INTRODUCTION
The Koyna Dam is one of the largest dams in
Maharashtra, India.
It is a rubble-concrete dam constructed on Koyna
River which rises in Mahabaleshwar, a hillstation in
Sahyadri ranges.
It is located in Koyna Nagar, Satara district, nestled
in the Western Ghats on the state highway between
Chiplun and Karad.
WATER POWER ENGINEERING
3
ABOUT DAM
• Construction began - 1956
• Opening date - 1964
• TYPE OF DAM- Rubble-concrete dam
• Height - 103.2 m (339 ft )
• Length - 807.2 m (2,648 ft)
• Creates - SHIVAJISAGAR LAKE
• Total capacity- 2,797,400,000 m
3
• Surface area- 891.78 km
2
• Basin- Krishna , west flowing river.
• Total Projects cost - 4,953 Crore Rupees
WATER POWER ENGINEERING
4
OFFICIAL NAME Koyna Dam D05104
PURPOSE
The main purpose of the dam is hydroelectricity
generation
Some irrigation in neighboring areas.
Flood control
Navigation
Domestic purpose
WATER POWER ENGINEERING
5
POWER STATION
Turbines
Koyna dam foot
powerhouse: 2 x 20 MW
stage 1: 4 x 70 MW
stage 2: 4 x 75 MW
stage 3: 4 x 80 MW
stage 4: 4 x 250 MW
Total = 18 Pelton turbines
Installed capacity - 1,960 MW
WATER POWER ENGINEERING
6
WATER POWER ENGINEERING
7
INDEX PLAN- KOYNA H.E.PROJECT
WATER POWER ENGINEERING
8
LAKE TAPPING
Lake Tapping – A nonconventional intake system
was created by piercing the lake from the bottom by
blasting the rock plug using dynamite.
Explosive used for the lake tapping were specially
bought from Denmark.
WATER POWER ENGINEERING
9
LAKE TAPPING (KOYNA)
 The first lake tapping was
done successfully in 1999
which produces 65TMC
water
 second lake tapping was
done on 26th April 2012
and water rose upto 15 ft
high creating waves.
 The process of double
tapping was the first of its
kind in ASIA
WATER POWER ENGINEERING
10
LAKE TAPPING (KOYNA)
WATER POWER ENGINEERING
11
EARTHQUAKE: KOYNANAGAR
 The Koyna earthquake of December 11, 1967, killed about 200
people and injured a few thousand. and it occured near the the
site of koyna dam
 The epicentre was within 5 km of the Koyna Dam
(17° 23′ N., 73° 45′ E.).
 The depth of focus of the earthquake has been estimated at
about 30 km.
 The earthquake was felt over distances up to 700 km from the
epicentre.
 Total damage: 4 lakhs USD
WATER POWER ENGINEERING
12
ABOUT KOYNANAGAR EARTHQUAKE
• Construction began-
1956
• Opening date-1964
• Earthquake date:
11 December
1967
Max. intensity: IX (Severe)
WATER POWER ENGINEERING
13
ACCELERATION VS TIME
Koyna
Earthquake in
near by Area
in1967 after
Dam was Built
WATER POWER ENGINEERING
14
REFERENCE
 G.V.Berg, Y.C.Das,K.V.G.K.Gokhale and A.V.Setlur, “THE
KOYNA,INDIA,EARTHQUAKES.”, poc.4th wld conf.
Earthquake Eng.,Santiago,chile,1969
 www.mahagenco.in (Maharashtra state power generation
Co.Ltd)
{ Nagivation – generation - Hydropower station-
c) koyna hydro}
 sudhir k. jain “Indian earthquake-The koyna”-(max intensity)
 National Geophysical Research Institude(NGRI)
WATER POWER ENGINEERING
15
THANK YOU
WATER POWER ENGINEERING
16

More Related Content

What's hot

Sardar Sarovar Dam
Sardar Sarovar DamSardar Sarovar Dam
Sardar Sarovar DamKp Ahm
 
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015India Water Portal
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigationSAGAR RAUT
 
Koyna Hydro-electric Project
Koyna Hydro-electric Project Koyna Hydro-electric Project
Koyna Hydro-electric Project Agrodwip Das
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower projectMuhammad Aqeel
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report muhammad khurram
 
Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...Denish Jangid
 
Design Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryDesign Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryLatif Hyder Wadho
 
Silt excluders
Silt excludersSilt excluders
Silt excludersRaees Shah
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater TunnelsIshan Parekh
 
narmada river scheme con
narmada river scheme connarmada river scheme con
narmada river scheme conNiraj Chand
 
indus basin and salient fatures of barrages and link canals in pakistan
indus basin and salient fatures of barrages and link canals in pakistanindus basin and salient fatures of barrages and link canals in pakistan
indus basin and salient fatures of barrages and link canals in pakistanM. Zahaib Mudabber Khan
 

What's hot (20)

Energy project report on hydropower
Energy project report on hydropowerEnergy project report on hydropower
Energy project report on hydropower
 
Sardar Sarovar Dam
Sardar Sarovar DamSardar Sarovar Dam
Sardar Sarovar Dam
 
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Koyna Hydro-electric Project
Koyna Hydro-electric Project Koyna Hydro-electric Project
Koyna Hydro-electric Project
 
Breakwaters
BreakwatersBreakwaters
Breakwaters
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower project
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report
 
Dams
Dams Dams
Dams
 
Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...
 
