Consulting Services offered:
 Tissue Mill Start-up support
o This service can be quite comprehensive and can include (but not limited to) any of the
following tasks:
 Operator training, certification and documentation development
 Process engineer training of higher level engineering, maintenance, chemistry
and operations best practices
 Engineering document review, analysis, feedback, optimization of process
design
 Construction, erection support; insure interferences are reduced, keep project
to schedule, advise on modifications to pipe runs and equipment location that
would help with the long term operation
 Equipment testing and commissioning support
 DCS implementation and optimization (i.e. Valmet DNA)
 DCS controls tuning, group start optimization, DCS/QCS optimization
 Reliability Based Maintenance or TPM implementation
 Tissue Machine or Converting
 Acting as impartial facilitator between different Valmet business units, Chemical
supplier, Piping contractor, Machine erector, Electrical Contractor
 Communicating through frequent written reports and regularly scheduled
meetings with upper management any gaps or opportunities in the
construction, equipment supply, commissioning, start-up, process that should
be addressed to allow for a smooth start-up and long term safe, reliable, high
quality tissue manufacturing process.
 Tissue Base Paper and Converted Finished Product Development and optimization
o Having the unique experience to have been able to travel and work inside 90% of the
Tissue manufacturing facilities in North America, the consultant can provide options,
ideas, input on product design, how it would compare to leading competitors and how
that design can be implemented in a safe, reliable and cost effective manner in the
tissue manufacturing process.
 Capital project review and optimization
o Many times, when a Tissue Mill Engineering team is in the process of making a capital
investment, it is very helpful to have an outside experienced resource to help fine tune
the Request for Bid documents, review the completed bids and help communicate to
the decision makers the differentiation between the bid packages. This can help greatly
on price, equipment included, performance guarantee included as well as
commissioning and long term support arrangements.
 Capital project feasibility study
o The consultant can complete a comprehensive study, analysis, calculations, flow
diagrams and equipment list to generate an accurate estimate for capital project
planning and assessment for adequate project ROI.
 Tissue Machine Rebuild Cost Estimate
o This estimate will give the client a description of the upgrades that will need to be
implemented for the desired outcome of the capital investment, an equipment list,
material take off, man hours and other details for accurately estimating the cost of a
major Tissue machine rebuild.
 Tissue machine Capacity Study
o Overall assessment of Tissue Machine and supporting process equipment to determine
improvements necessary to increase capacity permanently. Typically, used for
identifying capital expenditures that will permanently improve the capacity of the
process.
 Tissue machine bottleneck analysis
o Analysis of the Tissue making process to determine the bottlenecks in the order that are
holding the machine performance back. Could be a combination of repairs and
equipment upgrades that are identified.
 Reliability Based Maintenance Program Implementation
o This consulting service can be custom designed to meet a Tissue mill’s needs whether it
be in identifying opportunities and improving the current maintenance system, Leading
the implementation of a new, reliability based, proactive TPM maintenance system or
being a key tactical member of the maintenance system implementation team.
 Yankee Chatter analysis
o Thorough study of the machine and process to determine the cause(s) for intermittent
or continuous chatter in the Yankee surface or just developing in the coating chemistry.
Recommendations are issued to reduce greatly or eliminate the causes of the Yankee
chatter.
 Yankee Dryer Inspection Services
o This service can also be tailored to meet each customer’s needs. From routine annual
internal and external inspections to comprehensive inspection of the Yankee surface,
condensate removal equipment, steam quality, boiler water treatment and purification,
Yankee soda straw replacement and set-up, overseeing Yankee bearing or insulating
sleeve replacement and more.
 Sheet stability improvement assessment
o For light weight, low tensile sheet support, excellent sheet stability is required. This
assessment, reviews what the current sheet stability is and what improvements and
upgrades are needed to make the sheet stability align with world class technology for
sheet support.
 Tail threading optimization.
o Tail threading lost time does not need to be a major contributor to lost production with
a properly designed and optimized tail threading system. This study reviews the entire
system, makes improvements on the spot and recommendations for further
improvements for optimal tail threading.
 Sheet turn-up optimization
o Many tissue machines struggle to consistently and reliably perform sheet turn-
ups/transfers which contributes to major lost time and waste over time. This study will
assess the current equipment, set up and methods for making turn ups. At the outcome
of the study, turn up success rate will improve and recommendations will be made to
bring the turn up performance to world class standards.
 Felt, Wire or Structured Fabric life improvement
o This study will look thoroughly at all factors that affect the specific fabric runnability as
well as the reasons for shortened fabric life. At the outcome of this study, the customer
will have specific, concrete actions to take to improve fabric life.
 Creping Improvement study
o This study looks at all factors affecting the creping of the tissue web from the Yankee
dryer. Areas such as transfer, coating crosslinking, Yankee steam and condensate
function, Crepe blade holders, blade types, coating chemical package are all considered
to give the customer the best possible recommendations to improve creping quality and
performance.
 Stickies and contamination reduction
o This study looks at problem areas where stickies or other contamination are causing lost
quality or production and a wide array of prevention and mitigation techniques and
systems will then be recommended to the client.
 Employee training and development programs
o Having a work force with the right skills and tools to take ownership of the tissue making
process is critical to the long term success of a Tissue mill. Building tools, training
materials, conducting the training, certification and mastery process can all be part of a
training and development service package.
The above are just a few of the typical studies and services that I can perform for your organization.
There are many other services I have supported various Tissue industry customers with over the last
several years.
Customized studies can be designed for any specific outcome that you would like to see for your Tissue
Manufacturing Process.

