SlideShare a Scribd company logo
1 of 4
Rajesh B Wankhade
: 0240-2475933 / 09503050544
: rajeshbwankhede@gmail.com
~ STRATEGIC PLANNING ~ PRODUCTION OPERATIONS ~ PROCESS OPTIMIZATION ~
Result oriented professional with proficiency in running successful method-oriented operations & taking initiatives for
business excellence
Industry Preference: Automobile / Manufacturing
Location Preference: Pune / Nasik /Chakan
COMPETENCY MATRIX
Production Operations
Strategic Planning
Process Optimization
Maintenance Operations
Project Execution & Control
Training & Development
Robotics & Automation
Team Management
PROFILE SNAPSHOT
 A dynamic professional with 28 years of experience in steering initiatives towards
achievement of organizational goals with chief responsibilities pertaining to
Production & Maintenance Operations
 Hands on experience in implementing Total Productive Maintenance and improving
quality of machines, equipment & processes
 Effectively carried out Functional & Reliability Tests on various product
samples & implemented number of strategies to enhance product functions &
received zero customer complaints for export market
 Successfully introduced new models like Pulsar-135/150, Boxer’s Family &
all Discover New Family Models
 Instrumental inrecommending modifications to minimizeescalations & rejections in
the production process; realizing operational efficiencies and controlling costs &
cycle time
 Strong leader with excellent motivational skills to sustain forward growth
momentum while motivating peak individual performance from team members
A R E A S O F E X P E R T I S E
 Analyzingand mapping existingprocesses to the desired levels (GAPAnalysis) and suggestingappropriate business solutions to
achieve higher levels of efficiency and effectiveness
 Documenting various MIS reports for the top managements perusal & assisting in critical decision making
 Supervising & controlling production parameters for ensuring product quality in compliance with the given standards
 Establishing strong business rapport with the suppliers; managing day‐to‐day supplier performance for achieving service,
cost, delivery and quality norms
 Liaising with the team members to provide guidance on process development, detailing on quality requirements and
finalization of quality plans
 Working with a strong vigilance for any potential hazards by performing regular inspections and ensuring adherence to
health & safety parameters as per the rules & regulations
O R G A N I Z A T I O N E X P E R I E N C E
Aug’87 – June’15 Bajaj Auto, Ltd., Aurangabad
Growth Path:
April’05 – June’15 Senior Manager (Motorcycle Division) – Paint, ED and Fuel Tank Assembly Shop
Team Size: 10 Managers, 4 Section Managers, 16 Group Leaders & 300 Workmen
Nov’91 – Mar’05 Maintenance Manager (Motorcycle & 3WH Division) – Paint, ED, Electroplating, Vehicle Assembly
Shop & LPG Installations
Team Size: 4 Assistant Managers, 2 Section Managers, 28 Fitters & 8 Electricians
Aug’87 – Oct’91 Assistant Manager (Industrial Engineering Department) Motorcycle Division & 3WH Division
Key Result Areas:
As Senior Manager (Motorcycle Division)
 Devising strategic plans for entire Paint, ED Process & Assembly Shop Operations and implementing improvement projects
 Aligning the teams with company vision and objectives, aligning resources to achieve the goals.
 Developing and engaging the people, bring positive change, generate new ideas for continuous improvement.
 Achieving Daily and monthly targets of Domestic & Export Markets
 Liaising with:
o Vehicle Frame, ABS Part, Auto components, Paint & Decal Suppliers
o Engineering & Component Development Department for improvement activities
 Serving as:
o Core Member of Plant Steering Committee
o Coordinator for TPM, ISO 14001 & OHSAS (Environment Management Systems)
As Maintenance Manager (Motorcycle & 3WH Division)
 Spearheaded equipment maintenance of Paint, ED, Electroplating, Vehicle Assembly Shop & LPG Installations
 Executed preventive maintenance schedules, Time based maintenance & Condition based activities for:
o France Make PLC controlled SAMES Painting Systems, High Speed Magnetic Turbines & Bells
o Conveyors - Econ Super, Belt Conveyors, Slat Conveyors, Gear Boxes & Drives
o Thermax Aquatherm Boilers, US Make Maxon Burners, Oertli Make Burners & Heating Ovens
o Heat Exchangers – Plate & Coil Type and Pumps - Centrifugal, Reciprocating & Gear Pumps
o Atlas Make Reciprocating & Screw Type Compressors
o LPG Installations, Firefighting Systems & Incinerators Jig Burning Ovens
o Air Replacement Plants, Exhaust & Pneumatic Systems
o Nut Runners, Number Punching Machines, Pneumatic & Hydro Pneumatic Tools
o Paint Sludge Incinerators & Centrifuges
o Electroplating Wagons & Gear Boxes.
o Implemented concept of RCM for LPG system & boilers where high degree of function & safety is essential.
Assistant Manager (Industrial Engineering Department)
 Conducted time & work studies for press, assembly, machining operations.
 Planned multiple activity charts, manpower calculations, capacities, equipment &
manpower utilization
