Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
c.v.
1. MECHANICAL ENGINEER (PLUMBING / FIRE)
SYED MURSALIN JALAL
Objective
Seeking a career opportunity in a reputed organization, where my diverse skills can be
utilized for our mutual benefits
Key Qualification:
• Design of Soil & Waste, storm drainage, Firefighting & hot & cold water system of Hospitals,
Hotels, mosque high rise Commercial & residential Buildings using (U.P.C).(uniform
plumbing code Abu Dhabi) (IPC) International Plumbing Codes (N.P.C) National Plumbing
codes & others etc.
• Designing and construction supervision of Ventilation and calculating Load, Ducts design
making relevant calculation sheets etc.
• Design and construction supervision of Fire Fighting System using U.A.E fire & safety code
of practices & N.F.P.A codes
• Design calculation of all types of All types of water /sewage pumps, construction supervision
of water, submersible, firefighting pumping system.
• Designing sizes of septic tank, Soakage pit, & grease interceptor O.H tanks and U.G tanks
as per water demand, flow chart, total population etc.
• Design external water supply network and making relevant calculation, pressure, flow, and
water demand etc. using (Epanet) software for analysis.
Professional Qualification:
Qualification: Bachelor of Technology in Mechanical Engineering
From Preston Institute of Engineering Science & Technology,
Karachi, 2005 (GPA: 3.5).
Diploma of Associate Engineer in (Civil) Engineering
From Zubeida Polytechnic Institute, Karachi, (1st Division).
Matriculation.
From National Grammar School & College, in (Sc.Group), 1995
Additional Skills: Familiar with operating software (Epanet -2) for Analysis the
Head, Pressure, velocity, diameter of pipe network .etc. Also
Familiar with operating software (AutoCAD 2D)
Membership: Life time member ship of (P.S.P.P)
Pakistan Society of Plumbing Professionals
U.A.E License: Holding Valid U.A.E Driving License
Certification Courses: MS office, MS word, MS excel, Html Java script,
Adobe Photoshop 5.5, swish 1.5 flash .5 and
Windows 98/95millennium from Mehran Institute
AutoCAD (14, 2007, 2013 version) from Microcline Institute.
1
CURRICULUM VITAE
Phone numbers:
Mobile #: 00971-529480137
Mobile #: 0092 -300-2288721
Passport no: A N 8 7 0 7 0 4 2
E-mail: smursalin80@hotmail.com
E-mail: smursalin80@yahoo.com
2. PROFESSIONAL EXPERIENCE:
From September 2014 : To Present
Organization : (IMPLEMENT)
Engineering Consultant (ABU
DHABI)
Position : Mechanical Design Engineer
Department : Facility Services
Responsibilities : Design sanitary drainage, storm drainage, Hot and
cold water supply & Firefighting system, of high-rise
buildings, villas, hospitals, mosque, school Making
relevant calculation water demand, pressure, flow,
Velocity. Calculation of pumps, sizes of septic tank,
Soakage pit, O.H tanks, U.G tanks accordingly etc.,
Works of the following Mega projects
Major Projects:
• AL ZAHRY TOWER, Abu Dhabi:
4B+G+M+18 Floors residential Building in Al Raha Beach for H.H. Sh. Nahyan Bin
Mubarak Al Nahyan.
Design sanitary drainage, Hot & cold system, of high-rise 24TH
floor building
Including 4no basements, Calculation of water Demands ,Hot water heaters
capacities, water flow sheet, Hot and cold water pipe sizing, drainage pipe sizing, as
per U.A.E codes etc.
multimedia filters, schedules, Lifting , Filter , pressure Boosting pumps capacities &
schedules , sizes, G.R.P O.H tanks ,U.G tanks accordingly etc., levels and slope of
the 200 mm drainage pipe.
• AL-RAHA BEACH-Saif Rashid Al Mansouri ( ABU DHABI ) :
3B+G+M+6 residential Building in Al Raha Beach for ALDAR Properties.
Design Sewage Drainage, storm Drainage, Hot & cold water system, sizing as per
(U.A.E standard), of 11 story building. Calculation of water Demands ,Hot Cold
water pipe sizes, Drainage pipe sizes, Flow sheet, Hot water heaters capacities &
itspowerrequirements,multimediafilters,U.Vsterilizationfilters,water,Lifting,Filter&pres
sure pumps and sewage pump capacities & schedules sizing, G.R.P O.H tanks ,
U.G tanks accordingly etc., levels and slope of the 200 mm drainage pipe .
