Sandro Suzart, Suzart, Relationship Google INC Impeachment of Ben Ali, Mubarak, Gaddafi
Sandro Suzart relationship on 2013 events of Demonstrations, a Media hierarchy of reporters covering the close event in Street DR Teodoro Baima, 51,52, República, São Paulo. Demonstrations event system in 2013, Mubarak and Gaddafi impeachment.
Call Girl Service in West Tripura 9332606886Call Girls Advance Cash On Deliv...
Material history of sandro suzart and the history of material means
1. Material History of Sandro Suzart
Study of the material means used by Sandro Suzart
The history of Sandro Suzart could be divided between the use of the streets and the use of the
targeted social group.
Behaviour of streets material means usage
2005 - 2008 : 2.400 hours
2009 - 2014 : 23.725 hours
2014 - 2016: 1.696 hours
2017 - 2018: 128 hours
Behaviour of Targeted social group material means usage
2013 - 2015 : 84 horas
2015 - 2017 : 4.000 hours
2017 : 81 hours
Both the material means lies on misery due to its state of quality and material poverty I need to
revolution these material means usage, which is a problem that most or all individuals I studied
have not solved, so the basic problem is to implement a behaviour with high degree of creativity
that may revolution the material means usage, this means to implement a techinical faculty or a
technical study on the implementation of this material means usage system.
Targeted standard:
- high degree of creativity
- high degree of state of quality
- high degree of material economic quality
Bibliography:
Development of Professional Expertise - K. Anders Ericsson
The Cambridge Handbook of Expertise and Expert Performance - K. Anders Ericsson
A Legal Business Information System: Implementation Process Context - Alok Mishra
Developing an implementation research proposal - World Bank
Enterprise Architecture Process - Klaus D. Niemann
Management of business process design - Technical University of Denmark
Social enterprise legal implementation - European Research Institute on Cooperative and
Social Enterprises
Models and Methods in Social Network Analysis - PETER J. CARRINGTON
METHODS AND TOOLS FOR COLLABORATIVE NETWORKED ORGANIZATIONS - European
Collaborative Networked Organizations
2. COLLABORATIVE NETWORKED ORGANIZATIONS - European Commission
Model for Legal implementation:
Quantity of hours of the work
This study will cost 500 hours and I will put it under Marx studies where it is already, to this
date, recorded more than 200 hours of study.
Organization
1 - To organize the expertise, defined here as the maximum technology applied to a given task
or labour, that will be organized in the form and language of Behaviour and Bodily Cetentered
Studies, the expertise will be evaluated and organised in Quantification of Behavior nominated
by Quantity of Hours that Quantify a give Behaviour.
2 - To organize the implementation process and study the material means usage, as material
means to be used it will be applied "Networking".
3 - To study, manage and apply "Networking".
1 - Methodology
3. MANAGEMENT OF BUSiNESS
PROCESS DESiGN
Economic trade on international level and forms of economic interaction on geo level have been
practised since Ancient Times, however in Twentieth Century the trade in geo scale have gained
scale and rate in intense way. The capital markets, technology revolution and distribution means
have catalysed the scale and rate of geo level trade.
Geo level trade requires integration of the network used to its broadness, to answer to that need
Information Technology has been applied and developed and has been able to create resources to
the organization. Also Information Technology provided communication and collaboration
capability and unified business process and data structure.
Information Technology is ubiquous in relation to geographical presence, the reproduction and
multiplication of Information Technology softwares and hardwares makes it of easy and free
access to enterpreneurs community, also, Information Technology is the mean of the future
developments on global scale implementations.
To the use of Information Technology as source of global scale implementation it is required
common standards for business process
Money related globalization in its most effortless casing, specifically exchange of finished items,
backpedals to the Grecian Empire. While it, the rate and degree of budgetary globalization have
uplifted in the course of recent years in surprising ways.
A fluid overall capital market, falling political and exact deterrents, the creative distress in
remaking and fusing wanders, and extended comparability in establishment, course channels, and
advancing methodologies are a segment of the forces for globalization clearly, immense
advancement in the amount of multinational organizations is a marker of the fast pace of
globalization.
Globalization is solidly related to the prerequisite for joining and control MNCs working in overall
markets are at a key inconvenience if they can't control and sort out their bewildering
arrangement of activities scattered general . In this way, interests in overall information
development structures are
consistently did as a bit of MNCs globalization process.
On an overall scale enhances control and coordination over a MNC and stipends duplication and
sharing of corporate resources. Ever‐increasing overall contention has especially extended the
noticeable quality of enormous business resource masterminding ERP
structures among MNCs and has changed the execution of corporate‐spanning overall ERP
systems into a fundamental bit of joining control.