 Ensured adherence to International Labor Organization (ILO Systems)
Significant Accomplishments:
 Received Excellence Award consistently from 2006 to 2012 for best performance.
 Received 1st prize for presentation at IMTMA for Best Asset Utilization in 2008
 Presented 45 Kaizens to TPM Guide which resulted in quality & cost benefits
 Served as Core Member in JIPM audit and received TPM Excellence Award
 Successfully nominated to study upgraded SAMES Painting Equipment at France 2014
K E Y P R O J E C T S H A N D L E D
Process Improvement Projects
Painting Lines Productivity:
Kaizen Implementation:
 Introduced Tectallis Process in place of Phosphating.
 Optimized Bell Painting Parameters for better DFT
 Reduced Pitch from 0.8 to 0.6 meters
 Increased Conveyor Speed from 1.5 to 2.4 mts/min
 Changed Oven Duct Design for Increased Conveyor Speed
Results Obtained:
 Improved Components/Hanger by 33% and Painting Line
capacity from 3000 to 8000 components/day
 Cost saving of instaling new painting line is eliminated.
Decal Application Cell:
 Implemented:
o Conveyorized Decal Application & Robotic Decal
Application which resulted in P,Q,C benefits to the
company
o Modifications in Decal Profiles for ease of applications
o Multi Model Fixtures for Decal Application which resulted in flexibility & setup time reduction
o Implemented robotic decal application process for fatigue reduction and productivity improvement.
Fuel Tank Assembly Cell:
 Implemented conveyorized Fuel Tank Assembly Process.
 Implemented kit bin concept for designing best assembly layout.
 Implemented online Leakage Testing Method for Fuel Tank Assembly which has benefitted in Steam lining the process
 Improved Line Balancing by 20% by Breaking Bottleneck Operations
 Reduced manpower by 30% using ECRS Concept and LCA.
Quality Improvement Projects
Dust & Dirt Defect Reduction:
 Implemented Dust Count Exercise & provision of Freudenberg Filters which reduced dust & dirt defect by 10%
 Made use of:
o Discs on Painting Hangers to prevent dust falling from Moving Conveyor and Non-metallic Indexing Guides to repel
Paint Deposition
o Air Curtains, Double Doors & De Ionizing Blowers to prevent dust and high pressure Air Knife to clean the object
Orange Peel Defect:
 Maintained:
o Humidity in the range of 60 to 80 RH by providing Fogging Nozzles ( a new concept)
o Temperature of paint kitchen by Chilling Unit
 Improved RA value of surface from 1.2 to 0.8 by providing 3M polishing equipments.
 Controlled viscosity by providing online Viscometer.
 Installed BYK Wave Scan Meter for controlling DOI values.
Paint Peel Off Defect:
 Made use of:
o PTFE Coated Screws for Fuel Tank Cap Fitment to arrest Petrol Fumes
o Notch for 0 Ring to avoid Dislocation & arrest Petrol Fumes
 Liaised with suppliers and increased petrol resistance of Paint Film
 Introduced Burr Free Washers of Fuel Cap Fitment
Fuel Tank Assembly Defects – Fuel Leakage from Fuel Tank:
 Changed:
o Differential Method of Leak Test to Direct Leak Test which has eliminated defects.
o Specifications of Water Dip Test from 15 to 10 PA/10 sec
o Supply Mode of Fuel Gauge 0 Ring to avoid deformation
 Made use of:
o Spigot in Fuel Cock body for perfect sealing.
o Illumination System for Water Dip Test Equipment for better inspection
Cost Reduction Projects
Paint Cost Reduction:
 Made use of High Transfer Efficiency Bells for better atomization & more coverage
 Reduced wastage by minimizing gap between components
 Planned alternate source of M/s Nippon to compete with KNPL & APPG
Energy Cost Reduction:
 Eliminated IR Heating Oven of decal by using Channelized Decal Liners
 Made use of stop mode for Air Replacement Blowers & Exhaust Blowers in recess time
LPG Cost Reduction:
 Reduced hanger weight to minimize load in oven
 Made use of Solar Concentrator to Heat Pretreatment Chemicals
 Replaced IR Heating Oven with LPG Fired Oven at Fuel Tank Dry Off Stage
Waste Reduction by 6R Principles – Environment Improvement:
 Eliminated Phosphate Sludge Generation completely at pre-treatment process
 Used Centrifuge System to reduce water content of Paint Sludge
 Collected Waste Thinner & re used the same which resulted in cost & impact on environment.
Safety Improvement Projects
 Made use of:
o Remote Operated Valve & Earth Monitoring System in LPG installations
o Shut Off Valves in Paint Kitchen Pneumatic System
o Anti-static Tubing & Conductive Matting in Paint Kitchen
P R O F E S S I O N A L Q U A L I F I C A T I O N S
1987 B.E. in Mechanical Engineering from Government College of Engineering, Amravati University
1989 Diploma in Business Management from College, Aurangabad University
Other Course:
 Completed course in Production Management from JIPM, Japan in 2011 (Delivered 2 hours lecture on “Jitzu Hozen
Activities” as requested by JIPM guide)
I T S K I L L S
 Sound knowledge of MS Office Suit & Microsoft Windows
P E R S O N A L D E T A I L S
Date of Birth : 28th March 1964
Languages Known : English, Hindi & Marathi
Address : “Trinity “Plot No 8, N2/A Sadashiv Nagar, CIDCO Jalna Road, Aurangabad – 431001, Maharashtra