• STH.Medeor 24/7 Hospital (ALAIN , U.A.E ) :
(Private Hospital including Operation Theaters, Imaging department, Labs, dialysis,
and patient rooms. Part of Burjeel group of hospitals)
Design sanitary drainage, Hot & cold water supply system, of Basement to Roof
Floor. Calculation of R.O water supply, C.SS.D sterilization, and dental units, Hot
water capacities, water flow sheet, Hot and cold water pipe sizing, drainage pipe
2
3. sizing, as per uniform plumbing codes, Feeding & pressure Boosting pumps
capacities & schedules & water Demands etc.
• HOTEL APARTMENT (MADINA ZAID , ABU DHABI) :
3B+G+M+12 residential Building in Al Raha Beach for H.H. Sh. Nahyan Bin Mubarak
Design Sewage Drainage , storm Drainage , Hot & cold water system, & F-Fighting
sprinkler pipe networks ,& sizing as per (U.A.E fire codes & standard),of 12 story
building. Calculation of water Demands ,Hot Cold water pipe sizes, Drainage pipe
sizes, Flow sheet, Hot water heaters capacities & its power requirements ,
multimedia filters, U.V sterilization filters,water,Lifting,Filter&pressure pumps and
sewage pump capacities & schedules sizing, G.R.P O.H tanks , U.G tanks
accordingly etc., levels and slope of the 200 mm drainage pipe .
• L.L.H. Burjeel Day Care Hospital (REEM ISLAND , ABU DHABI) :
(Converting a shopping mall in Gate District Hospital Theater, Imaging
department, labs, dialysis and patient rooms)
Design sanitary drainage, Hot & cold water supply system, of ground and first floor.
Calculation of R.O water supply for Dialysis Units ,sterilization, and dental units, Hot
water heaters capacities, water flow sheet, Hot and cold water pipe sizing, drainage
pipe sizing, as per uniform plumbing codes, Feeding & pressure Boosting pumps
capacities schedules of Equipment’s & water Demands etc.
• VILLA (SHAIKH AYEDA IBRAHIM ALI DUSOUKI ) ABU DHABI :
Design sanitary drainage, Hot & cold water system, of 2 story floor building ,
Calculation of water Demands ,Hot water heaters , multimedia filters, schedules,
Lifting, Filter , pressure pumps capacities & schedules , sizes, G.R.P O.H tanks ,
G.R.P U.G tanks accordingly etc., levels and slope of the 150 mm drainage pipe .
• ABU DHABI POLICE GHQ BUILDING :
Grade-A hospital with 6 operation theaters and 8 story, Clinics floors
Air cooled chiller plant of 1000 tons 2 Pearls Estidama approved
(Under Construction
• ICAD III LIGHT INDUSTRIAL UNITS & WARE HOUSES :
(mussafah , ABU DHABI)
Design sanitary drainage, Hot & cold water system, & storm water system,
Calculation of water Demands, Hot water heaters, External sewerage & schedules,
sizes, accordingly etc.
• DANET TOWER (ABU DHABI):
3B+G+podium +21 floor residential Building
Design Sewage Drainage , storm Drainage , Hot & cold water system, & F-Fighting
sprinkler pipe networks ,& sizing as per (U.A.E fire codes & standard),of 21 story
building. Calculation of water Demands ,Hot Cold water pipe sizes, Drainage pipe
sizes, Flow sheet, Hot water heaters capacities & its power requirements ,
multimedia filters, U.V sterilization filters,water,Lifting,Filter&pressure pumps and
3
4. sewage pump capacities & schedules sizing, G.R.P O.H tanks , U.G tanks
accordingly etc., levels and slope of the 200 mm drainage pipe .
From October 2013 : To SEPT. 2014
Organization : FOREMAN ROBERTS
Consulting Engineer (DUBAI)
Position : Sr. Public Health Engineer
Department : Facility Services
Responsibilities : Design high-rise buildings, villa, hospitals, sanitary
drainage, sewerage, storm drainage, Hot and cold
water supply & Firefighting system, Making relevant
calculation water demand, pressure, flow, Velocity.
