SlideShare a Scribd company logo
1 of 1
Download to read offline
PRO Structures Ltd, 12 Dowry Square, Hotwells, Bristol BS8 4SH
Tel: 0117 923 8777 / Fax: 0117 372 1863. Email: info@prostructures.co.uk
www.prostructures.co.uk
Case Study
Water Lane, Wotton-under-Edge
12 new family homes
PRO Structures was the structural engineer for this exclusive development of twelve new family homes in the
picturesque Cotswold town of Wotton-under-Edge. As part of our brief, we designed the new deep strip foundations for
the site, which had previously been used as a commercial office and warehouse building.
This change of use, combined with the presence of high water-demand leylandii trees in the area’s clay soil, posed
specific challenges which led to our choice of deep strip foundations.
During the course of our site inspections, we also advised the contractor on the need to remove unsuitable
obstructions in the ground, to ensure the stability of the new build.
PRO Structures’ work involved:
 Structural design for the substructure elements
 Structural drawing in relation to the substructure
 Liaison with the subcontractors and developer
 Site inspections to advise the contractor on remedies for structural problems uncovered during the build.
Client and Architect:
Elan Homes Ltd
Project value:
£1.2m
Location:
Wotton-under-Edge, near Stroud,
Gloucestershire
Scope:
12 new terraced two-storey
houses, built using traditional load-
bearing masonry.
Services provided:
Structural design for the buildings’
substructure; site inspection and
reports.

More Related Content

What's hot

Case Study - Atlantic Point
Case Study - Atlantic PointCase Study - Atlantic Point
Case Study - Atlantic PointChris Barnard
 
Case Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley RoadCase Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley RoadSteve Mandry
 
Case Study - Armstrong Estate, Greenwich Council
Case Study - Armstrong Estate, Greenwich CouncilCase Study - Armstrong Estate, Greenwich Council
Case Study - Armstrong Estate, Greenwich CouncilSteve Mandry
 
profix portfolio 2016
profix portfolio 2016profix portfolio 2016
profix portfolio 2016Phil Syers
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15Ron O'Connor
 
Parking lot concrete repair checklist
Parking lot concrete repair checklistParking lot concrete repair checklist
Parking lot concrete repair checklistCarolina Sunrock LLC
 
BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 StrucSoft Solutions
 
Hemp Lime Concrete (HLC): A carbon-negative construction material
Hemp Lime Concrete (HLC): A carbon-negative construction materialHemp Lime Concrete (HLC): A carbon-negative construction material
Hemp Lime Concrete (HLC): A carbon-negative construction materialDidier Lesueur
 
Case Study - 34 Elvaston Place
Case Study - 34 Elvaston PlaceCase Study - 34 Elvaston Place
Case Study - 34 Elvaston PlaceSteve Mandry
 
Construction green breakfast - you don't have to be a hippy to build with hemp!
Construction green breakfast - you don't have to be a hippy to build with hemp!Construction green breakfast - you don't have to be a hippy to build with hemp!
Construction green breakfast - you don't have to be a hippy to build with hemp!Blake Morgan
 
PEB Steel Buildings_English Brochure 2017
PEB Steel Buildings_English Brochure 2017PEB Steel Buildings_English Brochure 2017
PEB Steel Buildings_English Brochure 2017PEB Steel Buildings
 
Neptune solutions brochure jm mike
Neptune solutions brochure jm mikeNeptune solutions brochure jm mike
Neptune solutions brochure jm mikeMicheal Mullvihill
 
Lynx Precast Case Study
Lynx Precast Case StudyLynx Precast Case Study
Lynx Precast Case StudyMJDelaMasa
 
B&B Attachments Provides a Layer Picking Solution for Fresh Fruit and Vegetab...
B&B Attachments Provides a Layer Picking Solution for Fresh Fruit and Vegetab...B&B Attachments Provides a Layer Picking Solution for Fresh Fruit and Vegetab...
B&B Attachments Provides a Layer Picking Solution for Fresh Fruit and Vegetab...MJDelaMasa
 
Mark Hudspeth C.V. 2015
Mark Hudspeth C.V. 2015Mark Hudspeth C.V. 2015
Mark Hudspeth C.V. 2015mark hudspeth
 

What's hot (20)

Case Study - Atlantic Point
Case Study - Atlantic PointCase Study - Atlantic Point
Case Study - Atlantic Point
 
Case Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley RoadCase Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley Road
 
Case Study - Armstrong Estate, Greenwich Council
Case Study - Armstrong Estate, Greenwich CouncilCase Study - Armstrong Estate, Greenwich Council
Case Study - Armstrong Estate, Greenwich Council
 
profix portfolio 2016
profix portfolio 2016profix portfolio 2016
profix portfolio 2016
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15
 
Formwork brochure.
Formwork brochure.Formwork brochure.
Formwork brochure.
 