Various far reaching MNCs held onto ERP system execution as a champion among the most
4. forceful information structures stretches out in their histories. Overall ERP structures support
joining and control in MNCs in two key ways. In any case, these systems give the imaginative
capacity to joint exertion and correspondence across after some time and space.
Second, overall ERP systems give a regular vernacular across finished MNCs by restricting together
business methodology and data structure.
Text Analyses of the above paragraphes:
Number of characters (including spaces) : 3064
Number of characters (without spaces) :2549
Number of words : 441
Lexical Density :51.7007
Number of sentences : 16
Number of syllables : 903
Some top phrases containing 3 words (without punctuation marks) Occurrences
of information technology 2
and data structure 2
also information technology 2
joining and control 2
scale and rate 2
geo level trade 2
information technology is 2
overall erp systems 2
5. Some top phrases containing 2 words (without punctuation marks) Occurrences
information technology 6
of the 4
to the 4
overall erp 3
geo level 3
as a 2
and data 2
has been 2
global scale 2
also information 2
erp structures 2
joining and 2
of information 2
bit of 2
business process 2
systems give 2
and control 2
and has2
scale and 2
erp systems 2
and rate 2
level trade 2
control and 2
6. in overall 2
data structure 2
technology is 2
in the 2
Unfiltered word count :
Order Unfiltered word count Occurrences Percentage
1. and 27 6.1224
2. of 21 4.7619
3. the 21 4.7619
4. in 17 3.8549
5. to 11 2.4943
6. a 9 2.0408
7. information 8 1.8141
8. overall 8 1.8141
9. technology 7 1.5873
10. globalization 6 1.3605
11. scale 6 1.3605
12. mncs 6 1.3605
13. is 5 1.1338
14. control 5 1.1338
15. erp 5 1.1338
16. on 4 0.9070
17. structures 4 0.9070
7. 18. have 4 0.9070
19. business 4 0.9070
20. geo 4 0.9070
21. has 4 0.9070
22. level 4 0.9070
23. trade 4 0.9070
24. as 3 0.6803
25. it 3 0.6803
26. been 3 0.6803
27. joining 3 0.6803
28. systems 3 0.6803
29. process 3 0.6803
30. rate 3 0.6803
31. are 3 0.6803
32. for 3 0.6803
33. among 2 0.4535
34. give 2 0.4535
35. execution 2 0.4535
36. global 2 0.4535
37. capital 2 0.4535
38. data 2 0.4535
39. extended 2 0.4535
40. across 2 0.4535
41. finished 2 0.4535
42. structure 2 0.4535
43. resources 2 0.4535
8. 44. most 2 0.4535
45. course 2 0.4535
46. their 2 0.4535
47. bit 2 0.4535
48. economic 2 0.4535
49. ways 2 0.4535
50. its 2 0.4535
51. key 2 0.4535
52. out 2 0.4535
53. also 2 0.4535
54. markets 2 0.4535
55. way 2 0.4535
56. related 2 0.4535
57. times 1 0.2268
58. enterpreneurs 1 0.2268
59. an 1 0.2268
60. at 1 0.2268
61. by 1 0.2268
62. if 1 0.2268
63. create 1 0.2268
64. international 1 0.2268
65. free 1 0.2268
66. access 1 0.2268
67. onto 1 0.2268
68. ever‐increasing 1 0.2268
69. money 1 0.2268
15. 226. falling 1 0.2268
227. exchange 1 0.2268
228. amount 1 0.2268
Methodology of Innovation Map
0
10
20
30
40
50
of information
technology
and data structure also information
technology
joining and control
Data
Information
technology
0
1
2
3
4
5
6
information
technology
overall ERP geo level and data ERP
structures
Information
Data
ERP
17. Business process design is a basic concern while executing overall ERP structures in MNCs. Passing
on an overall ERP system as a gadget to energize control and coordination across finished
assistants requires essential gages for business strategies and data structure. Along these lines, an
anomalous condition of process standardization is among the basic drivers of ERP mix attempts in
MNCs.
Accomplishing an overall concurrence on shared process and data gages has exhibited hard to
achieve. The days of national and regional slants are gone and that there is a union in shared
trademark, in fact business frames transversely finished MNC reinforcements are unmistakable
due to grouped assortment in national culture, lingo, organization style, administrative issues,
controls, conventions, and market requirements.
Process organization attempts are similarly demolished by universality–individuality and
efficiency–flexibility problems regulation of business shapes over a MNC may in like manner be
hampered by correspondence issues, unmistakable necessities and penchants, and political
conflicts. All these make business process design, particularly process systematization, a clumsy
task while executing overall ERP structures in MNCs.
