IMPROVING NDT COMPLIANCE
A NEW APPROACH IN SOFTWARE THAT ADDS VALUE TO YOUR PROJECT
Streamlining Non-Destructive Pipework Testing with Technology
CONTENTS
3CHALLENGES
1INTRODUCTION
4#1 GENERATING THE REQUESTS
5#2 MANAGING THE REPORTS
6#3 TRACKING NDT PROGRESS
8#1 GENERATING THE REQUESTS
9#2 MANAGING THE REPORTS
10#3 TRACKING NDT PROGRESS
2STANDARD INDUSTRY PROCEDURES
7SOLUTION: EIDA
12ABOUT EIDA SOLUTIONS
11CONCLUSION
CONTACT US 13
January 2016 @ EIDA Solutions
Improving NDT Compliance: A New Approach in Software
1
INTRODUCTION
Non-destructive pipework testing (NDT/NDE) is an integral part of all projects
that will have a ‘process’ output; particularly on oil & gas and pharmaceutical
projects. NDT plays a crucial role in quality assurance (QA) and quality
control (QC). It allows piping to be examined and evaluated without the
pipework being damaged in the process.
For QA/QC personnel the management of NDT has traditionally been a
manual process involving the use of tools such as Excel spreadsheets, request
books and email. This process is onerous and resource-draining, resulting in
costly delays and rework for contractors.
However, software designed for the construction industry streamlines NDT
management by:
Introduction
Ensuring contractors are compliant with client specifications by
providing real-time NDT statistics.
Reducing errors and rework by providing a smart, centralised
platform.
Speeding up data entry and document management allowing employee
time to be redistributed.
Providing a comprehensive audit trail ensuring full traceability.
Improving NDT Compliance: A New Approach in Software
2
NDT administration is managed in much the same way as other aspects
of the construction process. Information is logged and maintained using
multiple Excel spreadsheets or Word documents and is stored in a
shared folder.
NDT administration typically involves the following stages:
1. The NDT request form is filled out by hand listing the welds to be
tested. The request and corresponding drawings are emailed to the
NDT contractor.
2. When testing is complete, the report indicating accepted and
rejected welds is communicated and the results are recorded against
the weld log database.
3. Statistics are updated and compared to the project piping
specifications to ensure NDT compliance.
STANDARD INDUSTRY PROCEDURES
Managing NDT is time consuming, involving unnecessary hours spent
on manual entry and cross-referencing between multiple documents
and platforms. This costs contractors time and money, and working with
inefficient tools is frustrating for employees.
Problems
can arise if
employees
are working
from
outdated
information
so care must
be taken
to ensure
only live,
untested
welds are
selected.
StandardProcedures
TIME SAVED
PER
ACTIVITY
45 30 5 80MANUAL
5 5 Instant 10SOFTWARE
Generate
Request
Total
Per
Request
Manage
Reports
Track
Statistics
70
minutes saved per
request.
Improving NDT Compliance: A New Approach in Software
3
CHALLENGES
Generating NDT request Managing the reports Tracking the statistics
Challenges
Construction companies are under pressure to deliver higher quality
projects in shorter periods of time.
NDT management is time consuming and tedious for project engineers, weld
inspectors and QA/QC personnel.
The tools available for NDT administration weren’t built with the construction
industry in mind and are often limited and inefficient in managing large
volumes of documentation, fast-paced work environments and multiple users.
NDT often exceeds its allocated budget due to costly rework caused by the
limitations of existing tools.
The limitations of inefficient tools can cause challenges during the following
processes:
Improving NDT Compliance: A New Approach in Software
4
#1 GENERATING NDT REQUESTS
At the moment most companies fill out NDT requests by hand and
rely on different documents such as Excel spreadsheets, project piping
specifications and email to decide what tests need to be carried out.
In order to generate a single request using a manual process employees
must sift through weld log databases, compare project parameters and NDT
reports, handwrite a request form and compile the necessary isometrics.
The limitations of current tools in generating NDT requests is costly for
contractors.
For example generating a single NDT request with 20 welds can take 45
minutes to complete, with up to 20 of these minutes being spent handwriting
the request sheet. Moving between different documents and platforms, along
with writing the information out by hand leaves the process more prone to
mistakes and can result in incorrect welds being tested or welds being missed.
Even after the requests are filled out, time is often needed to clarify, edit or
redo the form.
The current process for managing NDT requests can be a huge source of
frustration for contractors and their employees who are under pressure to meet
deadlines.
Challenges
Scanning & Emailing5
A request of 20 welds takes
approximately 45 minutes
to generate.
15
20
Double-checking Request
Handwriting Request
Searching for welds
5
45
Minutes
Improving NDT Compliance: A New Approach in Software
5
#2 MANAGING THE REPORTS
Challenges
30
Minutes
“I had to
manually search
the weld log for
each individual
weld and add the
results in one by
one”.
Jason Radley,
Head of Project
Controls,
Radley Engineering
Contractors depend upon the management
of NDT results to ensure compliance and
determine outstanding NDT.
After NDT has been carried out the QA team
receive a report that lists the results of the welds
tested. These results are logged against the weld log
database. The report itself is scanned and stored in a
folder and the hard-copy is filed.
Manually logging and managing these reports is a
painful process as:
• matching the reports to the weld log database
is time consuming.
• switching between multiple applications leaves
more room for human error.
• reports can be lost or difficult to locate.
• it can result in non-compliance to project
specifications.
These challenges can affect business relationships
and the company’s reputation by resulting in delays
and reworks.
Improving NDT Compliance: A New Approach in Software
6
#3 TRACKING STATISTICS
Accurately maintaining NDT statistics is of major concern to contractors.
These statistics are used to determine outstanding testing and ensure
standards are met.
The statistics are calculated by using a combination of Excel formulae to
compare the project parameters to NDT results that have been recorded in
the weld log. As the weld log is updated with new NDT results the statistics
are updated automatically. The amount of welds to be tested are calculated
manually from these statistics.
On large, high-value projects, companies could be conducting 7 different
types of NDT on up to 12 piping specifications and 30 fluid types.
Challenges
Figure 2: Tracking NDT Statistics Using Excel
5
Minutes
These large and complex spreadsheets cause challenges for users. They are
challenging to set up, and then are slow to open and difficult to navigate due to
the large volumes of information contained over multiple spreadsheets.
