SlideShare a Scribd company logo
1 of 3
Download to read offline
Randal Link
10148 Buckeye Rd., Festus, MO 63028
(314) 226-3485 / Rklink71@yahoo.com
Professional Summary:
Master Carpenter who worked as part of a union and as an independent contractor. Brings valuable
experience from large corporate construction sites to residential home repair projects. Excellent
interpersonal skills and works in a timely and efficient manner to see challenging jobs through to
completion.
Accomplishments:
 21 years of experience as Journeyman Carpenter
 11 years of experience supervising crews of 20 carpenters in various projects including decks,
windows, doors, roofing, siding, remodel and new construction
 8 years of experience in building maintenance and preventative inspections
 Promoted quickly from apprentice carpenter to Journeyman Carpenter, hired as Superintendent
for a large construction company
 Established Link Construction, LLC in 2006 and became an independent contractor of a small
successful company covering all construction needs
Skills:
 General contracting professional / Project Scheduling
 Self-motivated, dependable & reliable / Excellent customer relations
 Subcontractor management / Knowledge in construction safety
 Interior and exterior renovation / Start to finish home construction
 Painting interior/exterior wall coatings and finishes
 Power and hand tools / Operates Skid steer, Lull and forklifts
 Effective at multi-tasking / Proficient with Microsoft Word and Excel
Work History:
Lechateau-Co (April 12, 2016 – Current)
Journeyman Carpenter
 Frame structures and walls and install cabinets, ceilings, doors, floors, fixtures, prefabricated
panels and scaffolding, drywall, taping, painting, trim and tile work.
 Use measuring devices, electric saws, hammers, levels, miter boxes, pneumatic nail guns,
sanding machines and squares.
 Read and act on blueprints and other plan documents.
Michael Baker International
Waterproofing Technician Specialist (05/2015 to 04/2016)
 Specialize in commercial roof inspections of multiple types.
 Performs preventative maintenance and repairs.
 Currently carries top secret security clearance for work on American embassies around the
world.
Dunklin R5 – Pevely, MO
School Bus Driver (10/2010 to 04/2015)
Link Construction LLC – Festus, MO
Owner / Carpenter (04/2006 to 04/2015)
 Projects included roofing, siding, windows, doors, bathrooms, kitchens, additions, basements
and/or complete remodels and start to finish construction.
 Ensured compliance to safety operating procedures.
 Maintained and operated various electrical tools.
 Assisted in renovation of structures and erected prefabricated panels.
 Monitored erecting of rough timber structures for construction process.
 Interpreted all drawings as per required specifications and plans.
 Performed operational maintenance on pre-engineered structures and equipments.
 Developed building layouts and installed floorings and partitions.
 Performed all heavy carpentry work for structural assemblies.
 Accurately estimated time and materials costs for projects.
 Provided accurate measurements and estimates for all projects.
 Applied caulk, sealants and other agents to installed surfaces.
Stocker Construction – Kirkwood, MO (04/2003 to 02/2006)
Lead Carpenter / Superintendent
 Supervised and managed crew / ensured compliance to safety operating procedures.
 Maintained and operated various electrical tools
 Assisted in renovation of structures and erected prefabricated panels.
 Interpreted all drawings as per required specifications and plans.
 Performed operational maintenance on pre-engineered structures and equipments.
 Developed building layouts and installed floorings and partitions.
 Performed all heavy carpentry work for structural assemblies.
 Accurately estimated time and materials costs for projects.
 Provided accurate measurements and estimates for all projects.
Durbin Carpentry – Kirkwood, MO
Journeyman Carpenter / Foreman (03/2000 to 02/2003)
Education:
GED (1990): DeSoto High School – DeSoto, MO
Carpenter (2000): Union Carpenters School of Training - St. Louis, MO
Certifications:
Certa NRCA Certification, CertainTeed shingle master, IKO pro plus installer, Tamko installer, Hardee
board siding installer, CertainTeed siding installer, Royal siding installer, Torch applicator, EPDM, TPO,
Fall Protection and OSIA Courses and CDL
Randy Link 06.28.16

