SlideShare a Scribd company logo
1 of 2
Download to read offline
Factory Overhaul
Screwcompressorprogram
Have the experienced staff of Johnson Controls
overhaul your compressor in one of the highly
qualified compressor service centres.
Benefits of choosing factory overhaul
• Overhaul cost surprises are avoided
• Reduces need for on-site spares inventory
• Eliminates costs from improper repair
techniques or non-OEM parts usage
• Reduced onsite maintenance man-hours
• Extends equipment life through proper
maintenance and refurbishment
Factory overhaul will
reduce unpleasant
repair costs
Global reach
Improvements
Innovation
Customer satisfaction
Sustainability
Our global service & parts
network ensures customers an
organisation with a global reach
that is also known and active at
the local level.
To continually improve the value
we provide to customers we
strive to become more competi-
tive and capture new opportuni-
ties.
We believe that there is always
a better way. This belief inspires
to new solutions, change and
opportunity we pass on to our
customers.
Our 142.000 global colleagues strive
to serve our customers in the best
way, customer focus is our key to
success.
We believe that sustainability will
play a significant role in any future
development of our products,
services and operations, where
focus will be on efficiency and
environmental protection.
Quality
We will distinguish ourselves with
our customers through the excep-
tional quality of our products and
services.
Features
• Factory overhaul includes inspection of;
- Critical components
- Tolerances
- Replacement of wear parts and filters
• Fixed price including labour costs and parts
according to specifications
• We offer to inspect parts to original manufacturing
specifications/tolerances
• We provide a competitively priced alternative to
onsite repair or exchange
www.johnsoncontrols.com/marine
Options:
• On request we can offer you a full workshop report with
pictures as well as certificates on test runs and pressure
tests.
• For Sabroe compressor especially there are several
options for upgraded to later version technical designs
Guarantee:
A 6 months guarantee from shipping date is granted for
marine applications
We welcome you to contact one of our sales representa-
tives for further information and possibilities.
Most overhauls involving standard wear components will
be performed within 10 working days of receiving unit and
purchase order. Turnaround time on more extensive repairs
will be quoted on a case-by-case basis.
We welcome you to contact one of our sales representa-
tives for further information and possibilities.
Our brands

More Related Content

What's hot

What's hot (18)

Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
RES
RESRES
RES
 
Dasibi 1008 Ozone Monitor Manual
Dasibi 1008 Ozone Monitor Manual Dasibi 1008 Ozone Monitor Manual
Dasibi 1008 Ozone Monitor Manual
 
POM - ACC case
POM - ACC casePOM - ACC case
POM - ACC case
 
Quick Changeover
Quick ChangeoverQuick Changeover
Quick Changeover
 
eProcurement
eProcurementeProcurement
eProcurement
 
Supplier Charge back and Reducing CoPQ
Supplier Charge back and Reducing CoPQSupplier Charge back and Reducing CoPQ
Supplier Charge back and Reducing CoPQ
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
A History of Denholm Rees & O'Donnell
A History of Denholm Rees & O'DonnellA History of Denholm Rees & O'Donnell
A History of Denholm Rees & O'Donnell
 
Chain Of Quality
Chain Of QualityChain Of Quality
Chain Of Quality
 
Zatec High Performance Cleaning Blades
Zatec High Performance Cleaning BladesZatec High Performance Cleaning Blades
Zatec High Performance Cleaning Blades
 
How Should Suppliers be Penalized for Late Deliveries or Poor Quality
How Should Suppliers be Penalized for Late Deliveries or Poor QualityHow Should Suppliers be Penalized for Late Deliveries or Poor Quality
How Should Suppliers be Penalized for Late Deliveries or Poor Quality
 
TTP
TTPTTP
TTP
 
lean manufacturing
lean manufacturinglean manufacturing
lean manufacturing
 
SC Data sheet
SC Data sheetSC Data sheet
SC Data sheet
 
Tissue Mill Services September, 2016
Tissue Mill Services September, 2016Tissue Mill Services September, 2016
Tissue Mill Services September, 2016
 
Advance Balancing Pune
Advance Balancing PuneAdvance Balancing Pune
Advance Balancing Pune
 

Viewers also liked

Formato en blancoclases23
Formato en blancoclases23Formato en blancoclases23
Formato en blancoclases23Leonimoyano
 
