SlideShare a Scribd company logo
1 of 2
Julio Esparza
Stickney, IL 60402 | 708.828.4373 | julioesparza91@yahoo.com | LinkedIn: Julio Esparza
Summary
I am a Production Specialist with a keen eye toward lean manufacturing. My history with process
improvement includes system automation and production floor efficiencies. With expertise in cost benefit
analysis, I have contributed to materials cost savings of over $700K. My degree in Industrial Engineering
contributes to my focus on design and team collaboration. I am conversational in Spanish and have
AutoCAD, Pro Engineer, Mastercam, Minitab, Flexsim, and MRP (SAP) skills.
Career History
Peacock Engineering Company, LLC, Bolingbrook, IL 2015 – Present
Planning and Materials Management Specialist
• Procure materials (consigned & turnkey) needed for production to ensure customer delivery
compliance.
• Manage inventory to just in time philosophy.
• Responsible for data maintenance, updating system records and reports for supply chain.
• Part number and bill of material setups.
• Constantly in communication with suppliers and customer on materials activity.
Gardner Denver, Inc., Princeton, IL 2012 – 2015
Production Scheduler II, Reciprocating Operations (2013 – 2015)
• Collaborated with cross-functional team to convert manual scheduling system to SAP MII. Project
entailed design, testing, and implementation. Increased production 30% over manual system,
improved project tracking for assemblers and management, and enhanced inventory oversight.
• Identified order processing flow obstruction, delaying acknowledgement of purchase orders and
impacting material requirements oversight. Investigated process flow at other Gardner location
and determined cause to be use of incorrect SAP transactions. Refined process to utilize new
transaction resulting in improved order response times and inventory planning.
• Reduced production inefficiencies with effective and frequent communication with purchasing
regarding supply chain shortages of high-volume products. Proactively rescheduling orders based
on in-stock supplies maintains production at highest level possible.
• Improved production speed and inventory levels as part of team directed to redesign assembly
line area in response to Kaizen event. Interviewed assemblers for ease of use and researched
component usage history. Designed and installed rack system based on product use frequency
and best placement allowing assemblers ready access to necessary parts.
• Updated daily report sent to plant manager communicating cycle of order status’s, material
issues, and production levels. Streamlines production efficiency and allows for transparency of
monthly forecast progress.
Supply Chain, Corporate Intern (2012 - 2013)
• Managed $700K materials cost reduction project by analyzing potential suppliers including
international sources. Teamed with quality department to inspect outsourced finished product
quality versus in-house casting machining along with volume costs and freight costs.
• Designed project management format implemented at all plant locations.
• Offered on-going part-time position while attending classes after conclusion of summer term.
Received full-time position at graduation.
Hellmann Worldwide Logistics, Des Plaines, IL
2011
Air Import Coordinator, Summer Intern
• Input cost information and verified accuracy of 50-100 domestic and international orders daily.
• Challenged and negotiated late fees and other charges.
Education
Bradley University, Peoria, IL, Bachelor of Industrial Engineering, Business Management
minor.
Coursework included Lean Manufacturing, Quality Control, Operations Research, Facilities Planning,
Occupational Ergonomics, Engineering Economics, Statistical Methods, and Business Law.
Senior Project: Caterpillar Assembly Omission Prevention Project.
Certifications
APICS Certification in Production and Inventory Management (CPIM) in progress.

More Related Content

What's hot

MarcusMarshallResume2016
MarcusMarshallResume2016MarcusMarshallResume2016
MarcusMarshallResume2016Marcus Marshall
 
Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)Dennis Bertoni
 
White kent resume_2017
White kent resume_2017White kent resume_2017
White kent resume_2017Kent White
 
Jim Albers Resume (4) (1)
Jim Albers Resume (4) (1)Jim Albers Resume (4) (1)
Jim Albers Resume (4) (1)Jim Albers
 
MRP & Inventory Performance Management
MRP & Inventory Performance ManagementMRP & Inventory Performance Management
MRP & Inventory Performance ManagementMurugeshan KN
 
Analyst - Supply Chain Management
Analyst - Supply Chain ManagementAnalyst - Supply Chain Management
Analyst - Supply Chain ManagementChirag Dabhee
 
