GHRIS - Stage 3 APAC Rollout Current Phase: Build
MeasurementsAgainstPlan
Actual Percent
Complete
(Total Project)
Actual Percent
Complete
(This Phase)
Planned Percent
Complete
(Total Project)
Planned Percent
Complete
(This Phase)
Ahead/On
Track/Behind
61% 83% 60% 81% On Track
High-Level AssessmentofProjectHealth
Schedule: Cost: Quality: Overall:
Task CompletionsThisPeriod
 Collectedthe global andlocal datafromcountries
 ConverteddatainpreparationforSystemsIntegrationTesting
 Unit testedall outboundvendorinterfaces(exceptRAMCO)
Work In Progress
 Prepfor SIT – testscenarios,secure responsibilities,setupof the environment
PlannedCompletionsforNextPeriod
 SIT WeekOne (Onsite) –Complete
 Finish1st
round of data evaluationandfixes
 RefreshANHUfromProduction
Current Risks & Issues
Type Category Description Effects Actions Taken / Mitigations
Issue Quality Malaysia,Lanka and
Thailandwere late in
gettingtheirconversion
extractsto us (2 weeks).
Thisforcedus to skipkey
data review/qualitysteps.
Many data defectshave
beenreported.
Higher
defect
rate on
all
RICEW
Objects,
Interface
Failure
1.) Yousuf Admani (HRIS) isfull
time assignedtogetcountry
data cleanedup
2.) Deloitte will runasecondpass
of the data afterSIT cleanup
effortson18-Mar
3.) We have three calendarweeks
betweenSITendandUAT
begintoget to a betterstate
Issue Cost The implementationteam
wantsanotherinstance to
performUAT efforts
More $$ 1.) Launcheda CR withScott
JohnsonanCore Services
2.) The program can absorb the
additional costs
Issue Cost In orderto complywith
Ansell policy,the setups
done inthe additional
instance will needtobe
re-done inANHUand
regressiontested.
More $$ 1.) Deloitte isresearchingthe
additional laborcostandwill
revertback withanestimate
Issue Calendar,
Quality
The independent
contractor hiredtomodify
the RAMCO applicationto
accept data fromthe
Oracle HCM application
can onlydeliveronMarch
20th
, well pastourwindow
Calendar
Variance
1.) We will launchaseparate
QA/SITeffortforthisinterface
2.) The contractor will notbend
on schedule,claiming
bandwidthissues
to testinterfaces
GHRIS - Phase 3 Cloud
Compensation
Current Phase: Design
MeasurementsAgainstPlan
Actual Percent
Complete
(Total Project)
Actual Percent
Complete
(This Phase)
Planned Percent Complete
(Total Project)
Planned Percent
Complete
(This Phase)
Ahead/On
Track/Behind
37% 94% 41% 100% On Track
High-Level AssessmentofProjectHealth
Scope: Calendar: Cost/
Quality:
Overall:
Task CompletionsThisPeriod
Functional Specificationssignedoff forall reports(LATE)
Work In Progress
Functional SpecsforEBS >> Fusion>> EBS Interfacesinreview (LATE)
Technical SpecsforEBS >> Fusion>> EBS Interfacesinreview(LATE)
Technical SpecificationsforRICEWObjects(mostlyreports)
BuildforFast Formulas
Change Managementactivities(new SoP’s,flows,e.g.)
PlannedCompletionsforNextPeriod
SignOff for Functional SpecsforEBS>> Fusion >> EBS Interfaces(LATE)
Current Risks & Issues
Type Category Description Effects Actions Taken / Mitigations
Risk Calendar Fusion(eComp) hasa
hard deadline of 6/30 in
orderto deliverforthis
year’scompcycle
Calendar
Overruns,
Rescheduling
to NextYear
1.) Deloitte andAnsellare
activelymanagingthe
interdependenciesbetween
the APACand Fusion
Projects
Risk Technical FusionDependson
provisionof converted
EBS data for APACto be
successful;variance in
conversionfordelivery
for Stage 3 could
negativelyaffectthe
FusionProject
Calendar
Overruns,
Rescheduling
to NextYear
1.) We have a mitigation
strategyinplace to extract
requiredFusiondatafrom
Deloitte templates
2.) ThisRiskis the reasonI’ve
placedFusionin“yellow”
status
Issue Functional Ansell isabout3 weeks
late inapproving
Functional
SpecificationsforFusion
Interfaces
Delaysin
Build
1.) Deloitte hascalculatedthat
theycan make up the Build
time (fornow)
2.) I’ve alertedthe PMOand
Vikrant/Jeff thatthisisa
priority.
GHRIS - Stage 2 EMEA/LAC Rollout Current Phase: Operate
MeasurementsAgainstPlan
Actual Percent
Complete
(Total Project)