Connie merchant- Madame Yevonde
Connie merchant- Madame YevondeConnie merchant- Madame Yevonde
Connie merchant- Madame Yevondemercconn
 
Mhs03 Power Point
Mhs03 Power PointMhs03 Power Point
Mhs03 Power Pointstaceyl
 
A Day in the Life
A Day in the LifeA Day in the Life
A Day in the Liferlopezp1
 
Jóvenes e Internet
Jóvenes e InternetJóvenes e Internet
Jóvenes e Internetapaismtic
 
Texas S Ta R Chart
Texas S Ta R ChartTexas S Ta R Chart
Texas S Ta R Chartchristims
 
Ses feixes roberto bo
Ses feixes roberto boSes feixes roberto bo
Ses feixes roberto bocapdestudisgm
 
Funciones Varias Variables
Funciones Varias VariablesFunciones Varias Variables
Funciones Varias VariablesGuadaleivaq
 
Celebra La Vida
Celebra La VidaCelebra La Vida
Celebra La Vidahome
 
Rucspetit
RucspetitRucspetit
RucspetitDavid
 
Documento para evaluar actividades o campañas
Documento para evaluar actividades o campañasDocumento para evaluar actividades o campañas
Documento para evaluar actividades o campañasMaria Leticia Ditrani
 
2010 lidiane szerwinskcamargos-bororo
2010 lidiane szerwinskcamargos-bororo2010 lidiane szerwinskcamargos-bororo
2010 lidiane szerwinskcamargos-bororoValquiria Azevedo
 

Viewers also liked (20)

Formato en blancoclases23
Formato en blancoclases23Formato en blancoclases23
Formato en blancoclases23
 
Interpretaciones oficiales 2010
Interpretaciones oficiales 2010Interpretaciones oficiales 2010
Interpretaciones oficiales 2010
 
Connie merchant- Madame Yevonde
Connie merchant- Madame YevondeConnie merchant- Madame Yevonde
Connie merchant- Madame Yevonde
 
Hvac cost
Hvac costHvac cost
Hvac cost
 
Mhs03 Power Point
Mhs03 Power PointMhs03 Power Point
Mhs03 Power Point
 
A Day in the Life
A Day in the LifeA Day in the Life
A Day in the Life
 
memory lane buttons
memory lane buttonsmemory lane buttons
memory lane buttons
 
Novice vp2
Novice vp2Novice vp2
Novice vp2
 
Jóvenes e Internet
Jóvenes e InternetJóvenes e Internet
Jóvenes e Internet
 
Texas S Ta R Chart
Texas S Ta R ChartTexas S Ta R Chart
Texas S Ta R Chart
 
Cuando Yo Me Vaya
Cuando Yo Me VayaCuando Yo Me Vaya
Cuando Yo Me Vaya
 
Ses feixes roberto bo
Ses feixes roberto boSes feixes roberto bo
Ses feixes roberto bo
 
Funciones Varias Variables
Funciones Varias VariablesFunciones Varias Variables
Funciones Varias Variables
 
Ecosistemes.bioformigueta 2
Ecosistemes.bioformigueta 2Ecosistemes.bioformigueta 2
Ecosistemes.bioformigueta 2
 
Celebra La Vida
Celebra La VidaCelebra La Vida
Celebra La Vida
 
Rucspetit
RucspetitRucspetit
Rucspetit
 
Miata short presentation
Miata short presentationMiata short presentation
Miata short presentation
 
Surfer Dude
Surfer DudeSurfer Dude
Surfer Dude
 
Documento para evaluar actividades o campañas
Documento para evaluar actividades o campañasDocumento para evaluar actividades o campañas
Documento para evaluar actividades o campañas
 
2010 lidiane szerwinskcamargos-bororo
2010 lidiane szerwinskcamargos-bororo2010 lidiane szerwinskcamargos-bororo
2010 lidiane szerwinskcamargos-bororo
 

Similar to Factory overhaul ny

Service Brochure 2015
Service Brochure  2015Service Brochure  2015
Service Brochure 2015Mark Roebuck
 
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for PerformanceDenholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for PerformanceBSAMARKETING
 
ACS - It Pays to Keep Maintenance
ACS - It Pays to Keep MaintenanceACS - It Pays to Keep Maintenance
ACS - It Pays to Keep MaintenanceDanielle Harclerode
 
Trillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre CapabilitiesTrillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre CapabilitiesMatthew Hewett
 
KES - Company Overview v2023-03-23.pptx
KES - Company Overview v2023-03-23.pptxKES - Company Overview v2023-03-23.pptx
KES - Company Overview v2023-03-23.pptxssuser45c724
 
Commercial AC Repair Why It’s Critical For Your Business (1).pdf
Commercial AC Repair Why It’s Critical For Your Business (1).pdfCommercial AC Repair Why It’s Critical For Your Business (1).pdf
Commercial AC Repair Why It’s Critical For Your Business (1).pdfGO Heating, Air & Plumbing
 
Reliable Performance of the Mill Circuit with Products and Services
Reliable Performance of the Mill Circuit with Products and ServicesReliable Performance of the Mill Circuit with Products and Services
Reliable Performance of the Mill Circuit with Products and ServicesLOESCHE
 
Zeppelin -Company Profile
Zeppelin -Company ProfileZeppelin -Company Profile
Zeppelin -Company ProfileHardik Patel
 
Consolidated power srvc_valves_brochure_0512
Consolidated power srvc_valves_brochure_0512Consolidated power srvc_valves_brochure_0512
Consolidated power srvc_valves_brochure_0512Juan Carlos Elías
 
Digitechx Repair Division Presentation
Digitechx Repair Division PresentationDigitechx Repair Division Presentation
Digitechx Repair Division PresentationJean-Francois Cavelier
 
Refrigeration Brochure
Refrigeration BrochureRefrigeration Brochure
Refrigeration Brochurea1-cbiss
 
What we are about- Residential HVAC
What we are about- Residential HVACWhat we are about- Residential HVAC
What we are about- Residential HVACrobwhite1
 
Gaining a competitive advantage through customized control - US
Gaining a competitive advantage through customized control - USGaining a competitive advantage through customized control - US
Gaining a competitive advantage through customized control - USWest Control Solutions
 
Gaining a competitive advantage through customised control - UK & Europe
Gaining a competitive advantage through customised control - UK & EuropeGaining a competitive advantage through customised control - UK & Europe
Gaining a competitive advantage through customised control - UK & EuropeWest Control Solutions
 

Similar to Factory overhaul ny (20)

Service Brochure 2015
Service Brochure  2015Service Brochure  2015
Service Brochure 2015
 
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for PerformanceDenholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
 
ACS - It Pays to Keep Maintenance
ACS - It Pays to Keep MaintenanceACS - It Pays to Keep Maintenance
ACS - It Pays to Keep Maintenance
 
New E-Profile.pptx
New E-Profile.pptxNew E-Profile.pptx
New E-Profile.pptx
 
Trillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre CapabilitiesTrillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre Capabilities
 
KES - Company Overview v2023-03-23.pptx
KES - Company Overview v2023-03-23.pptxKES - Company Overview v2023-03-23.pptx
KES - Company Overview v2023-03-23.pptx
 
KI Brochure
KI BrochureKI Brochure
KI Brochure
 
Commercial AC Repair Why It’s Critical For Your Business (1).pdf
Commercial AC Repair Why It’s Critical For Your Business (1).pdfCommercial AC Repair Why It’s Critical For Your Business (1).pdf
Commercial AC Repair Why It’s Critical For Your Business (1).pdf
 
Reliable Performance of the Mill Circuit with Products and Services
Reliable Performance of the Mill Circuit with Products and ServicesReliable Performance of the Mill Circuit with Products and Services
Reliable Performance of the Mill Circuit with Products and Services
 
Zeppelin -Company Profile
Zeppelin -Company ProfileZeppelin -Company Profile
Zeppelin -Company Profile
 
Consolidated power srvc_valves_brochure_0512
Consolidated power srvc_valves_brochure_0512Consolidated power srvc_valves_brochure_0512
Consolidated power srvc_valves_brochure_0512
 
Digitechx Repair Division Presentation
Digitechx Repair Division PresentationDigitechx Repair Division Presentation
Digitechx Repair Division Presentation
 
Refrigeration Brochure
Refrigeration BrochureRefrigeration Brochure
Refrigeration Brochure
 