Resume - Steve K. Mu - Supply Chain Engineer 0611
Resume - Steve K. Mu - Supply Chain Engineer 0611Resume - Steve K. Mu - Supply Chain Engineer 0611
Resume - Steve K. Mu - Supply Chain Engineer 0611Ko-Ping Mu
 
Prashant Resume-22.11.15
Prashant Resume-22.11.15Prashant Resume-22.11.15
Prashant Resume-22.11.15Prashant Asati
 
Sean Costin resume
Sean Costin resumeSean Costin resume
Sean Costin resumeSeanCostin2
 
Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow
 
Lori Green's Resume
Lori Green's ResumeLori Green's Resume
Lori Green's ResumeLori Green
 
Advanced Planning And Optimization
Advanced Planning And OptimizationAdvanced Planning And Optimization
Advanced Planning And OptimizationHitesh Kumar Markam
 

What's hot (20)

MarcusMarshallResume2016
MarcusMarshallResume2016MarcusMarshallResume2016
MarcusMarshallResume2016
 
Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
 
Mills, Art - Resume 2
Mills, Art - Resume 2Mills, Art - Resume 2
Mills, Art - Resume 2
 
Keith resume
Keith resumeKeith resume
Keith resume
 
Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)
 
White kent resume_2017
White kent resume_2017White kent resume_2017
White kent resume_2017
 
Jim Albers Resume (4) (1)
Jim Albers Resume (4) (1)Jim Albers Resume (4) (1)
Jim Albers Resume (4) (1)
 
MRP & Inventory Performance Management
MRP & Inventory Performance ManagementMRP & Inventory Performance Management
MRP & Inventory Performance Management
 
Resume2015
Resume2015Resume2015
Resume2015
 
Analyst - Supply Chain Management
Analyst - Supply Chain ManagementAnalyst - Supply Chain Management
Analyst - Supply Chain Management
 
HeenanResume2016 R1
HeenanResume2016 R1HeenanResume2016 R1
HeenanResume2016 R1
 
Pravy SC
Pravy SCPravy SC
Pravy SC
 
Resume - Steve K. Mu - Supply Chain Engineer 0611
Resume - Steve K. Mu - Supply Chain Engineer 0611Resume - Steve K. Mu - Supply Chain Engineer 0611
Resume - Steve K. Mu - Supply Chain Engineer 0611
 
Prashant Resume-22.11.15
Prashant Resume-22.11.15Prashant Resume-22.11.15
Prashant Resume-22.11.15
 
T. Keith Bishop 18
T. Keith Bishop 18T. Keith Bishop 18
T. Keith Bishop 18
 
Sean Costin resume
Sean Costin resumeSean Costin resume
Sean Costin resume
 
Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015
 
Lori Green's Resume
Lori Green's ResumeLori Green's Resume
Lori Green's Resume
 
Advanced Planning And Optimization
Advanced Planning And OptimizationAdvanced Planning And Optimization
Advanced Planning And Optimization
 
Resume_Shantanu
Resume_ShantanuResume_Shantanu
Resume_Shantanu
 

Similar to Julio Esparza Production Specialist Resume

Similar to Julio Esparza Production Specialist Resume (20)

ruthgehrmann
ruthgehrmannruthgehrmann
ruthgehrmann
 
Ruthgehrmann
RuthgehrmannRuthgehrmann
Ruthgehrmann
 
Gitanjali - SAP (MM)
Gitanjali - SAP (MM)Gitanjali - SAP (MM)
Gitanjali - SAP (MM)
 
Tyler Bloodworth Resume
Tyler Bloodworth ResumeTyler Bloodworth Resume
Tyler Bloodworth Resume
 
HPoole_Resume-10-2015
HPoole_Resume-10-2015HPoole_Resume-10-2015
HPoole_Resume-10-2015
 
Magendran New Resume
Magendran New ResumeMagendran New Resume
Magendran New Resume
 
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENTJAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
 
Resume
Resume  Resume
Resume
 
CV
CVCV
CV
 
jg resume 2017
jg resume 2017jg resume 2017
jg resume 2017
 
Griselda Arevalo Resume
Griselda Arevalo ResumeGriselda Arevalo Resume
Griselda Arevalo Resume
 
Robert - Resume - modified
Robert - Resume - modifiedRobert - Resume - modified
Robert - Resume - modified
 
