SlideShare a Scribd company logo
1 of 15
Introduction
 Job work means processing or working on raw materials or semi-
finished goods supplied by the principal manufacturer to the job
worker. This is to complete a part or whole of the process which
results in the manufacture or finishing of an article or any other
essential operation.
 Job Work Means a Work Delegated by a Principal Manufacturer
to Job Worker.
People Involved in Job Work
JOB WORK
Principal
Manufacturer(Sundry
Debtors)
Job Worker( Sundry
Creditors)
Enabling Job Work in Tally Erp 9
 Creating Company is in Normal Form (Way) of Creating in Tally
 Enabling Job Work in Tally
1) After Creating the Company, Enable Job Work
2) Click /Press F11 (Features), then Click/Press
F2(Inventory Features)
3) Enable Job–order Processing, Purchase-Order Processing,
Sales-Order Processing
4) Enable Material In and Material Out
CONTD
 Enable Multiple Godown
 Enable Track Stock & Item Cost
Technical Terms about JOB WORK
 Job Work out(Principal Manufacturer)
Goods Lying with the Job Worker.
 Job Work In(Job Worker)
Account the Goods Received from thee Principal Manufacturer for
Job Work.
 Material Out(Principal Manufacturer)
Can use the Voucher to Transfer the Raw Material to the job
worker.
CONTD
 Material Out(Job Worker)
Can Use the Voucher to Transfer the Finished Goods to the
Principal Manufacturer.
 Material In(Principal Manufacturer)
Can Use this Voucher to Record the Receipt of Finished Goods
From Job Worker.
 Material In(Job worker)
Can Use the Voucher as Receipt of Raw Material From
Principal Manufacturer.
 Creating Material In Voucher (RM)
Short Key = ALT(A+V+C)
Enter the Name
Method = Automatic
Allow Job Work In & Job Work Out
Allow the Narration in Voucher
 Creating Material Out Voucher(Transfer/RG)
Short Key = ALT(A+V+C)
Enter the Name
Method = Automatic
Allow Job Work In & Job Work Out
Allow the Narration in Voucher
Bills of Material
 It is a List of Constituents Items Along with Quantity
Details That Can be allocated for the Manufacturer of a Certain
Product , by- Product or Co-Product.
 Types of BOM
1) Standard BOM
This is used for in-House Production
2)Job Work BOM
It is Used when the Manufacturer of Goods is Delegated to a
Job Worker
Ledger Creation
 Ledgers is Created for Job Workers, Principal Manufacturer,
Godown Location.
 Creating Godown Location(Table Shown Below)
GODOWNS UNDER OUR STOCK
WITH THIRD
PARTY
THIRD PARTY
STOCK WITH US
RAW MATERIAL
LOCATION
PRIMARY NO NO
FINISHED
GOODS
LOCATION
PRIMARY NO NO
SCRAP
LOCATION
PRIMARY NO NO
JOB WORK OUT
LOCATION
PRIMARY YES NO
JOB WOR IN PRIMARY NO YES
STOCK ITEMS CREATION
GATEWAY OF
TALLY
STOCK ITEMS INVENTORY INFO
STOCK ITEMSCREATE
CONTD
In”Name”Field Enter the Stock Name
Group the Stock Item under the stock Group RM
In Units Field, Select the Applicable Unit of Measurement
Retain No For Enable Cost Tracking
Enter Save
(Short Note = If any of the ledger is not Given or Prepared,
then Click ALT+C)
Creating Job Work Order
 1) Go to GOT(Gateway of Tally)>Order Voucher>W:Job Work
In Order
 2) Enter the Date
 3)Party A/c Name : In Fields Select the Principal
Manufacturer Ledger from whom the job Work In Order
Received
 4)In Process Instruction
Duration of Process
Nature of Processing = Specify the Details of Nature of
Process to be Carried out in the Manufacturing the Expected
Goods
CONTD
 5) Order No = JOB1N00
 6)In Stock Item Allocation = Item Allocation : By Default, the
Stock Item Specified will be Displayed , Indicating that the
allocation is for the Selected Item
 For Order Number = By Default the Job Order Specified in
the Job Work out order will be Displayed indicating that the
Time Also.
CONTD
 Enter Due Date
 Godown = In This Field , Select the Godown , where the
Finished Goods will be Stored after Manufacture of Goods,
Eg: Job Work - in – Godown
 Enter the Rate of the Product and Amount
 Enter the tax Amount with Narration
 Short note:-
 To View the Job-Work-in-order
GOT-Display-Job Work in Reports-Job Work Register-Job
Work in orders