Excel also does not allow multiple users to edit or amend a document at the
same time. On large projects this is an issue resulting in incorrect statistics
leading to non-compliance.
Care must be taken not to disrupt the Excel formulae when editing. Small
changes can disrupt the calculations, causing inaccuracies and delays.
Improving NDT Compliance: A New Approach in Software
7
SOFTWARE SOLUTION: EIDA
EIDA Solutions’ intelligent construction software simplifies and streamlines
NDT management, reducing the time spent on its administration and
increasing accuracy and efficiency.
NDT parameters are defined and set in EIDA at the beginning of a project and
integrated with weld history providing real-time project statistics. NDT requests
and reports can easily be managed and accessed by a keyword search or filtered
by date, type of NDT, piping specifications or fluid-type.
EIDA’s 3 step process has reduced the time our clients spend on NDT
administration by up to 88%, offering the following benefits:
Solution
Main
ContractorContractorUsers
Ensures contractors are compliant.
Protects relationship with client in assuring their
standards have been met.
Full traceability throughout.
Employees working to a standardised process.
Information furnished to NDT contractor
automatically.
Archived NDT reports available for auditing and
handover.
Less time spent managing requests & reports.
Rework eliminated.
No need to update or amend Excel.
Improving NDT Compliance: A New Approach in Software
8
#1: GENERATING THE REQUESTS
With EIDA, requests are quickly and accurately created directly from the
weld log in 3 simple steps:
Solution
5
Minutes
The NDT type to
be carried out is
selected. EIDA uses
rules-based logic to
ensure only welds
that require this
particular type of
NDT are available
for selection.
Welds can
be filtered by
welder, piping
specification, fluid-
type, date welded
and more. Only live
and untested welds
can be selected.
Relevant personnel,
including the NDT
inspector are selected
from a list, and the
request along with the
necessary isometrics
are instantly compiled
and automatically
emailed.
1 2 3
2
Figure 3: EIDA’s Request Management Interface
Improving NDT Compliance: A New Approach in Software
9
#2 LOGGING THE REPORTS
EIDA provides a centralised platform for the
management of NDT information. This is particularly
useful for managing the NDT reports.
With EIDA, users can view generated NDT requests and
can easily apply the results from the NDT report to each
weld. This takes just a few seconds.
A PDF of the NDT report can be seamlessly uploaded to
all relevant welds.
EIDA also provides users with the option to attach a file
to each weld listed in an NDT request. Contractors can
use this feature to upload relevant documentation such as
borescopic video files.
The ability
to store NDT
documentation
on one platform
reduces the
amount of time
spent searching
for information
and ensures full
traceability.
Solution
Figure 4: EIDA’s Report Management Interface
5
Minutes
Improving NDT Compliance: A New Approach in Software
10
#3 TRACKING NDT STATISTICS
By clicking on the ‘NDT Statistics’ tab users instantly have access to
real-time calculations indicating project compliance.
In-built logic connects the weld log, requests and reports to the project
parameters to instantly calculate statistics and determine if the project is
complying to the NDT requirements. Piping specifications that have met
their targets are highlighted in green, while those that are below target are
highlighted in red with the quantity of welds required to be tested indicated in
brackets.
With this information readily available to the project team, corrective and
preventive actions can quickly be taken to ensure that NDT remains on
schedule, within budget and fully compliant.
Solution
Figure 5: EIDA’s Compliance Tracking Interface
Instant
Improving NDT Compliance: A New Approach in Software
11
EIDA Solutions provides contractors with a powerful, smart and
centralised platform for the management and administration of
Non-Destructive Testing.
On large process projects NDT can demand the generation and management
of hundreds of requests and reports a week.
Commonly used tools lack the ability to efficiently manage this process.
This presents the following problems for contractors:
• Inefficient, and sometimes incorrect input of information.
• Documentation is lost or difficult to locate.
• Man-hours lost on inefficient administration process.
• Project over-budget due to delays and reworks.
• Damaged reputation and relationship with client.
EIDA Solutions’ NDT management system addresses these problems by:
• Fully integrating NDT with the weld history records to ensure that only
live, targeted welds are made available for selection based on the NDT
project parameters.
• Accelerating NDT data entry by archiving NDT reports and their results
against NDT requests and automatically applying them to the weld log.
• Providing real-time NDT statistics instantly.
• Ensuring compliance is achieved and documentation is readily available
for auditing and handover.
“EIDA is a life saver on our project”
Anke Bessing, QA Manager, M+W Group
“Thanks for the support last week.
That was a real demonstration in how it should be done.
Mobilisation /demo/implementation. Great job.
When you implement change this is what you need.
Well done.”
Tony Hennessey, Project Manager, Mercury Engineering
CONCLUSION
Conclusion
Improving NDT Compliance: A New Approach in Software
12
ABOUT EIDA SOLUTIONS
Established in 2010, EIDA Solutions brings together a wealth of experience
in the construction and technology industries. We have leveraged this
domain expertise to develop a ground breaking solution to assist engineering
companies in this digital age.
The construction sector has been slow to embrace IT solutions to aid
engineers and management in the delivery of projects. We believe that this is
due to traditional software applications being focused on IT capabilities rather
than delivering systems which meet the needs of construction engineering
professionals. At EIDA Solutions we are committed to providing a client-
driven product and service, and offer software tailored to project specific
requirements.
By embracing the concept of software as a service (SaaS) we enable our
clients to reduce project operating costs, enhance quality and optimise site
performance with customised software, thus differentiating the services that
we provide from those offered by our competitors.
EIDA Solutions continues to provide software services to a number of high-
profile clients, on a variety of high-specification, high-value projects, both
nationally and internationally.
AboutEIDA
Improving NDT Compliance: A New Approach in Software
13
CONTACT US
Corporate Head Office: Mainland European Office:
IRELAND BELGIUM
Suite One, The Avenue
Beacon Court, Bracken Road
Sandyford
Co. Dublin
+353 (01) 539 4500
Science 14 Atrium,
14b, Rue de la Science
1040
Bruxelles
+32 (0)2 880 3758
Schedule a Demo
info@eidasolutions.com
www.eidasolutions.com
ContactUs