Calculation of pumps, sizes of septic tank, Soakage
pit, O.H tanks, U.G tanks accordingly etc., Works of
the following Mega projects
Major Projects:
• GEMS BAKU AMERICAN ACEDEMY (Azerbaijan) :
Design sanitary drainage & external sewerage system of (Teaching Block, Admin Block,
and Sports Block etc.). Calculation of water Demands pumps sizes, O.H tanks ,U.G
tanks accordingly etc., levels and slope of the 200 mm drainage pipe including sizes of
pressure breaking manhole ,lift station , calculation and sizes of septic tank and soak pit
,Holding Tank , etc.
• ABU DHABI PLAZA (A.D.P) :
Calculation of water Demands pumps sizes, O.H tanks, accordingly etc., levels and
slope of the sewer pipe etc. Vetting design of 76 floor building check for 4no new blocks
0ffice, Residential, Hotel, Podium blocks check sanitary drainage, firefighting, water
supply etc.
From July 2011 : To October 2013
Organization : MUSHTAQ AND BILAL
Consulting Engineers
Position : Plumbing & Fire Fighting Engineer
Department : Facility Services
Responsibilities : Designing Plumbing & Fire Fighting system,
Making relevant calculation water demand, pressure,
flow, Velocity. Sanitary Drainage & Fire Fighting
4
5. system, Calculation of pumps, sizes of septic tank,
Soakage pit, O.H tanks, U.G tanks accordingly
etc,Towns, residential, commercial&industrialbuildings,
hospitals,etc Works of the following Mega projects:
Major Projects:
• Sind Rural Support Organization (S.R.S.O):
Design sanitary drainage, Fire Fighting, and water supply system of new blocks
(Administration, Staff Quarter, Hostel & Cafeteria etc.). Calculation of water Demands
pumps sizes, O.H tanks ,U.G tanks accordingly etc, levels and slope of the R.C.C
drainage pipe including preparation of BOQ, Engineering Estimates & Specification
• National Food Factory P.v.t Limited (Grinding Mill):
Design sanitary drainage, water supply system for new blocks. Calculation of water
Demands pumps sizes, O.H tanks, accordingly etc, levels and slope of the R.C.C
drainage pipe including preparation of BOQ, Engineering Estimates & Specification
• Green Shield Public School :
Design sanitary drainage , water supply system .Calculation of water Demands pumps
sizes, O.H tanks ,U.G tanks accordingly etc, levels and slope of the R.C.C drainage
pipe including preparation of BOQ, Engineering Estimates & Specification
From June 2004 : To July 2011
Organization : E.C.I.L
Engineering Consultants Int’l. (Pvt.) Ltd.
Position : Asst. Design Engineer
Department : Facility Services (ISD. Department)
Responsibilities : Designing External water supply networks
making relevant calculation water demand,
pressure, flow, Velocity etc. using (Epanet)
software for analysis. Sanitary Drainage & F.
Fighting system, Calculation of pumps, sizes of
septic tank, Soakage pit, O.H tanks, U.G tanks
accordinglyetc, Towns, residential, commercial
industrial buildings, etc. Works of the following
Mega projects:
Major Projects:
• Malir Development Authority (M.D.A) Taiser town:
Design external Main water supply network of the commercial & residential sectors
Making relevant calculation water demand, pressure, flow, pipe dia, velocity etc Also
using (Epanet) software for analysis.
• Aga khan hospital & university. (Proposed 2 MG Tanks):
5
6. Design external water supply system, calculation of pumps and pipe sizes & selection
of pipe types such as Mild Steel, ductile Iron, and Upvc. Preparing of Mechanical
drawings & sketch including preparation of BOQ, Engineering Estimates & (Epanet)
software for analysis.
• Karachi university Project:
Design drainage & water supply system of 16no new blocks. Calculation of pumps
sizes, levels and slope of the R.C.C drainage pipe including preparation of BOQ,
Engineering Estimates & Specification.
• Air traffic control complex (Abu Dhabi):
Design external firefighting & water supply system calculation of pumps making (BOQ,
SPEC) setting of drawings, sketch etc. under the Supervision of my chief Engineer, Ecil.
Mr Jawed shah Professor (N.E.D UNIVERSITY) (Epanet) software for analysis.
• Jinnah International Airport Karachi.