CrackGuard
CrackGuardCrackGuard
CrackGuard
 
Parking lot concrete repair checklist
Parking lot concrete repair checklistParking lot concrete repair checklist
Parking lot concrete repair checklist
 
DVCV060715
DVCV060715DVCV060715
DVCV060715
 
BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9
 
Hemp Lime Concrete (HLC): A carbon-negative construction material
Hemp Lime Concrete (HLC): A carbon-negative construction materialHemp Lime Concrete (HLC): A carbon-negative construction material
Hemp Lime Concrete (HLC): A carbon-negative construction material
 
Case Study - 34 Elvaston Place
Case Study - 34 Elvaston PlaceCase Study - 34 Elvaston Place
Case Study - 34 Elvaston Place
 
Construction green breakfast - you don't have to be a hippy to build with hemp!
Construction green breakfast - you don't have to be a hippy to build with hemp!Construction green breakfast - you don't have to be a hippy to build with hemp!
Construction green breakfast - you don't have to be a hippy to build with hemp!
 
PEB Steel Buildings_English Brochure 2017
PEB Steel Buildings_English Brochure 2017PEB Steel Buildings_English Brochure 2017
PEB Steel Buildings_English Brochure 2017
 
Neptune solutions brochure jm mike
Neptune solutions brochure jm mikeNeptune solutions brochure jm mike
Neptune solutions brochure jm mike
 
Lynx Precast Case Study
Lynx Precast Case StudyLynx Precast Case Study
Lynx Precast Case Study
 
Superior Brochure
Superior BrochureSuperior Brochure
Superior Brochure
 
B&B Attachments Provides a Layer Picking Solution for Fresh Fruit and Vegetab...
B&B Attachments Provides a Layer Picking Solution for Fresh Fruit and Vegetab...B&B Attachments Provides a Layer Picking Solution for Fresh Fruit and Vegetab...
B&B Attachments Provides a Layer Picking Solution for Fresh Fruit and Vegetab...
 
Mark Hudspeth C.V. 2015
Mark Hudspeth C.V. 2015Mark Hudspeth C.V. 2015
Mark Hudspeth C.V. 2015
 
RCC Divider
RCC DividerRCC Divider
RCC Divider
 

Viewers also liked

Five tricks to become successful in life
Five tricks to become successful in life Five tricks to become successful in life
Five tricks to become successful in life Adnan ul Islam
 
Equipo 2 expo. Tencent
Equipo 2 expo. TencentEquipo 2 expo. Tencent
Equipo 2 expo. TencentVirgCSan
 
Markedspsykologi med Holberg Fondene, Nordnet investorkveld 25.11.15 i Trondheim
Markedspsykologi med Holberg Fondene, Nordnet investorkveld 25.11.15 i TrondheimMarkedspsykologi med Holberg Fondene, Nordnet investorkveld 25.11.15 i Trondheim
Markedspsykologi med Holberg Fondene, Nordnet investorkveld 25.11.15 i TrondheimNordnet Norge
 
Corporate Overview
Corporate OverviewCorporate Overview
Corporate OverviewJames Armont
 
Eprograming
EprogramingEprograming
EprogramingVirgCSan
 
Maintaining Trust & Control of your Data in the Cloud
Maintaining Trust & Control of your Data in the CloudMaintaining Trust & Control of your Data in the Cloud
Maintaining Trust & Control of your Data in the CloudAmazon Web Services
 
Project-Scope-Statement
Project-Scope-StatementProject-Scope-Statement
Project-Scope-StatementJeremy Heady
 

Viewers also liked (11)

Five tricks to become successful in life
Five tricks to become successful in life Five tricks to become successful in life
Five tricks to become successful in life
 
Equipo 2 expo. Tencent
Equipo 2 expo. TencentEquipo 2 expo. Tencent
Equipo 2 expo. Tencent
 
Delphi International Training
Delphi International TrainingDelphi International Training
Delphi International Training
 
Markedspsykologi med Holberg Fondene, Nordnet investorkveld 25.11.15 i Trondheim
Markedspsykologi med Holberg Fondene, Nordnet investorkveld 25.11.15 i TrondheimMarkedspsykologi med Holberg Fondene, Nordnet investorkveld 25.11.15 i Trondheim
Markedspsykologi med Holberg Fondene, Nordnet investorkveld 25.11.15 i Trondheim
 
Diploma Brazil 2
Diploma Brazil 2Diploma Brazil 2
Diploma Brazil 2
 
Corporate Overview
Corporate OverviewCorporate Overview
Corporate Overview
 
French 101
French 101French 101
French 101
 
Eprograming
EprogramingEprograming
Eprograming
 
ModApts
ModAptsModApts
ModApts
 
Maintaining Trust & Control of your Data in the Cloud
Maintaining Trust & Control of your Data in the CloudMaintaining Trust & Control of your Data in the Cloud
Maintaining Trust & Control of your Data in the Cloud
 
Project-Scope-Statement
Project-Scope-StatementProject-Scope-Statement
Project-Scope-Statement
 