More Related Content

What's hot

What's hot (20)

jake bellamy Resume 1 (1).PDF
jake bellamy Resume 1 (1).PDFjake bellamy Resume 1 (1).PDF
jake bellamy Resume 1 (1).PDF
 
Alan Behnke Team
Alan Behnke TeamAlan Behnke Team
Alan Behnke Team
 
Bryan W Pelky Resume
Bryan W Pelky ResumeBryan W Pelky Resume
Bryan W Pelky Resume
 
MAIN CV Trevor Harrison16 - Copy[4762] - Copy
MAIN CV Trevor Harrison16 - Copy[4762] - CopyMAIN CV Trevor Harrison16 - Copy[4762] - Copy
MAIN CV Trevor Harrison16 - Copy[4762] - Copy
 
CV
CVCV
CV
 
Resume for Steve White 042115
Resume for Steve White 042115Resume for Steve White 042115
Resume for Steve White 042115
 
john kinds resume 2015
john kinds resume 2015john kinds resume 2015
john kinds resume 2015
 
KevinMaxwellCV2
KevinMaxwellCV2KevinMaxwellCV2
KevinMaxwellCV2
 
Patrick N Moore Resume 2017 (Spring)
Patrick N Moore Resume 2017 (Spring)Patrick N Moore Resume 2017 (Spring)
Patrick N Moore Resume 2017 (Spring)
 
resume revised
resume revisedresume revised
resume revised
 
RESUME 2016 Construction PM
RESUME 2016 Construction PMRESUME 2016 Construction PM
RESUME 2016 Construction PM
 
Reneman Superintendent Resume
Reneman Superintendent ResumeReneman Superintendent Resume
Reneman Superintendent Resume
 
Ekes holdings profile
Ekes holdings profileEkes holdings profile
Ekes holdings profile
 
Darrell-Hammett (1)
Darrell-Hammett (1)Darrell-Hammett (1)
Darrell-Hammett (1)
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Burts Resume 1
Burts Resume 1Burts Resume 1
Burts Resume 1
 
Richard O'Neill Resume
Richard O'Neill ResumeRichard O'Neill Resume
Richard O'Neill Resume
 
Aug 2016
Aug 2016Aug 2016
Aug 2016
 
CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)
 
Peter Miller CV 2015
Peter Miller CV 2015Peter Miller CV 2015
Peter Miller CV 2015
 

Viewers also liked

Mario soluciones entrega
Mario soluciones entregaMario soluciones entrega
Mario soluciones entregamario torres
 
Task 1 – digital project
Task 1 – digital projectTask 1 – digital project
Task 1 – digital projectGeorgia Smith
 
An ideal world english project
An ideal world english projectAn ideal world english project
An ideal world english projectmariamh3001
 
Portfolio-Monica-Bravo
Portfolio-Monica-BravoPortfolio-Monica-Bravo
Portfolio-Monica-BravoMonica Bravo
 
Repuesta inmune antitumoral y marcadores tumorales para la
Repuesta inmune antitumoral y marcadores tumorales para laRepuesta inmune antitumoral y marcadores tumorales para la
Repuesta inmune antitumoral y marcadores tumorales para laEdidt Sanchez Frias
 
Lael Shamir Cervantes González
Lael Shamir Cervantes GonzálezLael Shamir Cervantes González
Lael Shamir Cervantes GonzálezLaelCervantes
 
Presentación personal
Presentación personal Presentación personal
Presentación personal pazguna
 
Mario soluciones entrega
Mario soluciones entregaMario soluciones entrega
Mario soluciones entregamario torres
 
Lael Shamir Cervantes González
Lael Shamir Cervantes GonzálezLael Shamir Cervantes González
Lael Shamir Cervantes GonzálezLaelCervantes
 
Team c unit_mapping_chart-4
Team c unit_mapping_chart-4Team c unit_mapping_chart-4
Team c unit_mapping_chart-4carmi504
 

Viewers also liked (18)

Escuelas Económicas
Escuelas Económicas Escuelas Económicas
Escuelas Económicas
 
Nicolay atocha
Nicolay atochaNicolay atocha
Nicolay atocha
 
Mario soluciones entrega
Mario soluciones entregaMario soluciones entrega
Mario soluciones entrega
 
