SlideShare a Scribd company logo
1 of 6
Download to read offline
FREDERICK DICHOSO ESCORIAL
Current Residence
BUILDING # 28 AL SAHAD BIN ABBAS ST. NAJMA
DOHA QATAR
Mobile no: +97477577322/+97430791643
Origin Residence
#132 SEBASTIAN St. SAN ANTONIO SAV 6
SAN ISIDRO PARANAQUE CITY
Mobile no: +639159051321
Telephone No: 6595233
OBJECTIVES:
Challenging entry in Engineering or any position related to electrical engineering field which
will enhance my skills through challenging opportunity and career growth.
PERSONAL INFORMATION:
Date of Birth : April 01, 1983
Place of Birth : Temblique, Baggao, Cagayan
Age : 31
Height : 5’ 5”
Weight : 65 kgs
Gender : Male
Religion : Roman Catholic
Civil Status : Married
Languages Spoken : English, Tagalog, Ilocano
Citizenship : Filipino
EDUCATIONAL BACKGROUND:
Tertiary Manuel L. Quezon University
College of Engineering
Bachelor of Science in Electrical Engineering
2000-2007
Secondary Baggao National High School
Poblacion, Baggao, Cagayan
1996-2000
Elementary Baggao Central Elementary School
Poblacion, Baggao, Cagayan
1990-1996
SEMINARS ATTENDED:
Mak-Ban Geothermal Power Plant
August 2004
Quezon Power Plant Limited
January 2007
Basic Safety Training
 Personal Survival Techniques
 Elementary First-Aid
 Fire Prevention and Fire Fighting
 Personal Safety and Social Responsibility
October 10-19 2007
Confine Space Entry
 Seminar for Confine Space Traning
 February 24, 2014
CERTIFICATE:
 Ministry of Municipality & Urban Planning Certificate
OXYGEN PARK PROJECT
WORK EXPERIENCE:
COMPANY: Metrix Qatar WLL
ADDRESS: 1st
flr. Al Emadi Building D. Ring Road Doha Qatar
TELEPHONE #: 44553311
P.O. Box # 31382
DURATION: April 18, 2013-Upto Present
PROJECT SITE: Oxygen Park Project (Al Ryan Qatar Foundation Qatar)
POSITION: Electrical Site Engineer
DUTIES:
 Supervising and Monitoring of all electrical works and check status of construction
activities in the site.
 Giving instructions to all Field Engineer and Foreman at the site.
 Reviewing and verifying of Electrical plans for proper implementation at the site.
 Progress Report, Megger Testing, and Functional Schedule.
 Preparing for testing and commissioning.
 Preparing for Inspection Work Request.
 Monitoring for proper wiring installation.
 Preparation of Material Submittal
VIVA BAHRIYA TOWER 22 & 23 PROJECT
WORK EXPERIENCE:
COMPANY: Metrix Qatar WLL
ADDRESS: 1st
flr. Al Emadi Building D. Ring Road Doha Qatar
TELEPHONE #: 44553311
P.O. Box # 31382
DURATION: July 18, 2012- April 17, 2013
PROJECT SITE: Viva Bahriya Tower 22 & 23 Project (The Pearl Qatar)
POSITION: Electrical Site Engineer
DUTIES:
 Supervising and Monitoring of all electrical works and check status of construction
activities in the site.
 Giving instructions to all Field Engineer and Foreman at the site.
 Reviewing and verifying of Electrical plans for proper implementation at the site.
 Preparing for testing and commissioning.
 Preparing for Inspection Work Request.
 Monitoring for proper wiring installation.
WORK EXPERIENCE:
COMPANY: GIGATECH INC.
ADDRESS: Blk. 2 lot 1 MON-EL SUBDIVISION PARANAQUE CITY
TELEPHONE #: 8202593
DURATION: NOV. 03, 2010-July 2, 2012
PROJECT SITE: EAST SUPER BLOCK
POSITION: PROJECT ELECTRICAL ENGR /ELETRICAL ESTIMATOR
DUTIES:
 Supervising and Monitoring of all electrical works and check status of construction
activities in the site.
