static
• Moving targets get even harder to hit when integration is involved
Limit changes as you near the end
• Only minor changes past core team acceptance
• Stand by what you built
Lessons Learned: Build It
Find capable, enthusiastic adopters for training
• Likely to give good, constructive feedback
• Likely to play in the system and find things you may have missed
• Likely to stay positive and spread the word
Have a wingman in your early training sessions
• Allows you to focus on the adopters while they document changes
Lessons Learned: Use It
• What are some of the advantages of Fusion
Lifecycle over traditional PLM?
• What is NPI, and what does it mean to you?
• What are three of the common business apps
that part of or connected to NPI?
Gift Cards!
Any Questions?
Questions
Contact Information
Feel free to follow up:
Rodney Coffey
Manager - PLM
Email: rodney.coffey@razorleaf.com
Office: 330.676.0022 x7124
Cell: 937.241.9177

More Related Content

What's hot

Plural's PLM services presentation
Plural's PLM services presentationPlural's PLM services presentation
Plural's PLM services presentationPlural Technolog
 
PTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignPTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignEMA Design Automation
 
Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140kailashgavare
 
Introduction to Adaptive and 3DEXPERIENCE
Introduction to Adaptive and 3DEXPERIENCE Introduction to Adaptive and 3DEXPERIENCE
Introduction to Adaptive and 3DEXPERIENCE Adaptive Corporation
 
Building An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLMBuilding An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLMAdaptive Corporation
 
IsoDraw - Optimising the Technical Illustration Process
IsoDraw - Optimising the Technical Illustration ProcessIsoDraw - Optimising the Technical Illustration Process
IsoDraw - Optimising the Technical Illustration ProcessConcurrent Engineering
 
Zws Corporate Presentation Agile Implementation Approach
Zws Corporate Presentation  Agile Implementation ApproachZws Corporate Presentation  Agile Implementation Approach
Zws Corporate Presentation Agile Implementation ApproachZero Wait-State
 
Discovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
Discovering New Product Introduction (NPI) using Autodesk Fusion LifecycleDiscovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
Discovering New Product Introduction (NPI) using Autodesk Fusion LifecycleRazorleaf Corporation
 
Oracle OpenWorld 2015 Recap Webinar: What's New with WebCenter, The Cloud, an...
Oracle OpenWorld 2015 Recap Webinar: What's New with WebCenter, The Cloud, an...Oracle OpenWorld 2015 Recap Webinar: What's New with WebCenter, The Cloud, an...
Oracle OpenWorld 2015 Recap Webinar: What's New with WebCenter, The Cloud, an...Fishbowl Solutions
 
Don’t Overlook the Million Dollar Idea –Idea Management with K2 and Project O...
Don’t Overlook the Million Dollar Idea –Idea Management with K2 and Project O...Don’t Overlook the Million Dollar Idea –Idea Management with K2 and Project O...
Don’t Overlook the Million Dollar Idea –Idea Management with K2 and Project O...TPG The Project Group
 
Agile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsAgile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsulfkoester
 
Implementing and Extending Oracle PLM Cloud for Gibson Overseas
Implementing and Extending Oracle PLM Cloud for Gibson OverseasImplementing and Extending Oracle PLM Cloud for Gibson Overseas
Implementing and Extending Oracle PLM Cloud for Gibson OverseasJade Global
 
Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...p6academy
 
Introduction to Adaptive and 3DEXPERIENCE Cloud
Introduction to Adaptive and 3DEXPERIENCE CloudIntroduction to Adaptive and 3DEXPERIENCE Cloud
Introduction to Adaptive and 3DEXPERIENCE CloudAdaptive Corporation
 
Ptc creo aax sales positioning
Ptc creo aax sales positioningPtc creo aax sales positioning
Ptc creo aax sales positioningVictor Mitov
 
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial DesignerDesigning with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial DesignerDesign World
 
OrCAD Library Builder Overview Presentation
OrCAD Library Builder Overview PresentationOrCAD Library Builder Overview Presentation
OrCAD Library Builder Overview PresentationEMA Design Automation
 
