RONALD A BRAY
1923 S Vancouver St. APT 180, Kennewick, WA 99337 | (H) 208-921-3211 | (C) 208-921-3210 |
boltman1990@gmail.com
Professional Summary
Results-oriented Mechanical Engineer with a hands-on approach to tackling projects and accomplishing goals.
Over 8 years experience managing large scale projects in the power industry and over 20 years experience in the
workforce.
Skills
 Over 7 years experience working in the power generation industry.
 Licensed EIT (License #: E-6798) with the Idaho Board of Professional Engineers.
 Familiar with ASME Boiler and Pressure Vessel Code.
 I hold a commission as an Owner User Inspector for boilers and pressure vessels by the National Board of Boiler and
Pressure Vessel Inspectors. (Commission No: 15523)
 Managed projects that range from $50,000 to $14,000,000 during my time in the power generation industry.
 Worked at power plants with a generation capacity of 2130 NMW, 38 NMW, 68 NMW and 980 NMW.
 Performed project justification studies, wrote project justifications, preformed Return On Investment (ROI)
calculations, developed project budgets, evaluated bidders for projects, managed construction crews for projects,
and tracked costs for projects while a Project Manager for PacifiCorp Energy, Arizona Public Service and Rosebud
Operating Services, Inc.
 Performed cyclic failure analysis calculations, factor of safety calculations, pump sizing, and piping sizing while a
Boiler Engineer at PacifiCorp, Arizona Public Service and a Project Engineer at Rosebud Operating Services, Inc.
 Familiar with ASME Welding Codes for high pressure tubing and headers in fossil fuel boilers.
 Familiar with post weld heat treatment requirements for tubing, piping, and headers.
 Familiar with boiler tubing material selection based off of pressure and temperature.
 Familiar with Non Destructive Examination (NDE) boiler tube testing techniques and boiler tube failure analysis.
 Familiar with ASME PTC 30.1 Air Cooled Steam Condenser Code.
 Have worked with Alstom, Intertek, 5 Star, TEAM Industrial, Bermingham Controls, Babcock Power, GEA, Foster
Wheeler, Valmet, Irwin Construction, PMSI Construction, CB&I and Titan Construction among others during my time
in the power generation industry.
 Familiar with OSHA fall protection requirements, lockout/tag out requirements, confined space requirements, and
hot work permit requirements.
 Was a member of the emergency rescue crew at the Jim Bridger Power Plant, have CPR training, and have
participated on safety teams.
 Completed blaster training and managed blaster explosives while at the Jim Bridger Power Plant.
 Managed tube leak repair crews and maintenance crews while at the Jim Bridger and Cholla Power Plants.
 Familiar with Primavera, Excel, Word, SAP, and Outlook.
 Familiar with Environmental permitting processes and reporting requirements for air pollutants, storm water runoff,
and waste water discharge for fossil fuel power plants.
 Familiar with combustion optimization and tuning for PC fossil fuel tangentially fired boilers.
 Familiar with vibration analysis of rotating machinery and have balanced fans using the single plane method during
my time at Arizona Public Service.
 Assisted with the design of an Economizer Catch Basin Project at the Yellowstone Power Plant while with Rosebud
Operating Services, Inc.
 Designed the layout, sizing, location, and damper configuration for a Primary Air (PA) fan inlet duct project while at
Rosebud Operating Services, Inc.
Work History
Boiler Engineer Feb 2015 – Jun 2016
Arizona Public Service (APS) Cholla Power Plant
 NBIC OUI for the R program at the Cholla Power Plant.
 Preformed boiler and pressure vessel inspections and authorized code repairs under the R program at the Cholla Power
Plant.
 Assisted maintenance and operations with boiler and associated systems troubleshooting at the plant.
 Assisted with planning of Capital and O&M Projects for outages.
 Assisted with the High Energy Piping (HEP) and Flow Accelerated Corrosion (FAC) programs at the Cholla Power
Plant.
 Provided vibration analysis and balancing using the single plane method on rotating machinery at the Cholla Power
Plant.
 Developed Apparent Cause Analysis Reports (ACA) and Problem Resolution Documents (PRD) to provide analysis of
failure mechanisms for equipment and present solutions.
 Read and interpreted blueprints, technical drawings, schematics and computer-generated reports.
Project Engineer Jun 2010 – Feb 2015
Rosebud Operating Services, Inc. Boise, ID
 Managed a 14 million dollar Air Cooled Condenser Tube Bundle Replacement Project. The project was completed
on time and within the budget.
 Managed a Primary Air Duct Modification Project. The project was completed on time and within the budget.
 Environmental compliance reporting, testing, and data collection for the two Montana Power Plants that Rosebud
Operating Services, Inc. operated.
 Engineering support for maintenance and operations at the two Montana Power Plants that Rosebud Operating
Services, Inc. operated.
Boiler Engineer May 2008 - Jun 2010
PacifiCorp Jim Bridger Power Plant
 Read and interpreted blueprints, technical drawings, schematics and computer-generated reports.
 Assisted in project scheduling and budgeting to successfully and quickly complete engineering projects.
 Developed cost estimates, procured equipment and tracked construction progress to efficiently complete large scale
projects.
 Participated in a project management team that oversaw two outages on two boilers in the Jim Bridger Power Plant
where large scale high pressure piping and header replacements were performed.
 Ran maintenance crews for emergency outages and during maintenance manager vacations.
 Was placed in charge of combustion and tuning of the Jim Bridger Power Plant tangentially fired pulverized coal
boilers.
 Assisted with the automated soot blowing system and boiler camera systems at the Jim Bridger Power Plant.
Intern Engineer Jan 2006 - May 2008
Micron Technology Boise, ID
 Investigated equipment failures to diagnose faulty operation and made appropriate maintenance
recommendations.
 Planned and evaluated results of analysis, modeling and experiments.
 Recommended design modifications to eliminate machine and system malfunctions.
 Statistical Process Control, design of experiments, report writing, PowerPoint presentations and data analysis.
 Calibrated and tested equipment while assisting with new product line development.
Management May 1988 - Nov 2003
Safeway Stores, Inc. Bend, OR
 Ordered product and was responsible for inventory control.
 Managed over 50 employees, preformed payroll duties, developed employee schedules and preformed merchandising
planning.
 Addressed customer complaints and taught customer service to employees.
Education
Bachelor of Science: Mechanical Engineering 2008
Boise State University Boise, ID
 Graduated Magna Cum Laud
 Maintained a 3.88 GPA in schoolwhile working 24 hr workweeks.
 Relevant Courses: Statics, Dynamics, Strength of Materials, Thermodynamics I & II, Fluid Dynamics, Statistics,
Electrical Theory, Heat Transfer, Kinematics, Machine Design, SolidWorks, Mechatronics, Fluid System Design, and
Vibrations.
References
References are available upon request.

