The following text is informational only and shall serve as an informational guide for HVAC contractors,
journeymen, and apprentices working in the Heating, Ventilation, and Air Conditioning industry. This
document shall NOT be used as a replacement for the 2007 Kentucky Residential Code or 2007 Kentucky
Building Code. In accordance with the 2007 Kentucky Residential Code, final interpretation and authority with
regard to this text is granted to the inspector. (see IRC R104.1)
Furthermore, as emphasized in the 2007 Kentucky Building Code, all Heating Ventilation, and Air
Conditioning work shall be conducted, installed, and completed in a workmanlike and acceptable manner so as
to secure the results intended by the code.
HVAC CODE CHECKLISTS
Residential Package Dual-Fuel Heat Pump Checklist
Ducts
1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq.
in. per 1000 btu 'sfor heat pumps. (Per IRC M1403.1)
2. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per
IMC 605.1.3)
3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual
D 1-9)
4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen,
garage, mechanical room, furnace room, or other dwelling units. (Per IRC M1602.2(4))
5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M1601.1)
6. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage
steel. (Per IRC R309.1.1)
7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC M1601.3.6)
8. Verify all exterior ducts are protected against the elements. (Per IRC M1601.3.4(2))
9. Verify if vibration isolators are required by MIl. If required, they are not to exceed ten inches (10") in
length. (Per IRC 1601.2.2)
10. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC
M1601.3.1)
11. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas.
(Per IRC Nll03.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential
code.
12. Verify penetration of foundations with ducts is rodent proof. (Per IRC 2404.9)
13. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five
feet (4-5') with one and a half inch (1-1/2") wide straps and no kinks or sharp bends. (Per MIl and
, ADC)
14. Verify all metal ducts are strapped every ten feet (10'). (Per IRC MI601.3.2)
15. Verify all fire rated assembles penetrated with duct on boots are "fire blocked" with approved fire block
material. (Per IRC R602.8(4))
16. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5').
One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into
the duct. (Per IRC M1502.5-2.6)
40
17.'Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any
direction from any opening into the building. Duct termination must be equipped with back draft
damper and shall not be screened. (per IRC MI502.2)
18. If kitchen exhaust is used, a minimum of one hundred (l00) cfm intermittent, twenty-five (25) cfrn
continuous. (Per IRC MI507.3)
19. Verify bathroom exhaust is fifty (50) cfrn intermittent, twenty (20) cfm continuous if no operable
windows. (per IRC MI507.3)
20. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the
building/structure. (per IRC M1601.1.I(2), M1507.2)
Drilling and Notching
1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions
of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing
members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2,
and IRC M1308.1.
2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per
IRC M1308.2)
Equipment
1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the
requirements of this code. (Per IRC M1401.I)
2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with
ACCA Manual J or other approved
methods. (per IRC MI401.3)
3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.I)
4. Verify outside equipment is on a level concrete slab or other approved materials. (per IMC 304.9)
5. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2)
6. Verify clearances around equipment. (Per MIl)
7. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC
E400 1.5 table and NEC)
8. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3)
9. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
10. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
11. Verify wiring is sized for maximum load. (Per NEC)
Gas
1. Verify gas shut-off is installed within six feet (6') of appliance. (Per IRC G2420.5)
2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRC G2419.4)
3. Verify hard pipe is used to access exterior of appliance cabinet. (per IRC G2422.1.2.3)
Residential Package Heat Pump Checklist
Ducts
1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq.
in. per 1000 btu 'sfor heat pumps. (Per IRC MI403.1)
2. Verify return is equipped with a filter allowing even distribution of air flow across the filter. (Per IMC
6.05.1.3)
41
3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual
D 1-9)
4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen,
garage, mechanical room, furnace room, or other dwelling units. (Per IRCMI602.2(4))
5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M1601.1)
6. Verify no duct openings in garage. Any duct passing through a garage must be 26-gauge steel. (Per IRC
R309.1.1)
7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6)
8. Verify all exterior ducts are protected against the elements. (Per IRC M1601.3.4(2))
9. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in
length. (per IRC 1601.2.2)
10. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC
MI601.3.l)
11. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas.
(Per IRC Nll03.2.l) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential
code.
12. Verify penetration of foundations with ducts is rodent-proof. (Per IRC G2404.9)
13. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five
feet (4'-5') with one and a half inch (1-1/2") wide straps with no kinks or sharp bends. (Per MIl and
ADC)
14. Verify all metal ducts are strapped every ten feet (10'). (Per IRC Ml601.3.2)
15. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block
material. (Per IRC R602.8(4))
16. Verify dryer ducts are limited to twenty-five feet (25') in length. One 90 degree = five feet (5'). One 45
degree = two and a half feet (212'). Shall be metal with no screws which extend into the duct. (Per IRC
MI502.5-2.6)
17. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any
direction from any opening into the building. Duct termination must be equipped with back draft
damper and shall not be screened. (Per IRC MI502.2)
18. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm
continuous. (Per IRC M1507.3)
19. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous ifno operable
windows. (Per IRC M1507.3)
20. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the
building/structure. (Per IRC M1601.1.1(2), M1507.2)
Drilling and Notching
1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions
of sections IRC R502.8, IRC R602.6, IRC R602.6.l, and IRC R802.7. Steel-Framed, load bearing
members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2,
and IRC M130S.1.
2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per
IRe M1308.2)
42
Equipment
I. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the
requirements of this code. (per IRC MI401.1)
2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with
ACCA Manual J or other approved methods. (per IRC MI401.3)
3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC MI307.1)
4. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9)
5. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2)
6. Verify clearances around equipment. (per MIl)
7. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC
E4001.5 table and NEC)
8. Verify thermostat wires are protected to resist sunlight and physical damage. (per IRe E3702.3.2-3.3)
9. Verify a condensate trap is installed. (per MIl and!MC 307.2.4)
10. Verify total KW of heat strips. (Per MIl)
11. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
12. Verify wiring is sized for maximum load. (Per NEC)
Residential Split- 80% Furnace with Air Checklist
Ducts
I. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per
IMC 605.1.3)
2. Verify return air is not being taken from any ofthe following: closet, bathroom, toilet room; kitchen,
garage, mechanical room, furnace room, or other dwelling units. (per IRC MI602.2(4)
3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual
D 1-9)
4. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (per IRC MI60 1.1)
5. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage
steel. (per IRC R309.1.I)
6. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6)
7: Verify if vibration isolators are required by MIl. Ifrequired, they are not to exceed ten inches (10") in
length. (Per IRC 1601.2.2)
8. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC
MI601.3.1)
9. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas .
. (per IRC Nll 03.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential
code.
10. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five
feet (4-5') with one and a half inch (1-1/2") wide straps and no kinks or sharp bends. (Per MIl and
ADC)
II. Verify all metal ducts are strapped every ten feet (10'). (per IRC MI601.3.2)
12. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block
material. (per IRC R602.8(4)
13. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5').
One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into
the duct. (Per IRe MI502.5-2.6)
43
14. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any
direction from any opening into the building. Duct termination must be equipped with back draft
damper and shall not be screened. (Per IRC M1502.2)
15. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm
continuous. (Per IRC M1507.3)
16. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable
windows. (Per IRC M1507.3)
17. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the
building/structure. (per IRC M1601.1.1(2), M1507.2)
Drilling and Notching
1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions
of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing
members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2,
and IRC M1308.1.
2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per
IRC Ml308.2)
Equipment
1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the
requirements ofthis code. (Per IRC M1401.1)
2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with
ACCA Manual J or other approved methods. (Per IRC M1401.3)
3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC Ml307.l)
4. Verify equipment in a garage with an ignition source is raised 18" above the floor. (Per IRC M1307.3)
5. Verify equipment in garage is protected from impact. (Per IRC M1307.3.1)
6. Verify appliances located in compartments, alcoves, basements, or similar spaces have an unobstructed
passageway that is 22" wide with a level service space of thirty by thirty inches (30"x30") in front of the
appliance door. (Per IRC M1305.1.2)
7. Verify equipment located within compartments or alcoves are at least twelve inches (12") larger than the
appliance. (Per IRC M1305.1.1)
8. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9)
9~ Verify outdoor equipment is installed three inches (3") above finished grade and is in accordance with
MIl. (Per IRC M1308.3)
10.Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC
E400 1.5 table and NEC)
11.Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3)
12.Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
13.Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
14.Verify wiring is sized for maximum load. (Per NEC)
Combustion Air
1. Verify combustion air is not being taking from any of the following: sleeping rooms, bathrooms, or toilet
rooms. (per IRC M1701.4)
2. Verify combustion air method follows manufacturer's instructions.
44
3. The following are some examples of approved combustion air methods:
• IRe M1702.1
Volume of space in which appliance is installed is greater than 50 cubic feet per 1000 btu's
• IRe M1702.2
Confined space "using adjacent spaces:" one opening within 12" of the ceiling and one within 12" of
the floor but not less than 100 sq. inches.
• IRe M1703.2
Outside combustion air supplied through openings or ducts, one opening within 12" of the ceiling
and one within 12" of the floor,
connecting directly with the crawl and attic space.
• IRe M1703.2.1
Openings communicating directly with the outdoors through vertical ducts: each opening shall have
1 sq. inch per 4000 btu's.
• IRe, M1703.2.1 Horizontal ducts communicating with the outdoors: each opening shall have 1 sq.
inch per 2000btu's.
• IRe M1703.4-M1703.2(4)
Under-floor combustion air using foundation louvers must be 1 sq. inch per 4000 btu's.
Venting
1. Verify venting type and method of venting. (Clearance to combustibles, number of appliances
connected, horizontal length, 1/4" per foot rise, roof penetration height, etc.) Determine also if chimney
liner is needed or required. (Per 2009 NFPA-54)
Gas
1. Verify gas shut offis installed within six feet (6') of appliance. (Per IRC G2420.5)
2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (per IRC G2419.4)
3. Verify hard pipe is used to access exterior of appliance cabinet. (PerIRC G2422.1.2.3)
Attic Appliances
1. Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest
appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A
level working space must be provided, 30"wide x 30" deep where access is required. If the passageway
is not less than 6' high the appliance can be moved back to 50' away. (Per IRC M1305.1.3 (2))
2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (per IRC
M1305.1.4.3)
3. Verify primary drain line IS installed to discharge condensate to an
approved place for disposal. (per MIl and IRC M1411.3)
4. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 W') deep