More Related Content

What's hot

Inline Quality Inspection Chechup – Optimierung von Produktionsprozessen mit ...
Inline Quality Inspection Chechup – Optimierung von Produktionsprozessen mit ...Inline Quality Inspection Chechup – Optimierung von Produktionsprozessen mit ...
Inline Quality Inspection Chechup – Optimierung von Produktionsprozessen mit ...Fraunhofer IFF
 
Workshop Borland - Caliber
Workshop Borland - CaliberWorkshop Borland - Caliber
Workshop Borland - CaliberMicrofocusitalia
 
Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)Kiran Walimbe
 
Unit II Software Testing and Quality Assurance
Unit II Software Testing and Quality AssuranceUnit II Software Testing and Quality Assurance
Unit II Software Testing and Quality AssuranceVinothkumaR Ramu
 
Agile for Software as a Medical Device
Agile for Software as a Medical DeviceAgile for Software as a Medical Device
Agile for Software as a Medical DeviceOrthogonal
 
Regulatory Considerations for use of Cloud Computing and SaaS Environments
Regulatory Considerations for use of Cloud Computing and SaaS EnvironmentsRegulatory Considerations for use of Cloud Computing and SaaS Environments
Regulatory Considerations for use of Cloud Computing and SaaS EnvironmentsInstitute of Validation Technology
 
IC Design Physical Verification
IC Design Physical VerificationIC Design Physical Verification
IC Design Physical VerificationIRJET Journal
 
6 article azojete vol 9 51 67
6 article azojete vol 9 51 676 article azojete vol 9 51 67
6 article azojete vol 9 51 67Oyeniyi Samuel
 
Chapter14 quality
Chapter14 qualityChapter14 quality
Chapter14 qualityVin Voro
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET Journal
 

What's hot (14)

Inline Quality Inspection Chechup – Optimierung von Produktionsprozessen mit ...
Inline Quality Inspection Chechup – Optimierung von Produktionsprozessen mit ...Inline Quality Inspection Chechup – Optimierung von Produktionsprozessen mit ...
Inline Quality Inspection Chechup – Optimierung von Produktionsprozessen mit ...
 
