SlideShare a Scribd company logo
1 of 3
ROBERT H. BARLOW
4652 Bliss Dr. Norton, Ohio 44203 ● (330) 212-8687 ● rwolrab@aol.com
MATERIALS MANAGEMENT
Materials professional with 20+ years of practical experience in fulfillment and sourcing. Good
understanding of Lean Manufacturing techniques working with KANBAN systems, pull systems, Kaizan
events and manufacturing cells. Focused, goal-driven individual with strong communication,
organizational, interpersonal, and problem-solving skills and the ability to work independently or as a
member of team. Skills and expertise include:
• Supervision / Leadership • Buying / Planning
• MRP Systems • LEAN Principles
• Continuous Improvement • International / Custom Compliance
• Scheduling • Vendor Relations / Purchasing
PROFESSIONAL EXPERIENCE
EP CLEVELAND, Valley View OH 2011 TO PRESENT
$21 million global manufacturer of high pressure hydraulic hose and hose fittings for the industrial auto
motive and trucking industry. Including hoses built and supplied to the hydraulic lift industry as well as
hose assemblies built for air compressor and pneumatic applications.
Purchasing Manager (2011-Now)
• Responsibilities include overseeing $10 million in annual global purchasing of raw material for the
production of high pressure hydraulic hose assemblies.
• Interact with suppliers to negotiate pricing and delivery of materials from worldwide supplier base
that meet EP Cleveland specifications and quality.
• Work closely with Engineering to quote new business opportunities and products to increase EP
Cleveland sales and income.
• Responsible for $1.1 million inventory reduction during FY 2012 with no production interruptions
or increases in expedited freight expense.
INVACARE CORPORATION, Cleveland, OH 2006 to 2011
$1.8 billion leading global manufacturer of medical devices and health care products for the acute and
non-acute care environment, including home health care, retail and extended care markets.
Materials Specialist (2008 to 2011)
• Planned 1100 active material part numbers with an inventory value of $1.2 million to ensure meeting
financial goals and continue to ship finished product on time to meet customer expectations.
• Interacted with suppliers to setup and maintain consignment inventory is a daily ongoing part of
material planning.
• Maintained data accuracy and scheduling production daily.
• Collaborated with Assembly supervision and lead personnel to determine material needs helps to
continuously improve the flow of material.
Materials Supervisor (2006 to 2008)
• Led and managed the activities of Buyer/Planners focusing on the procurement of materials and
goods for the daily production of custom powered wheelchairs.
• Managed Supply Chain from both International and Domestic suppliers to obtain timely, accurate
and quality deliveries of products to support production.
ROBERT H. BARLOW, PAGE 2
• Scheduled delivery of products from outside processing suppliers including anodized, heat treated,
plated, brazed and other process that required to support the production..
• Managed associates in the daily processes of supplying material to the production floor.
• Implemented and maintained cycle count procedures to improve inventory accuracy.
• Set the Master Production Plan in the system working closely with Marketing and Customer Service
to ensure proper planning of finished goods.
PARKER HANNIFIN, Cleveland, OH 2000 to 2006
$12 billion and world's leading diversified manufacturer of motion and control technologies and systems
Buyer/Planner
• Maintained over $4.5 million dollars of raw material for the production of actuators and cylinders for
motion control devices.
• Purchased aluminum castings, aluminum extrusions held to tight tolerances and various grades of
steel and aluminum bar stock.
• Planned and scheduled production of hydraulic, pneumatic and electrical cylinders and actuators
based on MRP requirements.
• Scheduled outside processes necessary for our products including machining due to capacity
constraints including anodizing, heat treating, blackening, etc.
• Reduced lead times for raw materials and reduced the dollar value of inventory as a result using Lean
principles.
• Served as Import/Export coordinator responsible for making sure that the Actuator Division is in
compliance with US Customs regulations for importing material, as well as exporting finished goods.
ALPHA TECHNOLOGIES, Akron, OH 1993 to 2000
Purchasing Supervisor
• Responsible for Just-in-Time purchasing of all components for the manufacture and support of
complex testing instruments based on Economic Order Quantities and Economic Order Intervals.
Procurements include components for electrical sub-assemblies.
• Purchased mechanical components made to drawings including castings and raw material.
• Operated and maintained Material Requirements Planning (MRPII) database.
• Conducted vendor evaluation audits to assure quality performance by both current and future
vendors.
• Contributed to Make vs. Buy decisions.
• Play major role outsourcing project for both mechanical and electrical components.
• Contributed to the efforts for Certification of ISO 9001.
MONSANTO RUBBER INSTRUMENTS 1983 to 1993
Storeroom Supervisor (1986 to 1993)
Journeyman Machinist (1969 to 1986)
CNC Machining setup and programming
EDUCATION
BS, Industrial Management, The University of Akron, Akron, OH
Concentration: Production
U.S. Customs Brokerage Training
Kanban/Lean Training at Parker Hannifin
ROBERT H. BARLOW, PAGE 3
TECHNICAL SKILLS
MRP systems
Microsoft Office Excel, Word

