Pdcm Ltd. Oxford, Oxfordshire, United Kingdom Jun 2013–Oct 2014 
Project Manager / Asst. Owners Representative (Contract Administrator) 
University of Oxford 
Andrew Wiles Building - New Mathematical Institute 
$90m (Final Phases through End of Defects) 
Physical Theoretical Chemistry Laboratory $2m (Design Stage B design through Completion) 
Worcester College - Listed Kitchen & Infrastructure Upgrade $2m (Stage C design through Completion) 
Old Road Campus(Medical Research) Infrastructure Upgrade $3m (Contractor Instruction through Completion) 
Park Hospital Master Plan (Services Strategy) $1m (Masterplan Infrastructure Report) 
Assisted in project scheduling & planning of numerous other educational facilities, accommodation,retail and mixed 
use developmentsthrough the design, procurement, and tender phase ranging from $1m-$50m. 
 Created detailed project programmes from concept to completion 
 Completed complex project within Grade II listed building on time and budget after extra 8 weeks of unforeseen 
archaeological investigations through re-sequencing and staging of works 
 Completed intricate laboratory refurbishment (PTCL) within live environments on time and budget 
 Managed design coordination with client and project team 
 Coordinated with architects, consultants and city council with regards to discharge of planning conditions 
 Drafted & issued ‘Expression of Interest’ ‘Project Briefs’ & ‘Tender Packages’ for consultants & contractor bids 
 Investigated tender returns and advised clients on consultant and contractor short lists 
 Interviewed prospective contractors and advised clients on contractor selection 
 Assisted in management of contract negotiations 
 Formally instructed consultant and contractor appointments 
 Evaluated contractors’ programme of works 
 Evaluated progress for inclusion in client reports 
 Chaired contractor progress meetings 
 Written and presented monthly client progress reports 
 Assisted project team in achieving milestones& KPIs 
Hunters & Partners Architects.Barnham, West Sussex, UK Jun 2011–Jun2013 
Client Design Consultant(Risk & Safety) 
Perry Street Development (High Rise Accommodation), London $16m (Final Phases through End of Defects) 
RAF Uxbridge Academy (Secondary School), London $12m (Design Stages) 
Lake Farm Academy (Secondary School), London $12m (Design Stages) 
South Ruislip Library (Library / Residential), London $10m (Construction Phase) 
Edenbridge Development (Residential), Edenbridge $10m (Construction Phase) 
Advised on a 100+ projects ranging from $50k –$16m 
 Advised clients on responsibilities under Construction, Design,& Management Regulations 
 Advised on selection of project teams 
 Introduced new file formats that were adopted by main client base as standard 
 Produced pre-construction information packs on project safety & risk 
 Coordinated design with architects and other consultants 
 Advised on suitability of construction design, methods, materials,& management with regards to risk & safety 
during the construction process and future use of the building 
 Streamlined existing methods of working and introduced new work practices 
 Assisted with business plans and business expansion proposals 
 Accountable for the compilation of statutory Health & Safety Documentation 
BSc (Hons) Project Management. (Accelerated Degree) April 2009–Feb 2011 
Student, Leeds Metropolitan University 
 Graduated with a 3.8 GPA 
 Attained Ian Bancroft award for excellence from School of the Built Environment
Parkway Construction. Lewisville, TX June 2007– Nov 2008 
Superintendent 
Discount Tire,Atlanta, Georgia $3m 
Discount Tire, Dallas, Texas $3m 
Discount Tire, Raliegh, N. Carolina $5m 
 Carried out the duties of a site project manager from site clearance to handover 
 Achieved ”Project Excellence” award for achieving all project KPI’s & milestones 
SRC Construction. Satellite Beach, FL Feb 2006–April 2007 
Lead Construction Manager in team of 4 
Demolition of 1950s base housing and construction of 
new 3-5 bedroom homes for the USAF 45th Space Wing $60m 
 Introduced new handover procedures that increased productivity 
 In charge of USAF and city inspections 
 Advised on construction methods to improve quality 
 Acted as liason between General Contractor, USAF,and Family’s Liason Group 
 Reduced build times, increased production and reduced costs through aggressive scheduling 
 Handed over 34 homes in 3 months when the previous manager had achieved 6 handovers 
Rogers Homes. York (UK) (Temporary position during relocation to US March 2005–Nov 2005 
Site Manager 
Three Storey timber frame custom apartment complex $5 
 Carried out duties of site manger on busy city center project 
 In overall charge of up to 100 operatives 
 D & B project with new systems and technologies 
Previous Experience 
Site Manager(Custom Homes) 2002–2004 
Assistant Site Manager (Multi-story & custom) 2001–2002 
Warranty Manager (Custom Homes) 1999–2001 
Tradesman (Bricklaying/Roofing Residential & Commercial) 1993–1998 
Armed Forces (Northern Ireland, Gulf, medals received) 1 9 8 7 – 1 993 
Education 
 Management of Construction Design & Management Regulations 
 (Association for Project Safety) 
2012 
 BSc (Hons) Project Management(Leeds Metropolitan University, UK) 2009–2011 
 ECDL, Word processing, Spread-sheets & Databases (York College, York) 2009 
 9 CSEs, 4 GCSEs (All Saints Secondary, York) (High School Equivalent) 1986 
Awards & Affiliations 
BSc (Hons) Project Management (2.1 awarded) (Equivalent 3.8 GPA) 
Ian Bancroft Award for excellence (Leeds Met. University) 
RMaPS (Association for Project Safety) 
”Project Excellence” (Parkway Construction.) 
APM (Association for Project Management) 
Technical Training & Expertise 
BIM (Currently studying) 
LEED (Currently studying) 
Site Managers Safety Training Scheme (Supervisors Level) 
Microsoft Project (Advanced planning)