Genisision – Sales – 012 – Capability Statement Expanded
Genisision – Sales – 012 – Capability Statement ExpandedGenisision – Sales – 012 – Capability Statement Expanded
Genisision – Sales – 012 – Capability Statement Expanded
 
Workshop Borland - Caliber
Workshop Borland - CaliberWorkshop Borland - Caliber
Workshop Borland - Caliber
 
Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)
 
Unit II Software Testing and Quality Assurance
Unit II Software Testing and Quality AssuranceUnit II Software Testing and Quality Assurance
Unit II Software Testing and Quality Assurance
 
Agile for Software as a Medical Device
Agile for Software as a Medical DeviceAgile for Software as a Medical Device
Agile for Software as a Medical Device
 
Swetha Nelluru
Swetha NelluruSwetha Nelluru
Swetha Nelluru
 
Cv 1
Cv 1Cv 1
Cv 1
 
Regulatory Considerations for use of Cloud Computing and SaaS Environments
Regulatory Considerations for use of Cloud Computing and SaaS EnvironmentsRegulatory Considerations for use of Cloud Computing and SaaS Environments
Regulatory Considerations for use of Cloud Computing and SaaS Environments
 
IC Design Physical Verification
IC Design Physical VerificationIC Design Physical Verification
IC Design Physical Verification
 
6 article azojete vol 9 51 67
6 article azojete vol 9 51 676 article azojete vol 9 51 67
6 article azojete vol 9 51 67
 
Chapter14 quality
Chapter14 qualityChapter14 quality
Chapter14 quality
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
 
107 quality control
107 quality control107 quality control
107 quality control
 

Viewers also liked

20140824 주일예배, 마21장23절 46절, 모퉁이 머릿돌
20140824 주일예배, 마21장23절 46절, 모퉁이 머릿돌20140824 주일예배, 마21장23절 46절, 모퉁이 머릿돌
20140824 주일예배, 마21장23절 46절, 모퉁이 머릿돌Myeongnyun Mission Church
 
Evaluation question 1 in what way does your media product...
Evaluation question 1   in what way does your media product...Evaluation question 1   in what way does your media product...
Evaluation question 1 in what way does your media product...haverstockmedia
 
Section manager perfomance appraisal 2
Section manager perfomance appraisal 2Section manager perfomance appraisal 2
Section manager perfomance appraisal 2tonychoper5804
 
Be-Verb Pattern Elimination
Be-Verb Pattern EliminationBe-Verb Pattern Elimination
Be-Verb Pattern EliminationDrStovall
 
Lame para Audacity
Lame para AudacityLame para Audacity
Lame para Audacityjuanluru
 
Tipos de licencias de software
Tipos de licencias de softwareTipos de licencias de software
Tipos de licencias de softwareBourvon
 
Stores manager perfomance appraisal 2
Stores manager perfomance appraisal 2Stores manager perfomance appraisal 2
Stores manager perfomance appraisal 2tonychoper5804
 
Online Peer-to-Peer Fundraising Best Practices
Online Peer-to-Peer Fundraising Best PracticesOnline Peer-to-Peer Fundraising Best Practices
Online Peer-to-Peer Fundraising Best PracticesAseem Thakur
 
Customer service executive performance appraisal
Customer service executive performance appraisalCustomer service executive performance appraisal
Customer service executive performance appraisalrosegriffin6
 
Holograma punterolaser
Holograma punterolaserHolograma punterolaser
Holograma punterolaserConsu Muñoz
 
Modul 1 kb 2 tahapan persalinan
Modul 1 kb 2   tahapan persalinanModul 1 kb 2   tahapan persalinan
Modul 1 kb 2 tahapan persalinanpjj_kemenkes
 
ประกาศจังหวัดบุรีรัมย์Ekg
ประกาศจังหวัดบุรีรัมย์Ekgประกาศจังหวัดบุรีรัมย์Ekg
ประกาศจังหวัดบุรีรัมย์Ekgnirutnon
 

Viewers also liked (20)

20140824 주일예배, 마21장23절 46절, 모퉁이 머릿돌
20140824 주일예배, 마21장23절 46절, 모퉁이 머릿돌20140824 주일예배, 마21장23절 46절, 모퉁이 머릿돌
20140824 주일예배, 마21장23절 46절, 모퉁이 머릿돌
 
Всё про mmorpg
Всё про mmorpgВсё про mmorpg
Всё про mmorpg
 
Evaluation question 1 in what way does your media product...
Evaluation question 1   in what way does your media product...Evaluation question 1   in what way does your media product...
Evaluation question 1 in what way does your media product...
 
Section manager perfomance appraisal 2
Section manager perfomance appraisal 2Section manager perfomance appraisal 2
Section manager perfomance appraisal 2
 
Be-Verb Pattern Elimination
Be-Verb Pattern EliminationBe-Verb Pattern Elimination
Be-Verb Pattern Elimination
 
Manual de funciones
Manual de funcionesManual de funciones
Manual de funciones
 
Touch anywhere!
Touch anywhere!Touch anywhere!
Touch anywhere!
 