Best practices-for-upgrading-to-sap-bi-4.0
Best practices-for-upgrading-to-sap-bi-4.0Best practices-for-upgrading-to-sap-bi-4.0
Best practices-for-upgrading-to-sap-bi-4.0Sambasivarao Doppalapudi
 
Bi 4.0 Migration Strategy and Best Practices
Bi 4.0 Migration Strategy and Best PracticesBi 4.0 Migration Strategy and Best Practices
Bi 4.0 Migration Strategy and Best PracticesEric Molner
 

What's hot (20)

Plural's PLM services presentation
Plural's PLM services presentationPlural's PLM services presentation
Plural's PLM services presentation
 
PTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignPTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB Design
 
Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140
 
Introduction to Adaptive and 3DEXPERIENCE
Introduction to Adaptive and 3DEXPERIENCE Introduction to Adaptive and 3DEXPERIENCE
Introduction to Adaptive and 3DEXPERIENCE
 
Building An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLMBuilding An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLM
 
IsoDraw - Optimising the Technical Illustration Process
IsoDraw - Optimising the Technical Illustration ProcessIsoDraw - Optimising the Technical Illustration Process
IsoDraw - Optimising the Technical Illustration Process
 
Zws Corporate Presentation Agile Implementation Approach
Zws Corporate Presentation  Agile Implementation ApproachZws Corporate Presentation  Agile Implementation Approach
Zws Corporate Presentation Agile Implementation Approach
 
Discovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
Discovering New Product Introduction (NPI) using Autodesk Fusion LifecycleDiscovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
Discovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
 
Oracle OpenWorld 2015 Recap Webinar: What's New with WebCenter, The Cloud, an...
Oracle OpenWorld 2015 Recap Webinar: What's New with WebCenter, The Cloud, an...Oracle OpenWorld 2015 Recap Webinar: What's New with WebCenter, The Cloud, an...
Oracle OpenWorld 2015 Recap Webinar: What's New with WebCenter, The Cloud, an...
 
Don’t Overlook the Million Dollar Idea –Idea Management with K2 and Project O...
Don’t Overlook the Million Dollar Idea –Idea Management with K2 and Project O...Don’t Overlook the Million Dollar Idea –Idea Management with K2 and Project O...
Don’t Overlook the Million Dollar Idea –Idea Management with K2 and Project O...
 
Agile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsAgile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystems
 
Implementing and Extending Oracle PLM Cloud for Gibson Overseas
Implementing and Extending Oracle PLM Cloud for Gibson OverseasImplementing and Extending Oracle PLM Cloud for Gibson Overseas
Implementing and Extending Oracle PLM Cloud for Gibson Overseas
 
Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...
 
Introduction to Adaptive and 3DEXPERIENCE Cloud
Introduction to Adaptive and 3DEXPERIENCE CloudIntroduction to Adaptive and 3DEXPERIENCE Cloud
Introduction to Adaptive and 3DEXPERIENCE Cloud
 
Ptc creo aax sales positioning
Ptc creo aax sales positioningPtc creo aax sales positioning
Ptc creo aax sales positioning
 
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial DesignerDesigning with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
 
OrCAD Library Builder Overview Presentation
OrCAD Library Builder Overview PresentationOrCAD Library Builder Overview Presentation
OrCAD Library Builder Overview Presentation
 
COE 2017: Atomic Content
COE 2017: Atomic ContentCOE 2017: Atomic Content
COE 2017: Atomic Content
 
Best practices-for-upgrading-to-sap-bi-4.0
Best practices-for-upgrading-to-sap-bi-4.0Best practices-for-upgrading-to-sap-bi-4.0
Best practices-for-upgrading-to-sap-bi-4.0
 
Bi 4.0 Migration Strategy and Best Practices
Bi 4.0 Migration Strategy and Best PracticesBi 4.0 Migration Strategy and Best Practices
Bi 4.0 Migration Strategy and Best Practices
 

Viewers also liked (7)

Quality Control for CAD/BIM Managers: Robert Green
Quality Control for CAD/BIM Managers: Robert GreenQuality Control for CAD/BIM Managers: Robert Green
Quality Control for CAD/BIM Managers: Robert Green
 