More Related Content

What's hot

What's hot (19)

R Rao CV update
R Rao CV updateR Rao CV update
R Rao CV update
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resume
 
SENTHIL PANDIAN CV
SENTHIL PANDIAN CVSENTHIL PANDIAN CV
SENTHIL PANDIAN CV
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs final
 
Arslan Cv OIL&GAS
Arslan Cv OIL&GASArslan Cv OIL&GAS
Arslan Cv OIL&GAS
 
Application for, Refinery Operator.
Application for, Refinery Operator.Application for, Refinery Operator.
Application for, Refinery Operator.
 
Sr.Inst Tech
Sr.Inst TechSr.Inst Tech
Sr.Inst Tech
 
CURRENT CV1 2015
CURRENT CV1 2015CURRENT CV1 2015
CURRENT CV1 2015
 
Madan_RESUME
Madan_RESUMEMadan_RESUME
Madan_RESUME
 
Chirag darji resume for production operator (oil & gas)
Chirag darji resume for production operator (oil & gas)Chirag darji resume for production operator (oil & gas)
Chirag darji resume for production operator (oil & gas)
 
Abdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application EngineerAbdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application Engineer
 
CV operator Oil movement
CV operator Oil movementCV operator Oil movement
CV operator Oil movement
 
CV- QA- QC Engineer- 14 july 2019
CV-  QA- QC Engineer- 14 july 2019CV-  QA- QC Engineer- 14 july 2019
CV- QA- QC Engineer- 14 july 2019
 