More Related Content

What's hot

What's hot (18)

Managerial Economics Production Analysis ppt by NDP
Managerial Economics Production Analysis ppt by NDPManagerial Economics Production Analysis ppt by NDP
Managerial Economics Production Analysis ppt by NDP
 
Theory of Production
Theory of ProductionTheory of Production
Theory of Production
 
Theory of Production
Theory of ProductionTheory of Production
Theory of Production
 
7 Production function
7 Production function7 Production function
7 Production function
 
Production function
Production functionProduction function
Production function
 
Theory of Production
Theory of ProductionTheory of Production
Theory of Production
 
Production and cost
Production and costProduction and cost
Production and cost
 
Production function
Production functionProduction function
Production function
 
Theory of production 1 gp
Theory of production 1 gpTheory of production 1 gp
Theory of production 1 gp
 
Job order cost system
Job order cost systemJob order cost system
Job order cost system
 
Production (MANAGERIAL ECONOMICS)
Production (MANAGERIAL ECONOMICS)Production (MANAGERIAL ECONOMICS)
Production (MANAGERIAL ECONOMICS)
 
MEFA II UNIT COMPLETE NOTES
MEFA II UNIT COMPLETE NOTESMEFA II UNIT COMPLETE NOTES
MEFA II UNIT COMPLETE NOTES
 
Production Managerial Economics
Production Managerial EconomicsProduction Managerial Economics
Production Managerial Economics
 
Production function
Production functionProduction function
Production function
 
Theory of Production
Theory of ProductionTheory of Production
Theory of Production
 
Job,batch and contract costing
Job,batch and contract costingJob,batch and contract costing
Job,batch and contract costing
 
Contract costing
Contract costingContract costing
Contract costing
 
Akaun Chapter 8
Akaun Chapter 8Akaun Chapter 8
Akaun Chapter 8
 

Similar to Job work Part 1

Complete step by step guide to odoo manufacturing
Complete step by step guide to odoo manufacturingComplete step by step guide to odoo manufacturing
Complete step by step guide to odoo manufacturingRishi Pujara
 
Garrison lecture Chapter 3.ppt ...............................................
Garrison lecture Chapter 3.ppt ...............................................Garrison lecture Chapter 3.ppt ...............................................
Garrison lecture Chapter 3.ppt ...............................................iansaptr
 
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptx
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptxMaria Khoso and Nimrta Nanwani Managerial-Accounting.pptx
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptxMariaKhoso1
 
ACC 116 JOB COSTING
ACC 116 JOB COSTINGACC 116 JOB COSTING
ACC 116 JOB COSTINGShadina Shah
 
Checkmate Jobdata Presentation
Checkmate  Jobdata PresentationCheckmate  Jobdata Presentation
Checkmate Jobdata PresentationDynamic Systems
 
Managerial Accounting in class exercise chapter 4 solution
Managerial Accounting in class exercise chapter 4 solutionManagerial Accounting in class exercise chapter 4 solution
Managerial Accounting in class exercise chapter 4 solutionHelen Wong
 
Odoo manufacturing v12
Odoo manufacturing v12Odoo manufacturing v12
Odoo manufacturing v12Celine George
 
Basic Handover of Bill of Material(2).docx
Basic Handover of Bill of Material(2).docxBasic Handover of Bill of Material(2).docx
Basic Handover of Bill of Material(2).docxDipak Banerjee
 
Complete step by step guide to odoo 13 manufacturing
Complete step by step guide to odoo 13 manufacturingComplete step by step guide to odoo 13 manufacturing
Complete step by step guide to odoo 13 manufacturingPlanetOdoo
 

Similar to Job work Part 1 (20)

Job work
Job workJob work
Job work
 
Planning & Route Sheet.ppt
Planning & Route Sheet.pptPlanning & Route Sheet.ppt
Planning & Route Sheet.ppt
 
Complete step by step guide to odoo manufacturing
Complete step by step guide to odoo manufacturingComplete step by step guide to odoo manufacturing
Complete step by step guide to odoo manufacturing
 
Garrison lecture Chapter 3.ppt ...............................................
Garrison lecture Chapter 3.ppt ...............................................Garrison lecture Chapter 3.ppt ...............................................
Garrison lecture Chapter 3.ppt ...............................................
 
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptx
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptxMaria Khoso and Nimrta Nanwani Managerial-Accounting.pptx
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptx
 
ACC 116 JOB COSTING
ACC 116 JOB COSTINGACC 116 JOB COSTING
ACC 116 JOB COSTING
 
Checkmate Jobdata Presentation
Checkmate  Jobdata PresentationCheckmate  Jobdata Presentation
Checkmate Jobdata Presentation
 
11 job costing
11 job costing11 job costing
11 job costing
 
Budgetting for pm .
Budgetting for pm .Budgetting for pm .
Budgetting for pm .
 