Collaboration for Revit – Bill Knittle, Synergis
Collaboration for Revit – Bill Knittle, SynergisCollaboration for Revit – Bill Knittle, Synergis
Collaboration for Revit – Bill Knittle, Synergis
 
Planning Your CAD Future – Robert Green, Robert Green Consulting Group
Planning Your CAD Future – Robert Green, Robert Green Consulting GroupPlanning Your CAD Future – Robert Green, Robert Green Consulting Group
Planning Your CAD Future – Robert Green, Robert Green Consulting Group
 
New Product Introduction- Pencil Sharpener
New Product Introduction- Pencil SharpenerNew Product Introduction- Pencil Sharpener
New Product Introduction- Pencil Sharpener
 
Moving From AutoCAD to Electrical and What's New in AutoCAD Electrcial
Moving From AutoCAD to Electrical and What's New in AutoCAD ElectrcialMoving From AutoCAD to Electrical and What's New in AutoCAD Electrcial
Moving From AutoCAD to Electrical and What's New in AutoCAD Electrcial
 
Dynamo for Revit – Bill Knittle, Synergis
Dynamo for Revit – Bill Knittle, SynergisDynamo for Revit – Bill Knittle, Synergis
Dynamo for Revit – Bill Knittle, Synergis
 
Collaboration and Data Management in a BIM World
Collaboration and Data Management in a BIM WorldCollaboration and Data Management in a BIM World
Collaboration and Data Management in a BIM World
 

Similar to Discovering NPI using Fusion Lifecycle

Training on ASAP Methodology.ppt
Training on ASAP Methodology.pptTraining on ASAP Methodology.ppt
Training on ASAP Methodology.pptAshwaniKumar207236
 
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...ghaeltailyn
 
Best practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementationBest practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementationmohamed refaei
 
Training on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.pptTraining on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.pptAshwaniKumar207236
 
20 best practices for fusion hcm cloud implementation
20   best practices for fusion hcm cloud implementation20   best practices for fusion hcm cloud implementation
20 best practices for fusion hcm cloud implementationmohamed refaei
 
Best practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementationBest practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementationFeras Ahmad
 
AU 2015: Enterprise, Beam Me Up: Inphi's Enterprise PLM Solution (PPT)
AU 2015: Enterprise, Beam Me Up: Inphi's Enterprise PLM Solution (PPT)AU 2015: Enterprise, Beam Me Up: Inphi's Enterprise PLM Solution (PPT)
AU 2015: Enterprise, Beam Me Up: Inphi's Enterprise PLM Solution (PPT)Razorleaf Corporation
 
Paperless Document Control
Paperless Document ControlPaperless Document Control
Paperless Document Controlp6academy
 
Migrating from ClearCase
Migrating from ClearCaseMigrating from ClearCase
Migrating from ClearCaseCollabNet
 
ALM with TFS: From the Drawing Board to the Cloud
ALM with TFS: From the Drawing Board to the CloudALM with TFS: From the Drawing Board to the Cloud
ALM with TFS: From the Drawing Board to the CloudJeremy Likness
 
Extending Microsoft Project into a Unified Work Management Solution
Extending Microsoft Project into a Unified Work Management SolutionExtending Microsoft Project into a Unified Work Management Solution
Extending Microsoft Project into a Unified Work Management SolutionMichelle Manimtim
 
Quantifying DevOps Adoption Empirically for Demonstrable ROI
Quantifying DevOps Adoption Empirically for Demonstrable ROIQuantifying DevOps Adoption Empirically for Demonstrable ROI
Quantifying DevOps Adoption Empirically for Demonstrable ROIDevOps for Enterprise Systems
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Chris Baichoo
 
Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017Daniel Thuraiappah
 
Change Management in Hybrid landscapes 2017
Change Management in Hybrid landscapes 2017Change Management in Hybrid landscapes 2017
Change Management in Hybrid landscapes 2017Chris Kernaghan
 
Patching is Your Friend in the New World Order of EPM and ERP Cloud
Patching is Your Friend in the New World Order of EPM and ERP CloudPatching is Your Friend in the New World Order of EPM and ERP Cloud
Patching is Your Friend in the New World Order of EPM and ERP CloudDatavail
 
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...ssuser835d1a
 

Similar to Discovering NPI using Fusion Lifecycle (20)