More Related Content

What's hot

Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15 Mike Syslak
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos BalanaoFroilan Balanao
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016Smith Joshua
 
Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016Danielle Krysiak
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERjaved hazari
 
Aadil Rasheed - Mech Engr Piping.
Aadil Rasheed - Mech Engr  Piping.Aadil Rasheed - Mech Engr  Piping.
Aadil Rasheed - Mech Engr Piping.nnaaz
 
BhaskarNeogi - Resume
BhaskarNeogi - ResumeBhaskarNeogi - Resume
BhaskarNeogi - ResumeBhaskar Neogi
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEErik NEILSEN
 
Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs
 
Mark_Peterson_Jr_resume
Mark_Peterson_Jr_resumeMark_Peterson_Jr_resume
Mark_Peterson_Jr_resumeMark Peterson
 
Ummar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXUmmar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXummar shaik
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 

What's hot (19)

Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
Resume 5 13 16 months
Resume 5 13 16 monthsResume 5 13 16 months
Resume 5 13 16 months
 
Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016
 
MGoutho_Res_0816
MGoutho_Res_0816MGoutho_Res_0816
MGoutho_Res_0816
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEER
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
Aadil Rasheed - Mech Engr Piping.
Aadil Rasheed - Mech Engr  Piping.Aadil Rasheed - Mech Engr  Piping.
Aadil Rasheed - Mech Engr Piping.
 