Actual Percent
Complete
(This Phase)
Planned Percent
Complete
(Total Project)
Planned Percent
Complete
(This Phase)
Ahead/On
Track/Behind
N/A N/A N/A N/A N/A
High-Level AssessmentofProjectHealth
Scope: Calendar: Cost/
Quality:
Overall:
Task CompletionsThisPeriod
 Brazil – completedcorrectionstocontactrecords forADP Interface
 Brazil – code for loadingcontactrecordswas migratedtoPROD
Work In Progress
 Interface Parallel Testing(see below fordetails)
Interface name No. of error records
on the latestinterface
file
1st
Payroll Parallel
Run Status
2nd
Payroll
Parallel Run
Status
France –
Comasec
0(2nd
Payroll Parallel
Count)
Successful Successful
Mexico– Fortia 5(2nd
Payroll Parallel
Count)
Successful Successful
Belgium–SD
WORX
3(1st Payroll Parallel
Count)
Successful Errors in Source
RecordsNeedto
be correctedin
orderto run
Brazil – ADP 277(1st
Payroll Parallel
Count)
Successful Corrected
Contactsto be
movedintoPROD
Portugal – PHC 1(1st
Payroll Parallel
Count)
Successful Connectivity
Issues
Lithuania– Alga
2000
0(2nd
Payroll Parallel
Count)
Successful Successful
 Steady – State Defect(see detailsbelow);manyitemshave beenfixedandmigratedto
production.Yousuf isworkingwithDeloitte tochange status onthese itemsto“closed”.
Week-over-weekchange:-2Open+2 Closed(bothcategories)
PlannedCompletionsforNextPeriod
 Brazil – CorrectedContactrecordswill be loadedandthe parallel rerun
 Belgium–Lesleywill correctsource HCMrecords; rerunthe parallel
 Portugal – resolve connectivityproblemswithFTPsite andrerun
 Applicationandtestingof language packs(BrazilianPortuguese,FrenchandSimplified
Chinese) toSIT,UAT priorto eventual rollouttoProduction.(ETCMarch 17th
)
Current Risks & Issues
Type Category Description Effects Actions Taken / Mitigations
Issue Technical Connectivityproblems
withthe Portugal Payroll
Vendor
Delay
in
Rollout
1.) Scott Johnson’s teamhasbeen
alertedandisactivelyworking
thisissue.Potentiallya
passwordproblem.
GHRIS – MSS / ESS Rollout Current Phase: Transition
MeasurementsAgainstPlan
Actual Percent
Complete
(Total Project)
Actual Percent
Complete
(This Phase)
Planned Percent
Complete
(Total Project)
Planned Percent
Complete
(This Phase)
Ahead/On
Track/Behind
29% 30% 48% 73% Behind
High-Level AssessmentofProjectHealth
Ansell GHRIS Project Status Measurements
Phase 2 Stage 2 Steady State Date: 3/11/2015
Closed Open
Ready for
retest
In
Progress
Closed Open
Ready for
retest
In
Progress
Totals
Core HR 5 9 0 0 12 14 0 0 40
Report 0 0 2 0 0 2 1 0 5
Self-
Service
0 0 0 0 0 2 0 0 2
HR 0 0 0 0 0 3 0 0 3
5 9 2 0 12 21 1 0 50
P2 P3
Module
Scope: Calendar: Cost/
Quality:
Overall:
Task CompletionsThisPeriod
 HRIT (Kiran) developedqueriestoidentifymissingdataandpassedoverto HRIS
 Finalizedthe scope objectivesandapproachforthe project(phasedfunctionalityrolloutfor
the pilots)
 Completedprojectplanandgotagreementfromkeystakeholders(Jeff,Vikrant,Kiran)
Work In Progress
 Identificationandremediationof incorrectdataonthe currentProductionHCMapplication
for NorthAmerica,EMEA and LAC(LATE)
 Reviewof currenttrainingandSOPcollateral forESS/MSS
PlannedCompletionsforNextPeriod
 Contact the Global headsof PilotDepartments
 Developcommunicationof rolloutforthe pilotpopulation
Current Risks & Issues
Type Category Description Effects Actions Taken / Mitigations
Risk Quality,
Calendar
Employee andManager
Self Service have been
identifiedaskeytoolsfor
cleansingdataforthe
FusionCompProject;thus
ESS/MSS rolloutisonthat
project’scritical path
Calendar
Slippage,
Data
Quality
Issues
1.) The ESS/MSS rolloutis
enqueuedwell aheadof the
FusionUAT effort(slack)
Issue Scope The newapproach
involvingacascade of
functionality(EEinquiry,
EE Update,Mgr Inquiry,
MGR Update) requires
that we add tasksand
calendarto the plan
Possible
Calendar
Riskto
Other
Projects
1.) SDR Will re-baselineand
conferwithEarl onpotential
knockon effects
Issue Calendar Verylittle progresshas
beenmade tocleansing
the ProductionDatabase
of missingorincorrect
data
Data
Quality