Training on ASAP Methodology.ppt
Training on ASAP Methodology.pptTraining on ASAP Methodology.ppt
Training on ASAP Methodology.ppt
 
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
 
Best practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementationBest practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementation
 
Training on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.pptTraining on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.ppt
 
20 best practices for fusion hcm cloud implementation
20   best practices for fusion hcm cloud implementation20   best practices for fusion hcm cloud implementation
20 best practices for fusion hcm cloud implementation
 
Best practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementationBest practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementation
 
Introduction to ERP Concept
Introduction to ERP ConceptIntroduction to ERP Concept
Introduction to ERP Concept
 
AU 2015: Enterprise, Beam Me Up: Inphi's Enterprise PLM Solution (PPT)
AU 2015: Enterprise, Beam Me Up: Inphi's Enterprise PLM Solution (PPT)AU 2015: Enterprise, Beam Me Up: Inphi's Enterprise PLM Solution (PPT)
AU 2015: Enterprise, Beam Me Up: Inphi's Enterprise PLM Solution (PPT)
 
IT NPI Process
IT NPI ProcessIT NPI Process
IT NPI Process
 
Paperless Document Control
Paperless Document ControlPaperless Document Control
Paperless Document Control
 
Migrating from ClearCase
Migrating from ClearCaseMigrating from ClearCase
Migrating from ClearCase
 
ALM with TFS: From the Drawing Board to the Cloud
ALM with TFS: From the Drawing Board to the CloudALM with TFS: From the Drawing Board to the Cloud
ALM with TFS: From the Drawing Board to the Cloud
 
Pm training day 3
Pm training   day 3Pm training   day 3
Pm training day 3
 
Extending Microsoft Project into a Unified Work Management Solution
Extending Microsoft Project into a Unified Work Management SolutionExtending Microsoft Project into a Unified Work Management Solution
Extending Microsoft Project into a Unified Work Management Solution
 
Quantifying DevOps Adoption Empirically for Demonstrable ROI
Quantifying DevOps Adoption Empirically for Demonstrable ROIQuantifying DevOps Adoption Empirically for Demonstrable ROI
Quantifying DevOps Adoption Empirically for Demonstrable ROI
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017
 
Change Management in Hybrid landscapes 2017
Change Management in Hybrid landscapes 2017Change Management in Hybrid landscapes 2017
Change Management in Hybrid landscapes 2017
 
Patching is Your Friend in the New World Order of EPM and ERP Cloud
Patching is Your Friend in the New World Order of EPM and ERP CloudPatching is Your Friend in the New World Order of EPM and ERP Cloud
Patching is Your Friend in the New World Order of EPM and ERP Cloud
 
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
 

More from Synergis Engineering Design Solutions

Autodesk Nastran In-CAD Introduction and Walkthrough - Dave May, Autodesk
Autodesk Nastran In-CAD Introduction and Walkthrough - Dave May, AutodeskAutodesk Nastran In-CAD Introduction and Walkthrough - Dave May, Autodesk
Autodesk Nastran In-CAD Introduction and Walkthrough - Dave May, AutodeskSynergis Engineering Design Solutions
 
Building a CAD Proving Ground – Robert Green, Robert Green Consulting Group
Building a CAD Proving Ground – Robert Green, Robert Green Consulting GroupBuilding a CAD Proving Ground – Robert Green, Robert Green Consulting Group
Building a CAD Proving Ground – Robert Green, Robert Green Consulting GroupSynergis Engineering Design Solutions
 
How to Use Sim CFD (to your advantage): A Primer for Computational Fluid Dyna...
How to Use Sim CFD (to your advantage): A Primer for Computational Fluid Dyna...How to Use Sim CFD (to your advantage): A Primer for Computational Fluid Dyna...
How to Use Sim CFD (to your advantage): A Primer for Computational Fluid Dyna...Synergis Engineering Design Solutions
 

More from Synergis Engineering Design Solutions (20)

Get the Sheet out of here! Plan production for jobs due yesterday
Get the Sheet out of here! Plan production for jobs due yesterdayGet the Sheet out of here! Plan production for jobs due yesterday
Get the Sheet out of here! Plan production for jobs due yesterday
 
