1. ISNetworld OQ Report
Kinder Morgan
Project Site: Kinder Morgan - General (JS-239)
Report Date: 7/16/2015 4:45:48 AM
Report Run By: Automatically Generated OQ Report
Form ID: 184329-AO-1D321FEA
Dugas, Ross
Pipeline Safety, LLC (ISN-02273745)
Task Qualification Method Type Evaluation Date Expiration Date Class
001.01.01 - Abnormal Operations OQSG - CT60 - General Abnormal Operating Conditions A 7/7/2015 12/31/2018 V
008.02.01 - Damage Prevention During Excavation Activities
(Span of Control: 1 to 1)
OQSG - CT65 - Damage Prevention During Excavation Activities By or
On Behalf of the Operator
W 5/2/2013 12/31/2016 V
008.02.01 - Damage Prevention During Excavation Activities OQSG - CT60 - General Abnormal Operating Conditions A 7/7/2015 12/31/2018 V
014.05.01 - Underground Clearances
(Span of Control: 1 to 3)
OQSG - CT31 - Measure Clearance from Existing Pipe to Underground
Structures Installed by Excavation, Boring, Directional Drilling
W 5/1/2013 12/31/2016 V
014.08.01 - Cover - Service Lines, Mains & Transmission
Lines
(Span of Control: 1 to 3)
OQSG - CT35 - Backfilling a Trench Following Maintenance W 5/2/2013 12/31/2016 V
014.09.01 - Inspection: Compliance with Procedures &
Standards
(Span of Control: 1 to 2)
OQSG - CT10U - Inspection of Underwater Pipeline Facilities W 5/1/2013 12/31/2016 V
014.09.02 - Inspection: Inspection of Materials
(Span of Control: 1 to 2)
OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
W 5/1/2013 12/31/2016 V
014.09.02 - Inspection: Inspection of Materials OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
P 5/1/2013 12/31/2096 V
014.13.01 - Protection When Minimum Cover Not Met
(Span of Control: 1 to 3)
OQSG - CT35 - Backfilling a Trench Following Maintenance W 5/2/2013 12/31/2016 V
024.01.01 - Welding Process
(Span of Control: 1 to 0)
OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
W 5/1/2013 12/31/2016 V
024.01.01 - Welding Process OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
P 5/1/2013 12/31/2016 V
024.02.01 - Visual Inspection of Welds
(Span of Control: 1 to 1)
OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
W 5/1/2013 12/31/2016 V
024.02.01 - Visual Inspection of Welds OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
P 5/1/2013 12/31/2016 V
024.03.01 - Nondestructive Testing of Welds
(Span of Control: 1 to 3)
OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
W 5/1/2013 12/31/2016 V
024.03.01 - Nondestructive Testing of Welds OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
P 5/1/2013 12/31/2016 V
101.01 - Abnormal Conditions - Outside Control Room OQSG - CT60 - General Abnormal Operating Conditions A 7/7/2015 12/31/2018 V
103.09 - Nondestructive Testing of Welds
(Span of Control: 1 to 3)
OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
W 5/1/2013 12/31/2016 V
103.09 - Nondestructive Testing of Welds OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
P 5/1/2013 12/31/2016 V
103.11 - Damage Prevention During Excavation Activities OQSG - CT65 - Damage Prevention During Excavation Activities By or W 5/2/2013 12/31/2016 V
Page 1 of 2
2. (Span of Control: 1 to 1) On Behalf of the Operator
103.12 Inspection activities – welding on pipeline system
(Span of Control: 1 to 1)
OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
W 5/1/2013 12/31/2016 V
103.13 Inspection activities – nondestructive testing
(Span of Control: 1 to 1)
OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
W 5/1/2013 12/31/2016 V
104.14 General pipeline repair – component replacement
(Span of Control: 1 to 2)
OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
W 5/1/2013 5/1/2016 V
104.14 General pipeline repair – component replacement OQSG - CT34 - Inspection Activities for Tie-ins, Pipeline
Replacements, or Other Components Connecting to an Existing
Pipeline
P 5/1/2013 5/1/2016 V
Automatically Generated OQ Report
Page 2 of 2