More Related Content

What's hot

**NOW HIRING** - QC Tech East Shore Locations
**NOW HIRING** - QC Tech East Shore Locations**NOW HIRING** - QC Tech East Shore Locations
**NOW HIRING** - QC Tech East Shore LocationsChristy Keck
 
Quality and Cost Management: Methods and Results
Quality and Cost Management: Methods and ResultsQuality and Cost Management: Methods and Results
Quality and Cost Management: Methods and Resultstimwrodgers
 
Acumen Packaging Services LA
Acumen Packaging Services  LAAcumen Packaging Services  LA
Acumen Packaging Services LALavaish Agarwal
 
Precast Plant Quality System Documentation Set
Precast Plant Quality System Documentation SetPrecast Plant Quality System Documentation Set
Precast Plant Quality System Documentation Setsjlines
 
Non confirming product according to food Authority
Non confirming product according to food AuthorityNon confirming product according to food Authority
Non confirming product according to food AuthoritySuperior University
 
Corporate Restructuring through Quality Initiatives
Corporate Restructuring through Quality InitiativesCorporate Restructuring through Quality Initiatives
Corporate Restructuring through Quality InitiativesShubham Singh
 
Christopher Ward Resume.01
Christopher Ward Resume.01Christopher Ward Resume.01
Christopher Ward Resume.01Logistix
 
Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)Traum Academy
 
production engineer
production engineerproduction engineer
production engineershiva lingam
 
Amed Resume[1]
Amed Resume[1]Amed Resume[1]
Amed Resume[1]aayubi
 

What's hot (20)

VignonDenisseExecutivesummary
VignonDenisseExecutivesummaryVignonDenisseExecutivesummary
VignonDenisseExecutivesummary
 
**NOW HIRING** - QC Tech East Shore Locations
**NOW HIRING** - QC Tech East Shore Locations**NOW HIRING** - QC Tech East Shore Locations
**NOW HIRING** - QC Tech East Shore Locations
 
Quality and Cost Management: Methods and Results
Quality and Cost Management: Methods and ResultsQuality and Cost Management: Methods and Results
Quality and Cost Management: Methods and Results
 
Acumen Packaging Services LA
Acumen Packaging Services  LAAcumen Packaging Services  LA
Acumen Packaging Services LA
 
Key duties
Key dutiesKey duties
Key duties
 
resume2016.doc1
resume2016.doc1resume2016.doc1
resume2016.doc1
 
Krishna Resume
Krishna ResumeKrishna Resume
Krishna Resume
 
Precast Plant Quality System Documentation Set
Precast Plant Quality System Documentation SetPrecast Plant Quality System Documentation Set
Precast Plant Quality System Documentation Set
 
Quality inspector
Quality inspectorQuality inspector
Quality inspector
 
Tennelli_Cost of Quality
Tennelli_Cost of QualityTennelli_Cost of Quality
Tennelli_Cost of Quality
 
Non confirming product according to food Authority
Non confirming product according to food AuthorityNon confirming product according to food Authority
Non confirming product according to food Authority
 
Corporate Restructuring through Quality Initiatives
Corporate Restructuring through Quality InitiativesCorporate Restructuring through Quality Initiatives
Corporate Restructuring through Quality Initiatives
 
Shyam c.v. 29.01.16
Shyam c.v. 29.01.16Shyam c.v. 29.01.16
Shyam c.v. 29.01.16
 
Christopher Ward Resume.01
Christopher Ward Resume.01Christopher Ward Resume.01
Christopher Ward Resume.01
 
Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)
 
Factory overhaul ny
Factory overhaul nyFactory overhaul ny
Factory overhaul ny
 
Robert-Calderon (1)
Robert-Calderon (1)Robert-Calderon (1)
Robert-Calderon (1)
 
production engineer
production engineerproduction engineer
production engineer
 
Amed Resume[1]
Amed Resume[1]Amed Resume[1]
Amed Resume[1]
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 

Similar to Tissue Mill Services September, 2016

The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceMANUEL PACINI
 
Sample sem 2 spring 2015
Sample sem 2 spring 2015Sample sem 2 spring 2015
Sample sem 2 spring 2015Tushar Ahuja
 
Hareshwar dongare cv13.doc
Hareshwar dongare cv13.docHareshwar dongare cv13.doc
Hareshwar dongare cv13.dochkdongare_1967
 
Manufacturing equipment new vs. remanufacturing
Manufacturing equipment  new vs. remanufacturingManufacturing equipment  new vs. remanufacturing
Manufacturing equipment new vs. remanufacturingAntonio Reis
 
CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5shreyas Shah
 
Thiru.resume.doc
Thiru.resume.docThiru.resume.doc
Thiru.resume.docTHIRR
 
Quality Management and Statistical Process Control
Quality Management and Statistical Process ControlQuality Management and Statistical Process Control
Quality Management and Statistical Process ControlMahmudul Hasan
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assetsAdvisian
 
Quality control and improvement concepts
Quality control and improvement conceptsQuality control and improvement concepts
Quality control and improvement conceptsBuddy Krishna
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master ClassMarcep Inc.
 

Similar to Tissue Mill Services September, 2016 (20)

The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenance
 
FINAL PROJECT-MBA
FINAL PROJECT-MBAFINAL PROJECT-MBA
FINAL PROJECT-MBA
 
Jagannath Adki
Jagannath AdkiJagannath Adki
Jagannath Adki
 
Sample sem 2 spring 2015
Sample sem 2 spring 2015Sample sem 2 spring 2015
Sample sem 2 spring 2015
 
Report for COOP PUPR without fusion
Report for COOP PUPR without fusionReport for COOP PUPR without fusion
Report for COOP PUPR without fusion
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Rcm
RcmRcm
Rcm
 
Hareshwar dongare cv13.doc
Hareshwar dongare cv13.docHareshwar dongare cv13.doc
Hareshwar dongare cv13.doc
 
Manufacturing equipment new vs. remanufacturing
Manufacturing equipment  new vs. remanufacturingManufacturing equipment  new vs. remanufacturing
Manufacturing equipment new vs. remanufacturing
 
Res 10-30-15
Res 10-30-15Res 10-30-15
Res 10-30-15
 
CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5
 
Thiru.resume.doc
Thiru.resume.docThiru.resume.doc
Thiru.resume.doc
 
Cv jacques kouadio cv
Cv jacques  kouadio   cvCv jacques  kouadio   cv
Cv jacques kouadio cv
 
Quality Management and Statistical Process Control
Quality Management and Statistical Process ControlQuality Management and Statistical Process Control
Quality Management and Statistical Process Control
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
Linked in attach
Linked in attachLinked in attach
Linked in attach
 
Quality control and improvement concepts
Quality control and improvement conceptsQuality control and improvement concepts
Quality control and improvement concepts
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master Class
 
MS Suresh -Jun-16
MS Suresh -Jun-16MS Suresh -Jun-16
MS Suresh -Jun-16
 
Quality - An Introduction-170715
Quality - An Introduction-170715Quality - An Introduction-170715
Quality - An Introduction-170715
 