A practical guide to GIS in Civil 3D
A practical guide to GIS in Civil 3DA practical guide to GIS in Civil 3D
A practical guide to GIS in Civil 3D
 
Introduction to BIM 360 Docs
Introduction to BIM 360 DocsIntroduction to BIM 360 Docs
Introduction to BIM 360 Docs
 
Bringing VR to your BIM Process
Bringing VR to your BIM ProcessBringing VR to your BIM Process
Bringing VR to your BIM Process
 
The no authority CAD Manager
The no authority CAD ManagerThe no authority CAD Manager
The no authority CAD Manager
 
Quality control for CAD managers
Quality control for CAD managersQuality control for CAD managers
Quality control for CAD managers
 
What's new in Revit 2017 – Bill Knittle, Synergis
What's new in Revit 2017 – Bill Knittle, SynergisWhat's new in Revit 2017 – Bill Knittle, Synergis
What's new in Revit 2017 – Bill Knittle, Synergis
 
Autodesk Nastran In-CAD Introduction and Walkthrough - Dave May, Autodesk
Autodesk Nastran In-CAD Introduction and Walkthrough - Dave May, AutodeskAutodesk Nastran In-CAD Introduction and Walkthrough - Dave May, Autodesk
Autodesk Nastran In-CAD Introduction and Walkthrough - Dave May, Autodesk
 
Building a CAD Proving Ground – Robert Green, Robert Green Consulting Group
Building a CAD Proving Ground – Robert Green, Robert Green Consulting GroupBuilding a CAD Proving Ground – Robert Green, Robert Green Consulting Group
Building a CAD Proving Ground – Robert Green, Robert Green Consulting Group
 
Autodesk CAM Portfolio – Russ Adams PartMaker
Autodesk CAM Portfolio – Russ Adams PartMakerAutodesk CAM Portfolio – Russ Adams PartMaker
Autodesk CAM Portfolio – Russ Adams PartMaker
 
Autodesk PLM 360
Autodesk PLM 360Autodesk PLM 360
Autodesk PLM 360
 
Leveraging GIS with AutoCAD
Leveraging GIS with AutoCADLeveraging GIS with AutoCAD
Leveraging GIS with AutoCAD
 
Getting the Most from Your Software: Robert Green
Getting the Most from Your Software: Robert GreenGetting the Most from Your Software: Robert Green
Getting the Most from Your Software: Robert Green
 
Implementing Engineering Standards through Autodesk Vault
Implementing Engineering Standards through Autodesk VaultImplementing Engineering Standards through Autodesk Vault
Implementing Engineering Standards through Autodesk Vault
 
Successful Factory Design Implementation
Successful Factory Design ImplementationSuccessful Factory Design Implementation
Successful Factory Design Implementation
 
How to Use Sim CFD (to your advantage): A Primer for Computational Fluid Dyna...
How to Use Sim CFD (to your advantage): A Primer for Computational Fluid Dyna...How to Use Sim CFD (to your advantage): A Primer for Computational Fluid Dyna...
How to Use Sim CFD (to your advantage): A Primer for Computational Fluid Dyna...
 
Managing Multi-Office, Multi-Platform Mayhem: Robert Green
Managing Multi-Office, Multi-Platform Mayhem: Robert GreenManaging Multi-Office, Multi-Platform Mayhem: Robert Green
Managing Multi-Office, Multi-Platform Mayhem: Robert Green
 
Data Management for Civil Infrastructure
Data Management for Civil InfrastructureData Management for Civil Infrastructure
Data Management for Civil Infrastructure
 
Transportation Analysis in Civil Infrastructure
Transportation Analysis in Civil InfrastructureTransportation Analysis in Civil Infrastructure
Transportation Analysis in Civil Infrastructure
 
Case Study: InfraWorks 360 in Land Development
Case Study: InfraWorks 360 in Land DevelopmentCase Study: InfraWorks 360 in Land Development
Case Study: InfraWorks 360 in Land Development
 

Recently uploaded

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 

Recently uploaded (20)