More Related Content

What's hot

10 - CIP-002-5.1 Medley - Carr
10 - CIP-002-5.1 Medley - Carr10 - CIP-002-5.1 Medley - Carr
10 - CIP-002-5.1 Medley - Carr
Bryan Carr
 
WJ White Resume_July15_Functional
WJ White Resume_July15_FunctionalWJ White Resume_July15_Functional
WJ White Resume_July15_Functional
Wm White
 
Introduction-for_management_program(part_1)
Introduction-for_management_program(part_1)Introduction-for_management_program(part_1)
Introduction-for_management_program(part_1)
hepta-sat
 
Cook.richard
Cook.richardCook.richard
Cook.richard
NASAPMC
 
65sp3 Rdidp Milestones.07.23.09
65sp3 Rdidp Milestones.07.23.0965sp3 Rdidp Milestones.07.23.09
65sp3 Rdidp Milestones.07.23.09
flau3388
 
Bilbro james
Bilbro jamesBilbro james
Bilbro james
NASAPMC
 
D brown gbezos_shirshorn
D brown gbezos_shirshornD brown gbezos_shirshorn
D brown gbezos_shirshorn
NASAPMC
 
Mikus Resume 2016
Mikus Resume 2016Mikus Resume 2016
Mikus Resume 2016
Kenny Mikus
 
Annex M to NETDET SOPv5
Annex M to NETDET SOPv5Annex M to NETDET SOPv5
Annex M to NETDET SOPv5
Salomon Pinzon
 
Armstrong
ArmstrongArmstrong
Armstrong
NASAPMC
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
Pieter van Asten
 
Sean carter dan_deans
Sean carter dan_deansSean carter dan_deans
Sean carter dan_deans
NASAPMC
 
Todd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 gov
Todd Dickey
 

What's hot (19)

10 - CIP-002-5.1 Medley - Carr
10 - CIP-002-5.1 Medley - Carr10 - CIP-002-5.1 Medley - Carr
10 - CIP-002-5.1 Medley - Carr
 
SPC Implementation - Mark Harrison
SPC Implementation - Mark HarrisonSPC Implementation - Mark Harrison
SPC Implementation - Mark Harrison
 
WJ White Resume_July15_Functional
WJ White Resume_July15_FunctionalWJ White Resume_July15_Functional
WJ White Resume_July15_Functional
 
Introduction-for_management_program(part_1)
Introduction-for_management_program(part_1)Introduction-for_management_program(part_1)
Introduction-for_management_program(part_1)
 
CMMC Overview Arrington_20200903
CMMC Overview Arrington_20200903CMMC Overview Arrington_20200903
CMMC Overview Arrington_20200903
 
Exploring ways to inform earned value using tp ms (v7)
Exploring ways to inform earned value using tp ms (v7)Exploring ways to inform earned value using tp ms (v7)
Exploring ways to inform earned value using tp ms (v7)
 
Cook.richard
Cook.richardCook.richard
Cook.richard
 
An Investigation Of EXtreme Programming Practices
An Investigation Of EXtreme Programming PracticesAn Investigation Of EXtreme Programming Practices
An Investigation Of EXtreme Programming Practices
 
65sp3 Rdidp Milestones.07.23.09
65sp3 Rdidp Milestones.07.23.0965sp3 Rdidp Milestones.07.23.09
65sp3 Rdidp Milestones.07.23.09
 
Bilbro james
Bilbro jamesBilbro james
Bilbro james
 
D brown gbezos_shirshorn
D brown gbezos_shirshornD brown gbezos_shirshorn
D brown gbezos_shirshorn
 