IssakakishC.V
IssakakishC.VIssakakishC.V
IssakakishC.V
 
BhaskarNeogi - Resume
BhaskarNeogi - ResumeBhaskarNeogi - Resume
BhaskarNeogi - Resume
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PE
 
Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0
 
Mark_Peterson_Jr_resume
Mark_Peterson_Jr_resumeMark_Peterson_Jr_resume
Mark_Peterson_Jr_resume
 
MAS Resume 12.15
MAS Resume 12.15MAS Resume 12.15
MAS Resume 12.15
 
Ummar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXUmmar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCX
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 

Viewers also liked

Ahmed Fahmy_resume
Ahmed Fahmy_resumeAhmed Fahmy_resume
Ahmed Fahmy_resumeAhmed Fahmy
 
D Beson Resume 7 2009
D Beson Resume 7 2009D Beson Resume 7 2009
D Beson Resume 7 2009dbeson
 
SANJAY KUMAR RESUME
SANJAY KUMAR RESUMESANJAY KUMAR RESUME
SANJAY KUMAR RESUMESanjay Kumar
 
Top 8 weapons engineer resume samples
Top 8 weapons engineer resume samplesTop 8 weapons engineer resume samples
Top 8 weapons engineer resume samplesmadelyntorres514
 
Resume for Chip Bennett - 2015
Resume for Chip Bennett - 2015Resume for Chip Bennett - 2015
Resume for Chip Bennett - 2015Chip Bennett
 
Evolving Infrastructure
Evolving InfrastructureEvolving Infrastructure
Evolving Infrastructurelouisadunne
 
Christopher Hudson- Resume
Christopher Hudson- ResumeChristopher Hudson- Resume
Christopher Hudson- ResumeHays Hudson
 
Amy Calliss - Resume
Amy Calliss - ResumeAmy Calliss - Resume
Amy Calliss - ResumeAmy Calliss
 
Resume Short Form April 1st, 2015
Resume Short Form April 1st, 2015Resume Short Form April 1st, 2015
Resume Short Form April 1st, 2015Willie Funk
 
Top 8 project surveyor resume samples
Top 8 project surveyor resume samplesTop 8 project surveyor resume samples
Top 8 project surveyor resume samplesRobertaFlack234
 
Top 8 bank underwriter resume samples
Top 8 bank underwriter resume samplesTop 8 bank underwriter resume samples
Top 8 bank underwriter resume samplesbravobenz12
 

Viewers also liked (15)

Ahmed Fahmy_resume
Ahmed Fahmy_resumeAhmed Fahmy_resume
Ahmed Fahmy_resume
 
Seo cv
Seo cvSeo cv
Seo cv
 
D Beson Resume 7 2009
D Beson Resume 7 2009D Beson Resume 7 2009
D Beson Resume 7 2009
 
SANJAY KUMAR RESUME
SANJAY KUMAR RESUMESANJAY KUMAR RESUME
SANJAY KUMAR RESUME
 
Top 8 weapons engineer resume samples
Top 8 weapons engineer resume samplesTop 8 weapons engineer resume samples
Top 8 weapons engineer resume samples
 
Resume for Chip Bennett - 2015
Resume for Chip Bennett - 2015Resume for Chip Bennett - 2015
Resume for Chip Bennett - 2015
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Visual Resume
Visual ResumeVisual Resume
Visual Resume
 
Evolving Infrastructure
Evolving InfrastructureEvolving Infrastructure
Evolving Infrastructure
 
Christopher Hudson- Resume
Christopher Hudson- ResumeChristopher Hudson- Resume
Christopher Hudson- Resume
 
TRIDIB_resume
TRIDIB_resumeTRIDIB_resume
TRIDIB_resume
 
Amy Calliss - Resume
Amy Calliss - ResumeAmy Calliss - Resume
Amy Calliss - Resume
 
Resume Short Form April 1st, 2015
Resume Short Form April 1st, 2015Resume Short Form April 1st, 2015
Resume Short Form April 1st, 2015
 
Top 8 project surveyor resume samples
Top 8 project surveyor resume samplesTop 8 project surveyor resume samples
Top 8 project surveyor resume samples
 
Top 8 bank underwriter resume samples
Top 8 bank underwriter resume samplesTop 8 bank underwriter resume samples
Top 8 bank underwriter resume samples
 

Similar to Ronald Bray Resume

Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resumeSteve Chu
 
gskresume_2015
gskresume_2015gskresume_2015
gskresume_2015Gary Katz
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedAbbas Saeidi
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016Khadar Ali Shaik,P.Eng
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
Jose Ruiz resume
Jose Ruiz resumeJose Ruiz resume
Jose Ruiz resumeJosé Ruiz
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalSam DiPasquale
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor ResumeRoy Firtha
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
Danielle krysiak mech engineer 5 5-2016
Danielle krysiak mech engineer 5 5-2016Danielle krysiak mech engineer 5 5-2016
Danielle krysiak mech engineer 5 5-2016Danielle Krysiak
 
