Residential and Commercial Developments
Location: Carolina, P.R.
Client: San José Lagoon Development
Contact: Mr. León Rubín
Tel. (787) 370−2423
Cost ($000): $750
Completion Date: 2004
A small gazebo was used to safely install
telephone, cable and electrical panels.
General view of buildings one to
five at Point Estates Lagoon
Project Description:
Point States Lagoon is a residential project consisting of 84 apartments in San José Bay Side in Carolina. A
requirement to obtain permits to install an electrical primary distribution, cable, telephone and intercom distribution to
supply the necessities of this project was made by the project owner who contracted our services to prepare the
design to comply with this requirements.
Electrical In−site primary and secondary distribution
Point States Lagoon
Location: Peñuelas, P.R.
Client: Galexda Development Corp.
Contact: José E. Pérez
Tel. (787) 566−0583
Cost ($000): $6,000
Completion Date: 2008
Project Description:
Complete Electrical Design for Mansiones de Puerto Galexda. The owner contracted our services to prepare the
offsite and exterior electrical primary distribution, secondary distribution, telephone and cable tv drawings.
Communications, Electrical, Lighting, Primary and Secondary Distribution Design
Houses in Construction Houses in Construction
Mansiones de Puerto Galexda
Location: Various
Client: PREPA Networks
Contact: José D. Casillas
Tel. (787) 625−9950
Cost ($000): $500
Completion Date: 2006
Project Description:
Complete Design for three (3) communications shelters in the metropolitan area
Communications Shelters
Finished shelter in Carolina
PREPA Network
Location: Toa Alta, P.R.
Client: JN Bracero & Associates
Contact: Erick Bracero
Tel. (787) 703−3942
Cost ($000): $1,250
Completion Date: 2005
Project Description:
Paseos del Plata is a residential project consisting of 54 residences in Bo. Ortiz, Sector Bucarabones in Toa Alta.
The owner contracted our services to prepare the offsite and exterior electrical primary distribution, secondary
distribution, telephone and cable tv drawings.
Typical House Main Street
Electrical In−site primary and secondary distribution
Paseos del Plata
Location: San Juan, P.R.
Client: Sr. Juan Arriaga
Contact: Sr. Juan Arriaga
Tel. (787) 603−1913
Cost ($000): $50
Completion Date: 2002
New transclosure beside faculty parking Panoramic view of Immaculate College
Project Description:
Immaculate College is a group of buildings located at Ponce de León Avenue in Santurce. These buildings have
been served from a one phase transformer. Since the transformer was not enough to satisfy the load
necessities, they requested our services to design and install a primary three phase substation.
Electrical design for New Substation
Colegio La Inmaculada
Location: Santurce, P.R.
Client: Juan Arriaga
Contact: Sr. Juan Arriaga
Tel. (787) 603−1913
Cost ($000): $50
Completion Date: 2001
Pad Mounted Transformer ˘ Installed in a
platform to facilitate access to pedestrians.
Project Description:
San Vicente de Paúl College consist of a group of buildings located at Bolívar Street in Santurce. These buildings
have been served from a 100 KVA /7.62 kV, one phase transformer. Since the capacity of the transformer was
not enough to serve the existing and future load, they requested our services to the design a primary three phase
substation. H2O also designed the platform to locate the transformer.
Electrical Design for new substation
Platform and Stair Access
San Vicente de Paul
Location: Gurabo, P.R.
Client: TICS Construction
Contact: José F. Padilla
Tel. (787) 250−7400
Cost ($000): $200
Completion Date: 1999
Residential Development Entrance Other view of the poles
Project Description:
Electrical design for a new 8.32 kV distribution line to serve a residential project in Bo. Hato Nuevo in Gurabo.
New 8.32 kV Distribution Line
Residential Project
Location: Caguas, P.R.
Client: Mr. Edwin Soto
Contact: Mr. Edwin Soto
Tel. (787) 250−8181
Cost ($000): $ 20
Completion Date: 2001
Electrical SubstationFront view of the location
Project Description:
Design of a three phase substation for the facilities of Perfect Cleaning Services.
Electrical Design for New Substation at Perfect Cleaning Services
Perfect Cleaning Services
Location: Various, P.R.
Client: AT&T
Contact: Rafael Meléndez
Tel. (787) 565−8231
Cost ($000): $50
Completion Date: 2000
Proposed site Existing meter bank to be studied
AT&T Communications Sites
Project Description:
Electrical design for AT&T new cellular sites and load and demand studies of energy consumption.
AT&T
Location: Carolina, P.R.
Client: Harold Hart & Assoc.
Contact: Eng. José Manota
Cost ($000): $300
Completion Date: 1999 Main entrance
at Los Colobos store
Prescription Pharmacy Area
at K−Mart Carolina
Project Description:
Electrical Interior Design Drawings for the Kmart pharmacy located at Los Colobos Shopping Center in Carolina.
Electrical Interior Design Drawings
Kmart
Electrical High Voltage Lines Relocation
Location: Trujillo Alto P.R.
Client: Consulting Engineering Group
Contact: Javier Llavona
Tel. (787) 525−6237
Cost ($000): $350
Completion Date: 1999
Poles to be relocated Area with lines relocated
Electrical Design for the relocation of various electrical lines
Project Description:
Electrical design for the relocation of 38, 13.2 and 8.32 kV aerial lines for the construction of the new
Government Center in Trujillo Alto
Centro de Gobierno
Location: Trujillo Alto, P.R.
Client: Brighton Homes
Contact: Enrique López
Tel. (787) 775−2200
Cost ($000): $100
Completion Date: 2001
Poles to be relocated Walk−up view
Electrical Design for the relocation of a 115 kV aerial line
Project Description:
Electrical design for the relocation of a 115 kV aerial lines for the construction of the new walk−up development,
Vista Serena.
Vista Serena Development
Location: Río Piedras, P.R.
Client: EAP Group Practice
Contact: Antonio Molina
Tel. (787) 753−2778
Cost ($000): $200
Completion Date: 2000
Poles to be relocated Area with lines relocated
Electrical Design for the relocation of a 115 kV aerial line