Mikus Resume 2016
Mikus Resume 2016Mikus Resume 2016
Mikus Resume 2016
 
Annex M to NETDET SOPv5
Annex M to NETDET SOPv5Annex M to NETDET SOPv5
Annex M to NETDET SOPv5
 
Data Recovery Approaches
Data Recovery ApproachesData Recovery Approaches
Data Recovery Approaches
 
Armstrong
ArmstrongArmstrong
Armstrong
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
 
Jen Tong Resume
Jen Tong ResumeJen Tong Resume
Jen Tong Resume
 
Sean carter dan_deans
Sean carter dan_deansSean carter dan_deans
Sean carter dan_deans
 
Todd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 gov
 

Viewers also liked

Exec summary template 2013-17_Post Consultation_V0 3LEO
Exec summary template 2013-17_Post Consultation_V0 3LEOExec summary template 2013-17_Post Consultation_V0 3LEO
Exec summary template 2013-17_Post Consultation_V0 3LEO
Lauren-Eloise Oxlade
 

Viewers also liked (10)

2 Exec Summary
2 Exec Summary2 Exec Summary
2 Exec Summary
 
Exec summary template 2013-17_Post Consultation_V0 3LEO
Exec summary template 2013-17_Post Consultation_V0 3LEOExec summary template 2013-17_Post Consultation_V0 3LEO
Exec summary template 2013-17_Post Consultation_V0 3LEO
 
Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008
 
One page effective project status report
One page effective project status reportOne page effective project status report
One page effective project status report
 
Project Performance Dashboard
Project Performance DashboardProject Performance Dashboard
Project Performance Dashboard
 
Executive Status Report Template
Executive Status Report TemplateExecutive Status Report Template
Executive Status Report Template
 
PMO Frameworks
PMO FrameworksPMO Frameworks
PMO Frameworks
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
SlideShare Experts - 7 Experts Reveal Their Presentation Design Secrets
SlideShare Experts - 7 Experts Reveal Their Presentation Design SecretsSlideShare Experts - 7 Experts Reveal Their Presentation Design Secrets
SlideShare Experts - 7 Experts Reveal Their Presentation Design Secrets
 

Similar to GHRIS Program Status 11-Mar-15

Ramachandran_Resume.doc
Ramachandran_Resume.docRamachandran_Resume.doc
Ramachandran_Resume.doc
Ramachandran M
 
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...
shawncarner
 
First Time IT Project Management Review
First Time IT Project Management ReviewFirst Time IT Project Management Review
First Time IT Project Management Review
davidzisu
 
DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.
Bill Bearnson
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
Steven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
Steven Bonacorsi
 

Similar to GHRIS Program Status 11-Mar-15 (20)

General Performance Testing Overview
General Performance Testing OverviewGeneral Performance Testing Overview
General Performance Testing Overview
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
IRJET- Quality Matrices of Project Schedule
IRJET- Quality Matrices of Project ScheduleIRJET- Quality Matrices of Project Schedule
IRJET- Quality Matrices of Project Schedule
 
6 sigma LTE release management process improvement
6 sigma LTE release management process improvement6 sigma LTE release management process improvement
6 sigma LTE release management process improvement
 
Managing projects by data
Managing projects by dataManaging projects by data
Managing projects by data
 
Test Metrics
Test MetricsTest Metrics
Test Metrics
 
Ramachandran_Resume.doc
Ramachandran_Resume.docRamachandran_Resume.doc
Ramachandran_Resume.doc
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
 
Tyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support ProjectTyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support Project
 
IRJET- A Testbed for Real Time Water Level Control System
IRJET- 	  A Testbed for Real Time Water Level Control SystemIRJET- 	  A Testbed for Real Time Water Level Control System
IRJET- A Testbed for Real Time Water Level Control System
 
Megalingam_Thiruvarangam_Resume
Megalingam_Thiruvarangam_ResumeMegalingam_Thiruvarangam_Resume
Megalingam_Thiruvarangam_Resume
 
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...
 