More Related Content

What's hot (20)

CV LM de Clercq 2017
CV  LM de Clercq 2017CV  LM de Clercq 2017
CV LM de Clercq 2017
 
haney resume 2017
haney resume 2017haney resume 2017
haney resume 2017
 
CV
CVCV
CV
 
2016 complete Resume USA
2016 complete Resume USA2016 complete Resume USA
2016 complete Resume USA
 
Current ian cv
Current ian cvCurrent ian cv
Current ian cv
 
John Maree CV
John Maree CVJohn Maree CV
John Maree CV
 
Mike Resume January 2015
Mike Resume January 2015Mike Resume January 2015
Mike Resume January 2015
 
newestcv
newestcvnewestcv
newestcv
 
RE Gamez
RE GamezRE Gamez
RE Gamez
 
RESUME
RESUMERESUME
RESUME
 
Resume Mark 061215
Resume Mark 061215Resume Mark 061215
Resume Mark 061215
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
Darren Mitchell CV - Sept 2015
Darren Mitchell CV - Sept 2015Darren Mitchell CV - Sept 2015
Darren Mitchell CV - Sept 2015
 
Poly excavator 220115
Poly excavator 220115Poly excavator 220115
Poly excavator 220115
 
Glenn Caron Resume May 2016
Glenn Caron Resume May 2016Glenn Caron Resume May 2016
Glenn Caron Resume May 2016
 
Christopher Persson CV
Christopher Persson CVChristopher Persson CV
Christopher Persson CV
 
resume revised
resume revisedresume revised
resume revised
 
rons resume 2015
rons resume 2015rons resume 2015
rons resume 2015
 
Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016
 
Resume4
Resume4Resume4
Resume4
 

Similar to Adrian Jackson Resume

Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell
 
Gareth_Lloyd_CV_v8
Gareth_Lloyd_CV_v8Gareth_Lloyd_CV_v8
Gareth_Lloyd_CV_v8Gareth Lloyd
 
Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic
 
Project management container pavilion
Project management container pavilionProject management container pavilion
Project management container pavilionjerryycc
 
Mike Haller - Professional Resume
Mike Haller - Professional ResumeMike Haller - Professional Resume
Mike Haller - Professional ResumeMichael Haller
 
CV - Anthony Oxlade NCSO Oct 2015
CV - Anthony Oxlade NCSO Oct 2015CV - Anthony Oxlade NCSO Oct 2015
CV - Anthony Oxlade NCSO Oct 2015Anthony Oxlade
 
My role and the projects I worked on while I was at Bond Bryan Architects
My role and the projects I worked on while I was at Bond Bryan ArchitectsMy role and the projects I worked on while I was at Bond Bryan Architects
My role and the projects I worked on while I was at Bond Bryan ArchitectsFaidon (Phé-thon) Nikiforiadis
 