Project Description:
Electrical design for the relocation of a 115 kV aerial lines for the construction of the new residential
development, Monteverde Real.
Monte Verde Real Development
Underground Electrical Design
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Florentino Pérez
Tel. (787) 521−6598
Cost ($000): $8,000
Completion Date: 2006
Project Description:
PREPA contracted our services to prepare the design of the underground of all transmission and
distribution lines at Fernández Juncos Ave. from the Old Naval Base at the Isla Grande up to
Víctor López Street.
Phase I − $3,470,299 from Old Base at Isla Grande up to Condado Street
Phase II − $3,140,172 from Hipódromo Street up to Víctor López Street
Phase III − from Víctor López Street up to Rosales Street, costs to be disclosed
Design, Supervision, Inspection and Project Management of the Underground of the electrical distribution system
Electrical Substation Primary Junction Box in
Manhole
Fernández Juncos Underground
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Florentino Pérez
Tel. (787) 521−6598
Cost ($000): To Be Disclosed
Completion Date: 2003
Project Description:
PREPA contracted our services to prepare the design of the underground of all transmission and distribution lines
at Fernández Juncos Avenue in Hipódromo and Figueroa Street
Design, Supervision, Inspection and Project Management of the Underground of the electrical distribution system
Existing Transclosure Existing Meter Bank
Hipódromo & Figueroa Street Underground
Location: Yauco, P.R.
Client: Yauco Municipality
Contact: Hon. Abel Nazario
Tel. (787) 856−1345
Cost ($000): To Be Disclosed
Completion Date: 2007
Project Description:
This is the first phase of a Master Plan that Major Abel Nazario is proposing to continue with the underground
of the existing infraestructure in Yauco. The second phase will be on Santo Domingo and the 25th July Street.
Muñoz Rivera, Mejias Street Underground at La Trocha Sector, Yauco
Proposed Master Plan Existing Electrical Lines
Yauco Municipality Underground
Location: Yauco, P.R.
Client: Yauco Municipality
Contact: Hon. Abel Nazario
Tel. (787) 856−1345
Cost ($000): To Be Disclosed
Completion Date: 2008
Project Description:
This is the third phase of a Master Plan that Major Abel Nazario is proposing to continue with the underground
of the existing infraestructure in Yauco. This phase covers Ave. Barbosa, 25 de Julio, Santo Domingo and
Vivaldi Streets.
Ave. Barbosa, 25 de Julio, Santo Domingo and Vivaldi Streets, Yauco
Proposed Master Plan Existing Electrical Lines
Yauco Municipality Underground, Phase III
Specialized Designs and Generation Projects
Location: Various, P.R.
Client: PREPA
Contact: Eng. Dolores Reyes
Tel. (787) 521−6448
Cost ($000): $150,000
Completion Date: 2008
Tower Transportation
Project Description:
In conjunction with POWER Engineers, Inc. (POWER) we were contracted by PREPA to prepare the design of
the new 230 kV transmission line from Costa Sur Generating Plant to Aguas Buenas Transmission Center. We
created a team which includes John Chance Land Surveyors, Aerofoto International, Agr. Julio Soto and APRO.
Complete design
Tower Installation
230 kV Transmission Line from Costa Sur to Aguas Buenas
Project Description:
Design of control and protection system and full system integration services. Amgen
awarded us a contract to prepare the design of their new 115kV GIS Substation at
Juncos. The design included complete specifications, diagrams, grounding system and
protection and control system.
Location: Juncos, PR
Client: AMGEN
Contact: Eng. Luis F. Riollano
Cost ($000): $4,700
Completion Date: 2009
Full design of control and protection system. Full system integration services
Aerial Site Photo
AMGEN GIS
Inspection and Project Management
Location: Various, P.R.
Client: PREPA
Contact: Iván Cepeda
Tel. (787) 521−6553
Completion Date: 2008
Project Description:
With the support of POWER Engineers, Inc. (POWER) we assists PREPA on the administration, engineering,
safety monitoring, inspection, testing and commissioning required for managing the six (6) stages of the 115
kV underground loop.
Project and Construction Management, Administration and Engineering Services
115 kV Underground Loop
Phase I − Monacillos Transmission Center to Hato Rey Transmission Center
Contractor − Bermúdez & Longo
Approximately Costs − $25,307,652
Directional Drilling Installation Trench Installation
Phase IIA, IIB ˘ Hato Rey Transmission Center−Martin Peña GIS − Viaducto Transmission Center
Contractor ˘ Lord Electric
Approximately Costs − $16,316,318
Concrete Pouring
GIS Substation
Phase IIC, IID ˘ Viaducto Transmission Center−Isla Grande GIS− San Juan Steam Plant
Contractor ˘ Lord Electric
Approximately Costs − $29,098,870
San Juan Steam Plant backfilling and
compaction of trench at the entrance
38 kV Cables Cutting
Phase IIIA − San Juan Steam Plant to Palo Seco
Contractor ˘ Lord Electric
Approximately Costs − $14,007,944
Trench Installation Manhole Installation
Phase IIIB ˘ Palo Seco to Bayamón Transmission Center
Contractor ˘ Lord Electric
Approximately Costs − $18,168,870
Reactors Conduit Installation
Duct Installation
Phase IV ˘ Bayamón Transmission Center to Monacillos Transmission Center
Contractor ˘ Bermúdez & Longo
Approximately Costs − $31,500,600
GIS Substation Splices Installation
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Cepeda
Tel. (787) 521−6553
Cost ($000s): $8,000
Completion Date: 2006
Conduit installation Manhole installation
Project Description:
PREPA contracted us to provide the inspection and construction management for the Underground of all the
transmission and distribution lines at Fernández Juncos Ave. From the old Naval Base at the Isla Grande up to
Del Parque Street. PREPA awarded the project to contractor Bermúdez & Longo.
Supervision, Inspection and Project Management of the Underground of the electrical distribution system
Fernández Juncos Underground
Location: Ponce, P.R.
Client: PREPA
Contact: Iván Cepeda
Tel. (787) 521−6553
Cost ($000): $20,970