What we are about- Residential HVAC
What we are about- Residential HVACWhat we are about- Residential HVAC
What we are about- Residential HVAC
 
Turbine maintenance
Turbine maintenanceTurbine maintenance
Turbine maintenance
 
Service Presentation
Service PresentationService Presentation
Service Presentation
 
Tank Calibration by Consultec
Tank Calibration by ConsultecTank Calibration by Consultec
Tank Calibration by Consultec
 
Gaining a competitive advantage through customized control - US
Gaining a competitive advantage through customized control - USGaining a competitive advantage through customized control - US
Gaining a competitive advantage through customized control - US
 
Gaining a competitive advantage through customised control - UK & Europe
Gaining a competitive advantage through customised control - UK & EuropeGaining a competitive advantage through customised control - UK & Europe
Gaining a competitive advantage through customised control - UK & Europe
 
Firetrucks Unlimited Brochure
Firetrucks Unlimited BrochureFiretrucks Unlimited Brochure
Firetrucks Unlimited Brochure
 

More from Peter Heisenberg

More from Peter Heisenberg (13)

Compressors
CompressorsCompressors
Compressors
 
Exhibition in chicago 1950
Exhibition in chicago 1950Exhibition in chicago 1950
Exhibition in chicago 1950
 
Apmt aarhus
Apmt aarhusApmt aarhus
Apmt aarhus
 
Maritime
MaritimeMaritime
Maritime
 
Cost2
Cost2Cost2
Cost2
 
Information is power
Information is powerInformation is power
Information is power
 
Compressor
CompressorCompressor
Compressor
 
iRIS platform
iRIS platformiRIS platform
iRIS platform
 
Recip or screw_-_the_customers_choice
Recip or screw_-_the_customers_choiceRecip or screw_-_the_customers_choice
Recip or screw_-_the_customers_choice
 
Benefits of choosing factory overhaul
Benefits of choosing factory overhaulBenefits of choosing factory overhaul
Benefits of choosing factory overhaul
 
Offshore solutions
Offshore solutionsOffshore solutions
Offshore solutions
 
How to deal with your R22 system
How to deal with your R22 systemHow to deal with your R22 system
How to deal with your R22 system
 
Original parts results in lower energy consumption
Original parts results in lower energy consumptionOriginal parts results in lower energy consumption
Original parts results in lower energy consumption
 

Factory overhaul ny

  • 1. Factory Overhaul Screwcompressorprogram Have the experienced staff of Johnson Controls overhaul your compressor in one of the highly qualified compressor service centres. Benefits of choosing factory overhaul • Overhaul cost surprises are avoided • Reduces need for on-site spares inventory • Eliminates costs from improper repair techniques or non-OEM parts usage • Reduced onsite maintenance man-hours • Extends equipment life through proper maintenance and refurbishment Factory overhaul will reduce unpleasant repair costs Global reach Improvements Innovation Customer satisfaction Sustainability Our global service & parts network ensures customers an organisation with a global reach that is also known and active at the local level. To continually improve the value we provide to customers we strive to become more competi- tive and capture new opportuni- ties. We believe that there is always a better way. This belief inspires to new solutions, change and opportunity we pass on to our customers. Our 142.000 global colleagues strive to serve our customers in the best way, customer focus is our key to success. We believe that sustainability will play a significant role in any future development of our products, services and operations, where focus will be on efficiency and environmental protection. Quality We will distinguish ourselves with our customers through the excep- tional quality of our products and services. Features • Factory overhaul includes inspection of; - Critical components - Tolerances - Replacement of wear parts and filters • Fixed price including labour costs and parts according to specifications • We offer to inspect parts to original manufacturing specifications/tolerances • We provide a competitively priced alternative to onsite repair or exchange
  • 2. www.johnsoncontrols.com/marine Options: • On request we can offer you a full workshop report with pictures as well as certificates on test runs and pressure tests. • For Sabroe compressor especially there are several options for upgraded to later version technical designs Guarantee: A 6 months guarantee from shipping date is granted for marine applications We welcome you to contact one of our sales representa- tives for further information and possibilities. Most overhauls involving standard wear components will be performed within 10 working days of receiving unit and purchase order. Turnaround time on more extensive repairs will be quoted on a case-by-case basis. We welcome you to contact one of our sales representa- tives for further information and possibilities. Our brands