Business process setup ends up being considerably more basic while considering the emphasis of
the third wave in process organization thought on steady business‐process change. The
contemporary business process organization BPM thought recommends that change is the basic
arrangement objective, as opposed to business process reengineering that as an one‐off activity
did not support control over business shapes, BPM advocates relentless improvement of an
organizations business frames. While the extending base on updating relationship around business
shapes provoked an enormous surge of ERP.
Execution in the BPM recognizing a motivating force from ERP structures demands endless change
of the ERP system and embedded business shapes. Along these lines, business process design is no
more an one‐off wander that strong tosses business shapes into the ERP system, however rather a
ceaseless development.
While sending BPM as an organization educate, affiliations require new abilities to manage the
possibility of consistent business
18. process design and change. Despite the creating noticeable quality of overall ERP utilization, ERP
investigate has, all things considered, focused on intra‐organizational parts of ERP execution. Little
is considered how to alter ERP game plan in MNCs with business essentials in solitary
reinforcements
besides, meanwhile recognize coordination and joint effort on an overall level.
There is insufficient picking up concerning how to design and adjust business frames
Inside an arrangement of relationship in labour and expert examinations on process organization
are conspicuously lost in light of existing examination fissure in overall ERP executions and
organization of business shapes in an overall setting, tries to develop a perception of the criticality
of business process design in MNCs, and elucidate BPM capacities that assistance and upgrade
business process.
19. Framework over the traverse of an overall ERP execution. To investigate this topic had the
opportunity to work with GEA Process Engineering, a primary
association in offering advancement to the sustenance and engineered planning endeavors. To
diminish costs, empower cash related uncovering, and upgrade facilitated exertion transversely
finished reinforcements, GEA Process Engineering blended the ERP systems over its own helpers
and impelled an overall ERP program.
20. Number of characters (including spaces) : 3686
Number of characters (without spaces) :3081
Number of words : 517
Lexical Density :49.3230
Number of sentences : 19
Number of syllables : 1089
Some top phrases containing 7 words (without punctuation marks) Occurrences
while executing overall erp structures in mncs 2
Some top phrases containing 6 words (without punctuation marks) Occurrences
executing overall erp structures in mncs 2
while executing overall erp structures in 2
Some top phrases containing 5 words (without punctuation marks) Occurrences
overall erp structures in mncs 2
executing overall erp structures in 2
while executing overall erp structures 2
21. Some top phrases containing 4 words (without punctuation marks) Occurrences
business process design is 2
executing overall erp structures 2
while executing overall erp 2
overall erp structures in2
erp structures in mncs 2
Some top phrases containing 3 words (without punctuation marks) Occurrences
business process design 5
an overall erp 3
overall erp structures 2
erp structures in 2
gea process engineering 2
while executing overall 2
executing overall erp 2
on an overall 2
structures in mncs 2
along these lines 2
the erp system 2
of business shapes 2
process design is 2
22. Some top phrases containing 2 words (without punctuation marks) Occurrences
business process 9
overall erp 7
business shapes 6
an overall 6
process design 5
in mncs5
process organization 4
erp structures 3
erp system 3
the erp 3
business frames 3
of business 3
of erp 3
of the 3
as an 2
of an 2
on an 2
structures in 2
23. is a 2
and data 2
how to 2
the basic 2
design and 2
and upgrade 2
there is 2
an one‐off 2
design is 2
gea process 2
along these 2
process engineering 2
Unfiltered word count :
Order Unfiltered word count Occurrences Percentage
1. business 20 3.8685
2. and 20 3.8685
3. in 17 3.2882
4. of 17 3.2882
24. 5. process 17 3.2882
6. the 17 3.2882
7. erp 16 3.0948
8. an 13 2.5145
9. to 12 2.3211
10. overall 10 1.9342
11. a 9 1.7408
12. is 7 1.3540
13. on 7 1.3540
14. organization 7 1.3540
15. design 6 1.1605
16. shapes 6 1.1605
17. that 5 0.9671
18. mncs 5 0.9671
19. bpm 5 0.9671
20. while 5 0.9671
21. as 4 0.7737
22. over 4 0.7737
23. change 4 0.7737
24. basic 4 0.7737
25. are 4 0.7737
26. structures 3 0.5803
27. execution 3 0.5803
28. finished3 0.5803
29. frames 3 0.5803
30. these 3 0.5803
25. 31. system 3 0.5803
32. reinforcements 3 0.5803
33. by 2 0.3868
34. unmistakable 2 0.3868
35. up 2 0.3868
36. this 2 0.3868
37. thought 2 0.3868
38. arrangement 2 0.3868
39. engineering 2 0.3868
40. executing 2 0.3868
41. issues 2 0.3868
42. data 2 0.3868
43. gages 2 0.3868
44. more 2 0.3868
45. lines 2 0.3868
46. control 2 0.3868
47. one‐off 2 0.3868
48. shared 2 0.3868
49. upgrade 2 0.3868
50. investigate 2 0.3868
51. there 2 0.3868
52. all 2 0.3868
53. transversely 2 0.3868
54. relationship 2 0.3868
55. gea 2 0.3868
56. considered 2 0.3868
36. The modern process of Enterprise Management is based on information and Design Thinking
among the structure of process in an enterprise. The management follows Design Thinking
standards with data and information of the many process been managed by information based
systems such as software and visualization software, the data is an important asset and the
process is based on information flow.