Completion Date: 2007
Project Description:
We assisted PREPA on the administration, engineering, safety monitoring inspection required for managing the
first phase of the Ponce en Marcha underground. This project has sanitary, water, telephone, cable tv and
electrical infrastructure.
Water meter connections Conduits installation
Project and Construction Management, Administration and Engineering Services
Ponce en Marcha
Location: Ponce, P.R.
Client: PREPA
Contact: Iván Cepeda
Tel. (787) 521−6553
Cost ($000): $17,925
Completion Date: 2010
Project Description:
We assisted PREPA on the administration, engineering, safety monitoring inspection required for managing the
second phase of the Ponce en Marcha underground. This project has sanitary, water, telephone, cable tv and
electrical infrastructure.
Conduits installation in Victoria
Street
Vacuum Switch in Molina Street
Project and Construction Management, Administration and Engineering Services
Ponce en Marcha−Phase II
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Rivera
Tel. (787) 485−4411
Cost ($000): $3,100
Completion Date: 2010 Site Preparation
Project Description:
On February 14, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform the
Administration, Engineering, Monitoring and Inspection Services for the Construction of the new underground at San
Francisco and Del Cristo Street at Old San Juan This project was awarded to Edison Electrical Contractors for $3.1
million of dollars. The project begins on March 2009 due to some problems with the permits and availability from
San Juan Municipality.
Supervision, Inspection and Project Management of the Underground of the electrical distribution system
Underground at San Francisco & Del Cristo Street at Old San Juan
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Rivera
Tel. (787) 485−4411
Cost ($000): $3,100
Completion Date: 2010 Manhole Installation
Project Description:
On August 14, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform the
Administration, Engineering, Monitoring and Inspection Services for the Construction of the new 38 kV underground
line from Caparra to Cachete Substation. This project was awarded to BLDM for $3.1 million of dollars.
Supervision, Inspection and Project Management of the Underground of the electrical distribution system
38 kV Underground Line from Caparra to Cachete Substation
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Rivera,
Tel. (787) 485−4411
Cost ($000): $457.571
Completion Date: June 2009
New Fence
Project Description:
On October 2, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform the
Administration, Engineering, Monitoring and Inspection Services for the Construction of a new perimeter fence at
PREPA Vega Baja Office. This project was awarded to IND General Contractor Corp for $457,751.00 dollars.
Supervision, Inspection and Project Management of the Construction
Fence Construction
Perimeter Fence at PREPA Vega Baja Offices
Location: Ponce, P.R.
Client: BPPR
Contact: Arq. Sofia Marrero
Tel. (787) 765−9800 x 5242
Cost ($000): $854
Completion Date: 2010
Site Preparation
Project Description:
On February 14, 2008, Banco Popular of Puerto Rico awarded us the contract to perform the
Administration, Engineering, Monitoring and Inspection Services for the Construction of the new
underground BPPR Ponce Town Center Bank.
Supervision, Inspection and Project Management of the building construction
New BPPR Ponce Town Center Bank
Location: San Juan, P.R.
Client: Sistema de Retiro−UPR
Contact: Sr. Willie Rosario
Tel. (787) 751−4550
Cost ($000): $250
Completion Date: 2009 Existing Building BIDS
Project Description:
On October 20, 2007, Sistema de Retiro−Universidad de Puerto Rico awarded us the contract to perform the
Administration, Engineering, Monitoring and Inspection Services for the Construction of the remodeling of the existing
Marshall building in Río Piedras. We use BIDS magazine to open the bids process for this project. The project was show
on Bids magazine, Vol. 27, No. 09 of March 10, 2008. This project was awarded on Ju1y 10, 2008 to
Construction Management Consultant Group for $250,000.00.
Supervision, Inspection and Project Management of the building construction
New UPR Retirement System Building
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Rivera
Tel. (787) 485−4411
Cost ($000): $2,600
Completion Date: 2008
Manhole Inspection Conduits Installation
Project Description:
On June 2007, PREPA awarded us the contract to perform the Administration, Engineering, Monitoring and
Inspection Services for the Construction of two(2) new 38 kV underground lines in San Juan Steam Plant. The
project was awarded to BLDM for $2.6 million of dollars and was finished on January 2008.
Supervision, Inspection and Project Management of the Underground of the electrical distribution system
Underground Lines 8200 & 3900 in San Juan Steam Plant
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Rivera
Tel. (787) 485−4411
Cost ($000): $8,675
Completion Date: 2009
Project Sign Manhole Inspection
Project Description:
On May 15, 2007, PREPA awarded us the Administration, Monitoring and Inspection Services for the
construction of the new 38kV Underground Line from Sábana Llana TC to Carolina Pueblo Substation. The
project was awarded to BLDM for $8.675 million of dollars and was finished on January 2009.
Supervision, Inspection and Project Management of the Underground of the electrical distribution system
Underground Lines from Sábana Llana TC to Carolina Pueblo Substation
Location: San Juan, P.R.
Client: Lord Electric
Contact: Ing. Javier Pérez
Tel. (787) 758−4040
Cost ($000): $9,000
Completion Date: 2010
Substation
Project Description:
Lord Electric awarded us the complete design of the new 40MVA @ 38kV Electrical Substation at
Ft. Buchanan. The design has to comply with the US Corps of Engineers regulations. The design was
Design and Build and included the design of three(3) new distribution feeders.
Complete design of a new 38kV substation
New 40MVA @ 38kV Electrical Substation
Feeders