and three inches (3") wider than the appliance. The pan shall drain to a conspicuous location, a float
switch, or other approved method. (Per IRC M1411.3.1(1))
5. Verify a condensate trap is installed. (per MIl and IMC 307.2.4)
6. Verify disconnecting means. (Per IRe E4001.5 table)
7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
8. Verify wiring is sized for maximum load. (Per NEC)
Under Floor Appliances
1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest
appliance. Must have an unobstructed passageway of 22" wide and 30"high and be no farther away than
45
20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the
passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC
M1305.1.4)
2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC
M1305.1.4.3)
3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from
the floor must have a clearance of six inches (6") from the ground. (Per IRC M13 05.1.4.1)
4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC
M1411.3)
5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
6. Verify disconnecting means. (Per IRC E4001.5 table)
7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
8. Verify wiring is sized for maximum load. (per NEC)
Residential Dual-Fuel Split Heat Pump Checklist
Ducts
1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq.
in. per 1000 btu 'sfor heat pumps. (Per IRC M 1403.1)
2. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (per
IMC 605.1.3)
3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual
D 1-9)
4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen,
garage, mechanical room, furnace room, or other dwelling units. (Per IRC MI602.2(4))
5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC MI601.1)
6. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage
steel. (Per IRC R309.1.1)
7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6)
8. Verify all exterior ducts are protected against the elements. (Per IRC MI601.3.4(2))
9. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in
length. (PerIRC 1601.2.2)
10. Verify all joints are sealed on both supply and re~ ducts with approved tapes or mastics. (Per IRC
MI601.3.1)
11. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas.
(Per IRC Nll03.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential
code.
12. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five
feet (4-5') with one and a half inch (1-112") wide straps and no kinks or sharp bends. (Per MIl and
ADC)
13. Verify all metal ducts are strapped every ten feet (10'). (Per IRC MI601.3.2)
14. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block
material. (Per IRC R602.8( 4))
** Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5').
One forty-five (45) degree = two and a half feet (2 Y2'). Shall be metal with no screws which extend into the
duct. (Per IRC MI502.5-2.6)
46
15. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any
direction from any opening into the building. Duct termination must be equipped with back draft
damper and shall not be screened. (Per IRC M1502.2)
16. If kitchen exhaust is used, a minimum of one hundred (l00) cfm intermittent, twenty-five (25) cfm
continuous. (Per IRC MI507.3)
17. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable
windows. (Per IRC M1507.3)
18. Verify bathroom exhaust duct must be a class 1 or class 0 type ducts & must exhaust to the outside.
IRC,M1601.1.l(2) & IRC, M1507.2
Drilling and Notching
1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions
of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing
members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRe R804.2,
and IRC M1308.1.
2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per
IRC M1308.2)
Equipment
1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the
requirements of this code. (Per IRC MI401.1)
2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with
ACCA Manual J or other approved methods. (Per IRC MI401.3)
3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.l)
4. Verify equipment in a garage with an ignition source is raised 18" above the floor. (Per IRe M1307.3)
5. Verify equipment in garage is protected from impact. (per IRC M1307.3.1)
6. Verify appliances located in compartments, alcoves, basements, or similar spaces have an unobstructed
passageway that is 22" wide with a level service space of thirty by thirty inches (30"x30") in front of the
appliance door. (Per IRe M1305.1.2)
7. Verify equipment located within compartments or alcoves are at least twelve inches (12") larger than the
appliance. (Per IRC MI305.1.1)
8. Verify condensate drain is protected from freezing.
9. Verify a condensate trap is installed. (per MIl and IMe 307.2.4)
10. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9)
11. Verify heat pumps are three inches (3") off the pad. (Per IRe MI403.2)
12. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC
E400I.5 table and NEC)
13. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3)
14. Verify breakers are sized as per equipment data plate. (Per MIl and NEe)
15. Verify wiring is sized for maximum load. (Per NEe)
Combustion Air
1. Verify combustion air is not being taking from any of the following: sleeping rooms, bathrooms, or
toilet rooms. (Per IRC MI701.4)
2. Verify combustion air method follows manufacturer's instructions.
47
Venting
1. Verify venting follows manufacturer's instructions.
Gas
1. Verify gas shut off is installed within six feet (6') of appliance. (Per IRC G2420.5)
2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRe G2419.4)
3. Verify hard pipe is used to access exterior of appliance cabinet. (Per IRe G2422.1.2.3)
Attic Appliances
Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest
appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A level
working space must be provided, 30"wide x 30" deep where access is required. If the passageway is not less
than 6' high the appliance can be moved back to 50' away. (Per IRe M1305.1.3 (2))
1. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRe
M1305.1.4.3)
2. Verify primary drain line is installed to discharge condensate to an approved place for disposal. (Per MIl
and IRC M1411.3)
3. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 12") deep
and three inches (3") wider than the appliance. The pan shall drain to a conspicuous location, a float
switch, or other approved method. (Per IRC M1411.3.1 (1)
4. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
5. Verify disconnecting means. (Per IRC E4001.5 table)
6. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
7. Verify wiring is sized for maximum load. (per NEC)
Under Floor Appliances
1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest
appliance. Must have an unobstructed passageway of22" wide and 30"high and be no-farther away than
20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the
passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC
M1305.1.4)
2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC
M1305.1.4.3)
3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from
the floor must have a clearance of six inches (6") from the ground. (Per IRC M1305.1.4.1)
4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC
M1411.3)
5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
6. Verify disconnecting means. (Per IRC E4001.5 table)
7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
8. Verify wiring is sized for maximum load. (Per NEC)
48
Residential Package Gas Pack Checklist
Ducts
1. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per
IMC 605.1.3)
2. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual
D 1-9)
3. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen,
garage, mechanical room, furnace room, or other dwelling units. (Per IRC M1602.2(4))
4. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M1601.I)
5. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage
steel. (Per IRC R309.1.I)
6. Verify supply and return ducts are four inches (4") off the ground. (Per IRC M1601.3.6)
7. Verify all exterior ducts are protected against the elements. (Per IRC MI601.3.4(2))
8. Verify if vibration isolators are required by MIl. If required, they are not to exceed ten inches (10") in
length. (perIRC 1601.2.2)
9. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC
M1601.3.1)
10. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas.
(Per IRC N1103.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential
code.
11. Verify penetration of foundations with ducts is rodent proof. (per IRC 2404.9)
12. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five
feet (4-5 ') with one and a half inch (1-112") wide straps and no kinks or sharp bends. (Per Mil and
ADC)
13. Verify all metal ducts are strapped every ten feet (10'). (per IRC MI601.3.2)
14. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block
material. (Per IRC R602.8(4))
15. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5').
One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into
the duct. (Per IRe MI502.5-2.6)
16. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any
direction from any opening into the building. Duct termination must be equipped with back draft
damper and shall not be screened. (Per IRe MI502.2)
17. If kitchen exhaust is used, a minimum of one hundred (100) cfrn intermittent, twenty-five (25) cfm
continuous. (Per IRe M1507.3)
18. Verify bathroom exhaust is fifty (50) dill intermittent, twenty (20) cfrn continuous if no operable
windows. (Per IRe MI507.3)
19. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the
building/structure. (per IRC M1601.1.1(2), M1507.2)
Drilling and Notching
1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions
of sections IRe R502.8, IRe R602.6, IRe R602.6.1, and IRe R802.7. Steel-Framed, load bearing
49
members shall be permitted only in accordance with sections IRe R505.2, IRe R603.2, IRe R804.2,
and IRC M1308.1.
2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per
IRC M1308.2
Equipment
1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the
requirements of this code. (per IRC Ml401.l)
2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with
ACCA Manual J or other approved methods. (Per IRC MI40l.3)
3. Verify manufacturer's instructions are with appliances and were
followed. (Per IRC M1307.l)
4. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9)
5. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2)
6. Verify clearances around equipment. (Per MIl
7. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC
E4001.5 table and NEC)
8. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3)
9. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
10. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
11. Verify wiring is sized for maximum load. (Per NEC)
Gas
1. Verify gas shut-off is installed within six feet (6') of appliance. (Per IRC G2420.5)
2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRC G2419.4)
3. Verify hard pipe is used to access exterior of appliance cabinet. (Per IRC G2422.1.2.3)
Residential Geo-Thermal Checklist
Ducts
1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq.
in. per 1000 btu 'sfor heat pumps. (Per IRC M 1403.1)
2. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (per
IMC 605.1.3)
3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual
D 1-9)
4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen,
garage, mechanical room, furnace room, or other dwelling units. (Per IRC MI602.2(4»
5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M 1601.1)
6. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage
steel. (Per IRC R309.1.1)
7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6)
8. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (l0") in
length. (per IRC 1601.2.2)
50
9. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC
MI601.3.1)
10. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas.
(per IRC Nll03.2.l) Insulation has beenrevised from R-8 to R-4 by the 2007 Kentucky Residential
code.
11. Verify all flex ducts are installed as per Mil and are as straight as possible, strapped every four to five
feet (4-5') with one and a half inch (1 Yz") wide straps and no kinks or sharp bends. (Per MIl and ADC)
12. Verify all metal ducts are strapped every ten feet (10'). (per IRC MI601.3.2)
13. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block
material. (Per IRC R602.8(4))
14. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5').
One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into
the duct. (per IRC MI502.5-2.6)
15. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any
direction from any opening into the building.
16. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC
MI502.2)
17. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm
continuous. (Per IRC M1507.3Verify bathroom exhaust must be 50 cfm intermittent, 20 cfm continuous
ifno operable windows. IRC,MI507.3
18. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable
windows. (Per IRC MI507.3)
19. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the
building/structure. (Per IRC MI601.1.1(2), MI507.2)
Drilling and Notching
1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions
of sections IRe R502.8, IRe R602.6, IRe R602.6.l, and IRe R802.7. Steel-Framed, load bearing
members shall be permitted only in accordance with sections IRe R505.2, IRC R603.2, IRC R804.2,
and IRC M1308.1.
2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per
IRC MI308.2)
Equipment
1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the
requirements of this code. (Per IRC MI401.1)
2. Verify heating and cooling equipment IS sized based on building loads
calculated in accordance with ACCA Manual J or other approved methods. (Per IRe MI401.3)