Tissue Mill Services September, 2016

  • 1. Romeo Urbinelli Tissue Mill Consultant Consulting Services offered:  Tissue Mill Start-up support o This service can be quite comprehensive and can include (but not limited to) any of the following tasks:  Operator training, certification and documentation development  Process engineer training of higher level engineering, maintenance, chemistry and operations best practices  Engineering document review, analysis, feedback, optimization of process design  Construction, erection support; insure interferences are reduced, keep project to schedule, advise on modifications to pipe runs and equipment location that would help with the long term operation  Equipment testing and commissioning support  DCS implementation and optimization (i.e. Valmet DNA)  DCS controls tuning, group start optimization, DCS/QCS optimization  Reliability Based Maintenance or TPM implementation  Tissue Machine or Converting  Acting as impartial facilitator between different Valmet business units, Chemical supplier, Piping contractor, Machine erector, Electrical Contractor  Communicating through frequent written reports and regularly scheduled meetings with upper management any gaps or opportunities in the construction, equipment supply, commissioning, start-up, process that should be addressed to allow for a smooth start-up and long term safe, reliable, high quality tissue manufacturing process.  Tissue Base Paper and Converted Finished Product Development and optimization o Having the unique experience to have been able to travel and work inside 90% of the Tissue manufacturing facilities in North America, the consultant can provide options, ideas, input on product design, how it would compare to leading competitors and how that design can be implemented in a safe, reliable and cost effective manner in the tissue manufacturing process.
  • 2.  Capital project review and optimization o Many times, when a Tissue Mill Engineering team is in the process of making a capital investment, it is very helpful to have an outside experienced resource to help fine tune the Request for Bid documents, review the completed bids and help communicate to the decision makers the differentiation between the bid packages. This can help greatly on price, equipment included, performance guarantee included as well as commissioning and long term support arrangements.  Capital project feasibility study o The consultant can complete a comprehensive study, analysis, calculations, flow diagrams and equipment list to generate an accurate estimate for capital project planning and assessment for adequate project ROI.  Tissue Machine Rebuild Cost Estimate o This estimate will give the client a description of the upgrades that will need to be implemented for the desired outcome of the capital investment, an equipment list, material take off, man hours and other details for accurately estimating the cost of a major Tissue machine rebuild.  Tissue machine Capacity Study o Overall assessment of Tissue Machine and supporting process equipment to determine improvements necessary to increase capacity permanently. Typically, used for identifying capital expenditures that will permanently improve the capacity of the process.  Tissue machine bottleneck analysis o Analysis of the Tissue making process to determine the bottlenecks in the order that are holding the machine performance back. Could be a combination of repairs and equipment upgrades that are identified.  Reliability Based Maintenance Program Implementation o This consulting service can be custom designed to meet a Tissue mill’s needs whether it be in identifying opportunities and improving the current maintenance system, Leading the implementation of a new, reliability based, proactive TPM maintenance system or being a key tactical member of the maintenance system implementation team.  Yankee Chatter analysis o Thorough study of the machine and process to determine the cause(s) for intermittent or continuous chatter in the Yankee surface or just developing in the coating chemistry.
  • 3. Recommendations are issued to reduce greatly or eliminate the causes of the Yankee chatter.  Yankee Dryer Inspection Services o This service can also be tailored to meet each customer’s needs. From routine annual internal and external inspections to comprehensive inspection of the Yankee surface, condensate removal equipment, steam quality, boiler water treatment and purification, Yankee soda straw replacement and set-up, overseeing Yankee bearing or insulating sleeve replacement and more.  Sheet stability improvement assessment o For light weight, low tensile sheet support, excellent sheet stability is required. This assessment, reviews what the current sheet stability is and what improvements and upgrades are needed to make the sheet stability align with world class technology for sheet support.  Tail threading optimization. o Tail threading lost time does not need to be a major contributor to lost production with a properly designed and optimized tail threading system. This study reviews the entire system, makes improvements on the spot and recommendations for further improvements for optimal tail threading.  Sheet turn-up optimization o Many tissue machines struggle to consistently and reliably perform sheet turn- ups/transfers which contributes to major lost time and waste over time. This study will assess the current equipment, set up and methods for making turn ups. At the outcome of the study, turn up success rate will improve and recommendations will be made to bring the turn up performance to world class standards.  Felt, Wire or Structured Fabric life improvement o This study will look thoroughly at all factors that affect the specific fabric runnability as well as the reasons for shortened fabric life. At the outcome of this study, the customer will have specific, concrete actions to take to improve fabric life.  Creping Improvement study o This study looks at all factors affecting the creping of the tissue web from the Yankee dryer. Areas such as transfer, coating crosslinking, Yankee steam and condensate function, Crepe blade holders, blade types, coating chemical package are all considered to give the customer the best possible recommendations to improve creping quality and performance.
  • 4.  Stickies and contamination reduction o This study looks at problem areas where stickies or other contamination are causing lost quality or production and a wide array of prevention and mitigation techniques and systems will then be recommended to the client.  Employee training and development programs o Having a work force with the right skills and tools to take ownership of the tissue making process is critical to the long term success of a Tissue mill. Building tools, training materials, conducting the training, certification and mastery process can all be part of a training and development service package. The above are just a few of the typical studies and services that I can perform for your organization. There are many other services I have supported various Tissue industry customers with over the last several years. Customized studies can be designed for any specific outcome that you would like to see for your Tissue Manufacturing Process.