More Related Content

What's hot

L'Avenue Office & Apartment
L'Avenue Office & ApartmentL'Avenue Office & Apartment
L'Avenue Office & ApartmentKindy Aufa Insan
 
Cutsheet Drafts 1
Cutsheet Drafts 1Cutsheet Drafts 1
Cutsheet Drafts 1guestab2e38
 
Dcnpl hills vistaa Indore- A Premium Residential Real Estate Township near Su...
Dcnpl hills vistaa Indore- A Premium Residential Real Estate Township near Su...Dcnpl hills vistaa Indore- A Premium Residential Real Estate Township near Su...
Dcnpl hills vistaa Indore- A Premium Residential Real Estate Township near Su...HVantage Technologies Inc. USA.
 
San Marino Residences - Cebu, Philippines
San Marino Residences - Cebu, PhilippinesSan Marino Residences - Cebu, Philippines
San Marino Residences - Cebu, PhilippinesJustin Marc Tariman
 

What's hot (6)

L'Avenue Office & Apartment
L'Avenue Office & ApartmentL'Avenue Office & Apartment
L'Avenue Office & Apartment
 
Cutsheet Drafts 1
Cutsheet Drafts 1Cutsheet Drafts 1
Cutsheet Drafts 1
 
Cebu Condominium investment
Cebu Condominium investmentCebu Condominium investment
Cebu Condominium investment
 
MICHAEL+HOLLAND (2) 2
MICHAEL+HOLLAND (2) 2MICHAEL+HOLLAND (2) 2
MICHAEL+HOLLAND (2) 2
 
Dcnpl hills vistaa Indore- A Premium Residential Real Estate Township near Su...
Dcnpl hills vistaa Indore- A Premium Residential Real Estate Township near Su...Dcnpl hills vistaa Indore- A Premium Residential Real Estate Township near Su...
Dcnpl hills vistaa Indore- A Premium Residential Real Estate Township near Su...
 
San Marino Residences - Cebu, Philippines
San Marino Residences - Cebu, PhilippinesSan Marino Residences - Cebu, Philippines
San Marino Residences - Cebu, Philippines
 

Similar to Project Presentation

19.2 CV M. Arteaga updated on August, 2015_engl version
19.2 CV M. Arteaga updated on August, 2015_engl version19.2 CV M. Arteaga updated on August, 2015_engl version
19.2 CV M. Arteaga updated on August, 2015_engl versionMario Arteaga
 
MEC - COMPANY PROFILE
MEC - COMPANY PROFILEMEC - COMPANY PROFILE
MEC - COMPANY PROFILECarlos Camino
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Boytoy Domer
 
Abi Aad CV. English New
Abi Aad CV. English NewAbi Aad CV. English New
Abi Aad CV. English NewFarid Abiaad
 