Saurav Rawat CV
Saurav Rawat CVSaurav Rawat CV
Saurav Rawat CV
 
RAJENDRA SHARMA CV
RAJENDRA SHARMA CVRAJENDRA SHARMA CV
RAJENDRA SHARMA CV
 
CV Dian Risdiana
CV Dian RisdianaCV Dian Risdiana
CV Dian Risdiana
 
OMV Muzaffar CV
OMV Muzaffar CVOMV Muzaffar CV
OMV Muzaffar CV
 
Southern California "Greenbook" public works specification book update
Southern California "Greenbook" public works specification book updateSouthern California "Greenbook" public works specification book update
Southern California "Greenbook" public works specification book update
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 

Similar to Rajesh Resume (20)

updated_resume
updated_resumeupdated_resume
updated_resume
 
Steve Mutch
Steve MutchSteve Mutch
Steve Mutch
 
Resume word format
Resume word formatResume word format
Resume word format
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultant
 
Rajiv Latest Revised
Rajiv Latest RevisedRajiv Latest Revised
Rajiv Latest Revised
 
Getme fast(v2)
Getme fast(v2)Getme fast(v2)
Getme fast(v2)
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
Analyzer MNT Speciyalist
Analyzer MNT SpeciyalistAnalyzer MNT Speciyalist
Analyzer MNT Speciyalist
 
updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016
 
updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016
 
STS Product Sheet Final
STS Product Sheet FinalSTS Product Sheet Final
STS Product Sheet Final
 
Clean Energy Compression Corporate overview
Clean Energy Compression Corporate overview Clean Energy Compression Corporate overview
Clean Energy Compression Corporate overview
 
Clean Energy Compression Corporation - Corporate Overview
Clean Energy Compression Corporation - Corporate OverviewClean Energy Compression Corporation - Corporate Overview
Clean Energy Compression Corporation - Corporate Overview
 
Segment Presentation RES Oil and Gas Industry
Segment Presentation RES Oil and Gas IndustrySegment Presentation RES Oil and Gas Industry
Segment Presentation RES Oil and Gas Industry
 
kshitij_resume_R&D
kshitij_resume_R&Dkshitij_resume_R&D
kshitij_resume_R&D
 
resume new
resume newresume new
resume new
 
SSK - Business Analyst
SSK - Business AnalystSSK - Business Analyst
SSK - Business Analyst
 