Kevin A Fitzgerald Resume Oct 2023.pdf
Kevin A Fitzgerald Resume Oct 2023.pdfKevin A Fitzgerald Resume Oct 2023.pdf
Kevin A Fitzgerald Resume Oct 2023.pdfkevinafitzgerald1
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe
 
Engineering Resume - 13.June.2016
Engineering Resume - 13.June.2016Engineering Resume - 13.June.2016
Engineering Resume - 13.June.2016Marc Lagattuta
 
ShostMike_MEP.docx 3
ShostMike_MEP.docx 3ShostMike_MEP.docx 3
ShostMike_MEP.docx 3mike shost
 

Similar to Adrian Jackson Resume (20)

Resume_CPM
Resume_CPMResume_CPM
Resume_CPM
 
Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2
 
CWong Resume
CWong ResumeCWong Resume
CWong Resume
 
Gareth_Lloyd_CV_v8
Gareth_Lloyd_CV_v8Gareth_Lloyd_CV_v8
Gareth_Lloyd_CV_v8
 
Sean Cody - Resume
Sean Cody - ResumeSean Cody - Resume
Sean Cody - Resume
 
Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume Word
 
Project List 1
Project List 1Project List 1
Project List 1
 
Project management container pavilion
Project management container pavilionProject management container pavilion
Project management container pavilion
 
Mike Haller - Professional Resume
Mike Haller - Professional ResumeMike Haller - Professional Resume
Mike Haller - Professional Resume
 
CV - Anthony Oxlade NCSO Oct 2015
CV - Anthony Oxlade NCSO Oct 2015CV - Anthony Oxlade NCSO Oct 2015
CV - Anthony Oxlade NCSO Oct 2015
 
20100730 Jordan Cv
20100730 Jordan Cv20100730 Jordan Cv
20100730 Jordan Cv
 
My role and the projects I worked on while I was at Bond Bryan Architects
My role and the projects I worked on while I was at Bond Bryan ArchitectsMy role and the projects I worked on while I was at Bond Bryan Architects
My role and the projects I worked on while I was at Bond Bryan Architects
 
Kevin A Fitzgerald Resume Oct 2023.pdf
Kevin A Fitzgerald Resume Oct 2023.pdfKevin A Fitzgerald Resume Oct 2023.pdf
Kevin A Fitzgerald Resume Oct 2023.pdf
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016
 
Engineering Resume - 13.June.2016
Engineering Resume - 13.June.2016Engineering Resume - 13.June.2016
Engineering Resume - 13.June.2016
 
Tringale Resume 9-2-14
Tringale Resume 9-2-14Tringale Resume 9-2-14
Tringale Resume 9-2-14
 
PM
PMPM
PM
 
Dennis Resume
Dennis ResumeDennis Resume
Dennis Resume
 
ShostMike_MEP.docx 3
ShostMike_MEP.docx 3ShostMike_MEP.docx 3
ShostMike_MEP.docx 3
 