The information flow might take the form of structured data or unstructured data, the data should
be visualized easily and if it is unstructured it should be managed and made into the form of
statistics, graphics and info graphics that would create an easy in data management and data
visualization.
The Data management of the enterprise evolves into Design Thinking, the Design Thinking is a
creative process where the needs and necessity is drafted to valuate ideas in a way to obtain a
design of outline will perform the creation, prototype and immersion in an imaginary of signs that
may solve the needs and necessities that the environment or the internal environment of the
company demands.
While executing overall information structures in enterprises business process design is the
pattern model in modernity and executing overall information structures is the model of
management to be explored, information structures and Design Thinking are the business process
design and to immerse in that environment is of fundamental feature to the adaptation to modern
times.
Business process are of Design Thinking approach and solution, the Design guides the commitment
and the labour, overall information structures in enterprise is the form that replace cash inflow of
past hierarchized and centered enterprises, the flow of information irrigates and generates
process and sustain the labour and the targeted activity of the enterprise, the flow of feed to the
labour process are made by information flow instead of cash flow.
Business is guided by information technology and managed by information technology, the
information process substitutes the cash flow of the company creating an information flow that
irrigates the organization, this means that the organization is irrigated and its many process fed by
information, instead of cash it is used information to sustain the many labour process of the
company.
37. Information process form:
The information may take form of:
- audiovisual - documentary - fiction film - webinar - lecture on video
- cinema - radio - video art
- Journalism - facts exposure - digital journalism - data driven journalism
- story telling journalism - investigative journalism - social networking journalism
- Theater - Drama - Tragedy - Comedy - Musical Theater - Dance
- History
- Music - Podcast - Radio
- Political Movement - Demonstrations - Collaborative Policy
38. 0
5
10
15
20
25
0 2 4 6 8
audiovisual
fiction film
lecture on video
radio
Journalism
digital journalism
story telling
journalism
social networking
journalism
Drama
Comedy
Dance
Music
Radio
Demonstrations
39. The organization of business and the business process are managed by information technology,
and to manage the information is the goal of the management. The cash flow is substituted by
information flow, the information flow supports the many labour process, in the case studied the
information flow is made of the following process:
- audiovisual - documentary - fiction film - webinar - lecture on video
- cinema - radio - video art
- Journalism - facts exposure - digital journalism - data driven journalism
- story telling journalism - investigative journalism - social networking journalism
- Theater - Drama - Tragedy - Comedy - Musical Theater - Dance
- History
- Music - Podcast - Radio
- Political Movement - Demonstrations - Collaborative Policy
Showed in the following graphes:
43. These information process are managed while executing overall information structures in the
enterprise, the business process design is Design Thinking, the Design Thinking business process
lead the management of the enterprise process and the enterprise labour process, the many
process of the company are managed by information structures and hierarchized by Design
Thinking.
The Business process are organized in form of information hierarchy, the hierarchy is composed in
form of information, since the management of the enterprise will be done through information
management, business are shaped by information and the process design is leaded by Design
Thinking this process of information hierarchization lead the process of organization.
Company Management
audiovisual
Journalism
Theater
Music
History
Political Movement
44. audiovisual
- audiovisual - documentary - fiction film - webinar - lecture on video
- cinema - radio - video art
Journalism
- Journalism - facts exposure - digital journalism - data driven journalism
- story telling journalism - investigative journalism - social networking journalism
Theater
- Theater - Drama - Tragedy - Comedy - Musical Theater - Dance
History
- History
Music
- Music - Podcast - Radio
Political Movement
- Political Movement - Demonstrations - Collaborative Policy
These are the process of information that does the organization and through which it is made the
management of the enterprise, the information flow replaces the cash flow, the information flow
does the support and feeding of the labour process, above is not illustrated the labour process but
the information process that will manage the enterprise, this information process will do the
management of the enterprise.