resume_janardhan
resume_janardhanresume_janardhan
resume_janardhan
 
Resume - Suncor
Resume - SuncorResume - Suncor
Resume - Suncor
 

Rajesh Resume

  • 1. Rajesh B Wankhade : 0240-2475933 / 09503050544 : rajeshbwankhede@gmail.com ~ STRATEGIC PLANNING ~ PRODUCTION OPERATIONS ~ PROCESS OPTIMIZATION ~ Result oriented professional with proficiency in running successful method-oriented operations & taking initiatives for business excellence Industry Preference: Automobile / Manufacturing Location Preference: Pune / Nasik /Chakan COMPETENCY MATRIX Production Operations Strategic Planning Process Optimization Maintenance Operations Project Execution & Control Training & Development Robotics & Automation Team Management PROFILE SNAPSHOT  A dynamic professional with 28 years of experience in steering initiatives towards achievement of organizational goals with chief responsibilities pertaining to Production & Maintenance Operations  Hands on experience in implementing Total Productive Maintenance and improving quality of machines, equipment & processes  Effectively carried out Functional & Reliability Tests on various product samples & implemented number of strategies to enhance product functions & received zero customer complaints for export market  Successfully introduced new models like Pulsar-135/150, Boxer’s Family & all Discover New Family Models  Instrumental inrecommending modifications to minimizeescalations & rejections in the production process; realizing operational efficiencies and controlling costs & cycle time  Strong leader with excellent motivational skills to sustain forward growth momentum while motivating peak individual performance from team members A R E A S O F E X P E R T I S E  Analyzingand mapping existingprocesses to the desired levels (GAPAnalysis) and suggestingappropriate business solutions to achieve higher levels of efficiency and effectiveness  Documenting various MIS reports for the top managements perusal & assisting in critical decision making  Supervising & controlling production parameters for ensuring product quality in compliance with the given standards  Establishing strong business rapport with the suppliers; managing day‐to‐day supplier performance for achieving service, cost, delivery and quality norms  Liaising with the team members to provide guidance on process development, detailing on quality requirements and finalization of quality plans  Working with a strong vigilance for any potential hazards by performing regular inspections and ensuring adherence to health & safety parameters as per the rules & regulations O R G A N I Z A T I O N E X P E R I E N C E Aug’87 – June’15 Bajaj Auto, Ltd., Aurangabad Growth Path: April’05 – June’15 Senior Manager (Motorcycle Division) – Paint, ED and Fuel Tank Assembly Shop Team Size: 10 Managers, 4 Section Managers, 16 Group Leaders & 300 Workmen Nov’91 – Mar’05 Maintenance Manager (Motorcycle & 3WH Division) – Paint, ED, Electroplating, Vehicle Assembly Shop & LPG Installations Team Size: 4 Assistant Managers, 2 Section Managers, 28 Fitters & 8 Electricians Aug’87 – Oct’91 Assistant Manager (Industrial Engineering Department) Motorcycle Division & 3WH Division Key Result Areas:
  • 2. As Senior Manager (Motorcycle Division)  Devising strategic plans for entire Paint, ED Process & Assembly Shop Operations and implementing improvement projects  Aligning the teams with company vision and objectives, aligning resources to achieve the goals.  Developing and engaging the people, bring positive change, generate new ideas for continuous improvement.  Achieving Daily and monthly targets of Domestic & Export Markets  Liaising with: o Vehicle Frame, ABS Part, Auto components, Paint & Decal Suppliers o Engineering & Component Development Department for improvement activities  Serving as: o Core Member of Plant Steering Committee o Coordinator for TPM, ISO 14001 & OHSAS (Environment Management Systems) As Maintenance Manager (Motorcycle & 3WH Division)  Spearheaded equipment maintenance of Paint, ED, Electroplating, Vehicle Assembly Shop & LPG Installations  Executed preventive maintenance schedules, Time based maintenance & Condition based activities for: o France Make PLC controlled SAMES Painting Systems, High Speed Magnetic Turbines & Bells o Conveyors - Econ Super, Belt Conveyors, Slat Conveyors, Gear Boxes & Drives o Thermax Aquatherm Boilers, US Make Maxon Burners, Oertli Make Burners & Heating Ovens o Heat Exchangers – Plate & Coil Type and Pumps - Centrifugal, Reciprocating & Gear Pumps o Atlas Make Reciprocating & Screw Type Compressors o LPG Installations, Firefighting Systems & Incinerators Jig Burning Ovens o Air Replacement Plants, Exhaust & Pneumatic Systems o Nut Runners, Number Punching Machines, Pneumatic & Hydro Pneumatic Tools o Paint Sludge Incinerators & Centrifuges o Electroplating Wagons & Gear Boxes. o Implemented concept of RCM for LPG system & boilers where high degree of function & safety is essential. Assistant Manager (Industrial Engineering Department)  Conducted time & work studies for press, assembly, machining operations.  