Frylinck John No CV 2015
Frylinck John No CV 2015Frylinck John No CV 2015
Frylinck John No CV 2015John Frylinck
 
Kennelly Constructions: Indigenous Contractor
Kennelly Constructions: Indigenous Contractor Kennelly Constructions: Indigenous Contractor
Kennelly Constructions: Indigenous Contractor Kennelly Constructions
 
RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)roncan1
 
Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Dennis Kehoe
 
Curriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen CuttingCurriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen CuttingGary Cutting
 
Tom's Resume 9-1-16
Tom's Resume 9-1-16Tom's Resume 9-1-16
Tom's Resume 9-1-16Tom Coughlin
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv newkarl davis
 

Similar to Project Presentation (20)

19.2 CV M. Arteaga updated on August, 2015_engl version
19.2 CV M. Arteaga updated on August, 2015_engl version19.2 CV M. Arteaga updated on August, 2015_engl version
19.2 CV M. Arteaga updated on August, 2015_engl version
 
CV_Oscar_Bandeira
CV_Oscar_BandeiraCV_Oscar_Bandeira
CV_Oscar_Bandeira
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
FREDERICK DICHOSO ESCORIAL
FREDERICK DICHOSO ESCORIALFREDERICK DICHOSO ESCORIAL
FREDERICK DICHOSO ESCORIAL
 
JOE RADTKE UP-DATED PROJECT LIST
JOE RADTKE UP-DATED PROJECT LISTJOE RADTKE UP-DATED PROJECT LIST
JOE RADTKE UP-DATED PROJECT LIST
 
bernie final cv update
bernie final cv updatebernie final cv update
bernie final cv update
 
MEC - COMPANY PROFILE
MEC - COMPANY PROFILEMEC - COMPANY PROFILE
MEC - COMPANY PROFILE
 
CURRICULUM VITAE FOR MOHAMMAD A
CURRICULUM VITAE FOR MOHAMMAD   ACURRICULUM VITAE FOR MOHAMMAD   A
CURRICULUM VITAE FOR MOHAMMAD A
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
 
John_Buckley_CV_V9
John_Buckley_CV_V9John_Buckley_CV_V9
John_Buckley_CV_V9
 
my cv
my cvmy cv
my cv
 
Abi Aad CV. English New
Abi Aad CV. English NewAbi Aad CV. English New
Abi Aad CV. English New
 
Frylinck John No CV 2015
Frylinck John No CV 2015Frylinck John No CV 2015
Frylinck John No CV 2015
 
Kennelly Constructions: Indigenous Contractor
Kennelly Constructions: Indigenous Contractor Kennelly Constructions: Indigenous Contractor
Kennelly Constructions: Indigenous Contractor
 
RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)
 
Update profile 2015
Update profile 2015Update profile 2015
Update profile 2015
 
Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015
 
Curriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen CuttingCurriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen Cutting
 
Tom's Resume 9-1-16
Tom's Resume 9-1-16Tom's Resume 9-1-16
Tom's Resume 9-1-16
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 

Recently uploaded

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 

Recently uploaded (20)