Zoom
ZoomZoom
Zoom
 
Task 1 – digital project
Task 1 – digital projectTask 1 – digital project
Task 1 – digital project
 
Sistema economico
Sistema economicoSistema economico
Sistema economico
 
An ideal world english project
An ideal world english projectAn ideal world english project
An ideal world english project
 
Portfolio-Monica-Bravo
Portfolio-Monica-BravoPortfolio-Monica-Bravo
Portfolio-Monica-Bravo
 
Mario c.a.
Mario c.a.Mario c.a.
Mario c.a.
 
Repuesta inmune antitumoral y marcadores tumorales para la
Repuesta inmune antitumoral y marcadores tumorales para laRepuesta inmune antitumoral y marcadores tumorales para la
Repuesta inmune antitumoral y marcadores tumorales para la
 
Lael Shamir Cervantes González
Lael Shamir Cervantes GonzálezLael Shamir Cervantes González
Lael Shamir Cervantes González
 
Presentación personal
Presentación personal Presentación personal
Presentación personal
 
Gerencia de proyectos
Gerencia de proyectosGerencia de proyectos
Gerencia de proyectos
 
Mario soluciones entrega
Mario soluciones entregaMario soluciones entrega
Mario soluciones entrega
 
FPP 1.5
FPP 1.5FPP 1.5
FPP 1.5
 
Lael Shamir Cervantes González
Lael Shamir Cervantes GonzálezLael Shamir Cervantes González
Lael Shamir Cervantes González
 
Mario c.a.
Mario c.a.Mario c.a.
Mario c.a.
 
Team c unit_mapping_chart-4
Team c unit_mapping_chart-4Team c unit_mapping_chart-4
Team c unit_mapping_chart-4
 

Similar to Randy Link 06.28.16

Similar to Randy Link 06.28.16 (20)

TAWANDA MAHLANGU CV.
TAWANDA MAHLANGU CV.TAWANDA MAHLANGU CV.
TAWANDA MAHLANGU CV.
 
Sean L Sullivan Resume final edit
Sean L Sullivan Resume  final editSean L Sullivan Resume  final edit
Sean L Sullivan Resume final edit
 
2016 Bob resume (003)
2016 Bob resume (003)2016 Bob resume (003)
2016 Bob resume (003)
 
Manal ibrahim.cv 17.docx
Manal ibrahim.cv 17.docxManal ibrahim.cv 17.docx
Manal ibrahim.cv 17.docx
 
Distefano_Marc_resume
Distefano_Marc_resumeDistefano_Marc_resume
Distefano_Marc_resume
 
Resume Rajesh
Resume RajeshResume Rajesh
Resume Rajesh
 
John Steven McRae Resume Generated April 2024
John Steven McRae Resume Generated April 2024John Steven McRae Resume Generated April 2024
John Steven McRae Resume Generated April 2024
 
CV sultan(Q)
CV sultan(Q)CV sultan(Q)
CV sultan(Q)
 
A P Rolfe CV March 2016
A P Rolfe  CV March 2016A P Rolfe  CV March 2016
A P Rolfe CV March 2016
 
Construction Management Resume 9.30.12
Construction Management Resume 9.30.12Construction Management Resume 9.30.12
Construction Management Resume 9.30.12
 
Jason Davenport Resume
Jason Davenport Resume Jason Davenport Resume
Jason Davenport Resume
 
AYAD QASIM
AYAD QASIMAYAD QASIM
AYAD QASIM
 
Chris Wons Resume
Chris Wons ResumeChris Wons Resume
Chris Wons Resume
 
1 steve's new resume 46 april n
1 steve's new resume 46 april n1 steve's new resume 46 april n
1 steve's new resume 46 april n
 
Dale buck jr. resume 2016
Dale buck jr. resume 2016Dale buck jr. resume 2016
Dale buck jr. resume 2016
 
Resume - Celieto Rey Suarez
Resume - Celieto Rey SuarezResume - Celieto Rey Suarez
Resume - Celieto Rey Suarez
 