Planned multiple activity charts, manpower calculations, capacities, equipment & manpower utilization  Ensured adherence to International Labor Organization (ILO Systems) Significant Accomplishments:  Received Excellence Award consistently from 2006 to 2012 for best performance.  Received 1st prize for presentation at IMTMA for Best Asset Utilization in 2008  Presented 45 Kaizens to TPM Guide which resulted in quality & cost benefits  Served as Core Member in JIPM audit and received TPM Excellence Award  Successfully nominated to study upgraded SAMES Painting Equipment at France 2014 K E Y P R O J E C T S H A N D L E D Process Improvement Projects Painting Lines Productivity: Kaizen Implementation:  Introduced Tectallis Process in place of Phosphating.  Optimized Bell Painting Parameters for better DFT  Reduced Pitch from 0.8 to 0.6 meters  Increased Conveyor Speed from 1.5 to 2.4 mts/min  Changed Oven Duct Design for Increased Conveyor Speed Results Obtained:  Improved Components/Hanger by 33% and Painting Line capacity from 3000 to 8000 components/day  Cost saving of instaling new painting line is eliminated. Decal Application Cell:  Implemented: o Conveyorized Decal Application & Robotic Decal Application which resulted in P,Q,C benefits to the company
  • 3. o Modifications in Decal Profiles for ease of applications o Multi Model Fixtures for Decal Application which resulted in flexibility & setup time reduction o Implemented robotic decal application process for fatigue reduction and productivity improvement. Fuel Tank Assembly Cell:  Implemented conveyorized Fuel Tank Assembly Process.  Implemented kit bin concept for designing best assembly layout.  Implemented online Leakage Testing Method for Fuel Tank Assembly which has benefitted in Steam lining the process  Improved Line Balancing by 20% by Breaking Bottleneck Operations  Reduced manpower by 30% using ECRS Concept and LCA. Quality Improvement Projects Dust & Dirt Defect Reduction:  Implemented Dust Count Exercise & provision of Freudenberg Filters which reduced dust & dirt defect by 10%  Made use of: o Discs on Painting Hangers to prevent dust falling from Moving Conveyor and Non-metallic Indexing Guides to repel Paint Deposition o Air Curtains, Double Doors & De Ionizing Blowers to prevent dust and high pressure Air Knife to clean the object Orange Peel Defect:  Maintained: o Humidity in the range of 60 to 80 RH by providing Fogging Nozzles ( a new concept) o Temperature of paint kitchen by Chilling Unit  Improved RA value of surface from 1.2 to 0.8 by providing 3M polishing equipments.  Controlled viscosity by providing online Viscometer.  Installed BYK Wave Scan Meter for controlling DOI values. Paint Peel Off Defect:  Made use of: o PTFE Coated Screws for Fuel Tank Cap Fitment to arrest Petrol Fumes o Notch for 0 Ring to avoid Dislocation & arrest Petrol Fumes  Liaised with suppliers and increased petrol resistance of Paint Film  Introduced Burr Free Washers of Fuel Cap Fitment Fuel Tank Assembly Defects – Fuel Leakage from Fuel Tank:  Changed: o Differential Method of Leak Test to Direct Leak Test which has eliminated defects. o Specifications of Water Dip Test from 15 to 10 PA/10 sec o Supply Mode of Fuel Gauge 0 Ring to avoid deformation  Made use of: o Spigot in Fuel Cock body for perfect sealing. o Illumination System for Water Dip Test Equipment for better inspection Cost Reduction Projects Paint Cost Reduction:  Made use of High Transfer Efficiency Bells for better atomization & more coverage  Reduced wastage by minimizing gap between components  Planned alternate source of M/s Nippon to compete with KNPL & APPG Energy Cost Reduction:  Eliminated IR Heating Oven of decal by using Channelized Decal Liners  Made use of stop mode for Air Replacement Blowers & Exhaust Blowers in recess time LPG Cost Reduction:  Reduced hanger weight to minimize load in oven  Made use of Solar Concentrator to Heat Pretreatment Chemicals  Replaced IR Heating Oven with LPG Fired Oven at Fuel Tank Dry Off Stage Waste Reduction by 6R Principles – Environment Improvement:  Eliminated Phosphate Sludge Generation completely at pre-treatment process  Used Centrifuge System to reduce water content of Paint Sludge
  • 4.  Collected Waste Thinner & re used the same which resulted in cost & impact on environment. Safety Improvement Projects  Made use of: o Remote Operated Valve & Earth Monitoring System in LPG installations o Shut Off Valves in Paint Kitchen Pneumatic System o Anti-static Tubing & Conductive Matting in Paint Kitchen P R O F E S S I O N A L Q U A L I F I C A T I O N S 1987 B.E. in Mechanical Engineering from Government College of Engineering, Amravati University 1989 Diploma in Business Management from College, Aurangabad University Other Course:  Completed course in Production Management from JIPM, Japan in 2011 (Delivered 2 hours lecture on “Jitzu Hozen Activities” as requested by JIPM guide) I T S K I L L S  Sound knowledge of MS Office Suit & Microsoft Windows P E R S O N A L D E T A I L S Date of Birth : 28th March 1964 Languages Known : English, Hindi & Marathi Address : “Trinity “Plot No 8, N2/A Sadashiv Nagar, CIDCO Jalna Road, Aurangabad – 431001, Maharashtra