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

Project Presentation

  • 2. Location: Carolina, P.R. Client: San José Lagoon Development Contact: Mr. León Rubín Tel. (787) 370−2423 Cost ($000): $750 Completion Date: 2004 A small gazebo was used to safely install telephone, cable and electrical panels. General view of buildings one to five at Point Estates Lagoon Project Description: Point States Lagoon is a residential project consisting of 84 apartments in San José Bay Side in Carolina. A requirement to obtain permits to install an electrical primary distribution, cable, telephone and intercom distribution to supply the necessities of this project was made by the project owner who contracted our services to prepare the design to comply with this requirements. Electrical In−site primary and secondary distribution Point States Lagoon
  • 3. Location: Peñuelas, P.R. Client: Galexda Development Corp. Contact: José E. Pérez Tel. (787) 566−0583 Cost ($000): $6,000 Completion Date: 2008 Project Description: Complete Electrical Design for Mansiones de Puerto Galexda. The owner contracted our services to prepare the offsite and exterior electrical primary distribution, secondary distribution, telephone and cable tv drawings. Communications, Electrical, Lighting, Primary and Secondary Distribution Design Houses in Construction Houses in Construction Mansiones de Puerto Galexda
  • 4. Location: Various Client: PREPA Networks Contact: José D. Casillas Tel. (787) 625−9950 Cost ($000): $500 Completion Date: 2006 Project Description: Complete Design for three (3) communications shelters in the metropolitan area Communications Shelters Finished shelter in Carolina PREPA Network
  • 5. Location: Toa Alta, P.R. Client: JN Bracero & Associates Contact: Erick Bracero Tel. (787) 703−3942 Cost ($000): $1,250 Completion Date: 2005 Project Description: Paseos del Plata is a residential project consisting of 54 residences in Bo. Ortiz, Sector Bucarabones in Toa Alta. The owner contracted our services to prepare the offsite and exterior electrical primary distribution, secondary distribution, telephone and cable tv drawings. Typical House Main Street Electrical In−site primary and secondary distribution Paseos del Plata
  • 6. Location: San Juan, P.R. Client: Sr. Juan Arriaga Contact: Sr. Juan Arriaga Tel. (787) 603−1913 Cost ($000): $50 Completion Date: 2002 New transclosure beside faculty parking Panoramic view of Immaculate College Project Description: Immaculate College is a group of buildings located at Ponce de León Avenue in Santurce. These buildings have been served from a one phase transformer. Since the transformer was not enough to satisfy the load necessities, they requested our services to design and install a primary three phase substation. Electrical design for New Substation Colegio La Inmaculada
  • 7. Location: Santurce, P.R. Client: Juan Arriaga Contact: Sr. Juan Arriaga Tel. (787) 603−1913 Cost ($000): $50 Completion Date: 2001 Pad Mounted Transformer ˘ Installed in a platform to facilitate access to pedestrians. Project Description: San Vicente de Paúl College consist of a group of buildings located at Bolívar Street in Santurce. These buildings have been served from a 100 KVA /7.62 kV, one phase transformer. Since the capacity of the transformer was not enough to serve the existing and future load, they requested our services to the design a primary three phase substation. H2O also designed the platform to locate the transformer. Electrical Design for new substation Platform and Stair Access San Vicente de Paul
  • 8. Location: Gurabo, P.R. Client: TICS Construction Contact: José F. Padilla Tel. (787) 250−7400 Cost ($000): $200 Completion Date: 1999 Residential Development Entrance Other view of the poles Project Description: Electrical design for a new 8.32 kV distribution line to serve a residential project in Bo. Hato Nuevo in Gurabo. New 8.32 kV Distribution Line Residential Project
  • 9. Location: Caguas, P.R. Client: Mr. Edwin Soto Contact: Mr. Edwin Soto Tel. (787) 250−8181 Cost ($000): $ 20 Completion Date: 2001 Electrical SubstationFront view of the location Project Description: Design of a three phase substation for the facilities of Perfect Cleaning Services. Electrical Design for New Substation at Perfect Cleaning Services Perfect Cleaning Services
  • 10. Location: Various, P.R. Client: AT&T Contact: Rafael Meléndez Tel. (787) 565−8231 Cost ($000): $50 Completion Date: 2000 Proposed site Existing meter bank to be studied AT&T Communications Sites Project Description: Electrical design for AT&T new cellular sites and load and demand studies of energy consumption. AT&T
  • 11. Location: Carolina, P.R. Client: Harold Hart & Assoc. Contact: Eng. José Manota Cost ($000): $300 Completion Date: 1999 Main entrance at Los Colobos store Prescription Pharmacy Area at K−Mart Carolina Project Description: Electrical Interior Design Drawings for the Kmart pharmacy located at Los Colobos Shopping Center in Carolina. Electrical Interior Design Drawings Kmart
  • 12. Electrical High Voltage Lines Relocation
  • 13. Location: Trujillo Alto P.R. Client: Consulting Engineering Group Contact: Javier Llavona Tel. (787) 525−6237 Cost ($000): $350 Completion Date: 1999 Poles to be relocated Area with lines relocated Electrical Design for the relocation of various electrical lines Project Description: Electrical design for the relocation of 38, 13.2 and 8.32 kV aerial lines for the construction of the new Government Center in Trujillo Alto Centro de Gobierno
  • 14. Location: Trujillo Alto, P.R. Client: Brighton Homes Contact: Enrique López Tel. (787) 775−2200 Cost ($000): $100 Completion Date: 2001 Poles to be relocated Walk−up view Electrical Design for the relocation of a 115 kV aerial line Project Description: Electrical design for the relocation of a 115 kV aerial lines for the construction of the new walk−up development, Vista Serena. Vista Serena Development