Lame para Audacity
Lame para AudacityLame para Audacity
Lame para Audacity
 
Tipos de licencias de software
Tipos de licencias de softwareTipos de licencias de software
Tipos de licencias de software
 
Construir una pica con base de apoyo
Construir una pica con base de apoyoConstruir una pica con base de apoyo
Construir una pica con base de apoyo
 
Stores manager perfomance appraisal 2
Stores manager perfomance appraisal 2Stores manager perfomance appraisal 2
Stores manager perfomance appraisal 2
 
Online Peer-to-Peer Fundraising Best Practices
Online Peer-to-Peer Fundraising Best PracticesOnline Peer-to-Peer Fundraising Best Practices
Online Peer-to-Peer Fundraising Best Practices
 
Customer service executive performance appraisal
Customer service executive performance appraisalCustomer service executive performance appraisal
Customer service executive performance appraisal
 
Holograma punterolaser
Holograma punterolaserHolograma punterolaser
Holograma punterolaser
 
Q-school
Q-schoolQ-school
Q-school
 
Modul 1 kb 2 tahapan persalinan
Modul 1 kb 2   tahapan persalinanModul 1 kb 2   tahapan persalinan
Modul 1 kb 2 tahapan persalinan
 
Modulo leyes de los gases 1-ok
Modulo   leyes de los gases 1-okModulo   leyes de los gases 1-ok
Modulo leyes de los gases 1-ok
 
ICSM07.ppt
ICSM07.pptICSM07.ppt
ICSM07.ppt
 
ประกาศจังหวัดบุรีรัมย์Ekg
ประกาศจังหวัดบุรีรัมย์Ekgประกาศจังหวัดบุรีรัมย์Ekg
ประกาศจังหวัดบุรีรัมย์Ekg
 
Herpetofauna Sightings in Fort Buchanan Poster
Herpetofauna Sightings in Fort Buchanan PosterHerpetofauna Sightings in Fort Buchanan Poster
Herpetofauna Sightings in Fort Buchanan Poster
 

Similar to Improving NDT Compliance: A New Approach in Software

COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...IRJET Journal
 
Welding Construction Mngmt_revert
Welding Construction Mngmt_revertWelding Construction Mngmt_revert
Welding Construction Mngmt_revertMike Lewin
 
Agile software development and challenges
Agile software development and challengesAgile software development and challenges
Agile software development and challengeseSAT Journals
 
Agile software development and challenges
Agile software development and challengesAgile software development and challenges
Agile software development and challengeseSAT Publishing House
 
VIVA PROJECT PROPOSAL CONSULTATION PROJECT (GROUP 2).pptx
VIVA PROJECT PROPOSAL CONSULTATION PROJECT (GROUP 2).pptxVIVA PROJECT PROPOSAL CONSULTATION PROJECT (GROUP 2).pptx
VIVA PROJECT PROPOSAL CONSULTATION PROJECT (GROUP 2).pptxvictorapoihelisav
 
Real-time Manufacturing Management for a Hybrid Process
Real-time Manufacturing Management for a Hybrid ProcessReal-time Manufacturing Management for a Hybrid Process
Real-time Manufacturing Management for a Hybrid Processmichaelthonea
 
Whitepaper fluke
Whitepaper flukeWhitepaper fluke
Whitepaper flukeClair Kirby
 
CTD for client signoff and early requirements validation - 11th IEEE SW Eng...
CTD for client signoff and early requirements validation   - 11th IEEE SW Eng...CTD for client signoff and early requirements validation   - 11th IEEE SW Eng...
CTD for client signoff and early requirements validation - 11th IEEE SW Eng...Saritha Route
 
To Study Effective Implementation of ERP System and Its Applicability to Mult...
To Study Effective Implementation of ERP System and Its Applicability to Mult...To Study Effective Implementation of ERP System and Its Applicability to Mult...
To Study Effective Implementation of ERP System and Its Applicability to Mult...IRJET Journal
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive MaintenanceBearingPoint
 
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNINGCUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNINGIRJET Journal
 
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...IRJET Journal
 
Database and Systems Integration Technologies.pptx
Database and Systems Integration Technologies.pptxDatabase and Systems Integration Technologies.pptx
Database and Systems Integration Technologies.pptxDatabase Homework Help
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
First time quality
First time qualityFirst time quality
First time qualityEWI
 
Optimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainOptimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainCognizant
 
IRJET- Vendor Management System using Machine Learning
IRJET-  	  Vendor Management System using Machine LearningIRJET-  	  Vendor Management System using Machine Learning
IRJET- Vendor Management System using Machine LearningIRJET Journal
 
Software Quality Assurance class 1
Software Quality Assurance  class 1Software Quality Assurance  class 1
Software Quality Assurance class 1Santhiya Grace
 

Similar to Improving NDT Compliance: A New Approach in Software (20)

COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
 
Welding Construction Mngmt_revert
Welding Construction Mngmt_revertWelding Construction Mngmt_revert
Welding Construction Mngmt_revert
 
Agile software development and challenges
Agile software development and challengesAgile software development and challenges
Agile software development and challenges
 
Agile software development and challenges
Agile software development and challengesAgile software development and challenges
Agile software development and challenges
 
