2. 10 Feb 2015 www.watermangroup.com 2
Introduction.
• Richard Wheeler – Resident Engineer
• Client Monitoring Team
• Contract meets Employer’s Requirements
3. 10 Feb 2015 www.watermangroup.com 3
Construction
• Concrete box for substructure
• Watertight with vapour membrane to provide
Grade Two and above standard
• Concrete core with shear walls providing
stability.
• Steel frame providing office space from First
to 13th floor level.
• Concrete on profiled metal decking above
ground level
• Intumescent paint for fire protection
4. 10 Feb 2015 www.watermangroup.com 4
Accuracy
• Core verticality within 25mm
• Steel frame tolerances “half National
Standard”
• Permitted deviations set out in tolerances
and deflections document
5. 10 Feb 2015 www.watermangroup.com 5
Quality
• Skanska and Severfield (UK) Ltd
• ISO 9001 certification and auditing
• Regular on site and off site inspections
• Daily dialogue with suppliers and contractors
• Taking ownership as a project team
6. 10 Feb 2015 www.watermangroup.com 6
Practice
• As-built records - EDM (Electronic Distance
Measurement)
• Concrete material sampling and testing
• Mill certificates
• Welding procedures
• Stud welding tests
7. 10 Feb 2015 www.watermangroup.com 7
3D views
• Overall Structure
• 1st Floor
• Basement