  • 15. Location: Río Piedras, P.R. Client: EAP Group Practice Contact: Antonio Molina Tel. (787) 753−2778 Cost ($000): $200 Completion Date: 2000 Poles to be relocated Area with lines relocated Electrical Design for the relocation of a 115 kV aerial line Project Description: Electrical design for the relocation of a 115 kV aerial lines for the construction of the new residential development, Monteverde Real. Monte Verde Real Development
  • 17. Location: San Juan, P.R. Client: PREPA Contact: Eng. Florentino Pérez Tel. (787) 521−6598 Cost ($000): $8,000 Completion Date: 2006 Project Description: PREPA contracted our services to prepare the design of the underground of all transmission and distribution lines at Fernández Juncos Ave. from the Old Naval Base at the Isla Grande up to Víctor López Street. Phase I − $3,470,299 from Old Base at Isla Grande up to Condado Street Phase II − $3,140,172 from Hipódromo Street up to Víctor López Street Phase III − from Víctor López Street up to Rosales Street, costs to be disclosed Design, Supervision, Inspection and Project Management of the Underground of the electrical distribution system Electrical Substation Primary Junction Box in Manhole Fernández Juncos Underground
  • 18. Location: San Juan, P.R. Client: PREPA Contact: Eng. Florentino Pérez Tel. (787) 521−6598 Cost ($000): To Be Disclosed Completion Date: 2003 Project Description: PREPA contracted our services to prepare the design of the underground of all transmission and distribution lines at Fernández Juncos Avenue in Hipódromo and Figueroa Street Design, Supervision, Inspection and Project Management of the Underground of the electrical distribution system Existing Transclosure Existing Meter Bank Hipódromo & Figueroa Street Underground
  • 19. Location: Yauco, P.R. Client: Yauco Municipality Contact: Hon. Abel Nazario Tel. (787) 856−1345 Cost ($000): To Be Disclosed Completion Date: 2007 Project Description: This is the first phase of a Master Plan that Major Abel Nazario is proposing to continue with the underground of the existing infraestructure in Yauco. The second phase will be on Santo Domingo and the 25th July Street. Muñoz Rivera, Mejias Street Underground at La Trocha Sector, Yauco Proposed Master Plan Existing Electrical Lines Yauco Municipality Underground
  • 20. Location: Yauco, P.R. Client: Yauco Municipality Contact: Hon. Abel Nazario Tel. (787) 856−1345 Cost ($000): To Be Disclosed Completion Date: 2008 Project Description: This is the third phase of a Master Plan that Major Abel Nazario is proposing to continue with the underground of the existing infraestructure in Yauco. This phase covers Ave. Barbosa, 25 de Julio, Santo Domingo and Vivaldi Streets. Ave. Barbosa, 25 de Julio, Santo Domingo and Vivaldi Streets, Yauco Proposed Master Plan Existing Electrical Lines Yauco Municipality Underground, Phase III
  • 21. Specialized Designs and Generation Projects
  • 22. Location: Various, P.R. Client: PREPA Contact: Eng. Dolores Reyes Tel. (787) 521−6448 Cost ($000): $150,000 Completion Date: 2008 Tower Transportation Project Description: In conjunction with POWER Engineers, Inc. (POWER) we were contracted by PREPA to prepare the design of the new 230 kV transmission line from Costa Sur Generating Plant to Aguas Buenas Transmission Center. We created a team which includes John Chance Land Surveyors, Aerofoto International, Agr. Julio Soto and APRO. Complete design Tower Installation 230 kV Transmission Line from Costa Sur to Aguas Buenas
  • 23. Project Description: Design of control and protection system and full system integration services. Amgen awarded us a contract to prepare the design of their new 115kV GIS Substation at Juncos. The design included complete specifications, diagrams, grounding system and protection and control system. Location: Juncos, PR Client: AMGEN Contact: Eng. Luis F. Riollano Cost ($000): $4,700 Completion Date: 2009 Full design of control and protection system. Full system integration services Aerial Site Photo AMGEN GIS
  • 25. Location: Various, P.R. Client: PREPA Contact: Iván Cepeda Tel. (787) 521−6553 Completion Date: 2008 Project Description: With the support of POWER Engineers, Inc. (POWER) we assists PREPA on the administration, engineering, safety monitoring, inspection, testing and commissioning required for managing the six (6) stages of the 115 kV underground loop. Project and Construction Management, Administration and Engineering Services 115 kV Underground Loop
  • 26. Phase I − Monacillos Transmission Center to Hato Rey Transmission Center Contractor − Bermúdez & Longo Approximately Costs − $25,307,652 Directional Drilling Installation Trench Installation
  • 27. Phase IIA, IIB ˘ Hato Rey Transmission Center−Martin Peña GIS − Viaducto Transmission Center Contractor ˘ Lord Electric Approximately Costs − $16,316,318 Concrete Pouring GIS Substation
  • 28. Phase IIC, IID ˘ Viaducto Transmission Center−Isla Grande GIS− San Juan Steam Plant Contractor ˘ Lord Electric Approximately Costs − $29,098,870 San Juan Steam Plant backfilling and compaction of trench at the entrance 38 kV Cables Cutting
  • 29. Phase IIIA − San Juan Steam Plant to Palo Seco Contractor ˘ Lord Electric Approximately Costs − $14,007,944 Trench Installation Manhole Installation
  • 30. Phase IIIB ˘ Palo Seco to Bayamón Transmission Center Contractor ˘ Lord Electric Approximately Costs − $18,168,870 Reactors Conduit Installation Duct Installation
  • 31. Phase IV ˘ Bayamón Transmission Center to Monacillos Transmission Center Contractor ˘ Bermúdez & Longo Approximately Costs − $31,500,600 GIS Substation Splices Installation
  • 32. Location: San Juan, P.R. Client: PREPA Contact: Eng. Iván Cepeda Tel. (787) 521−6553 Cost ($000s): $8,000 Completion Date: 2006 Conduit installation Manhole installation Project Description: PREPA contracted us to provide the inspection and construction management for the Underground of all the transmission and distribution lines at Fernández Juncos Ave. From the old Naval Base at the Isla Grande up to Del Parque Street. PREPA awarded the project to contractor Bermúdez & Longo. Supervision, Inspection and Project Management of the Underground of the electrical distribution system Fernández Juncos Underground