3. Verify manufacturer's instructions are with appliances and were followed. (per IRC M1307.l)
4. Verify loop system holds a 30-minute pressure test at 100psi before backfilling. (Per IRe 2105.1)
5. Verify equipment in a garage with an ignition source is raised eighteen inches (18") above the floor. Per
IRe MI307.3)
6. Verify appliances located in compartments, alcoves, basements, or similar spaces have an unobstructed
passageway that is 22" wide with a level service space of thirty by thirty inches (30"x30") in front of the
appliance door. (Per IRe M1305.1.2)
. 51
7. Verify equipment located within compartments or alcoves are at least twelve inches (12") larger than the
appliance. (Per IRC M1305.1.1)
8. Verify equipment in garages is protected from impact. (Per IRC M1307.3.l)
9. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9)
10. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2)
11. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC
E4001.5 table and NEC)
12. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3)
13. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
14. Verify total KW of heat strips. (Per MIl)
15. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
16. Verify wiring is sized for maximum load. (Per NEC)
Under Floor Appliances
1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest
appliance. Must have an unobstructed passageway of 22" wide and 30"high and be no farther away than
20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the
passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC
M1305.1.4)
2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC
M1305.1.4.3)
3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from
the floor must have a clearance of six inches (6") from the ground. (Per IRC M1305.1.4.l)
4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC
MI411.3)
5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
6. Verify disconnecting means. (Per IRC E4001.5 table)
7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
8. Verify wiring is sized for maximum load. (Per NEC)
Residential Split- 90% Furnace with Air Checklist
Ducts
1. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per
IMC 605.1.3)
2. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen,
garage, mechanical room, furnace room, or other dwelling units. (Per IRC M1602.2(4))
3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual
D 1-9)
4. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M160 1.1)
5. Verify no duct openings in garage. Ducts passing through a garage must be 26 gauge steel.
IRC,R309.1.1
6. Verify supply and return ducts are four inches (4") off the ground. (Per IRC M1601.3.6)
7. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in
length. (Per IRC 1601.2.2)
52
8. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC
M1601.3.l)
9. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas.
(Per IRC Nl103.2.l) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential
code.
10. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five
feet (4-5') with one and a half inch (1-112") wide straps and no kinks or sharp bends. (Per MIl and
AD C)
11. Verify all metal ducts are strapped every ten feet (10'). (Per IRC M1601.3.2)
12. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block
material. (Per IRC R602.8(4))
13. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5').
One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into
the duct. (Per IRC MI502.5-2.6)
14. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any
direction from any opening into the building. Duct termination must be equipped with back draft
damper and shall not be screened. (Per IRC MI502.2)
15. If kitchen exhaust is used, a minimum of one hundred (100) din intermittent, twenty-five (25) cfrn
continuous. (Per IRC MI507.3)
16. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable
windows. (Per IRe M1507.3) .
17. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the
building/structure. (Per IRC MI601.1.1(2), MlS07.2)
Drilling & Notching
1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions
of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing
members shall be permitted only in accordance with sections IRC RSOS.2, IRC R603.2, IRC RS04.2,
and IRC MI30S.1.
2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per
IRC M1308.2)
Equipment
1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the
requirements of this code. (Per IRC M1401.1)
2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with
ACCA Manual J or other approved methods. (Per IRC MI401.3)
3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.l)
4. Verify equipment in a garage with an ignition source is raised 18" above the floor. (Per IRC M1307.3)
5. Verify equipment in garage is protected from impact. (Per IRC M1307.3.1)
6. Verify appliances located in compartments, alcoves, basements or similar spaces have an unobstructed
passageway 22" wide, with a level service space of 30"x 30" in front of the appliance door. (per IRC
M130S.l.2)
7. Verify equipment located within compartments or alcoves are at least 12" larger than the appliance.
~Per IRC MI305.1.1)
53
8. Verify condensate drain is protected from freezing. (Per MIl)
9. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
10. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9)
11. Verify outdoor equipment is installed three inches (3") above finished grade and is in accordance with
MIL (Per IRC M1308.3)
12. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC
E4001.5 table and NEC)
13. Verify thermostat wires are protected to re Verify thermostat wires are protected to resist sunlight and
physical damage. (Per IRC E3702.3.2-3.3)
14. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
15. Verify wiring is sized for maximum load. (Per NEC)
Combustion Air
1. Verify combustion air is not being taking from any of the following: sleeping rooms, bathrooms, or
toilet rooms. (per IRC MI70I.4)
2. Verify combustion air method follows manufacturer's instructions.
Venting
1. Verify venting follows manufacturer's instructions.
Gas
1. Verify gas shut of is installed within six feet (6') of appliance. (Per IRC G2420.5)
2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRC G24I9.4)
3. Verify hard pipe is used to access exterior of appliance cabinet. (Per IRC G2422.I.2.3)
Attic Appliances
1. Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest
appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A
level working space must be provided, 30"wide x 30" deep where access is required. If the passageway
is not less than 6' high the appliance can be moved back to 50' away. (Per IRC MI305.1.3 (2»
2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC
M1305.1.4.3)
3. Verify primary drain line is installed to discharge condensate to an approved place for disposal. (Per MIl
and IRC MI4I1.3)
4. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 Yz") deep
and three inches (3") wider than the appliance. The pan shall drain to a conspicuous location, a float
switch, or other approved method. (per IRC MI4I1.3.1(1»
5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
6. Verify disconnecting means. (Per IRC E400I.5 table)
7. Verify breakers are sized as per equipment data plate. (per MIl and NEC)
8. Verify wiring is sized for maximum load. (Per NEC)
Under Floor Appliances
1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest
appliance. Must have an unobstructed passageway of 22" wide and 30"high and be no farther away than
20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the
54
passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC
M1305.1.4)
2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC
M1305.1.4.3)
3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from
the floor must have a clearance of six inches (6") from the ground. (PerIRC M1305.l.4.1)
4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC
M1411.3)
5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
6. Verify disconnecting means. (Per IRC E4001.5 table)
7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
8. Verify wiring is sized for maximum load. (per NEC)
Residential Split Heat Pump Checklist
Ducts
1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq.
in. per 1000 btu 'sfor heat pumps. (per IRC M 1403.1)
2. Verify return is equipped with a filter allowing even distribution of air flow across the filter. (per IMC
605.1.3)
3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual
D 1-9)
4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen,
garage, mechanical room, furnace room, or other dwelling units. (Per IRCM1602.2(4))
5. Verify supply duct sizing. If design is questionable, a Manual D must be provided (Per IRC M160 1.1)
6. Verify no duct openings in garage. Any duct passing through a garage must be 26-gauge steel. (Per IRC
R309.1.1)
7. Verify supply and return ducts are four inches (4") off the ground. (per IRC M1601.3.6)
8. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in
length. (Per IRC 1601.2.2)
9. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC
M1601.3.1)
10. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas.
(Per IRC Nll03.2.l) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential
code.
11. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five
feet (4'-5') with one and a half inch (1-1/2") wide straps with no kinks or sharp bends. (Per MIl and
AD C)
12. Verify all metal ducts are strapped every ten feet (10'). (Per IRe M1601.3.2)
13. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block
material. (Per IRC R602. 8(4))
14. Verify dryer ducts are limited to twenty-five feet (25') in length. One 90 degree = five feet (5'). One 45
degree = two and a half feet (2 ~'). Shall be metal with no screws which extend into the duct. (per IRC
M1502.5-2.6)
55
15. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any
direction from any opening into the building Duct termination must be equipped with back draft damper
and shall not be screened. (Per IRC MI502.2)
16. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm
continuous. (Per IRC M1507.3)
17. Verify bathroom exhaust must be 50 cfm intermittent, 20 cfm continuous if no operable windows.
IRC,MI507.3
18. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable
windows. (Per IRC MI507.3)
Drilling & Notching
1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions
of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing
members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2,
and IRC M1308.1.
2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per
IRC MI308.2)
Equipment
1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the
requirements ofthis code. (Per IRC M1401.1)
2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with
ACCA Manual J or other approved methods. (Per IRC M1401.3)
3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.1)
4. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9)
5. Verify appliances located in compartments, alcoves, basements or similar spaces have an unobstructed
passageway 22" wide, with a level service space of 30"x 30" in front of the appliance door. (Per IRC
M1305.1.2)
6. Verify equipment located within compartments or alcoves are at least 12" larger than the appliance.
(Per IRC M1305.1.1)
7. Verify equipment in garage is protected from impact. (Per IRC M1307.3.1)
8. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9)
9. Verify heat pumps are three inches (3") off the pad. (Per IRC M1403.2)
10. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC
E400 1.5 table and NEC)
11. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3)
12. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
13. Verify total KW of heat strips. (Per MIl)
14. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
15. Verify wiring is sized for maximum load. (Per NEC)
Attic Appliances
1. Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest
appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A
56
level working space must be provided, 30"wide x 30" deep where access is required. If the passageway
is not less than 6' high the appliance can be moved back to 50' away. (per IRC M1305.1.3 (2))
2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC
M1305.1.4.3)
3. Verify primary drain:line is installed to discharge condensate to an approved place for disposal. (Per MIl
and IRC M1411.3)
4. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 12") deep
and three inches (3") wider than the appliance. The pan shall drain to a conspicuous location, a float
. switch, or other approved method. (Per IRC M1411.3.1(1))
5. Verify a condensate trap is installed. (Per MIL and IMC 307.2.4)
6. Verify disconnecting means. (Per IRC E4001.5 table)
7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
8. Verify wiring is sized for maximum load. (Per NEC)
Under Floor Appliances
1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest
appliance. Must have an unobstructed passageway of22" wide and 30"high and be no farther away than
20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the
passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC
M1305.1.4)
2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (per IRC
M1305.1.4.3)
3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from
the floor must have a clearance of six inches (6") from the ground. (per IRe M1305.1.4.l)
4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC
M1411.3)
5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4)
6. Verify disconnecting means. (per IRC E400 1.5 table)
7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC)
8. Verify wiring is sized for maximum load. (Per NEC)
57