CV
CVCV
CV
 

Adrian Jackson Resume

  • 1. ADRIAN JACKSON BSc (Hons), RMaPS adrianjackson78@yahoo.com / (562) 235-7885 http://uk.linkedin.com/pub/adrian-jackson-bsc-hons-rmaps/32/814/5b7/ Relevant/Recent Experience Pdcm Ltd. Oxford, Oxfordshire, United Kingdom Jun 2013–Oct 2014 Project Manager / Asst. Owners Representative (Contract Administrator) University of Oxford Andrew Wiles Building - New Mathematical Institute $90m (Final Phases through End of Defects) Physical Theoretical Chemistry Laboratory $2m (Design Stage B design through Completion) Worcester College - Listed Kitchen & Infrastructure Upgrade $2m (Stage C design through Completion) Old Road Campus(Medical Research) Infrastructure Upgrade $3m (Contractor Instruction through Completion) Park Hospital Master Plan (Services Strategy) $1m (Masterplan Infrastructure Report) Assisted in project scheduling & planning of numerous other educational facilities, accommodation,retail and mixed use developmentsthrough the design, procurement, and tender phase ranging from $1m-$50m.  Created detailed project programmes from concept to completion  Completed complex project within Grade II listed building on time and budget after extra 8 weeks of unforeseen archaeological investigations through re-sequencing and staging of works  Completed intricate laboratory refurbishment (PTCL) within live environments on time and budget  Managed design coordination with client and project team  Coordinated with architects, consultants and city council with regards to discharge of planning conditions  Drafted & issued ‘Expression of Interest’ ‘Project Briefs’ & ‘Tender Packages’ for consultants & contractor bids  Investigated tender returns and advised clients on consultant and contractor short lists  Interviewed prospective contractors and advised clients on contractor selection  Assisted in management of contract negotiations  Formally instructed consultant and contractor appointments  Evaluated contractors’ programme of works  Evaluated progress for inclusion in client reports  Chaired contractor progress meetings  Written and presented monthly client progress reports  Assisted project team in achieving milestones& KPIs Hunters & Partners Architects.Barnham, West Sussex, UK Jun 2011–Jun2013 Client Design Consultant(Risk & Safety) Perry Street Development (High Rise Accommodation), London $16m (Final Phases through End of Defects) RAF Uxbridge Academy (Secondary School), London $12m (Design Stages) Lake Farm Academy (Secondary School), London $12m (Design Stages) South Ruislip Library (Library / Residential), London $10m (Construction Phase) Edenbridge Development (Residential), Edenbridge $10m (Construction Phase) Advised on a 100+ projects ranging from $50k –$16m  Advised clients on responsibilities under Construction, Design,& Management Regulations  Advised on selection of project teams  Introduced new file formats that were adopted by main client base as standard  Produced pre-construction information packs on project safety & risk  Coordinated design with architects and other consultants  Advised on suitability of construction design, methods, materials,& management with regards to risk & safety during the construction process and future use of the building  Streamlined existing methods of working and introduced new work practices  Assisted with business plans and business expansion proposals  Accountable for the compilation of statutory Health & Safety Documentation BSc (Hons) Project Management. (Accelerated Degree) April 2009–Feb 2011 Student, Leeds Metropolitan University  Graduated with a 3.8 GPA  Attained Ian Bancroft award for excellence from School of the Built Environment
  • 2. Parkway Construction. Lewisville, TX June 2007– Nov 2008 Superintendent Discount Tire,Atlanta, Georgia $3m Discount Tire, Dallas, Texas $3m Discount Tire, Raliegh, N. Carolina $5m  Carried out the duties of a site project manager from site clearance to handover  Achieved ”Project Excellence” award for achieving all project KPI’s & milestones SRC Construction. Satellite Beach, FL Feb 2006–April 2007 Lead Construction Manager in team of 4 Demolition of 1950s base housing and construction of new 3-5 bedroom homes for the USAF 45th Space Wing $60m  Introduced new handover procedures that increased productivity  In charge of USAF and city inspections  Advised on construction methods to improve quality  Acted as liason between General Contractor, USAF,and Family’s Liason Group  Reduced build times, increased production and reduced costs through aggressive scheduling  Handed over 34 homes in 3 months when the previous manager had achieved 6 handovers Rogers Homes. York (UK) (Temporary position during relocation to US March 2005–Nov 2005 Site Manager Three Storey timber frame custom apartment complex $5  Carried out duties of site manger on busy city center project  In overall charge of up to 100 operatives  D & B project with new systems and technologies Previous Experience Site Manager(Custom Homes) 2002–2004 Assistant Site Manager (Multi-story & custom) 2001–2002 Warranty Manager (Custom Homes) 1999–2001 Tradesman (Bricklaying/Roofing Residential & Commercial) 1993–1998 Armed Forces (Northern Ireland, Gulf, medals received) 1 9 8 7 – 1 993 Education  Management of Construction Design & Management Regulations  (Association for Project Safety) 2012  BSc (Hons) Project Management(Leeds Metropolitan University, UK) 2009–2011  ECDL, Word processing, Spread-sheets & Databases (York College, York) 2009  9 CSEs, 4 GCSEs (All Saints Secondary, York) (High School Equivalent) 1986 Awards & Affiliations BSc (Hons) Project Management (2.1 awarded) (Equivalent 3.8 GPA) Ian Bancroft Award for excellence (Leeds Met. University) RMaPS (Association for Project Safety) ”Project Excellence” (Parkway Construction.) APM (Association for Project Management) Technical Training & Expertise BIM (Currently studying) LEED (Currently studying) Site Managers Safety Training Scheme (Supervisors Level) Microsoft Project (Advanced planning)