TCO TPI EXPEDITOR Resume REV 01-24-16
TCO TPI EXPEDITOR Resume REV 01-24-16TCO TPI EXPEDITOR Resume REV 01-24-16
TCO TPI EXPEDITOR Resume REV 01-24-16Tim Odom
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P. Henderson
 
Mark T Davis Resume new2
Mark T Davis Resume new2Mark T Davis Resume new2
Mark T Davis Resume new2Mark Davis
 

Similar to Ronald Bray Resume (20)

Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
gskresume_2015
gskresume_2015gskresume_2015
gskresume_2015
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
Jordan Dorwart, P.E. - Resume
Jordan Dorwart, P.E. - ResumeJordan Dorwart, P.E. - Resume
Jordan Dorwart, P.E. - Resume
 
PathakA Resume
PathakA ResumePathakA Resume
PathakA Resume
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
Jose Ruiz resume
Jose Ruiz resumeJose Ruiz resume
Jose Ruiz resume
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
Resume01
Resume01Resume01
Resume01
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor Resume
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Danielle krysiak mech engineer 5 5-2016
Danielle krysiak mech engineer 5 5-2016Danielle krysiak mech engineer 5 5-2016
Danielle krysiak mech engineer 5 5-2016
 
TCO TPI EXPEDITOR Resume REV 01-24-16
TCO TPI EXPEDITOR Resume REV 01-24-16TCO TPI EXPEDITOR Resume REV 01-24-16
TCO TPI EXPEDITOR Resume REV 01-24-16
 
Marshall Steve (pm)
Marshall Steve (pm)Marshall Steve (pm)
Marshall Steve (pm)
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 
Mark T Davis Resume new2
Mark T Davis Resume new2Mark T Davis Resume new2
Mark T Davis Resume new2
 