VIVA PROJECT PROPOSAL CONSULTATION PROJECT (GROUP 2).pptx
VIVA PROJECT PROPOSAL CONSULTATION PROJECT (GROUP 2).pptxVIVA PROJECT PROPOSAL CONSULTATION PROJECT (GROUP 2).pptx
VIVA PROJECT PROPOSAL CONSULTATION PROJECT (GROUP 2).pptx
 
Real-time Manufacturing Management for a Hybrid Process
Real-time Manufacturing Management for a Hybrid ProcessReal-time Manufacturing Management for a Hybrid Process
Real-time Manufacturing Management for a Hybrid Process
 
Whitepaper fluke
Whitepaper flukeWhitepaper fluke
Whitepaper fluke
 
CTD for client signoff and early requirements validation - 11th IEEE SW Eng...
CTD for client signoff and early requirements validation   - 11th IEEE SW Eng...CTD for client signoff and early requirements validation   - 11th IEEE SW Eng...
CTD for client signoff and early requirements validation - 11th IEEE SW Eng...
 
Harnessing Digital Technologies
Harnessing Digital TechnologiesHarnessing Digital Technologies
Harnessing Digital Technologies
 
To Study Effective Implementation of ERP System and Its Applicability to Mult...
To Study Effective Implementation of ERP System and Its Applicability to Mult...To Study Effective Implementation of ERP System and Its Applicability to Mult...
To Study Effective Implementation of ERP System and Its Applicability to Mult...
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenance
 
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNINGCUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
 
Class Discussion (ERP Vendors)
Class Discussion (ERP Vendors)Class Discussion (ERP Vendors)
Class Discussion (ERP Vendors)
 
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...
 
Database and Systems Integration Technologies.pptx
Database and Systems Integration Technologies.pptxDatabase and Systems Integration Technologies.pptx
Database and Systems Integration Technologies.pptx
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
First time quality
First time qualityFirst time quality
First time quality
 
Optimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainOptimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value Chain
 
IRJET- Vendor Management System using Machine Learning
IRJET-  	  Vendor Management System using Machine LearningIRJET-  	  Vendor Management System using Machine Learning
IRJET- Vendor Management System using Machine Learning
 
Software Quality Assurance class 1
Software Quality Assurance  class 1Software Quality Assurance  class 1
Software Quality Assurance class 1
 

Recently uploaded

ADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxFIDO Alliance
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
How to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cfHow to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cfdanishmna97
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAnitaRaj43
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
UiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewUiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewDianaGray10
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxFIDO Alliance
 
Choreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringChoreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringWSO2
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
Design and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data ScienceDesign and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data SciencePaolo Missier
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
The Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightThe Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightSafe Software
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Navigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseNavigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseWSO2
 

Recently uploaded (20)

ADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptx
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
How to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cfHow to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cf
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
UiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewUiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overview
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptx
 
Choreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringChoreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software Engineering
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Design and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data ScienceDesign and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data Science
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
The Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightThe Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and Insight
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Navigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseNavigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern Enterprise
 