More Related Content

What's hot

Motor Starters - DOL Direct on Line ATEX 5.5KW - Walsall DOL5.5
Motor Starters - DOL Direct on Line ATEX 5.5KW - Walsall DOL5.5Motor Starters - DOL Direct on Line ATEX 5.5KW - Walsall DOL5.5
Motor Starters - DOL Direct on Line ATEX 5.5KW - Walsall DOL5.5Thorne & Derrick International
 
Flameproof Highproof Low Range DP Switch FC Series
Flameproof Highproof Low Range DP Switch FC SeriesFlameproof Highproof Low Range DP Switch FC Series
Flameproof Highproof Low Range DP Switch FC SeriesNK Instruments Pvt. Ltd.
 
Explosionproof Bellow operated Paddle type Flow Switch EPFSPT
Explosionproof Bellow operated Paddle type Flow Switch EPFSPTExplosionproof Bellow operated Paddle type Flow Switch EPFSPT
Explosionproof Bellow operated Paddle type Flow Switch EPFSPTNK Instruments Pvt. Ltd.
 
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...Factory Furnace Outlet
 
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...Factory Furnace Outlet
 
Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03Ian de Mink
 
Distillation column level
Distillation column levelDistillation column level
Distillation column levelNatasha Emlyn
 
מזגן אוורור
מזגן אוורורמזגן אוורור
מזגן אוורורBanner Israel
 
Usr for pcr machine
Usr for pcr machineUsr for pcr machine
Usr for pcr machineAnwar Parvez
 

What's hot (16)

Motor Starters - DOL Direct on Line ATEX 5.5KW - Walsall DOL5.5
Motor Starters - DOL Direct on Line ATEX 5.5KW - Walsall DOL5.5Motor Starters - DOL Direct on Line ATEX 5.5KW - Walsall DOL5.5
Motor Starters - DOL Direct on Line ATEX 5.5KW - Walsall DOL5.5
 
Flameproof Highproof Low Range DP Switch FC Series
Flameproof Highproof Low Range DP Switch FC SeriesFlameproof Highproof Low Range DP Switch FC Series
Flameproof Highproof Low Range DP Switch FC Series
 
Explosionproof Bellow operated Paddle type Flow Switch EPFSPT
Explosionproof Bellow operated Paddle type Flow Switch EPFSPTExplosionproof Bellow operated Paddle type Flow Switch EPFSPT
Explosionproof Bellow operated Paddle type Flow Switch EPFSPT
 
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...
 
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...
Goodman 5 Ton 16 Seer Air Conditioner Condenser W R410A Refrigerant at The Fu...
 