Ronald Bray Resume

  • 1. RONALD A BRAY 1923 S Vancouver St. APT 180, Kennewick, WA 99337 | (H) 208-921-3211 | (C) 208-921-3210 | boltman1990@gmail.com Professional Summary Results-oriented Mechanical Engineer with a hands-on approach to tackling projects and accomplishing goals. Over 8 years experience managing large scale projects in the power industry and over 20 years experience in the workforce. Skills  Over 7 years experience working in the power generation industry.  Licensed EIT (License #: E-6798) with the Idaho Board of Professional Engineers.  Familiar with ASME Boiler and Pressure Vessel Code.  I hold a commission as an Owner User Inspector for boilers and pressure vessels by the National Board of Boiler and Pressure Vessel Inspectors. (Commission No: 15523)  Managed projects that range from $50,000 to $14,000,000 during my time in the power generation industry.  Worked at power plants with a generation capacity of 2130 NMW, 38 NMW, 68 NMW and 980 NMW.  Performed project justification studies, wrote project justifications, preformed Return On Investment (ROI) calculations, developed project budgets, evaluated bidders for projects, managed construction crews for projects, and tracked costs for projects while a Project Manager for PacifiCorp Energy, Arizona Public Service and Rosebud Operating Services, Inc.  Performed cyclic failure analysis calculations, factor of safety calculations, pump sizing, and piping sizing while a Boiler Engineer at PacifiCorp, Arizona Public Service and a Project Engineer at Rosebud Operating Services, Inc.  Familiar with ASME Welding Codes for high pressure tubing and headers in fossil fuel boilers.  Familiar with post weld heat treatment requirements for tubing, piping, and headers.  Familiar with boiler tubing material selection based off of pressure and temperature.  Familiar with Non Destructive Examination (NDE) boiler tube testing techniques and boiler tube failure analysis.  Familiar with ASME PTC 30.1 Air Cooled Steam Condenser Code.  Have worked with Alstom, Intertek, 5 Star, TEAM Industrial, Bermingham Controls, Babcock Power, GEA, Foster Wheeler, Valmet, Irwin Construction, PMSI Construction, CB&I and Titan Construction among others during my time in the power generation industry.  Familiar with OSHA fall protection requirements, lockout/tag out requirements, confined space requirements, and hot work permit requirements.  Was a member of the emergency rescue crew at the Jim Bridger Power Plant, have CPR training, and have participated on safety teams.  Completed blaster training and managed blaster explosives while at the Jim Bridger Power Plant.  Managed tube leak repair crews and maintenance crews while at the Jim Bridger and Cholla Power Plants.  Familiar with Primavera, Excel, Word, SAP, and Outlook.  Familiar with Environmental permitting processes and reporting requirements for air pollutants, storm water runoff, and waste water discharge for fossil fuel power plants.  Familiar with combustion optimization and tuning for PC fossil fuel tangentially fired boilers.  Familiar with vibration analysis of rotating machinery and have balanced fans using the single plane method during my time at Arizona Public Service.  Assisted with the design of an Economizer Catch Basin Project at the Yellowstone Power Plant while with Rosebud Operating Services, Inc.  Designed the layout, sizing, location, and damper configuration for a Primary Air (PA) fan inlet duct project while at Rosebud Operating Services, Inc.
  • 2. Work History Boiler Engineer Feb 2015 – Jun 2016 Arizona Public Service (APS) Cholla Power Plant  NBIC OUI for the R program at the Cholla Power Plant.  Preformed boiler and pressure vessel inspections and authorized code repairs under the R program at the Cholla Power Plant.  Assisted maintenance and operations with boiler and associated systems troubleshooting at the plant.  Assisted with planning of Capital and O&M Projects for outages.  Assisted with the High Energy Piping (HEP) and Flow Accelerated Corrosion (FAC) programs at the Cholla Power Plant.  Provided vibration analysis and balancing using the single plane method on rotating machinery at the Cholla Power Plant.  Developed Apparent Cause Analysis Reports (ACA) and Problem Resolution Documents (PRD) to provide analysis of failure mechanisms for equipment and present solutions.  Read and interpreted blueprints, technical drawings, schematics and computer-generated reports. Project Engineer Jun 2010 – Feb 2015 Rosebud Operating Services, Inc. Boise, ID  Managed a 14 million dollar Air Cooled Condenser Tube Bundle Replacement Project. The project was completed on time and within the budget.  Managed a Primary Air Duct Modification Project. The project was completed on time and within the budget.  Environmental compliance reporting, testing, and data collection for the two Montana Power Plants that Rosebud Operating Services, Inc. operated.  Engineering support for maintenance and operations at the two Montana Power Plants that Rosebud Operating Services, Inc. operated. Boiler Engineer May 2008 - Jun 2010 PacifiCorp Jim Bridger Power Plant  Read and interpreted blueprints, technical drawings, schematics and computer-generated reports.  Assisted in project scheduling and budgeting to successfully and quickly complete engineering projects.  Developed cost estimates, procured equipment and tracked construction progress to efficiently complete large scale projects.  Participated in a project management team that oversaw two outages on two boilers in the Jim Bridger Power Plant where large scale high pressure piping and header replacements were performed.  Ran maintenance crews for emergency outages and during maintenance manager vacations.  Was placed in charge of combustion and tuning of the Jim Bridger Power Plant tangentially fired pulverized coal boilers.  Assisted with the automated soot blowing system and boiler camera systems at the Jim Bridger Power Plant. Intern Engineer Jan 2006 - May 2008 Micron Technology Boise, ID  Investigated equipment failures to diagnose faulty operation and made appropriate maintenance recommendations.  Planned and evaluated results of analysis, modeling and experiments.  Recommended design modifications to eliminate machine and system malfunctions.  Statistical Process Control, design of experiments, report writing, PowerPoint presentations and data analysis.  Calibrated and tested equipment while assisting with new product line development.
  • 3. Management May 1988 - Nov 2003 Safeway Stores, Inc. Bend, OR  Ordered product and was responsible for inventory control.  Managed over 50 employees, preformed payroll duties, developed employee schedules and preformed merchandising planning.  Addressed customer complaints and taught customer service to employees. Education Bachelor of Science: Mechanical Engineering 2008 Boise State University Boise, ID  Graduated Magna Cum Laud  Maintained a 3.88 GPA in schoolwhile working 24 hr workweeks.  Relevant Courses: Statics, Dynamics, Strength of Materials, Thermodynamics I & II, Fluid Dynamics, Statistics, Electrical Theory, Heat Transfer, Kinematics, Machine Design, SolidWorks, Mechatronics, Fluid System Design, and Vibrations. References References are available upon request.