Design Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryDesign Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's Theory
 
science project.pptx
science project.pptxscience project.pptx
science project.pptx
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Weirs on Permeable Foundations
Weirs on Permeable FoundationsWeirs on Permeable Foundations
Weirs on Permeable Foundations
 
Silt excluders
Silt excludersSilt excluders
Silt excluders
 
theory of seepage
theory of seepagetheory of seepage
theory of seepage
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater Tunnels
 
narmada river scheme con
narmada river scheme connarmada river scheme con
narmada river scheme con
 
indus basin and salient fatures of barrages and link canals in pakistan
indus basin and salient fatures of barrages and link canals in pakistanindus basin and salient fatures of barrages and link canals in pakistan
indus basin and salient fatures of barrages and link canals in pakistan
 

Similar to KOYNA DAM,MAHARASHTRA

Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuVishweshwar Rao Narla
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge pptSourav Roy
 
Geology applied to engineering reference to india
Geology applied to engineering reference to indiaGeology applied to engineering reference to india
Geology applied to engineering reference to indiaDarshan Darji
 
Ailments of the First Concrete dam in Sri Lanka
Ailments of the First Concrete dam in Sri LankaAilments of the First Concrete dam in Sri Lanka
Ailments of the First Concrete dam in Sri LankaNihal Vitharana
 
Tsunami damage assessment for parts of Andaman and Nicobar Island: 2004 India...
Tsunami damage assessment for parts of Andaman and Nicobar Island: 2004 India...Tsunami damage assessment for parts of Andaman and Nicobar Island: 2004 India...
Tsunami damage assessment for parts of Andaman and Nicobar Island: 2004 India...IIT Kanpur
 
Hydro Power Plant -Surya
Hydro Power Plant -SuryaHydro Power Plant -Surya
Hydro Power Plant -Suryasuryakant soni
 
About Hoover DAM AND its construction.
About Hoover DAM AND its construction.About Hoover DAM AND its construction.
About Hoover DAM AND its construction.SHASHANKKUMAR426
 
Environmental disaters
Environmental disatersEnvironmental disaters
Environmental disatersMoonaRaja2
 
Ailments of the First Concrete Dam in Sri Lanka
Ailments of the First Concrete Dam in Sri LankaAilments of the First Concrete Dam in Sri Lanka
Ailments of the First Concrete Dam in Sri LankaNihal Vitharana
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plantpranavn007
 
CTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfCTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfPramodLimbore
 
Palm island Construction with Management 5 Ms
Palm island Construction with Management 5 MsPalm island Construction with Management 5 Ms
Palm island Construction with Management 5 MsGargi Kapadia
 
A case study on polavarm , Dowleswaram, Prakasam Projects
A case study on polavarm , Dowleswaram, Prakasam ProjectsA case study on polavarm , Dowleswaram, Prakasam Projects
A case study on polavarm , Dowleswaram, Prakasam ProjectsLokeswar
 

Similar to KOYNA DAM,MAHARASHTRA (20)

Arch dam
Arch dam   Arch dam
Arch dam
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara Setu
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge ppt
 
Geology applied to engineering reference to india
Geology applied to engineering reference to indiaGeology applied to engineering reference to india
Geology applied to engineering reference to india
 
Ailments of the First Concrete dam in Sri Lanka
Ailments of the First Concrete dam in Sri LankaAilments of the First Concrete dam in Sri Lanka
Ailments of the First Concrete dam in Sri Lanka
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
 
Tsunami damage assessment for parts of Andaman and Nicobar Island: 2004 India...
Tsunami damage assessment for parts of Andaman and Nicobar Island: 2004 India...Tsunami damage assessment for parts of Andaman and Nicobar Island: 2004 India...
Tsunami damage assessment for parts of Andaman and Nicobar Island: 2004 India...
 
Hydro Power Plant -Surya
Hydro Power Plant -SuryaHydro Power Plant -Surya
Hydro Power Plant -Surya
 
About Hoover DAM AND its construction.
About Hoover DAM AND its construction.About Hoover DAM AND its construction.
About Hoover DAM AND its construction.
 