Variable Area Flow Meter - SeeFlo
Variable Area Flow Meter - SeeFloVariable Area Flow Meter - SeeFlo
Variable Area Flow Meter - SeeFlo
 
Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03
 
T type Two Valve Manifold (2VQ)
T type Two Valve Manifold (2VQ)T type Two Valve Manifold (2VQ)
T type Two Valve Manifold (2VQ)
 
R type Two Valve Manifold (2VM)
R type Two Valve Manifold (2VM)R type Two Valve Manifold (2VM)
R type Two Valve Manifold (2VM)
 
R type Two Valve Manifold (2VA)
R type Two Valve Manifold (2VA)R type Two Valve Manifold (2VA)
R type Two Valve Manifold (2VA)
 
R type Two Valve Manifold (2VT)
R type Two Valve Manifold (2VT)R type Two Valve Manifold (2VT)
R type Two Valve Manifold (2VT)
 
Back pressure valves for industrial process control
Back pressure valves for industrial process controlBack pressure valves for industrial process control
Back pressure valves for industrial process control
 
Distillation column level
Distillation column levelDistillation column level
Distillation column level
 
מזגן אוורור
מזגן אוורורמזגן אוורור
מזגן אוורור
 
Usr for pcr machine
Usr for pcr machineUsr for pcr machine
Usr for pcr machine
 
10810 62
10810 6210810 62
10810 62
 

Similar to HVAC Code Checklist Guide

specif-dust-extraction-system.pdf
specif-dust-extraction-system.pdfspecif-dust-extraction-system.pdf
specif-dust-extraction-system.pdfSergioPereira229337
 
Technical specification EEE
Technical specification EEETechnical specification EEE
Technical specification EEEAmit Kumar
 
HA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_ValdezHA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_ValdezPrudenceDaet
 
Chapter 4 ventilation
Chapter 4 ventilationChapter 4 ventilation
Chapter 4 ventilationLeody Diaz Jr
 
Sample CAD DWG_ROTHMAN_Nicole Eng
Sample CAD DWG_ROTHMAN_Nicole EngSample CAD DWG_ROTHMAN_Nicole Eng
Sample CAD DWG_ROTHMAN_Nicole EngNicole Eng
 
Fire Hoses and Hydrants Inspection
Fire Hoses and Hydrants InspectionFire Hoses and Hydrants Inspection
Fire Hoses and Hydrants InspectionLearnmarine
 
Integrated Flame Scanner For Commercial and Industrial Combustion Operations
Integrated Flame Scanner For Commercial and Industrial Combustion OperationsIntegrated Flame Scanner For Commercial and Industrial Combustion Operations
Integrated Flame Scanner For Commercial and Industrial Combustion OperationsCTi Controltech
 
Integrated Flame Scanner for Industrial Combustion Operations
Integrated Flame Scanner for Industrial Combustion OperationsIntegrated Flame Scanner for Industrial Combustion Operations
Integrated Flame Scanner for Industrial Combustion OperationsClassic Controls, Inc.
 
Titan Out Engineering Solution of Wall Sealing Refrigerant Line Penetrations ...
Titan Out Engineering Solution of Wall Sealing Refrigerant Line Penetrations ...Titan Out Engineering Solution of Wall Sealing Refrigerant Line Penetrations ...
Titan Out Engineering Solution of Wall Sealing Refrigerant Line Penetrations ...Airex Manufacturing Inc
 
Specification for electrical automation and instrumentation 02
Specification for electrical automation and instrumentation  02Specification for electrical automation and instrumentation  02
Specification for electrical automation and instrumentation 02Sajeewa Lakmal
 
10810 63 (smoke density)
10810 63 (smoke density)10810 63 (smoke density)
10810 63 (smoke density)Samsher Singh
 
NFPA 13 Installation of Sprinkler Systems.ppt
NFPA 13 Installation of Sprinkler Systems.pptNFPA 13 Installation of Sprinkler Systems.ppt
NFPA 13 Installation of Sprinkler Systems.pptssuser135ef41
 
NFPA 13 Installation of Sprinkler Systems.ppt
NFPA 13 Installation of Sprinkler Systems.pptNFPA 13 Installation of Sprinkler Systems.ppt
NFPA 13 Installation of Sprinkler Systems.ppt3scontrading
 
Crabtree Starbreaker 2016
Crabtree Starbreaker 2016Crabtree Starbreaker 2016
Crabtree Starbreaker 2016Darren Garbett
 
Bondstrand serie 2000 m-7000m product data
Bondstrand   serie 2000 m-7000m product dataBondstrand   serie 2000 m-7000m product data
Bondstrand serie 2000 m-7000m product dataMoises Casanova
 
Amended rule in_boiler_1160
Amended rule in_boiler_1160Amended rule in_boiler_1160
Amended rule in_boiler_1160Stan Macapili
 
Dust extrcaction system for lime stores
Dust extrcaction system for lime storesDust extrcaction system for lime stores
Dust extrcaction system for lime storesMadhuraSaputhantri
 

Similar to HVAC Code Checklist Guide (20)

specif-dust-extraction-system.pdf
specif-dust-extraction-system.pdfspecif-dust-extraction-system.pdf
specif-dust-extraction-system.pdf
 
Technical specification EEE
Technical specification EEETechnical specification EEE
Technical specification EEE
 
HA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_ValdezHA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_Valdez
 
Chapter 4 ventilation
Chapter 4 ventilationChapter 4 ventilation
Chapter 4 ventilation
 
Sample CAD DWG_ROTHMAN_Nicole Eng
Sample CAD DWG_ROTHMAN_Nicole EngSample CAD DWG_ROTHMAN_Nicole Eng
Sample CAD DWG_ROTHMAN_Nicole Eng
 
Fire Hoses and Hydrants Inspection
Fire Hoses and Hydrants InspectionFire Hoses and Hydrants Inspection
Fire Hoses and Hydrants Inspection
 
Integrated Flame Scanner For Commercial and Industrial Combustion Operations
Integrated Flame Scanner For Commercial and Industrial Combustion OperationsIntegrated Flame Scanner For Commercial and Industrial Combustion Operations
Integrated Flame Scanner For Commercial and Industrial Combustion Operations
 
Integrated Flame Scanner for Industrial Combustion Operations
Integrated Flame Scanner for Industrial Combustion OperationsIntegrated Flame Scanner for Industrial Combustion Operations
Integrated Flame Scanner for Industrial Combustion Operations
 
Titan Out Engineering Solution of Wall Sealing Refrigerant Line Penetrations ...
Titan Out Engineering Solution of Wall Sealing Refrigerant Line Penetrations ...Titan Out Engineering Solution of Wall Sealing Refrigerant Line Penetrations ...
Titan Out Engineering Solution of Wall Sealing Refrigerant Line Penetrations ...
 
Titan Outlet Airex Manufacturing Inc
Titan Outlet  Airex Manufacturing IncTitan Outlet  Airex Manufacturing Inc
Titan Outlet Airex Manufacturing Inc
 
Specification for electrical automation and instrumentation 02
Specification for electrical automation and instrumentation  02Specification for electrical automation and instrumentation  02
Specification for electrical automation and instrumentation 02
 
mechanical Presentation
mechanical Presentationmechanical Presentation
mechanical Presentation
 
10334
1033410334
10334
 
10810 63 (smoke density)
10810 63 (smoke density)10810 63 (smoke density)
10810 63 (smoke density)
 
NFPA 13 Installation of Sprinkler Systems.ppt
NFPA 13 Installation of Sprinkler Systems.pptNFPA 13 Installation of Sprinkler Systems.ppt
NFPA 13 Installation of Sprinkler Systems.ppt
 
NFPA 13 Installation of Sprinkler Systems.ppt
NFPA 13 Installation of Sprinkler Systems.pptNFPA 13 Installation of Sprinkler Systems.ppt
NFPA 13 Installation of Sprinkler Systems.ppt
 
Crabtree Starbreaker 2016
Crabtree Starbreaker 2016Crabtree Starbreaker 2016
Crabtree Starbreaker 2016
 
Bondstrand serie 2000 m-7000m product data
Bondstrand   serie 2000 m-7000m product dataBondstrand   serie 2000 m-7000m product data
Bondstrand serie 2000 m-7000m product data
 