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 

Discovering NPI using Fusion Lifecycle

  • 1. Discovering NPI using Fusion Lifecycle Rodney Coffey – Razorleaf Corporation Scott Stortz – Synergis Technologies
  • 2. Your Session Leader Rodney Coffey Manager – PLM, Razorleaf Corporation • 10+ years Supporting the Autodesk Manufacturing Channel • Extensive Experience with Autodesk PLM 360 Services including Enterprise Implementation & Integration • His team has been partnered with Autodesk Consulting and Partners alike to provide customers with PLM and Integration services since 2011
  • 3. Your Session Leader Scott Stortz PLM Application Consultant, Synergis • 20+ years engineering experience in a variety of manufacturing companies • Led successful PLM implementation prior to joining Synergis
  • 4. • Discover how to use Autodesk Fusion Lifecycle to capture diverse business processes • Learn how to manage your product development processes among all departments within your organization • Learn how to implement Autodesk Fusion Lifecycle and how to integrate with other business systems Class Summary
  • 5. Lessons Learned Use ItBuild ItMap it Fusion Lifecycle & NPI Session Agenda
  • 6. Why Autodesk Fusion Lifecycle • Limited IT Support • Low Cost of Entry • Easy to Administer, support • Secure with Limited infrastructure • Cloud Based • Administration & End User Experience • Configurability • Broad Application to Business Cases • Ability to integrate to other business systems • Cost of Ownership Common Customer Issues Fusion Lifecycle 360
  • 7. Why Autodesk Fusion Lifecycle • Improvement #1: Have key suppliers directly involved in Change Notice process. • Roadblocks: • Needed VPN access and active directory account • Purchase additional licenses • Impact: • Continued to use email to loop in the suppliers • Changes were not executed by supplier • How Fusion Lifecycle provides this improvement • All apps included • Cloud based - no VPN required, no active directory account needed • 3rd party licenses are free (for enterprise level customers) Fusion Lifecycle Advantage
  • 8. Why Autodesk Fusion Lifecycle • Improvement #2: Small, incremental improvements to forms and fields (changing fields, rearranging forms) • Roadblocks: • Complex administration and configuration • Consulting fees • Impact: • Stifled user engagement • How Fusion Lifecycle provides this improvement • Administration and configuration functionality much more simple Fusion Lifecycle Advantage
  • 9. Why Autodesk Fusion Lifecycle • Improvement #3: Equipment Calibration (or Field Service Report, or RMA) process. • Roadblocks: • No out of the box functionality • Very complex to create workflows, forms, and fields • Impact: • Continued to use Excel, and paper based processes that were known to be inefficient • How Fusion Lifecycle provides this improvement • Autodesk created an app just for this. Awesome. • Fusion Lifecycle’s ease of use makes it realistic to implement. Fusion Lifecycle Advantage
  • 10. Why Autodesk Fusion Lifecycle • Improvement #4: New Product Costing. • Roadblocks: • ERP remained master for financial information • Integration was too complex • Impact • Continued process of a data dump into Excel spreadsheet • BOM and costing information became less accurate as the project evolved • How Fusion Lifecycle provides this improvement • Fusion Lifecycle’s integration capabilities are much simpler – not only to setup, but also to maintain. • Rodney has a presentation from 3-4 in the Berks room Fusion Lifecycle Advantage
  • 11. Companies have many different methods that are not scalable or providing the desired results • Email, Spreadsheets, Network Drives, SharePoint With scattered information and a lack of control people are uninformed of: • Change - when, where, and why it took place • Where to find documentation, reports, product information Why PLM for NPI
  • 12. Lessons Learned Use ItBuild ItMap it Fusion Lifecycle & NPI Session Agenda
  • 13. Building the Right Team for the Job & Identifying a Process that will get results People & Process
  • 14. Build the Right Team for the Job
  • 15. The Iterative Design Process Map, Build It, Use It …. Build it, Use …. • Conference Room Pilots (CRP) • User Acceptance Testing (UAT) Map It Build It Use It CRPUAT
  • 16. Why Fusion Lifecycle works with the Iterative Design Process • Quickly build and show the foundation of the processes • Easily change and iterate the design and process • Facilitate functional design meetings • Helps capture many requirements in real time Fusion LC & the Iterative Design Process
  • 17. Identifying your NPI Needs People & Process