First Time IT Project Management Review
First Time IT Project Management ReviewFirst Time IT Project Management Review
First Time IT Project Management Review
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sample
 
DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Symons
SymonsSymons
Symons
 
JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008
 

GHRIS Program Status 11-Mar-15

  • 1. GHRIS - Stage 3 APAC Rollout Current Phase: Build MeasurementsAgainstPlan Actual Percent Complete (Total Project) Actual Percent Complete (This Phase) Planned Percent Complete (Total Project) Planned Percent Complete (This Phase) Ahead/On Track/Behind 61% 83% 60% 81% On Track High-Level AssessmentofProjectHealth Schedule: Cost: Quality: Overall: Task CompletionsThisPeriod  Collectedthe global andlocal datafromcountries  ConverteddatainpreparationforSystemsIntegrationTesting  Unit testedall outboundvendorinterfaces(exceptRAMCO) Work In Progress  Prepfor SIT – testscenarios,secure responsibilities,setupof the environment PlannedCompletionsforNextPeriod  SIT WeekOne (Onsite) –Complete  Finish1st round of data evaluationandfixes  RefreshANHUfromProduction Current Risks & Issues Type Category Description Effects Actions Taken / Mitigations Issue Quality Malaysia,Lanka and Thailandwere late in gettingtheirconversion extractsto us (2 weeks). Thisforcedus to skipkey data review/qualitysteps. Many data defectshave beenreported. Higher defect rate on all RICEW Objects, Interface Failure 1.) Yousuf Admani (HRIS) isfull time assignedtogetcountry data cleanedup 2.) Deloitte will runasecondpass of the data afterSIT cleanup effortson18-Mar 3.) We have three calendarweeks betweenSITendandUAT begintoget to a betterstate Issue Cost The implementationteam wantsanotherinstance to performUAT efforts More $$ 1.) Launcheda CR withScott JohnsonanCore Services 2.) The program can absorb the additional costs Issue Cost In orderto complywith Ansell policy,the setups done inthe additional instance will needtobe re-done inANHUand regressiontested. More $$ 1.) Deloitte isresearchingthe additional laborcostandwill revertback withanestimate Issue Calendar, Quality The independent contractor hiredtomodify the RAMCO applicationto accept data fromthe Oracle HCM application can onlydeliveronMarch 20th , well pastourwindow Calendar Variance 1.) We will launchaseparate QA/SITeffortforthisinterface 2.) The contractor will notbend on schedule,claiming bandwidthissues
  • 2. to testinterfaces GHRIS - Phase 3 Cloud Compensation Current Phase: Design MeasurementsAgainstPlan Actual Percent Complete (Total Project) Actual Percent Complete (This Phase) Planned Percent Complete (Total Project) Planned Percent Complete (This Phase) Ahead/On Track/Behind 37% 94% 41% 100% On Track High-Level AssessmentofProjectHealth Scope: Calendar: Cost/ Quality: Overall: Task CompletionsThisPeriod Functional Specificationssignedoff forall reports(LATE) Work In Progress Functional SpecsforEBS >> Fusion>> EBS Interfacesinreview (LATE) Technical SpecsforEBS >> Fusion>> EBS Interfacesinreview(LATE) Technical SpecificationsforRICEWObjects(mostlyreports) BuildforFast Formulas Change Managementactivities(new SoP’s,flows,e.g.) PlannedCompletionsforNextPeriod SignOff for Functional SpecsforEBS>> Fusion >> EBS Interfaces(LATE) Current Risks & Issues Type Category Description Effects Actions Taken / Mitigations Risk Calendar Fusion(eComp) hasa hard deadline of 6/30 in orderto deliverforthis year’scompcycle Calendar Overruns, Rescheduling to NextYear 1.) Deloitte andAnsellare activelymanagingthe interdependenciesbetween the APACand Fusion Projects Risk Technical FusionDependson provisionof converted EBS data for APACto be successful;variance in conversionfordelivery for Stage 3 could negativelyaffectthe FusionProject Calendar Overruns, Rescheduling to NextYear 1.) We have a mitigation strategyinplace to extract requiredFusiondatafrom Deloitte templates 2.) ThisRiskis the reasonI’ve placedFusionin“yellow” status Issue Functional Ansell isabout3 weeks late inapproving Functional SpecificationsforFusion Interfaces Delaysin Build 1.) Deloitte hascalculatedthat theycan make up the Build time (fornow) 2.) I’ve alertedthe PMOand Vikrant/Jeff thatthisisa priority.