Amended rule in_boiler_1160
Amended rule in_boiler_1160Amended rule in_boiler_1160
Amended rule in_boiler_1160
 
Dust extrcaction system for lime stores
Dust extrcaction system for lime storesDust extrcaction system for lime stores
Dust extrcaction system for lime stores
 

Recently uploaded

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 

Recently uploaded (20)

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 

HVAC Code Checklist Guide

  • 1. The following text is informational only and shall serve as an informational guide for HVAC contractors, journeymen, and apprentices working in the Heating, Ventilation, and Air Conditioning industry. This document shall NOT be used as a replacement for the 2007 Kentucky Residential Code or 2007 Kentucky Building Code. In accordance with the 2007 Kentucky Residential Code, final interpretation and authority with regard to this text is granted to the inspector. (see IRC R104.1) Furthermore, as emphasized in the 2007 Kentucky Building Code, all Heating Ventilation, and Air Conditioning work shall be conducted, installed, and completed in a workmanlike and acceptable manner so as to secure the results intended by the code. HVAC CODE CHECKLISTS Residential Package Dual-Fuel Heat Pump Checklist Ducts 1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq. in. per 1000 btu 'sfor heat pumps. (Per IRC M1403.1) 2. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per IMC 605.1.3) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRC M1602.2(4)) 5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M1601.1) 6. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage steel. (Per IRC R309.1.1) 7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC M1601.3.6) 8. Verify all exterior ducts are protected against the elements. (Per IRC M1601.3.4(2)) 9. Verify if vibration isolators are required by MIl. If required, they are not to exceed ten inches (10") in length. (Per IRC 1601.2.2) 10. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC M1601.3.1) 11. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC Nll03.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 12. Verify penetration of foundations with ducts is rodent proof. (Per IRC 2404.9) 13. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4-5') with one and a half inch (1-1/2") wide straps and no kinks or sharp bends. (Per MIl and , ADC) 14. Verify all metal ducts are strapped every ten feet (10'). (Per IRC MI601.3.2) 15. Verify all fire rated assembles penetrated with duct on boots are "fire blocked" with approved fire block material. (Per IRC R602.8(4)) 16. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into the duct. (Per IRC M1502.5-2.6) 40
  • 2. 17.'Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (per IRC MI502.2) 18. If kitchen exhaust is used, a minimum of one hundred (l00) cfm intermittent, twenty-five (25) cfrn continuous. (Per IRC MI507.3) 19. Verify bathroom exhaust is fifty (50) cfrn intermittent, twenty (20) cfm continuous if no operable windows. (per IRC MI507.3) 20. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (per IRC M1601.1.I(2), M1507.2) Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC M1308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (Per IRC M1401.I) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (per IRC MI401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.I) 4. Verify outside equipment is on a level concrete slab or other approved materials. (per IMC 304.9) 5. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2) 6. Verify clearances around equipment. (Per MIl) 7. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E400 1.5 table and NEC) 8. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 9. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 10. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 11. Verify wiring is sized for maximum load. (Per NEC) Gas 1. Verify gas shut-off is installed within six feet (6') of appliance. (Per IRC G2420.5) 2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRC G2419.4) 3. Verify hard pipe is used to access exterior of appliance cabinet. (per IRC G2422.1.2.3) Residential Package Heat Pump Checklist Ducts 1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq. in. per 1000 btu 'sfor heat pumps. (Per IRC MI403.1) 2. Verify return is equipped with a filter allowing even distribution of air flow across the filter. (Per IMC 6.05.1.3) 41
  • 3. 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRCMI602.2(4)) 5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M1601.1) 6. Verify no duct openings in garage. Any duct passing through a garage must be 26-gauge steel. (Per IRC R309.1.1) 7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6) 8. Verify all exterior ducts are protected against the elements. (Per IRC M1601.3.4(2)) 9. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in length. (per IRC 1601.2.2) 10. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC MI601.3.l) 11. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC Nll03.2.l) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 12. Verify penetration of foundations with ducts is rodent-proof. (Per IRC G2404.9) 13. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4'-5') with one and a half inch (1-1/2") wide straps with no kinks or sharp bends. (Per MIl and ADC) 14. Verify all metal ducts are strapped every ten feet (10'). (Per IRC Ml601.3.2) 15. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602.8(4)) 16. Verify dryer ducts are limited to twenty-five feet (25') in length. One 90 degree = five feet (5'). One 45 degree = two and a half feet (212'). Shall be metal with no screws which extend into the duct. (Per IRC MI502.5-2.6) 17. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC MI502.2) 18. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm continuous. (Per IRC M1507.3) 19. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous ifno operable windows. (Per IRC M1507.3) 20. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (Per IRC M1601.1.1(2), M1507.2) Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.l, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2, and IRC M130S.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRe M1308.2) 42
  • 4. Equipment I. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (per IRC MI401.1) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (per IRC MI401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC MI307.1) 4. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 5. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2) 6. Verify clearances around equipment. (per MIl) 7. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E4001.5 table and NEC) 8. Verify thermostat wires are protected to resist sunlight and physical damage. (per IRe E3702.3.2-3.3) 9. Verify a condensate trap is installed. (per MIl and!MC 307.2.4) 10. Verify total KW of heat strips. (Per MIl) 11. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 12. Verify wiring is sized for maximum load. (Per NEC) Residential Split- 80% Furnace with Air Checklist Ducts I. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per IMC 605.1.3) 2. Verify return air is not being taken from any ofthe following: closet, bathroom, toilet room; kitchen, garage, mechanical room, furnace room, or other dwelling units. (per IRC MI602.2(4) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (per IRC MI60 1.1) 5. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage steel. (per IRC R309.1.I) 6. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6) 7: Verify if vibration isolators are required by MIl. Ifrequired, they are not to exceed ten inches (10") in length. (Per IRC 1601.2.2) 8. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC MI601.3.1) 9. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas . . (per IRC Nll 03.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 10. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4-5') with one and a half inch (1-1/2") wide straps and no kinks or sharp bends. (Per MIl and ADC) II. Verify all metal ducts are strapped every ten feet (10'). (per IRC MI601.3.2) 12. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (per IRC R602.8(4) 13. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into the duct. (Per IRe MI502.5-2.6) 43
  • 5. 14. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC M1502.2) 15. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm continuous. (Per IRC M1507.3) 16. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable windows. (Per IRC M1507.3) 17. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (per IRC M1601.1.1(2), M1507.2) Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC Ml308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements ofthis code. (Per IRC M1401.1) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRC M1401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC Ml307.l) 4. Verify equipment in a garage with an ignition source is raised 18" above the floor. (Per IRC M1307.3) 5. Verify equipment in garage is protected from impact. (Per IRC M1307.3.1) 6. Verify appliances located in compartments, alcoves, basements, or similar spaces have an unobstructed passageway that is 22" wide with a level service space of thirty by thirty inches (30"x30") in front of the appliance door. (Per IRC M1305.1.2) 7. Verify equipment located within compartments or alcoves are at least twelve inches (12") larger than the appliance. (Per IRC M1305.1.1) 8. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 9~ Verify outdoor equipment is installed three inches (3") above finished grade and is in accordance with MIl. (Per IRC M1308.3) 10.Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E400 1.5 table and NEC) 11.Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 12.Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 13.Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 14.Verify wiring is sized for maximum load. (Per NEC) Combustion Air 1. Verify combustion air is not being taking from any of the following: sleeping rooms, bathrooms, or toilet rooms. (per IRC M1701.4) 2. Verify combustion air method follows manufacturer's instructions. 44
  • 6. 3. The following are some examples of approved combustion air methods: • IRe M1702.1 Volume of space in which appliance is installed is greater than 50 cubic feet per 1000 btu's • IRe M1702.2 Confined space "using adjacent spaces:" one opening within 12" of the ceiling and one within 12" of the floor but not less than 100 sq. inches. • IRe M1703.2 Outside combustion air supplied through openings or ducts, one opening within 12" of the ceiling and one within 12" of the floor, connecting directly with the crawl and attic space. • IRe M1703.2.1 Openings communicating directly with the outdoors through vertical ducts: each opening shall have 1 sq. inch per 4000 btu's. • IRe, M1703.2.1 Horizontal ducts communicating with the outdoors: each opening shall have 1 sq. inch per 2000btu's. • IRe M1703.4-M1703.2(4) Under-floor combustion air using foundation louvers must be 1 sq. inch per 4000 btu's. Venting 1. Verify venting type and method of venting. (Clearance to combustibles, number of appliances connected, horizontal length, 1/4" per foot rise, roof penetration height, etc.) Determine also if chimney liner is needed or required. (Per 2009 NFPA-54) Gas 1. Verify gas shut offis installed within six feet (6') of appliance. (Per IRC G2420.5) 2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (per IRC G2419.4) 3. Verify hard pipe is used to access exterior of appliance cabinet. (PerIRC G2422.1.2.3) Attic Appliances 1. Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A level working space must be provided, 30"wide x 30" deep where access is required. If the passageway is not less than 6' high the appliance can be moved back to 50' away. (Per IRC M1305.1.3 (2)) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (per IRC M1305.1.4.3) 3. Verify primary drain line IS installed to discharge condensate to an approved place for disposal. (per MIl and IRC M1411.3) 4. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 W') deep and three inches (3") wider than the appliance. The pan shall drain to a conspicuous location, a float switch, or other approved method. (Per IRC M1411.3.1(1)) 5. Verify a condensate trap is installed. (per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRe E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) Under Floor Appliances 1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide and 30"high and be no farther away than 45