Rob Resume (1)
Rob Resume (1)Rob Resume (1)
Rob Resume (1)
 
Cv
CvCv
Cv
 
CV
CVCV
CV
 
RESUME3.3.2016
RESUME3.3.2016RESUME3.3.2016
RESUME3.3.2016
 

Randy Link 06.28.16

  • 1. Randal Link 10148 Buckeye Rd., Festus, MO 63028 (314) 226-3485 / Rklink71@yahoo.com Professional Summary: Master Carpenter who worked as part of a union and as an independent contractor. Brings valuable experience from large corporate construction sites to residential home repair projects. Excellent interpersonal skills and works in a timely and efficient manner to see challenging jobs through to completion. Accomplishments:  21 years of experience as Journeyman Carpenter  11 years of experience supervising crews of 20 carpenters in various projects including decks, windows, doors, roofing, siding, remodel and new construction  8 years of experience in building maintenance and preventative inspections  Promoted quickly from apprentice carpenter to Journeyman Carpenter, hired as Superintendent for a large construction company  Established Link Construction, LLC in 2006 and became an independent contractor of a small successful company covering all construction needs Skills:  General contracting professional / Project Scheduling  Self-motivated, dependable & reliable / Excellent customer relations  Subcontractor management / Knowledge in construction safety  Interior and exterior renovation / Start to finish home construction  Painting interior/exterior wall coatings and finishes  Power and hand tools / Operates Skid steer, Lull and forklifts  Effective at multi-tasking / Proficient with Microsoft Word and Excel Work History: Lechateau-Co (April 12, 2016 – Current) Journeyman Carpenter  Frame structures and walls and install cabinets, ceilings, doors, floors, fixtures, prefabricated panels and scaffolding, drywall, taping, painting, trim and tile work.  Use measuring devices, electric saws, hammers, levels, miter boxes, pneumatic nail guns, sanding machines and squares.  Read and act on blueprints and other plan documents. Michael Baker International Waterproofing Technician Specialist (05/2015 to 04/2016)  Specialize in commercial roof inspections of multiple types.  Performs preventative maintenance and repairs.  Currently carries top secret security clearance for work on American embassies around the world.
  • 2. Dunklin R5 – Pevely, MO School Bus Driver (10/2010 to 04/2015) Link Construction LLC – Festus, MO Owner / Carpenter (04/2006 to 04/2015)  Projects included roofing, siding, windows, doors, bathrooms, kitchens, additions, basements and/or complete remodels and start to finish construction.  Ensured compliance to safety operating procedures.  Maintained and operated various electrical tools.  Assisted in renovation of structures and erected prefabricated panels.  Monitored erecting of rough timber structures for construction process.  Interpreted all drawings as per required specifications and plans.  Performed operational maintenance on pre-engineered structures and equipments.  Developed building layouts and installed floorings and partitions.  Performed all heavy carpentry work for structural assemblies.  Accurately estimated time and materials costs for projects.  Provided accurate measurements and estimates for all projects.  Applied caulk, sealants and other agents to installed surfaces. Stocker Construction – Kirkwood, MO (04/2003 to 02/2006) Lead Carpenter / Superintendent  Supervised and managed crew / ensured compliance to safety operating procedures.  Maintained and operated various electrical tools  Assisted in renovation of structures and erected prefabricated panels.  Interpreted all drawings as per required specifications and plans.  Performed operational maintenance on pre-engineered structures and equipments.  Developed building layouts and installed floorings and partitions.  Performed all heavy carpentry work for structural assemblies.  Accurately estimated time and materials costs for projects.  Provided accurate measurements and estimates for all projects. Durbin Carpentry – Kirkwood, MO Journeyman Carpenter / Foreman (03/2000 to 02/2003) Education: GED (1990): DeSoto High School – DeSoto, MO Carpenter (2000): Union Carpenters School of Training - St. Louis, MO Certifications: Certa NRCA Certification, CertainTeed shingle master, IKO pro plus installer, Tamko installer, Hardee board siding installer, CertainTeed siding installer, Royal siding installer, Torch applicator, EPDM, TPO, Fall Protection and OSIA Courses and CDL