  • 18. Identifying the key business applications that apply to NPI Identifying NPI Needs: Business Solutions Product Management • Items & BOMS • Project Management • Task Management & Validation Change Management • Change Requests • Change Orders Supplier Management • Business Audit Document Management • Revision Controlled Documents • Non-Revision Controlled Documents
  • 19. Identifying the key business system integration that apply to NPI Often times business systems already in place are part of the overall NPI process and must be considered for integration to Fusion Lifecycle in order to complete the NPI process Common Use Cases: Items & BOMs, Suppliers, Customers, etc. Identifying NPI Needs: Integration
  • 20. The number one goal: • Bring data and processes together in a single, easily consumed process Identifying NPI Needs: Data
  • 21. Mapping out the Solution Map It
  • 22. Key to Mapping: • Identify what “NPI” means to your business • Identify the individual business applications • Workspace Architecture Mapping It: Business Apps Change ManagementBOM Management Document ManagementNPI / Product Management
  • 23. Keys to building out a solid solution • Each piece (Workspace) is part of a bigger solution • Processes need to hold each department, party accountable • Information will come from numerous systems • Facilitate a long Product Lifecycle (12 months or more) Mapping It: Workspaces Change Orders Items & BOMs DocumentsProducts Documents - Rev Doc Change Order PD - Sales PD - Engineering PD - Manufacturing Product Management I & B Management Change Management Doc Management
  • 24. Mapping It: Relationships Change Orders Items & BOMs Documents Products Documents - Rev Doc Change Order PD - Sales PD - Engineering PD - Manufacturing PD – Name your Department
  • 25. Lessons Learned Use ItBuild ItMap it Fusion Lifecycle & NPI Session Agenda
  • 26. Build It: Workspace Architecture Change Orders Items & BOMs Documents Products Documents - Rev Doc Change Order PD - Sales PD - Engineering PD - Manufacturing Begin by building the individual workspaces in Fusion Lifecycle
  • 27. Then choose the functional areas of a Fusion Lifecycle workspace that are applicable: Build It: Workspace Functionality Item Details AttachmentsWorkflow Bill Of Materials Change Log MilestonesGrid Relationships
  • 28. Building It: Document Management Build It
  • 29. Document management workspaces are used to capture important revision controlled and non revision controlled data • Documents Rev: Specifications, Data Sheets, Quality Procedures, Work Instructions • Documents: Product Photos, Marketing, Scanned Communication Document Management Documents Documents - Rev Doc Change Order Supporting Workspaces Document Type Document Sequencers
  • 30. Document Management: Documents Item Details AttachmentsRelationships Change Log
  • 31. Document Management: Documents - Rev AttachmentsRelationshipsItem Details Change Log Workflow • This workspace with setup with the proper permissions allow the administrators to show only the pertinent information to end users, vendors
  • 32. Document Management: Document CO AttachmentsRelationshipsItem Details Change Log Workflow Managed Items
  • 33. • Only released data is available for consumption across vendors, and end users • Revision control allows companies to comply with important industry standards like ISO, • Pre-defined document types and numbering creates consistency across documents • Multiple document libraries allow better access control Document Management: Business Benefits
  • 34. Building It: Product Management / NPI Build It
  • 35. Product management workspaces are used to capture important product data and drive the process of taking a product through its complete lifecycle • Documents Rev: Specifications, Data Sheets, Quality Procedures, Work Instructions • Documents: Product Photos, Marketing, Scanned Communication Product Management Supporting Workspaces NPI Templates Products PD - Sales PD - Engineering PD - Manufacturing
  • 36. Product Management Item Details AttachmentsRelationships Change Log Workflow Bill Of Materials Milestones Grid Pre-Created items Clearly defined product leads Requirements
  • 37. Product Management: Workflow Product Setup Phase 1: Concept Phase 1: DRB Phase 2: Design Phase 3: Realize Phase 4: Service Obsolete Phase 2: DRB Phase 3: DRB Obsolete: DRB Product Management workflows vary from customer to customer but most follow some sort of phase gate process
  • 38. Product Management: Workflow Approvals for design reviews, or even customer reviews ensure that the process is followed and all parties involved in the process are held accountable. Workflow
