1. Soil
existing vegetation
existing utilities-electricity ,water
existing features -man made ,rock boulders
Front section
Left side section
Right section
Plan showing section lines vegetation
,trees ,temp.stalls
No existing utilities-electricity ,water have to take a connection of water and
electricity
Electricity connection depart. Is nearby and will be provided through poles and
by installing a transformers
For water they provide a connection through underground pipelines hence there
is no existing water pipeline connection on the site.
existing vegetation like trees,bushes and feature like boulders
New entrance from the left roadside
Future transformer
installation and
connection through
poles common way
Red-sandy soil on the site
GEOGRAPHICAL ANALYSIS
4. WATER MOVEMENT
Water goes through the given blue line and