Improving NDT Compliance: A New Approach in Software

  • 1. IMPROVING NDT COMPLIANCE A NEW APPROACH IN SOFTWARE THAT ADDS VALUE TO YOUR PROJECT
  • 2. Streamlining Non-Destructive Pipework Testing with Technology CONTENTS 3CHALLENGES 1INTRODUCTION 4#1 GENERATING THE REQUESTS 5#2 MANAGING THE REPORTS 6#3 TRACKING NDT PROGRESS 8#1 GENERATING THE REQUESTS 9#2 MANAGING THE REPORTS 10#3 TRACKING NDT PROGRESS 2STANDARD INDUSTRY PROCEDURES 7SOLUTION: EIDA 12ABOUT EIDA SOLUTIONS 11CONCLUSION CONTACT US 13 January 2016 @ EIDA Solutions
  • 3. Improving NDT Compliance: A New Approach in Software 1 INTRODUCTION Non-destructive pipework testing (NDT/NDE) is an integral part of all projects that will have a ‘process’ output; particularly on oil & gas and pharmaceutical projects. NDT plays a crucial role in quality assurance (QA) and quality control (QC). It allows piping to be examined and evaluated without the pipework being damaged in the process. For QA/QC personnel the management of NDT has traditionally been a manual process involving the use of tools such as Excel spreadsheets, request books and email. This process is onerous and resource-draining, resulting in costly delays and rework for contractors. However, software designed for the construction industry streamlines NDT management by: Introduction Ensuring contractors are compliant with client specifications by providing real-time NDT statistics. Reducing errors and rework by providing a smart, centralised platform. Speeding up data entry and document management allowing employee time to be redistributed. Providing a comprehensive audit trail ensuring full traceability.
  • 4. Improving NDT Compliance: A New Approach in Software 2 NDT administration is managed in much the same way as other aspects of the construction process. Information is logged and maintained using multiple Excel spreadsheets or Word documents and is stored in a shared folder. NDT administration typically involves the following stages: 1. The NDT request form is filled out by hand listing the welds to be tested. The request and corresponding drawings are emailed to the NDT contractor. 2. When testing is complete, the report indicating accepted and rejected welds is communicated and the results are recorded against the weld log database. 3. Statistics are updated and compared to the project piping specifications to ensure NDT compliance. STANDARD INDUSTRY PROCEDURES Managing NDT is time consuming, involving unnecessary hours spent on manual entry and cross-referencing between multiple documents and platforms. This costs contractors time and money, and working with inefficient tools is frustrating for employees. Problems can arise if employees are working from outdated information so care must be taken to ensure only live, untested welds are selected. StandardProcedures TIME SAVED PER ACTIVITY 45 30 5 80MANUAL 5 5 Instant 10SOFTWARE Generate Request Total Per Request Manage Reports Track Statistics 70 minutes saved per request.
  • 5. Improving NDT Compliance: A New Approach in Software 3 CHALLENGES Generating NDT request Managing the reports Tracking the statistics Challenges Construction companies are under pressure to deliver higher quality projects in shorter periods of time. NDT management is time consuming and tedious for project engineers, weld inspectors and QA/QC personnel. The tools available for NDT administration weren’t built with the construction industry in mind and are often limited and inefficient in managing large volumes of documentation, fast-paced work environments and multiple users. NDT often exceeds its allocated budget due to costly rework caused by the limitations of existing tools. The limitations of inefficient tools can cause challenges during the following processes:
  • 6. Improving NDT Compliance: A New Approach in Software 4 #1 GENERATING NDT REQUESTS At the moment most companies fill out NDT requests by hand and rely on different documents such as Excel spreadsheets, project piping specifications and email to decide what tests need to be carried out. In order to generate a single request using a manual process employees must sift through weld log databases, compare project parameters and NDT reports, handwrite a request form and compile the necessary isometrics. The limitations of current tools in generating NDT requests is costly for contractors. For example generating a single NDT request with 20 welds can take 45 minutes to complete, with up to 20 of these minutes being spent handwriting the request sheet. Moving between different documents and platforms, along with writing the information out by hand leaves the process more prone to mistakes and can result in incorrect welds being tested or welds being missed. Even after the requests are filled out, time is often needed to clarify, edit or redo the form. The current process for managing NDT requests can be a huge source of frustration for contractors and their employees who are under pressure to meet deadlines. Challenges Scanning & Emailing5 A request of 20 welds takes approximately 45 minutes to generate. 15 20 Double-checking Request Handwriting Request Searching for welds 5 45 Minutes
  • 7. Improving NDT Compliance: A New Approach in Software 5 #2 MANAGING THE REPORTS Challenges 30 Minutes “I had to manually search the weld log for each individual weld and add the results in one by one”. Jason Radley, Head of Project Controls, Radley Engineering Contractors depend upon the management of NDT results to ensure compliance and determine outstanding NDT. After NDT has been carried out the QA team receive a report that lists the results of the welds tested. These results are logged against the weld log database. The report itself is scanned and stored in a folder and the hard-copy is filed. Manually logging and managing these reports is a painful process as: • matching the reports to the weld log database is time consuming. • switching between multiple applications leaves more room for human error. • reports can be lost or difficult to locate. • it can result in non-compliance to project specifications. These challenges can affect business relationships and the company’s reputation by resulting in delays and reworks.
  • 8. Improving NDT Compliance: A New Approach in Software 6 #3 TRACKING STATISTICS Accurately maintaining NDT statistics is of major concern to contractors. These statistics are used to determine outstanding testing and ensure standards are met. The statistics are calculated by using a combination of Excel formulae to compare the project parameters to NDT results that have been recorded in the weld log. As the weld log is updated with new NDT results the statistics are updated automatically. The amount of welds to be tested are calculated manually from these statistics. On large, high-value projects, companies could be conducting 7 different types of NDT on up to 12 piping specifications and 30 fluid types. Challenges Figure 2: Tracking NDT Statistics Using Excel 5 Minutes These large and complex spreadsheets cause challenges for users. They are challenging to set up, and then are slow to open and difficult to navigate due to the large volumes of information contained over multiple spreadsheets. Excel also does not allow multiple users to edit or amend a document at the same time. On large projects this is an issue resulting in incorrect statistics leading to non-compliance. Care must be taken not to disrupt the Excel formulae when editing. Small changes can disrupt the calculations, causing inaccuracies and delays.