Costing system
Costing systemCosting system
Costing system
 
Managerial Accounting in class exercise chapter 4 solution
Managerial Accounting in class exercise chapter 4 solutionManagerial Accounting in class exercise chapter 4 solution
Managerial Accounting in class exercise chapter 4 solution
 
Sample powerpoint
Sample powerpointSample powerpoint
Sample powerpoint
 
chapter 3.ppt
chapter 3.pptchapter 3.ppt
chapter 3.ppt
 
M.com (4)
M.com (4)M.com (4)
M.com (4)
 
Odoo manufacturing v12
Odoo manufacturing v12Odoo manufacturing v12
Odoo manufacturing v12
 
Basic Handover of Bill of Material(2).docx
Basic Handover of Bill of Material(2).docxBasic Handover of Bill of Material(2).docx
Basic Handover of Bill of Material(2).docx
 
16.bill of material
16.bill of material16.bill of material
16.bill of material
 
Manufacturing In Odoo
Manufacturing In OdooManufacturing In Odoo
Manufacturing In Odoo
 
Complete step by step guide to odoo 13 manufacturing
Complete step by step guide to odoo 13 manufacturingComplete step by step guide to odoo 13 manufacturing
Complete step by step guide to odoo 13 manufacturing
 
Go Live.pptx
Go Live.pptxGo Live.pptx
Go Live.pptx
 

Recently uploaded

Tech Framework Integrated Workspace Management System
Tech Framework Integrated Workspace Management SystemTech Framework Integrated Workspace Management System
Tech Framework Integrated Workspace Management SystemSushant Joshi
 
Financial management icar entrepreneurship development
Financial management icar entrepreneurship developmentFinancial management icar entrepreneurship development
Financial management icar entrepreneurship developmentJyotishBhagat1
 
AI Data Engineering for SMEs - some tricks and tools
AI Data Engineering for SMEs - some tricks and toolsAI Data Engineering for SMEs - some tricks and tools
AI Data Engineering for SMEs - some tricks and toolsScott Turner
 
Dropbox DBX Q1 2020 Investor Presentation.pdf
Dropbox DBX Q1 2020 Investor Presentation.pdfDropbox DBX Q1 2020 Investor Presentation.pdf
Dropbox DBX Q1 2020 Investor Presentation.pdfLeHerring LLC
 
Facebook_Meta_Q4-2018-Earnings-Presentation.pdf
Facebook_Meta_Q4-2018-Earnings-Presentation.pdfFacebook_Meta_Q4-2018-Earnings-Presentation.pdf
Facebook_Meta_Q4-2018-Earnings-Presentation.pdfLeHerring LLC
 
"NEON LIGHT CITY" AR PC game from M.A.D tronics Studios
"NEON LIGHT CITY" AR PC game from M.A.D tronics Studios"NEON LIGHT CITY" AR PC game from M.A.D tronics Studios
"NEON LIGHT CITY" AR PC game from M.A.D tronics Studiostess51
 

Recently uploaded (6)

Tech Framework Integrated Workspace Management System
Tech Framework Integrated Workspace Management SystemTech Framework Integrated Workspace Management System
Tech Framework Integrated Workspace Management System
 
Financial management icar entrepreneurship development
Financial management icar entrepreneurship developmentFinancial management icar entrepreneurship development
Financial management icar entrepreneurship development
 
AI Data Engineering for SMEs - some tricks and tools
AI Data Engineering for SMEs - some tricks and toolsAI Data Engineering for SMEs - some tricks and tools
AI Data Engineering for SMEs - some tricks and tools
 
Dropbox DBX Q1 2020 Investor Presentation.pdf
Dropbox DBX Q1 2020 Investor Presentation.pdfDropbox DBX Q1 2020 Investor Presentation.pdf
Dropbox DBX Q1 2020 Investor Presentation.pdf
 
Facebook_Meta_Q4-2018-Earnings-Presentation.pdf
Facebook_Meta_Q4-2018-Earnings-Presentation.pdfFacebook_Meta_Q4-2018-Earnings-Presentation.pdf
Facebook_Meta_Q4-2018-Earnings-Presentation.pdf
 
"NEON LIGHT CITY" AR PC game from M.A.D tronics Studios
"NEON LIGHT CITY" AR PC game from M.A.D tronics Studios"NEON LIGHT CITY" AR PC game from M.A.D tronics Studios
"NEON LIGHT CITY" AR PC game from M.A.D tronics Studios
 