  • 7. 20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC M1305.1.4) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from the floor must have a clearance of six inches (6") from the ground. (Per IRC M13 05.1.4.1) 4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC M1411.3) 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (per NEC) Residential Dual-Fuel Split Heat Pump Checklist Ducts 1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq. in. per 1000 btu 'sfor heat pumps. (Per IRC M 1403.1) 2. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (per IMC 605.1.3) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRC MI602.2(4)) 5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC MI601.1) 6. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage steel. (Per IRC R309.1.1) 7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6) 8. Verify all exterior ducts are protected against the elements. (Per IRC MI601.3.4(2)) 9. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in length. (PerIRC 1601.2.2) 10. Verify all joints are sealed on both supply and re~ ducts with approved tapes or mastics. (Per IRC MI601.3.1) 11. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC Nll03.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 12. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4-5') with one and a half inch (1-112") wide straps and no kinks or sharp bends. (Per MIl and ADC) 13. Verify all metal ducts are strapped every ten feet (10'). (Per IRC MI601.3.2) 14. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602.8( 4)) ** Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Y2'). Shall be metal with no screws which extend into the duct. (Per IRC MI502.5-2.6) 46
  • 8. 15. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC M1502.2) 16. If kitchen exhaust is used, a minimum of one hundred (l00) cfm intermittent, twenty-five (25) cfm continuous. (Per IRC MI507.3) 17. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable windows. (Per IRC M1507.3) 18. Verify bathroom exhaust duct must be a class 1 or class 0 type ducts & must exhaust to the outside. IRC,M1601.1.l(2) & IRC, M1507.2 Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRe R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC M1308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (Per IRC MI401.1) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRC MI401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.l) 4. Verify equipment in a garage with an ignition source is raised 18" above the floor. (Per IRe M1307.3) 5. Verify equipment in garage is protected from impact. (per IRC M1307.3.1) 6. Verify appliances located in compartments, alcoves, basements, or similar spaces have an unobstructed passageway that is 22" wide with a level service space of thirty by thirty inches (30"x30") in front of the appliance door. (Per IRe M1305.1.2) 7. Verify equipment located within compartments or alcoves are at least twelve inches (12") larger than the appliance. (Per IRC MI305.1.1) 8. Verify condensate drain is protected from freezing. 9. Verify a condensate trap is installed. (per MIl and IMe 307.2.4) 10. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 11. Verify heat pumps are three inches (3") off the pad. (Per IRe MI403.2) 12. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E400I.5 table and NEC) 13. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 14. Verify breakers are sized as per equipment data plate. (Per MIl and NEe) 15. Verify wiring is sized for maximum load. (Per NEe) Combustion Air 1. Verify combustion air is not being taking from any of the following: sleeping rooms, bathrooms, or toilet rooms. (Per IRC MI701.4) 2. Verify combustion air method follows manufacturer's instructions. 47
  • 9. Venting 1. Verify venting follows manufacturer's instructions. Gas 1. Verify gas shut off is installed within six feet (6') of appliance. (Per IRC G2420.5) 2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRe G2419.4) 3. Verify hard pipe is used to access exterior of appliance cabinet. (Per IRe G2422.1.2.3) Attic Appliances Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A level working space must be provided, 30"wide x 30" deep where access is required. If the passageway is not less than 6' high the appliance can be moved back to 50' away. (Per IRe M1305.1.3 (2)) 1. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRe M1305.1.4.3) 2. Verify primary drain line is installed to discharge condensate to an approved place for disposal. (Per MIl and IRC M1411.3) 3. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 12") deep and three inches (3") wider than the appliance. The pan shall drain to a conspicuous location, a float switch, or other approved method. (Per IRC M1411.3.1 (1) 4. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 5. Verify disconnecting means. (Per IRC E4001.5 table) 6. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 7. Verify wiring is sized for maximum load. (per NEC) Under Floor Appliances 1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest appliance. Must have an unobstructed passageway of22" wide and 30"high and be no-farther away than 20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC M1305.1.4) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from the floor must have a clearance of six inches (6") from the ground. (Per IRC M1305.1.4.1) 4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC M1411.3) 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) 48
  • 10. Residential Package Gas Pack Checklist Ducts 1. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per IMC 605.1.3) 2. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 3. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRC M1602.2(4)) 4. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M1601.I) 5. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage steel. (Per IRC R309.1.I) 6. Verify supply and return ducts are four inches (4") off the ground. (Per IRC M1601.3.6) 7. Verify all exterior ducts are protected against the elements. (Per IRC MI601.3.4(2)) 8. Verify if vibration isolators are required by MIl. If required, they are not to exceed ten inches (10") in length. (perIRC 1601.2.2) 9. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC M1601.3.1) 10. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC N1103.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 11. Verify penetration of foundations with ducts is rodent proof. (per IRC 2404.9) 12. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4-5 ') with one and a half inch (1-112") wide straps and no kinks or sharp bends. (Per Mil and ADC) 13. Verify all metal ducts are strapped every ten feet (10'). (per IRC MI601.3.2) 14. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602.8(4)) 15. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into the duct. (Per IRe MI502.5-2.6) 16. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRe MI502.2) 17. If kitchen exhaust is used, a minimum of one hundred (100) cfrn intermittent, twenty-five (25) cfm continuous. (Per IRe M1507.3) 18. Verify bathroom exhaust is fifty (50) dill intermittent, twenty (20) cfrn continuous if no operable windows. (Per IRe MI507.3) 19. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (per IRC M1601.1.1(2), M1507.2) Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRe R502.8, IRe R602.6, IRe R602.6.1, and IRe R802.7. Steel-Framed, load bearing 49
  • 11. members shall be permitted only in accordance with sections IRe R505.2, IRe R603.2, IRe R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC M1308.2 Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (per IRC Ml401.l) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRC MI40l.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.l) 4. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 5. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2) 6. Verify clearances around equipment. (Per MIl 7. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E4001.5 table and NEC) 8. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 9. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 10. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 11. Verify wiring is sized for maximum load. (Per NEC) Gas 1. Verify gas shut-off is installed within six feet (6') of appliance. (Per IRC G2420.5) 2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRC G2419.4) 3. Verify hard pipe is used to access exterior of appliance cabinet. (Per IRC G2422.1.2.3) Residential Geo-Thermal Checklist Ducts 1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq. in. per 1000 btu 'sfor heat pumps. (Per IRC M 1403.1) 2. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (per IMC 605.1.3) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRC MI602.2(4» 5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M 1601.1) 6. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage steel. (Per IRC R309.1.1) 7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6) 8. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (l0") in length. (per IRC 1601.2.2) 50
  • 12. 9. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC MI601.3.1) 10. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (per IRC Nll03.2.l) Insulation has beenrevised from R-8 to R-4 by the 2007 Kentucky Residential code. 11. Verify all flex ducts are installed as per Mil and are as straight as possible, strapped every four to five feet (4-5') with one and a half inch (1 Yz") wide straps and no kinks or sharp bends. (Per MIl and ADC) 12. Verify all metal ducts are strapped every ten feet (10'). (per IRC MI601.3.2) 13. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602.8(4)) 14. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into the duct. (per IRC MI502.5-2.6) 15. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. 16. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC MI502.2) 17. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm continuous. (Per IRC M1507.3Verify bathroom exhaust must be 50 cfm intermittent, 20 cfm continuous ifno operable windows. IRC,MI507.3 18. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable windows. (Per IRC MI507.3) 19. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (Per IRC MI601.1.1(2), MI507.2) Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRe R502.8, IRe R602.6, IRe R602.6.l, and IRe R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRe R505.2, IRC R603.2, IRC R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC MI308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (Per IRC MI401.1) 2. Verify heating and cooling equipment IS sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRe MI401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (per IRC M1307.l) 4. Verify loop system holds a 30-minute pressure test at 100psi before backfilling. (Per IRe 2105.1) 5. Verify equipment in a garage with an ignition source is raised eighteen inches (18") above the floor. Per IRe MI307.3) 6. Verify appliances located in compartments, alcoves, basements, or similar spaces have an unobstructed passageway that is 22" wide with a level service space of thirty by thirty inches (30"x30") in front of the appliance door. (Per IRe M1305.1.2) . 51