Environmental disaters
Environmental disatersEnvironmental disaters
Environmental disaters
 
Ailments of the First Concrete Dam in Sri Lanka
Ailments of the First Concrete Dam in Sri LankaAilments of the First Concrete Dam in Sri Lanka
Ailments of the First Concrete Dam in Sri Lanka
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
CTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfCTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdf
 
idukki Hydro power project
idukki Hydro power projectidukki Hydro power project
idukki Hydro power project
 
Report 2
Report 2Report 2
Report 2
 
MAITHON DAM
MAITHON DAMMAITHON DAM
MAITHON DAM
 
Palm island Construction with Management 5 Ms
Palm island Construction with Management 5 MsPalm island Construction with Management 5 Ms
Palm island Construction with Management 5 Ms
 
Howrah bridge
Howrah bridgeHowrah bridge
Howrah bridge
 
Karcham wangtoo
Karcham wangtooKarcham wangtoo
Karcham wangtoo
 
A case study on polavarm , Dowleswaram, Prakasam Projects
A case study on polavarm , Dowleswaram, Prakasam ProjectsA case study on polavarm , Dowleswaram, Prakasam Projects
A case study on polavarm , Dowleswaram, Prakasam Projects
 

Recently uploaded

Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 

Recently uploaded (20)

Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 

KOYNA DAM,MAHARASHTRA

  • 1. MAJOR DAMS IN INDIA WATER POWER ENGINEERING 1 WATER POWER ENGINEERING PRESENTATION BY, NAIK SAMEER RAMCHANDRA [MT18WRE001]
  • 2. KOYNA DAM (MAHARASHTRA) WATER POWER ENGINEERING 2
  • 3. INTRODUCTION The Koyna Dam is one of the largest dams in Maharashtra, India. It is a rubble-concrete dam constructed on Koyna River which rises in Mahabaleshwar, a hillstation in Sahyadri ranges. It is located in Koyna Nagar, Satara district, nestled in the Western Ghats on the state highway between Chiplun and Karad. WATER POWER ENGINEERING 3
  • 4. ABOUT DAM • Construction began - 1956 • Opening date - 1964 • TYPE OF DAM- Rubble-concrete dam • Height - 103.2 m (339 ft ) • Length - 807.2 m (2,648 ft) • Creates - SHIVAJISAGAR LAKE • Total capacity- 2,797,400,000 m 3 • Surface area- 891.78 km 2 • Basin- Krishna , west flowing river. • Total Projects cost - 4,953 Crore Rupees WATER POWER ENGINEERING 4 OFFICIAL NAME Koyna Dam D05104
  • 5. PURPOSE The main purpose of the dam is hydroelectricity generation Some irrigation in neighboring areas. Flood control Navigation Domestic purpose WATER POWER ENGINEERING 5
  • 6. POWER STATION Turbines Koyna dam foot powerhouse: 2 x 20 MW stage 1: 4 x 70 MW stage 2: 4 x 75 MW stage 3: 4 x 80 MW stage 4: 4 x 250 MW Total = 18 Pelton turbines Installed capacity - 1,960 MW WATER POWER ENGINEERING 6
  • 8. INDEX PLAN- KOYNA H.E.PROJECT WATER POWER ENGINEERING 8
  • 9. LAKE TAPPING Lake Tapping – A nonconventional intake system was created by piercing the lake from the bottom by blasting the rock plug using dynamite. Explosive used for the lake tapping were specially bought from Denmark. WATER POWER ENGINEERING 9
  • 10. LAKE TAPPING (KOYNA)  The first lake tapping was done successfully in 1999 which produces 65TMC water  second lake tapping was done on 26th April 2012 and water rose upto 15 ft high creating waves.  The process of double tapping was the first of its kind in ASIA WATER POWER ENGINEERING 10
  • 11. LAKE TAPPING (KOYNA) WATER POWER ENGINEERING 11
  • 12. EARTHQUAKE: KOYNANAGAR  The Koyna earthquake of December 11, 1967, killed about 200 people and injured a few thousand. and it occured near the the site of koyna dam  The epicentre was within 5 km of the Koyna Dam (17° 23′ N., 73° 45′ E.).  The depth of focus of the earthquake has been estimated at about 30 km.  The earthquake was felt over distances up to 700 km from the epicentre.  Total damage: 4 lakhs USD WATER POWER ENGINEERING 12
  • 13. ABOUT KOYNANAGAR EARTHQUAKE • Construction began- 1956 • Opening date-1964 • Earthquake date: 11 December 1967 Max. intensity: IX (Severe) WATER POWER ENGINEERING 13 ACCELERATION VS TIME
  • 14. Koyna Earthquake in near by Area in1967 after Dam was Built WATER POWER ENGINEERING 14
  • 15. REFERENCE  G.V.Berg, Y.C.Das,K.V.G.K.Gokhale and A.V.Setlur, “THE KOYNA,INDIA,EARTHQUAKES.”, poc.4th wld conf. Earthquake Eng.,Santiago,chile,1969  www.mahagenco.in (Maharashtra state power generation Co.Ltd) { Nagivation – generation - Hydropower station- c) koyna hydro}  sudhir k. jain “Indian earthquake-The koyna”-(max intensity)  National Geophysical Research Institude(NGRI) WATER POWER ENGINEERING 15