More Related Content

What's hot (20)

BARBARA J
BARBARA JBARBARA J
BARBARA J
 
Lori Green's Resume
Lori Green's ResumeLori Green's Resume
Lori Green's Resume
 
William Baxter Professional Resume
William Baxter Professional ResumeWilliam Baxter Professional Resume
William Baxter Professional Resume
 
Brian Resume
Brian ResumeBrian Resume
Brian Resume
 
sikkemamateria0119
sikkemamateria0119sikkemamateria0119
sikkemamateria0119
 
2016_AC_template_4-3_Final
2016_AC_template_4-3_Final2016_AC_template_4-3_Final
2016_AC_template_4-3_Final
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
CV Latest
CV LatestCV Latest
CV Latest
 
Getting things made
Getting things madeGetting things made
Getting things made
 
Rohit Anand
Rohit AnandRohit Anand
Rohit Anand
 
Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...
Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...
Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...
 
End of Year Presentation Adham Abdulqader
End of Year Presentation Adham AbdulqaderEnd of Year Presentation Adham Abdulqader
End of Year Presentation Adham Abdulqader
 
Esparza_Julio_Resume-2
Esparza_Julio_Resume-2Esparza_Julio_Resume-2
Esparza_Julio_Resume-2
 
DESRESUMEFL5
DESRESUMEFL5DESRESUMEFL5
DESRESUMEFL5
 
Ra'anan Sela
Ra'anan SelaRa'anan Sela
Ra'anan Sela
 
Product Realization
Product  RealizationProduct  Realization
Product Realization
 
Engineering Revisions and Engineering Change Orders (ECO)
Engineering Revisions and Engineering Change Orders (ECO)Engineering Revisions and Engineering Change Orders (ECO)
Engineering Revisions and Engineering Change Orders (ECO)
 
Mohan bhaltadak.
Mohan bhaltadak.Mohan bhaltadak.
Mohan bhaltadak.
 
Resume_Armando_Ibarra_Final_April 2015-CA
Resume_Armando_Ibarra_Final_April  2015-CAResume_Armando_Ibarra_Final_April  2015-CA
Resume_Armando_Ibarra_Final_April 2015-CA
 
Facility Manager resume 2016
Facility Manager resume 2016Facility Manager resume 2016
Facility Manager resume 2016
 

Viewers also liked (17)

Spanish festivities
Spanish festivitiesSpanish festivities
Spanish festivities
 
Shadows
ShadowsShadows
Shadows
 
14-1212-RGA-MPT__MTD_12(b)(6)_jt_infringe-2015
14-1212-RGA-MPT__MTD_12(b)(6)_jt_infringe-201514-1212-RGA-MPT__MTD_12(b)(6)_jt_infringe-2015
14-1212-RGA-MPT__MTD_12(b)(6)_jt_infringe-2015
 