Design sanitary drainage & water supply system for new toilet block located in C.I.P
lounge & state lounge. Including preparation of BOQ, Engineering Estimates &
Specification.
• Multan Airport Project:
Design sanitary drainage & water supply system for 19no new blocks (A.S.F, C.A.A,
AT.C Towers, Staff Residence, Mosque, Terminal Building offices etc.). Calculation
of water Demands pumps sizes, O.H tanks ,U.G tanks accordingly etc., levels and
slope of the R.C.C drainage pipe including preparation of BOQ, Engineering Estimates
& Specification
• Behria Foundation:
(Plumbing Network Design for O-H Tank, U-G Tank, Lift Station & preparing
Engineering Estimates, B.O.Q. etc.)
• Engro chemical p.v.t limited :
(Design drainage & water supply system for 5no new blocks. Calculation of water
Demands, pumps, Septic tanks, soakage pit sizes, levels s sizes, levels and slope of
the R.C.C drainage pipe including preparation of BOQ, Engineering Estimates &
Specification. )
• Slamkot Airport at Mithi :
(Design drainage & water supply system of main (Terminal building). Calculation of
tube well pumps sizes, levels and slope of the R.C.C drainage pipe including
preparation of BOQ, Engineering Estimates & Specification. )
• USAID :
(Design drainage & water supply system for 20no new School. Calculation of pumps
sizes, levels and slope of the R.C.C drainage pipe including preparation of BOQ,
Engineering Estimates & Specification.)
• D.H.A Post mall
6
7. Design drainage & water supply system). Calculated pumps sizes, invert levels & slope
of R.C.C drainage also making BOQ & Specification.
• Post office N.NAZIMABAD
Design drainage & water supply system). Calculated pumps sizes, invert levels & slope
of R.C.C drainage also making BOQ & Specification.
From May 2002 : To June 2004
Organization : Y.H. Associates Consulting Engineers
Position : Assistant Engineer
Responsibilities : Designed and Supervised of Plumbing and HVAC
Works of the following projects:
• Baitul Sukoon Hospital
Calculated invert levels and marks the R.C.C drainage pipe lines. Calculated plumbing
services like drainage system and water supply system counting fixtures attached on
bath room etc.
• Habib Public School :
Calculated invert levels and marks the R.C.C drainage pipe lines. Calculated plumbing
services like drainage system and water supply system counting fixtures attached on
bath room etc.
• Darul-uloom Korangi Karachi
Design all drainage & water supply system successfully. Calculated invert levels and
slope of the R.C.C drainage pipes.
• Memon Medical Hospital & Institute
Design successfully all drainage system, including cold & hot water supply system of
the project.
From July 2000 : To February 2002
Organization : Design Developers
Position : Assistant Engineer
Responsibilities : Supervised construction, laying and testing of water
supply network, sewerage network, drainage system
and Gas Pipeline of (DADEX) Eternit Private Limited
Head Office Project.
• Dadex Eternit Pvt. Limited
Making calculation of plumbing works of Water Supply, Drainage pipeline, & Gas
pipeline, leakage & pressure testing of the Water Supply, Gas, and Drainage pipe Line,
Using G I Pipe, UPVC Pipe, PPRC Pipes.
HVAC:
• Familiar with Thermal load calculation, pipe designing, kitchen ventilation, and
psychometric chart analysis. Air-conditioning equipment’s, like Chillers, Cooling Tower,
AHU units, packaged units, etc.
PLUMBING & SEWERAGE
7
8. • Familiar with hot & cold water supply pipelines designing & drainage system pipes
designing & marks the Invert Levels etc.
INTERESTS:
Internet browsing for latest News, technical breakthrough & political scenarios. Reading
technical magazines & knowledge based stuff. Very much keen of music, movies and
making good friends. Always love positive and encouraging stuffs.
PERSONAL PROFILE:
• Father Name : Syed Jalal-Uddin.
• Place of Birth : Karachi.
• Date of birth : 05/06/1979
• Domicile : Karachi.
• Marital Status Married
• ID Card No : 42101-1884704-1
• Passport No : AN8707042
• Home Address : D-1 Daulat Nagar Block "K" FL-11
North Nazimabad Karachi.
IN VIEW OF ABOVE FACTS, I HOPE YOU WILL GIVE ME A CHANCE, UNDER YOUR
KIND CONTROL.
8