Job work Part 1

  • 1.
  • 2. Introduction  Job work means processing or working on raw materials or semi- finished goods supplied by the principal manufacturer to the job worker. This is to complete a part or whole of the process which results in the manufacture or finishing of an article or any other essential operation.  Job Work Means a Work Delegated by a Principal Manufacturer to Job Worker.
  • 3. People Involved in Job Work JOB WORK Principal Manufacturer(Sundry Debtors) Job Worker( Sundry Creditors)
  • 4. Enabling Job Work in Tally Erp 9  Creating Company is in Normal Form (Way) of Creating in Tally  Enabling Job Work in Tally 1) After Creating the Company, Enable Job Work 2) Click /Press F11 (Features), then Click/Press F2(Inventory Features) 3) Enable Job–order Processing, Purchase-Order Processing, Sales-Order Processing 4) Enable Material In and Material Out
  • 5. CONTD  Enable Multiple Godown  Enable Track Stock & Item Cost
  • 6. Technical Terms about JOB WORK  Job Work out(Principal Manufacturer) Goods Lying with the Job Worker.  Job Work In(Job Worker) Account the Goods Received from thee Principal Manufacturer for Job Work.  Material Out(Principal Manufacturer) Can use the Voucher to Transfer the Raw Material to the job worker.
  • 7. CONTD  Material Out(Job Worker) Can Use the Voucher to Transfer the Finished Goods to the Principal Manufacturer.  Material In(Principal Manufacturer) Can Use this Voucher to Record the Receipt of Finished Goods From Job Worker.  Material In(Job worker) Can Use the Voucher as Receipt of Raw Material From Principal Manufacturer.
  • 8.  Creating Material In Voucher (RM) Short Key = ALT(A+V+C) Enter the Name Method = Automatic Allow Job Work In & Job Work Out Allow the Narration in Voucher  Creating Material Out Voucher(Transfer/RG) Short Key = ALT(A+V+C) Enter the Name Method = Automatic Allow Job Work In & Job Work Out Allow the Narration in Voucher
  • 9. Bills of Material  It is a List of Constituents Items Along with Quantity Details That Can be allocated for the Manufacturer of a Certain Product , by- Product or Co-Product.  Types of BOM 1) Standard BOM This is used for in-House Production 2)Job Work BOM It is Used when the Manufacturer of Goods is Delegated to a Job Worker
  • 10. Ledger Creation  Ledgers is Created for Job Workers, Principal Manufacturer, Godown Location.  Creating Godown Location(Table Shown Below) GODOWNS UNDER OUR STOCK WITH THIRD PARTY THIRD PARTY STOCK WITH US RAW MATERIAL LOCATION PRIMARY NO NO FINISHED GOODS LOCATION PRIMARY NO NO SCRAP LOCATION PRIMARY NO NO JOB WORK OUT LOCATION PRIMARY YES NO JOB WOR IN PRIMARY NO YES
  • 11. STOCK ITEMS CREATION GATEWAY OF TALLY STOCK ITEMS INVENTORY INFO STOCK ITEMSCREATE
  • 12. CONTD In”Name”Field Enter the Stock Name Group the Stock Item under the stock Group RM In Units Field, Select the Applicable Unit of Measurement Retain No For Enable Cost Tracking Enter Save (Short Note = If any of the ledger is not Given or Prepared, then Click ALT+C)
  • 13. Creating Job Work Order  1) Go to GOT(Gateway of Tally)>Order Voucher>W:Job Work In Order  2) Enter the Date  3)Party A/c Name : In Fields Select the Principal Manufacturer Ledger from whom the job Work In Order Received  4)In Process Instruction Duration of Process Nature of Processing = Specify the Details of Nature of Process to be Carried out in the Manufacturing the Expected Goods
  • 14. CONTD  5) Order No = JOB1N00  6)In Stock Item Allocation = Item Allocation : By Default, the Stock Item Specified will be Displayed , Indicating that the allocation is for the Selected Item  For Order Number = By Default the Job Order Specified in the Job Work out order will be Displayed indicating that the Time Also.
  • 15. CONTD  Enter Due Date  Godown = In This Field , Select the Godown , where the Finished Goods will be Stored after Manufacture of Goods, Eg: Job Work - in – Godown  Enter the Rate of the Product and Amount  Enter the tax Amount with Narration  Short note:-  To View the Job-Work-in-order GOT-Display-Job Work in Reports-Job Work Register-Job Work in orders