Amaazing shadows
Amaazing shadowsAmaazing shadows
Amaazing shadows
 
Amaazing shadows
Amaazing shadowsAmaazing shadows
Amaazing shadows
 
Shadows
ShadowsShadows
Shadows
 
Shadows
ShadowsShadows
Shadows
 
Año chino
Año chinoAño chino
Año chino
 
Amaazing shadows
Amaazing shadowsAmaazing shadows
Amaazing shadows
 
Spanish festivities
Spanish festivitiesSpanish festivities
Spanish festivities
 
Año chino
Año chinoAño chino
Año chino
 
Amaazing shadows
Amaazing shadowsAmaazing shadows
Amaazing shadows
 
Amaazing shadows
Amaazing shadowsAmaazing shadows
Amaazing shadows
 
Amaazing shadows
Amaazing shadowsAmaazing shadows
Amaazing shadows
 
Shadows
ShadowsShadows
Shadows
 
Amaazing shadows
Amaazing shadowsAmaazing shadows
Amaazing shadows
 
Shadows
ShadowsShadows
Shadows
 

Similar to Barlow,_Robert_Resume[2][1]

Similar to Barlow,_Robert_Resume[2][1] (20)

TONYA RESUME 112816
TONYA RESUME 112816TONYA RESUME 112816
TONYA RESUME 112816
 
Hieber, Bruce Resume
Hieber, Bruce ResumeHieber, Bruce Resume
Hieber, Bruce Resume
 
Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATD
 
Tito Camps Resume
Tito Camps ResumeTito Camps Resume
Tito Camps Resume
 
ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015
 
I. Bobko_Buyer-Expeditor
I. Bobko_Buyer-ExpeditorI. Bobko_Buyer-Expeditor
I. Bobko_Buyer-Expeditor
 
Bc Resume Updated Oct 2012
Bc Resume  Updated Oct 2012Bc Resume  Updated Oct 2012
Bc Resume Updated Oct 2012
 
Tom resume 2016
Tom resume 2016Tom resume 2016
Tom resume 2016
 
Tom resume 2016
Tom resume 2016Tom resume 2016
Tom resume 2016
 
Allen D. Polowinczak 2016
Allen D. Polowinczak 2016Allen D. Polowinczak 2016
Allen D. Polowinczak 2016
 
John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)
 
CV D.Blaskivich
CV D.BlaskivichCV D.Blaskivich
CV D.Blaskivich
 
Vinod Kumar CV
Vinod Kumar CVVinod Kumar CV
Vinod Kumar CV
 
Resume_JMD_ 01-14-17
Resume_JMD_ 01-14-17Resume_JMD_ 01-14-17
Resume_JMD_ 01-14-17
 
Resume J.Martinez
Resume J.MartinezResume J.Martinez
Resume J.Martinez
 
Brad M Johnson
Brad M JohnsonBrad M Johnson
Brad M Johnson
 
Conprofile.DOC
Conprofile.DOCConprofile.DOC
Conprofile.DOC
 
Liza_Uhlinger_Resume4
Liza_Uhlinger_Resume4Liza_Uhlinger_Resume4
Liza_Uhlinger_Resume4
 
James Resume
James ResumeJames Resume
James Resume
 
Nital Resume - QA Batch record review 2014
Nital Resume - QA Batch record review 2014Nital Resume - QA Batch record review 2014
Nital Resume - QA Batch record review 2014
 

Barlow,_Robert_Resume[2][1]