  • 3. GHRIS - Stage 2 EMEA/LAC Rollout Current Phase: Operate MeasurementsAgainstPlan Actual Percent Complete (Total Project) Actual Percent Complete (This Phase) Planned Percent Complete (Total Project) Planned Percent Complete (This Phase) Ahead/On Track/Behind N/A N/A N/A N/A N/A High-Level AssessmentofProjectHealth Scope: Calendar: Cost/ Quality: Overall: Task CompletionsThisPeriod  Brazil – completedcorrectionstocontactrecords forADP Interface  Brazil – code for loadingcontactrecordswas migratedtoPROD Work In Progress  Interface Parallel Testing(see below fordetails) Interface name No. of error records on the latestinterface file 1st Payroll Parallel Run Status 2nd Payroll Parallel Run Status France – Comasec 0(2nd Payroll Parallel Count) Successful Successful Mexico– Fortia 5(2nd Payroll Parallel Count) Successful Successful Belgium–SD WORX 3(1st Payroll Parallel Count) Successful Errors in Source RecordsNeedto be correctedin orderto run Brazil – ADP 277(1st Payroll Parallel Count) Successful Corrected Contactsto be movedintoPROD Portugal – PHC 1(1st Payroll Parallel Count) Successful Connectivity Issues Lithuania– Alga 2000 0(2nd Payroll Parallel Count) Successful Successful  Steady – State Defect(see detailsbelow);manyitemshave beenfixedandmigratedto production.Yousuf isworkingwithDeloitte tochange status onthese itemsto“closed”. Week-over-weekchange:-2Open+2 Closed(bothcategories)
  • 4. PlannedCompletionsforNextPeriod  Brazil – CorrectedContactrecordswill be loadedandthe parallel rerun  Belgium–Lesleywill correctsource HCMrecords; rerunthe parallel  Portugal – resolve connectivityproblemswithFTPsite andrerun  Applicationandtestingof language packs(BrazilianPortuguese,FrenchandSimplified Chinese) toSIT,UAT priorto eventual rollouttoProduction.(ETCMarch 17th ) Current Risks & Issues Type Category Description Effects Actions Taken / Mitigations Issue Technical Connectivityproblems withthe Portugal Payroll Vendor Delay in Rollout 1.) Scott Johnson’s teamhasbeen alertedandisactivelyworking thisissue.Potentiallya passwordproblem. GHRIS – MSS / ESS Rollout Current Phase: Transition MeasurementsAgainstPlan Actual Percent Complete (Total Project) Actual Percent Complete (This Phase) Planned Percent Complete (Total Project) Planned Percent Complete (This Phase) Ahead/On Track/Behind 29% 30% 48% 73% Behind High-Level AssessmentofProjectHealth Ansell GHRIS Project Status Measurements Phase 2 Stage 2 Steady State Date: 3/11/2015 Closed Open Ready for retest In Progress Closed Open Ready for retest In Progress Totals Core HR 5 9 0 0 12 14 0 0 40 Report 0 0 2 0 0 2 1 0 5 Self- Service 0 0 0 0 0 2 0 0 2 HR 0 0 0 0 0 3 0 0 3 5 9 2 0 12 21 1 0 50 P2 P3 Module
  • 5. Scope: Calendar: Cost/ Quality: Overall: Task CompletionsThisPeriod  HRIT (Kiran) developedqueriestoidentifymissingdataandpassedoverto HRIS  Finalizedthe scope objectivesandapproachforthe project(phasedfunctionalityrolloutfor the pilots)  Completedprojectplanandgotagreementfromkeystakeholders(Jeff,Vikrant,Kiran) Work In Progress  Identificationandremediationof incorrectdataonthe currentProductionHCMapplication for NorthAmerica,EMEA and LAC(LATE)  Reviewof currenttrainingandSOPcollateral forESS/MSS PlannedCompletionsforNextPeriod  Contact the Global headsof PilotDepartments  Developcommunicationof rolloutforthe pilotpopulation Current Risks & Issues Type Category Description Effects Actions Taken / Mitigations Risk Quality, Calendar Employee andManager Self Service have been identifiedaskeytoolsfor cleansingdataforthe FusionCompProject;thus ESS/MSS rolloutisonthat project’scritical path Calendar Slippage, Data Quality Issues 1.) The ESS/MSS rolloutis enqueuedwell aheadof the FusionUAT effort(slack) Issue Scope The newapproach involvingacascade of functionality(EEinquiry, EE Update,Mgr Inquiry, MGR Update) requires that we add tasksand calendarto the plan Possible Calendar Riskto Other Projects 1.) SDR Will re-baselineand conferwithEarl onpotential knockon effects Issue Calendar Verylittle progresshas beenmade tocleansing the ProductionDatabase of missingorincorrect data Data Quality