More Related Content
Similar to Stuart Wynn Resume
Similar to Stuart Wynn Resume (20)
Stuart Wynn Resume
- 1. Stuart Wynn 0418 900 063 stuwynn11@gmail.com
Career Profile
I have a track recordfor providinghighvalue tomyemployersthroughmyabilitytodevelop,lead
and motivate teamstooperate atlevelsthatsurpasstheirrole titlesorstatus.Iconsistentlydeliver
overand above andhave driven innovativesolutionstoengineeringandconstructionchallenges
that have savedtime ormoneyor resultedinproductionoutputincreases.Iamvaluesdrivenwith
an honest,ethical anddedicatedapproachtomyworkwhichI instil inmyworkforce.
Qualifications
UndergroundShiftSupervisorsCertificate2009
DGSC
AdvancedFirstAidCertificate
IntegratedTool CarrierLicense
Manual HandlingCertificate
Environmental HeritageCertificate
Career History
Company: MMG GoldenGrove WA
Dates: 2004 – 2016
Overview:MMG Limitedisa mid-tierglobal resourcescompany.GoldenGrove isanunderground
and openpitmine locatedinWA producesaround40,000 – 55,000 tonnesof zincand 21,000 –
24,000 tonnesof copperand employsaround560 employeesandcontractors.
Dates: 2014 to 2016 (reasonforleaving:myrole alongwitharound100 othersmade redundant)
Position:Production&DevelopmentShiftSupervisor(ScuddlesUndergroundMine)
ReportingTo: Mine SuperintendentandUndergroundManager
Responsibilities:
1 DevelopmentDrill
1 ProductionDrills
2 LoaderAD2900
Leadershipof 4 operatorsand4 service crew
3 Haulage Trucks
Undergroundcrusher,conveyancer&hoist
Achievements:
Oversawinstallationof escapeway ladderwayspumpstations,dewateringstations,
maintenance of windershaft,undergroundcrusherandconveyance whichwere all outside
of normal responsibilitiesof aShiftSupervisorsavingthe companybringinginspecialist
assistance.
All directreportswere trainedoverandabove theirjobdescriptionsenablingthemtobe
usedinan upscaledrole withouthavingtoemployexternal contractors
Consistentlytaskedwithproblemsolvingandgettingissuescorrected
- 2. Stuart Wynn 0418 900 063 stuwynn11@gmail.com
No serious accidentsorincidents(in12 yearson site).Mycrew had lowerincidentstatistics
than anyof the other3 crews.
Consistentlymetorexceededproductionanddevelopmenttargets
Position:DevelopmentShiftSupervisor
ReportingTo: Mine SuperintendentandUndergroundManager
Dates: 2013 to 2014
Responsibilities:
Running3 Jumbodrills
1 LoaderAD2900
Service CrewManagement(4) ConstructionCrew (4) anythingupto12 contractors
Haulage
Achievements:
Improveddrillingaccuracyby15-20% on developmentdrives
Restructure resultingin BackFill Formanrole nolongerbeingrequired.PromotedtoDevelopment
ShiftSupervisor
Position:Back Fill Forman(DepartmentHead)
ReportingTo: UndergroundManager
Dates: 2009 to 2013
Responsibilities:
Lead,develop,growteam
Ensure qualitysystems met
Crew(20) development
$45M budgetforconstructionof stope barricadesandfilling
Achievements
Oversawinstallationof escapewayladderwayspumpstations,dewateringstations,
maintenance of windershaft,undergroundcrusherandconveyance whichwere all outside
of normal responsibilitiesof aBack Fill Formansavingthe companybringinginspecialist
assistance.
Consistentlydeliveredproductiontargetat25-30% below budgetspend
Reducedstaff turnoverrate by60% fromapproximately50% downto 20%
Upgradedsafetysystems:
o Personal anchorpointsforfall arrestsystemswhichhada strongpotential forfailure
o Designedandinstalledconcrete truckstopstoreplace the temporarytruckstops
one of whichhadpreviouslyfailedresultinginafatality.
Whenstartingthe role,inheritedateamof demotivated,poorlytrainedandperforming
staff. Restructured,exitingthose thatcouldnotbe improvedandpromotingthose that
showedpromise.
- 3. Stuart Wynn 0418 900 063 stuwynn11@gmail.com
Lost a headdowna 400m deepriasboire hole.Engineeredarecoveryonsite directlyup
throughthe hole whichhadneverbeenachievedbefore.The equipmentwasvaluedatover
$360k and wasthe onlyone that existedonsite atthe time andtherefore hadtobe
recoveredtopreventweeksof possible downtime.
Oversawinstallationof escapewayladderwayspumpstations,dewateringstations,
maintenance of windershaft,undergroundcrusherandconveyance whichwere all outside
of normal responsibilitiesof a Back Fill Supervisorsavingthe companybringinginspecialist
assistance.
Streamlinedconstructionof stope barricadesintermsof redesignandorganisational
methodstoimprove productionby350%
2007 – 2009 heldthe Back Fill ForemanAlternate Position
Highlyregardedleadershipskills
Developedover6problematicstaff intohighperformers
Improvedstaff motivationandengagement
2005 to 2009: LeadingHand (ReportingtoBackFill Foreman)
2004 to 2005: ConstructionCrew (ReportingtoLeadingHand)
Priorto 2004: Self-employedbricklayer
Referee’s
Contact details available onrequest
WAYNEGAVALLISUndergroundMgr GREGORYWINDER Alternate UndergroundMgr
MMG GoldenGrove MMG GoldenGrove
GREG ROSS Mine Superintendent MARK O’MALLEY Mine Superintendent
MMG GoldenGrove MMG GoldenGrove