  • 9. Improving NDT Compliance: A New Approach in Software 7 SOFTWARE SOLUTION: EIDA EIDA Solutions’ intelligent construction software simplifies and streamlines NDT management, reducing the time spent on its administration and increasing accuracy and efficiency. NDT parameters are defined and set in EIDA at the beginning of a project and integrated with weld history providing real-time project statistics. NDT requests and reports can easily be managed and accessed by a keyword search or filtered by date, type of NDT, piping specifications or fluid-type. EIDA’s 3 step process has reduced the time our clients spend on NDT administration by up to 88%, offering the following benefits: Solution Main ContractorContractorUsers Ensures contractors are compliant. Protects relationship with client in assuring their standards have been met. Full traceability throughout. Employees working to a standardised process. Information furnished to NDT contractor automatically. Archived NDT reports available for auditing and handover. Less time spent managing requests & reports. Rework eliminated. No need to update or amend Excel.
  • 10. Improving NDT Compliance: A New Approach in Software 8 #1: GENERATING THE REQUESTS With EIDA, requests are quickly and accurately created directly from the weld log in 3 simple steps: Solution 5 Minutes The NDT type to be carried out is selected. EIDA uses rules-based logic to ensure only welds that require this particular type of NDT are available for selection. Welds can be filtered by welder, piping specification, fluid- type, date welded and more. Only live and untested welds can be selected. Relevant personnel, including the NDT inspector are selected from a list, and the request along with the necessary isometrics are instantly compiled and automatically emailed. 1 2 3 2 Figure 3: EIDA’s Request Management Interface
  • 11. Improving NDT Compliance: A New Approach in Software 9 #2 LOGGING THE REPORTS EIDA provides a centralised platform for the management of NDT information. This is particularly useful for managing the NDT reports. With EIDA, users can view generated NDT requests and can easily apply the results from the NDT report to each weld. This takes just a few seconds. A PDF of the NDT report can be seamlessly uploaded to all relevant welds. EIDA also provides users with the option to attach a file to each weld listed in an NDT request. Contractors can use this feature to upload relevant documentation such as borescopic video files. The ability to store NDT documentation on one platform reduces the amount of time spent searching for information and ensures full traceability. Solution Figure 4: EIDA’s Report Management Interface 5 Minutes
  • 12. Improving NDT Compliance: A New Approach in Software 10 #3 TRACKING NDT STATISTICS By clicking on the ‘NDT Statistics’ tab users instantly have access to real-time calculations indicating project compliance. In-built logic connects the weld log, requests and reports to the project parameters to instantly calculate statistics and determine if the project is complying to the NDT requirements. Piping specifications that have met their targets are highlighted in green, while those that are below target are highlighted in red with the quantity of welds required to be tested indicated in brackets. With this information readily available to the project team, corrective and preventive actions can quickly be taken to ensure that NDT remains on schedule, within budget and fully compliant. Solution Figure 5: EIDA’s Compliance Tracking Interface Instant
  • 13. Improving NDT Compliance: A New Approach in Software 11 EIDA Solutions provides contractors with a powerful, smart and centralised platform for the management and administration of Non-Destructive Testing. On large process projects NDT can demand the generation and management of hundreds of requests and reports a week. Commonly used tools lack the ability to efficiently manage this process. This presents the following problems for contractors: • Inefficient, and sometimes incorrect input of information. • Documentation is lost or difficult to locate. • Man-hours lost on inefficient administration process. • Project over-budget due to delays and reworks. • Damaged reputation and relationship with client. EIDA Solutions’ NDT management system addresses these problems by: • Fully integrating NDT with the weld history records to ensure that only live, targeted welds are made available for selection based on the NDT project parameters. • Accelerating NDT data entry by archiving NDT reports and their results against NDT requests and automatically applying them to the weld log. • Providing real-time NDT statistics instantly. • Ensuring compliance is achieved and documentation is readily available for auditing and handover. “EIDA is a life saver on our project” Anke Bessing, QA Manager, M+W Group “Thanks for the support last week. That was a real demonstration in how it should be done. Mobilisation /demo/implementation. Great job. When you implement change this is what you need. Well done.” Tony Hennessey, Project Manager, Mercury Engineering CONCLUSION Conclusion
  • 14. Improving NDT Compliance: A New Approach in Software 12 ABOUT EIDA SOLUTIONS Established in 2010, EIDA Solutions brings together a wealth of experience in the construction and technology industries. We have leveraged this domain expertise to develop a ground breaking solution to assist engineering companies in this digital age. The construction sector has been slow to embrace IT solutions to aid engineers and management in the delivery of projects. We believe that this is due to traditional software applications being focused on IT capabilities rather than delivering systems which meet the needs of construction engineering professionals. At EIDA Solutions we are committed to providing a client- driven product and service, and offer software tailored to project specific requirements. By embracing the concept of software as a service (SaaS) we enable our clients to reduce project operating costs, enhance quality and optimise site performance with customised software, thus differentiating the services that we provide from those offered by our competitors. EIDA Solutions continues to provide software services to a number of high- profile clients, on a variety of high-specification, high-value projects, both nationally and internationally. AboutEIDA
  • 15. Improving NDT Compliance: A New Approach in Software 13 CONTACT US Corporate Head Office: Mainland European Office: IRELAND BELGIUM Suite One, The Avenue Beacon Court, Bracken Road Sandyford Co. Dublin +353 (01) 539 4500 Science 14 Atrium, 14b, Rue de la Science 1040 Bruxelles +32 (0)2 880 3758 Schedule a Demo info@eidasolutions.com www.eidasolutions.com ContactUs