  • 13. 7. Verify equipment located within compartments or alcoves are at least twelve inches (12") larger than the appliance. (Per IRC M1305.1.1) 8. Verify equipment in garages is protected from impact. (Per IRC M1307.3.l) 9. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 10. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2) 11. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E4001.5 table and NEC) 12. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 13. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 14. Verify total KW of heat strips. (Per MIl) 15. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 16. Verify wiring is sized for maximum load. (Per NEC) Under Floor Appliances 1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide and 30"high and be no farther away than 20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC M1305.1.4) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from the floor must have a clearance of six inches (6") from the ground. (Per IRC M1305.1.4.l) 4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC MI411.3) 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) Residential Split- 90% Furnace with Air Checklist Ducts 1. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per IMC 605.1.3) 2. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRC M1602.2(4)) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M160 1.1) 5. Verify no duct openings in garage. Ducts passing through a garage must be 26 gauge steel. IRC,R309.1.1 6. Verify supply and return ducts are four inches (4") off the ground. (Per IRC M1601.3.6) 7. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in length. (Per IRC 1601.2.2) 52
  • 14. 8. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC M1601.3.l) 9. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC Nl103.2.l) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 10. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4-5') with one and a half inch (1-112") wide straps and no kinks or sharp bends. (Per MIl and AD C) 11. Verify all metal ducts are strapped every ten feet (10'). (Per IRC M1601.3.2) 12. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602.8(4)) 13. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into the duct. (Per IRC MI502.5-2.6) 14. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC MI502.2) 15. If kitchen exhaust is used, a minimum of one hundred (100) din intermittent, twenty-five (25) cfrn continuous. (Per IRC MI507.3) 16. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable windows. (Per IRe M1507.3) . 17. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (Per IRC MI601.1.1(2), MlS07.2) Drilling & Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC RSOS.2, IRC R603.2, IRC RS04.2, and IRC MI30S.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC M1308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (Per IRC M1401.1) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRC MI401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.l) 4. Verify equipment in a garage with an ignition source is raised 18" above the floor. (Per IRC M1307.3) 5. Verify equipment in garage is protected from impact. (Per IRC M1307.3.1) 6. Verify appliances located in compartments, alcoves, basements or similar spaces have an unobstructed passageway 22" wide, with a level service space of 30"x 30" in front of the appliance door. (per IRC M130S.l.2) 7. Verify equipment located within compartments or alcoves are at least 12" larger than the appliance. ~Per IRC MI305.1.1) 53
  • 15. 8. Verify condensate drain is protected from freezing. (Per MIl) 9. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 10. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 11. Verify outdoor equipment is installed three inches (3") above finished grade and is in accordance with MIL (Per IRC M1308.3) 12. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E4001.5 table and NEC) 13. Verify thermostat wires are protected to re Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 14. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 15. Verify wiring is sized for maximum load. (Per NEC) Combustion Air 1. Verify combustion air is not being taking from any of the following: sleeping rooms, bathrooms, or toilet rooms. (per IRC MI70I.4) 2. Verify combustion air method follows manufacturer's instructions. Venting 1. Verify venting follows manufacturer's instructions. Gas 1. Verify gas shut of is installed within six feet (6') of appliance. (Per IRC G2420.5) 2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRC G24I9.4) 3. Verify hard pipe is used to access exterior of appliance cabinet. (Per IRC G2422.I.2.3) Attic Appliances 1. Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A level working space must be provided, 30"wide x 30" deep where access is required. If the passageway is not less than 6' high the appliance can be moved back to 50' away. (Per IRC MI305.1.3 (2» 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify primary drain line is installed to discharge condensate to an approved place for disposal. (Per MIl and IRC MI4I1.3) 4. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 Yz") deep and three inches (3") wider than the appliance. The pan shall drain to a conspicuous location, a float switch, or other approved method. (per IRC MI4I1.3.1(1» 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E400I.5 table) 7. Verify breakers are sized as per equipment data plate. (per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) Under Floor Appliances 1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide and 30"high and be no farther away than 20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the 54
  • 16. passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC M1305.1.4) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from the floor must have a clearance of six inches (6") from the ground. (PerIRC M1305.l.4.1) 4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC M1411.3) 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (per NEC) Residential Split Heat Pump Checklist Ducts 1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq. in. per 1000 btu 'sfor heat pumps. (per IRC M 1403.1) 2. Verify return is equipped with a filter allowing even distribution of air flow across the filter. (per IMC 605.1.3) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRCM1602.2(4)) 5. Verify supply duct sizing. If design is questionable, a Manual D must be provided (Per IRC M160 1.1) 6. Verify no duct openings in garage. Any duct passing through a garage must be 26-gauge steel. (Per IRC R309.1.1) 7. Verify supply and return ducts are four inches (4") off the ground. (per IRC M1601.3.6) 8. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in length. (Per IRC 1601.2.2) 9. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC M1601.3.1) 10. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC Nll03.2.l) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 11. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4'-5') with one and a half inch (1-1/2") wide straps with no kinks or sharp bends. (Per MIl and AD C) 12. Verify all metal ducts are strapped every ten feet (10'). (Per IRe M1601.3.2) 13. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602. 8(4)) 14. Verify dryer ducts are limited to twenty-five feet (25') in length. One 90 degree = five feet (5'). One 45 degree = two and a half feet (2 ~'). Shall be metal with no screws which extend into the duct. (per IRC M1502.5-2.6) 55
  • 17. 15. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC MI502.2) 16. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm continuous. (Per IRC M1507.3) 17. Verify bathroom exhaust must be 50 cfm intermittent, 20 cfm continuous if no operable windows. IRC,MI507.3 18. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable windows. (Per IRC MI507.3) Drilling & Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC MI308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements ofthis code. (Per IRC M1401.1) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRC M1401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.1) 4. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 5. Verify appliances located in compartments, alcoves, basements or similar spaces have an unobstructed passageway 22" wide, with a level service space of 30"x 30" in front of the appliance door. (Per IRC M1305.1.2) 6. Verify equipment located within compartments or alcoves are at least 12" larger than the appliance. (Per IRC M1305.1.1) 7. Verify equipment in garage is protected from impact. (Per IRC M1307.3.1) 8. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 9. Verify heat pumps are three inches (3") off the pad. (Per IRC M1403.2) 10. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E400 1.5 table and NEC) 11. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 12. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 13. Verify total KW of heat strips. (Per MIl) 14. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 15. Verify wiring is sized for maximum load. (Per NEC) Attic Appliances 1. Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A 56
  • 18. level working space must be provided, 30"wide x 30" deep where access is required. If the passageway is not less than 6' high the appliance can be moved back to 50' away. (per IRC M1305.1.3 (2)) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify primary drain:line is installed to discharge condensate to an approved place for disposal. (Per MIl and IRC M1411.3) 4. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 12") deep and three inches (3") wider than the appliance. The pan shall drain to a conspicuous location, a float . switch, or other approved method. (Per IRC M1411.3.1(1)) 5. Verify a condensate trap is installed. (Per MIL and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) Under Floor Appliances 1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest appliance. Must have an unobstructed passageway of22" wide and 30"high and be no farther away than 20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC M1305.1.4) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (per IRC M1305.1.4.3) 3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from the floor must have a clearance of six inches (6") from the ground. (per IRe M1305.1.4.l) 4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC M1411.3) 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (per IRC E400 1.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) 57