  • 1. ROBERT H. BARLOW 4652 Bliss Dr. Norton, Ohio 44203 ● (330) 212-8687 ● rwolrab@aol.com MATERIALS MANAGEMENT Materials professional with 20+ years of practical experience in fulfillment and sourcing. Good understanding of Lean Manufacturing techniques working with KANBAN systems, pull systems, Kaizan events and manufacturing cells. Focused, goal-driven individual with strong communication, organizational, interpersonal, and problem-solving skills and the ability to work independently or as a member of team. Skills and expertise include: • Supervision / Leadership • Buying / Planning • MRP Systems • LEAN Principles • Continuous Improvement • International / Custom Compliance • Scheduling • Vendor Relations / Purchasing PROFESSIONAL EXPERIENCE EP CLEVELAND, Valley View OH 2011 TO PRESENT $21 million global manufacturer of high pressure hydraulic hose and hose fittings for the industrial auto motive and trucking industry. Including hoses built and supplied to the hydraulic lift industry as well as hose assemblies built for air compressor and pneumatic applications. Purchasing Manager (2011-Now) • Responsibilities include overseeing $10 million in annual global purchasing of raw material for the production of high pressure hydraulic hose assemblies. • Interact with suppliers to negotiate pricing and delivery of materials from worldwide supplier base that meet EP Cleveland specifications and quality. • Work closely with Engineering to quote new business opportunities and products to increase EP Cleveland sales and income. • Responsible for $1.1 million inventory reduction during FY 2012 with no production interruptions or increases in expedited freight expense. INVACARE CORPORATION, Cleveland, OH 2006 to 2011 $1.8 billion leading global manufacturer of medical devices and health care products for the acute and non-acute care environment, including home health care, retail and extended care markets. Materials Specialist (2008 to 2011) • Planned 1100 active material part numbers with an inventory value of $1.2 million to ensure meeting financial goals and continue to ship finished product on time to meet customer expectations. • Interacted with suppliers to setup and maintain consignment inventory is a daily ongoing part of material planning. • Maintained data accuracy and scheduling production daily. • Collaborated with Assembly supervision and lead personnel to determine material needs helps to continuously improve the flow of material. Materials Supervisor (2006 to 2008) • Led and managed the activities of Buyer/Planners focusing on the procurement of materials and goods for the daily production of custom powered wheelchairs. • Managed Supply Chain from both International and Domestic suppliers to obtain timely, accurate and quality deliveries of products to support production.
  • 2. ROBERT H. BARLOW, PAGE 2 • Scheduled delivery of products from outside processing suppliers including anodized, heat treated, plated, brazed and other process that required to support the production.. • Managed associates in the daily processes of supplying material to the production floor. • Implemented and maintained cycle count procedures to improve inventory accuracy. • Set the Master Production Plan in the system working closely with Marketing and Customer Service to ensure proper planning of finished goods. PARKER HANNIFIN, Cleveland, OH 2000 to 2006 $12 billion and world's leading diversified manufacturer of motion and control technologies and systems Buyer/Planner • Maintained over $4.5 million dollars of raw material for the production of actuators and cylinders for motion control devices. • Purchased aluminum castings, aluminum extrusions held to tight tolerances and various grades of steel and aluminum bar stock. • Planned and scheduled production of hydraulic, pneumatic and electrical cylinders and actuators based on MRP requirements. • Scheduled outside processes necessary for our products including machining due to capacity constraints including anodizing, heat treating, blackening, etc. • Reduced lead times for raw materials and reduced the dollar value of inventory as a result using Lean principles. • Served as Import/Export coordinator responsible for making sure that the Actuator Division is in compliance with US Customs regulations for importing material, as well as exporting finished goods. ALPHA TECHNOLOGIES, Akron, OH 1993 to 2000 Purchasing Supervisor • Responsible for Just-in-Time purchasing of all components for the manufacture and support of complex testing instruments based on Economic Order Quantities and Economic Order Intervals. Procurements include components for electrical sub-assemblies. • Purchased mechanical components made to drawings including castings and raw material. • Operated and maintained Material Requirements Planning (MRPII) database. • Conducted vendor evaluation audits to assure quality performance by both current and future vendors. • Contributed to Make vs. Buy decisions. • Play major role outsourcing project for both mechanical and electrical components. • Contributed to the efforts for Certification of ISO 9001. MONSANTO RUBBER INSTRUMENTS 1983 to 1993 Storeroom Supervisor (1986 to 1993) Journeyman Machinist (1969 to 1986) CNC Machining setup and programming EDUCATION BS, Industrial Management, The University of Akron, Akron, OH Concentration: Production U.S. Customs Brokerage Training Kanban/Lean Training at Parker Hannifin
  • 3. ROBERT H. BARLOW, PAGE 3 TECHNICAL SKILLS MRP systems Microsoft Office Excel, Word