  • 33. Location: Ponce, P.R. Client: PREPA Contact: Iván Cepeda Tel. (787) 521−6553 Cost ($000): $20,970 Completion Date: 2007 Project Description: We assisted PREPA on the administration, engineering, safety monitoring inspection required for managing the first phase of the Ponce en Marcha underground. This project has sanitary, water, telephone, cable tv and electrical infrastructure. Water meter connections Conduits installation Project and Construction Management, Administration and Engineering Services Ponce en Marcha
  • 34. Location: Ponce, P.R. Client: PREPA Contact: Iván Cepeda Tel. (787) 521−6553 Cost ($000): $17,925 Completion Date: 2010 Project Description: We assisted PREPA on the administration, engineering, safety monitoring inspection required for managing the second phase of the Ponce en Marcha underground. This project has sanitary, water, telephone, cable tv and electrical infrastructure. Conduits installation in Victoria Street Vacuum Switch in Molina Street Project and Construction Management, Administration and Engineering Services Ponce en Marcha−Phase II
  • 35. Location: San Juan, P.R. Client: PREPA Contact: Eng. Iván Rivera Tel. (787) 485−4411 Cost ($000): $3,100 Completion Date: 2010 Site Preparation Project Description: On February 14, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of the new underground at San Francisco and Del Cristo Street at Old San Juan This project was awarded to Edison Electrical Contractors for $3.1 million of dollars. The project begins on March 2009 due to some problems with the permits and availability from San Juan Municipality. Supervision, Inspection and Project Management of the Underground of the electrical distribution system Underground at San Francisco & Del Cristo Street at Old San Juan
  • 36. Location: San Juan, P.R. Client: PREPA Contact: Eng. Iván Rivera Tel. (787) 485−4411 Cost ($000): $3,100 Completion Date: 2010 Manhole Installation Project Description: On August 14, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of the new 38 kV underground line from Caparra to Cachete Substation. This project was awarded to BLDM for $3.1 million of dollars. Supervision, Inspection and Project Management of the Underground of the electrical distribution system 38 kV Underground Line from Caparra to Cachete Substation
  • 37. Location: San Juan, P.R. Client: PREPA Contact: Eng. Iván Rivera, Tel. (787) 485−4411 Cost ($000): $457.571 Completion Date: June 2009 New Fence Project Description: On October 2, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of a new perimeter fence at PREPA Vega Baja Office. This project was awarded to IND General Contractor Corp for $457,751.00 dollars. Supervision, Inspection and Project Management of the Construction Fence Construction Perimeter Fence at PREPA Vega Baja Offices
  • 38. Location: Ponce, P.R. Client: BPPR Contact: Arq. Sofia Marrero Tel. (787) 765−9800 x 5242 Cost ($000): $854 Completion Date: 2010 Site Preparation Project Description: On February 14, 2008, Banco Popular of Puerto Rico awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of the new underground BPPR Ponce Town Center Bank. Supervision, Inspection and Project Management of the building construction New BPPR Ponce Town Center Bank
  • 39. Location: San Juan, P.R. Client: Sistema de Retiro−UPR Contact: Sr. Willie Rosario Tel. (787) 751−4550 Cost ($000): $250 Completion Date: 2009 Existing Building BIDS Project Description: On October 20, 2007, Sistema de Retiro−Universidad de Puerto Rico awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of the remodeling of the existing Marshall building in Río Piedras. We use BIDS magazine to open the bids process for this project. The project was show on Bids magazine, Vol. 27, No. 09 of March 10, 2008. This project was awarded on Ju1y 10, 2008 to Construction Management Consultant Group for $250,000.00. Supervision, Inspection and Project Management of the building construction New UPR Retirement System Building
  • 40. Location: San Juan, P.R. Client: PREPA Contact: Eng. Iván Rivera Tel. (787) 485−4411 Cost ($000): $2,600 Completion Date: 2008 Manhole Inspection Conduits Installation Project Description: On June 2007, PREPA awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of two(2) new 38 kV underground lines in San Juan Steam Plant. The project was awarded to BLDM for $2.6 million of dollars and was finished on January 2008. Supervision, Inspection and Project Management of the Underground of the electrical distribution system Underground Lines 8200 & 3900 in San Juan Steam Plant
  • 41. Location: San Juan, P.R. Client: PREPA Contact: Eng. Iván Rivera Tel. (787) 485−4411 Cost ($000): $8,675 Completion Date: 2009 Project Sign Manhole Inspection Project Description: On May 15, 2007, PREPA awarded us the Administration, Monitoring and Inspection Services for the construction of the new 38kV Underground Line from Sábana Llana TC to Carolina Pueblo Substation. The project was awarded to BLDM for $8.675 million of dollars and was finished on January 2009. Supervision, Inspection and Project Management of the Underground of the electrical distribution system Underground Lines from Sábana Llana TC to Carolina Pueblo Substation
  • 42. Location: San Juan, P.R. Client: Lord Electric Contact: Ing. Javier Pérez Tel. (787) 758−4040 Cost ($000): $9,000 Completion Date: 2010 Substation Project Description: Lord Electric awarded us the complete design of the new 40MVA @ 38kV Electrical Substation at Ft. Buchanan. The design has to comply with the US Corps of Engineers regulations. The design was Design and Build and included the design of three(3) new distribution feeders. Complete design of a new 38kV substation New 40MVA @ 38kV Electrical Substation Feeders