Similar to Water Lane, Wootton-under-Edge_Mar13

1 Malmesbury Close_Mar13
1 Malmesbury Close_Mar131 Malmesbury Close_Mar13
1 Malmesbury Close_Mar13Ron O'Connor
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee
 
BUX-Building - Ioan Preda
BUX-Building - Ioan PredaBUX-Building - Ioan Preda
BUX-Building - Ioan PredaIoan Preda
 
Construction portfolio pdf 7-9-09
Construction portfolio   pdf 7-9-09Construction portfolio   pdf 7-9-09
Construction portfolio pdf 7-9-09LisaSnyder
 
Adopted Road and Footpath examples Cellweb TRP
Adopted Road and Footpath examples Cellweb TRPAdopted Road and Footpath examples Cellweb TRP
Adopted Road and Footpath examples Cellweb TRPOwen Hutchison
 
Waterproofing a garage
Waterproofing a garageWaterproofing a garage
Waterproofing a garageAneetahari
 
Portoles structural brochure
Portoles structural brochurePortoles structural brochure
Portoles structural brochureJosephine Young
 
James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James Lee
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyAndrew White
 
Clark Mulhern Construction - Sep 2016
Clark Mulhern Construction - Sep 2016Clark Mulhern Construction - Sep 2016
Clark Mulhern Construction - Sep 2016Sean Clark
 
Wilkie ccs master 090817
Wilkie ccs master 090817Wilkie ccs master 090817
Wilkie ccs master 090817Damian Connelly
 

Similar to Water Lane, Wootton-under-Edge_Mar13 (20)

1 Malmesbury Close_Mar13
1 Malmesbury Close_Mar131 Malmesbury Close_Mar13
1 Malmesbury Close_Mar13
 
Powerpoint 2 Looped
Powerpoint 2 LoopedPowerpoint 2 Looped
Powerpoint 2 Looped
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CV
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CV
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
Concrete Lego Block Ideas
Concrete Lego Block IdeasConcrete Lego Block Ideas
Concrete Lego Block Ideas
 
BUX-Building - Ioan Preda
BUX-Building - Ioan PredaBUX-Building - Ioan Preda
BUX-Building - Ioan Preda
 
Barwin profile
Barwin profileBarwin profile
Barwin profile
 
Construction portfolio pdf 7-9-09
Construction portfolio   pdf 7-9-09Construction portfolio   pdf 7-9-09
Construction portfolio pdf 7-9-09
 
Adopted Road and Footpath examples Cellweb TRP
Adopted Road and Footpath examples Cellweb TRPAdopted Road and Footpath examples Cellweb TRP
Adopted Road and Footpath examples Cellweb TRP
 
Introduction
IntroductionIntroduction
Introduction
 
Waterproofing a garage
Waterproofing a garageWaterproofing a garage
Waterproofing a garage
 
BPA Commercial
BPA CommercialBPA Commercial
BPA Commercial
 
Portoles structural brochure
Portoles structural brochurePortoles structural brochure
Portoles structural brochure
 
2016
20162016
2016
 
James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
 
Clark Mulhern Construction - Sep 2016
Clark Mulhern Construction - Sep 2016Clark Mulhern Construction - Sep 2016
Clark Mulhern Construction - Sep 2016
 
PROJECT EXPERIENCE 2016
PROJECT EXPERIENCE 2016PROJECT EXPERIENCE 2016
PROJECT EXPERIENCE 2016
 
Wilkie ccs master 090817
Wilkie ccs master 090817Wilkie ccs master 090817
Wilkie ccs master 090817
 

Water Lane, Wootton-under-Edge_Mar13

  • 1. PRO Structures Ltd, 12 Dowry Square, Hotwells, Bristol BS8 4SH Tel: 0117 923 8777 / Fax: 0117 372 1863. Email: info@prostructures.co.uk www.prostructures.co.uk Case Study Water Lane, Wotton-under-Edge 12 new family homes PRO Structures was the structural engineer for this exclusive development of twelve new family homes in the picturesque Cotswold town of Wotton-under-Edge. As part of our brief, we designed the new deep strip foundations for the site, which had previously been used as a commercial office and warehouse building. This change of use, combined with the presence of high water-demand leylandii trees in the area’s clay soil, posed specific challenges which led to our choice of deep strip foundations. During the course of our site inspections, we also advised the contractor on the need to remove unsuitable obstructions in the ground, to ensure the stability of the new build. PRO Structures’ work involved:  Structural design for the substructure elements  Structural drawing in relation to the substructure  Liaison with the subcontractors and developer  Site inspections to advise the contractor on remedies for structural problems uncovered during the build. Client and Architect: Elan Homes Ltd Project value: £1.2m Location: Wotton-under-Edge, near Stroud, Gloucestershire Scope: 12 new terraced two-storey houses, built using traditional load- bearing masonry. Services provided: Structural design for the buildings’ substructure; site inspection and reports.