Carol_Timms_resume 10 (2)
Carol_Timms_resume 10 (2)Carol_Timms_resume 10 (2)
Carol_Timms_resume 10 (2)
 
Bhanu tiwari it resume
Bhanu tiwari it resume Bhanu tiwari it resume
Bhanu tiwari it resume
 
Rick Inserra_Resume
Rick Inserra_ResumeRick Inserra_Resume
Rick Inserra_Resume
 
Resume -TARAK
Resume -TARAKResume -TARAK
Resume -TARAK
 
Polasik_Resume_061316
Polasik_Resume_061316Polasik_Resume_061316
Polasik_Resume_061316
 
John C Trimble 3
John C Trimble 3John C Trimble 3
John C Trimble 3
 
Jeremy_McGurk_Resume-2
Jeremy_McGurk_Resume-2Jeremy_McGurk_Resume-2
Jeremy_McGurk_Resume-2
 
CormanV5dates
CormanV5datesCormanV5dates
CormanV5dates
 

Julio Esparza Production Specialist Resume

  • 1. Julio Esparza Stickney, IL 60402 | 708.828.4373 | julioesparza91@yahoo.com | LinkedIn: Julio Esparza Summary I am a Production Specialist with a keen eye toward lean manufacturing. My history with process improvement includes system automation and production floor efficiencies. With expertise in cost benefit analysis, I have contributed to materials cost savings of over $700K. My degree in Industrial Engineering contributes to my focus on design and team collaboration. I am conversational in Spanish and have AutoCAD, Pro Engineer, Mastercam, Minitab, Flexsim, and MRP (SAP) skills. Career History Peacock Engineering Company, LLC, Bolingbrook, IL 2015 – Present Planning and Materials Management Specialist • Procure materials (consigned & turnkey) needed for production to ensure customer delivery compliance. • Manage inventory to just in time philosophy. • Responsible for data maintenance, updating system records and reports for supply chain. • Part number and bill of material setups. • Constantly in communication with suppliers and customer on materials activity. Gardner Denver, Inc., Princeton, IL 2012 – 2015 Production Scheduler II, Reciprocating Operations (2013 – 2015) • Collaborated with cross-functional team to convert manual scheduling system to SAP MII. Project entailed design, testing, and implementation. Increased production 30% over manual system, improved project tracking for assemblers and management, and enhanced inventory oversight. • Identified order processing flow obstruction, delaying acknowledgement of purchase orders and impacting material requirements oversight. Investigated process flow at other Gardner location and determined cause to be use of incorrect SAP transactions. Refined process to utilize new transaction resulting in improved order response times and inventory planning. • Reduced production inefficiencies with effective and frequent communication with purchasing regarding supply chain shortages of high-volume products. Proactively rescheduling orders based on in-stock supplies maintains production at highest level possible. • Improved production speed and inventory levels as part of team directed to redesign assembly line area in response to Kaizen event. Interviewed assemblers for ease of use and researched component usage history. Designed and installed rack system based on product use frequency and best placement allowing assemblers ready access to necessary parts. • Updated daily report sent to plant manager communicating cycle of order status’s, material issues, and production levels. Streamlines production efficiency and allows for transparency of monthly forecast progress. Supply Chain, Corporate Intern (2012 - 2013)
  • 2. • Managed $700K materials cost reduction project by analyzing potential suppliers including international sources. Teamed with quality department to inspect outsourced finished product quality versus in-house casting machining along with volume costs and freight costs. • Designed project management format implemented at all plant locations. • Offered on-going part-time position while attending classes after conclusion of summer term. Received full-time position at graduation. Hellmann Worldwide Logistics, Des Plaines, IL 2011 Air Import Coordinator, Summer Intern • Input cost information and verified accuracy of 50-100 domestic and international orders daily. • Challenged and negotiated late fees and other charges. Education Bradley University, Peoria, IL, Bachelor of Industrial Engineering, Business Management minor. Coursework included Lean Manufacturing, Quality Control, Operations Research, Facilities Planning, Occupational Ergonomics, Engineering Economics, Statistical Methods, and Business Law. Senior Project: Caterpillar Assembly Omission Prevention Project. Certifications APICS Certification in Production and Inventory Management (CPIM) in progress.