  • 39. Product Management: Task Management During each phase there are tasks that need to be finished in order to seek approval, and move on to the next phase. This allows product owners to hold the team accountable, and insure deliverables are complete, and on time. Grid
  • 40. Product Management: Automation P1: Concept P2: Design P3: Realize P4: Service Obsolete Goals of automating the process with scripting • User Experience • Overall Product Management process, and tasks should be connected • Full Proof the process to drive the right activity to occur at the right time • Ensure that the correct people are notified at the right time Process Automation – Scripting and Business Logic
  • 41. Product Management: Task Management During each phase there are tasks that need to be finished in order to seek approval, and move on to the next phase. This allows product owners to hold the team accountable, and insure deliverables are complete, and on time.
  • 42. • Ensure that all Product Management tasks are completed before moving to the next phase in the process • Notifications, emails, and reports ensure completion of tasks are timely and that managers can easily hold their teams accountable • Automation simplifies the user experience and creates a fuller proof process • Phase gate reporting allows managers to know where to focus resources and improvement initiatives Product Management: Business Benefits
  • 43. Building It: Items & BOMs & Change Management Build It
  • 44. The Items & BOMs workspace is where the items, bill of materials and all their relationship and pertinent data reside. • Relationships are built between these items and BOMs to the Products workspace to tie everything together • Some supporting documentation, CAD drawings, pdfs may be added to the attachments tab of the item itself Items BOMs & Change Management Change OrdersItems & BOMs Supporting Workspaces I & B Classification I & B Sequencers
  • 45. Items BOMs Item Details Attachments Change Log Assoc. Workflow Bill Of Materials Where Used
  • 46. Change Management: Change Order Item Details Attachments Change Log Grid Managed Items Workflow
  • 47. Change Management: Change Order Grid Workflow
  • 48. • Manage all the Items & BOMs in a single repository • Find where all Items are used • Track Inventory of Items across different facilities • Manage the Suppliers, and quotes provided for Items & BOMs • Interconnect Product BOMs with the PLM process • Tie BOM, and document data together Items BOMs & Change Management
  • 50. Integration: • Items & BOMs • Customers • Suppliers • Products Product Management Integration:
  • 51. Lessons Learned Use ItBuild ItMap it Fusion Lifecycle & NPI Session Agenda
  • 52. Use it: Process to Successful Adoption Core Team Focus Groups UAT Training
  • 53. Fusion Lifecycle used to manage training • Dedicated training tenant • Workspaces • Training Courses (agenda, training material) • Training (track who attended training) • Training Item (create items, add attachments, move through workflow) Training sessions • Initial Roll-out: Multiple large sessions held at every site • On-going: Self-paced training workspace for PLM basics • Prerequisite for production tenant access Use it: Training
  • 54. Lessons Learned Use ItBuild ItMap it Fusion Lifecycle & NPI Session Agenda
  • 55. Requirements for Mapping Phase • Core Team + Subject Matter Experts • PLM Software Matter Expert The Know and No • “Know” the scope of what you are building • Don’t be afraid to say “No” Have a third party document the requirements • All parties confirm the requirements • Avoid the “I said A, you heard B, then built C” scenario Lessons Learned: Map It
  • 56. Have an agreed upon plan • Document the foundation Workspace architecture and workflow first • Automate later. Moving targets are hard to hit. Integrate last when the workflow is static • Moving targets get even harder to hit when integration is involved Limit changes as you near the end • Only minor changes past core team acceptance • Stand by what you built Lessons Learned: Build It
  • 57. Find capable, enthusiastic adopters for training • Likely to give good, constructive feedback • Likely to play in the system and find things you may have missed • Likely to stay positive and spread the word Have a wingman in your early training sessions • Allows you to focus on the adopters while they document changes Lessons Learned: Use It
  • 58. • What are some of the advantages of Fusion Lifecycle over traditional PLM? • What is NPI, and what does it mean to you? • What are three of the common business apps that part of or connected to NPI? Gift Cards!
  • 60. Contact Information Feel free to follow up: Rodney Coffey Manager - PLM Email: rodney.coffey@razorleaf.com Office: 330.676.0022 x7124 Cell: 937.241.9177