 Coordinating to General Contractor and Sub-Contractor in all activities at the job site.
 Giving instructions to all Field Engineer and Foreman at the site.
 Attending the Construction Coordination Meeting, MEFPS Meeting, for the project
status.
 Reviewing and verifying of Electrical plans for proper implementation at the site.
 Making Construction Schedule, Progress Report Megger Testing, and Functionality Test
 Preparing for testing and commissioning.
 Preparing for Inspection Work Request.
 Monitoring for proper wiring installation.
WORK EXPERIENCE:
COMPANY: GIGATECH INC.
ADDRESS: Blk. 2 lot 1 MON-EL SUBDIVISION PARANAQUE CITY
TELEPHONE #: 8202593
DURATION: JUNE 15 2010 – NOV.02, 2010
PROJECT SITE: US EMBASSY
POSITION: PROJECT ELECTRICAL ENGR /ELETRICAL ESTIMATOR
DUTIES:
 Supervising and Monitoring of all electrical works and check status of construction
activities in the site.
 Coordinating to General Contractor and Sub-Contractor in all activities at the job site.
 Giving instructions to all Field Engineer and Foreman at the site.
 Attending the Construction Coordination Meeting, MEFPS Meeting, for the project
status.
 Reviewing and verifying of Electrical plans for proper implementation at the site.
 Making Construction Schedule, Progress Report, Megger Testing, and Functionality
Test.
 Preparing for testing and commissioning.
 Preparing for Inspection Work Request.
 Monitoring for proper wiring installation
WORK EXPERIENCE:
COMPANY: VOLTAGE ELECTRICAL CONTRACTOR CORP.
ADDRESS: #5 Catherine St., Perpetual Village, Taguig, Metro Manila
TELEPHONE No: 838-9090 to 95
DURATION: May 2008-May 10, 2009
POSITION: QA/QC Engineer
PROJECT SITE: TWO SERENDRA PHASE 2B SECTION D&E
DUTIES:
 Supervising and Monitoring of all electrical works and check status of construction
activities in the site.
 Coordinating to General Contractor and Sub-Contractor in all activities at the job site.
 Giving instructions to all Field Engineer and Foreman at the site.
 Attending the Construction Coordination Meeting, MEFPS Meeting, for the project
status.
 Reviewing and verifying of Electrical plans for proper implementation at the site.
 Making Construction Schedule, Progress Report, Megger Testing, and Functionality
Test.
 Preparing for testing and commissioning.
 Preparing for Inspection Work Request.
 Monitoring for proper wiring installation.
CHARACTER REFERENCE:
Engr. John Micheal S. Dasig
Site Engineer
Metrix Qatar Wll.
Contact No: +97477127928
Engr. Alvin Barracao
Site Engineer
Metrix Qatar Wll.
Contact No: +97477414743
Engr. Mark Ernani Tangalin
Electrical Autocad Engineer
Metrix Qatar Wll.
Contact No: +97477795833

More Related Content

What's hot (20)

Belco Company Description
Belco Company DescriptionBelco Company Description
Belco Company Description
 
Gebi prerna bhiwandi
Gebi prerna bhiwandiGebi prerna bhiwandi
Gebi prerna bhiwandi
 
CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5
 
CVELITE_67b6a3f47c1689cf3b3
CVELITE_67b6a3f47c1689cf3b3CVELITE_67b6a3f47c1689cf3b3
CVELITE_67b6a3f47c1689cf3b3
 
ROBERT BROWN CV 2015
ROBERT BROWN CV 2015ROBERT BROWN CV 2015
ROBERT BROWN CV 2015
 
Samuel olamolu resume
Samuel olamolu resumeSamuel olamolu resume
Samuel olamolu resume
 
up dated CV
up dated CVup dated CV
up dated CV
 
Pepe-Ramnath-2
Pepe-Ramnath-2Pepe-Ramnath-2
Pepe-Ramnath-2
 
Moh'd Gaweish_CV
Moh'd Gaweish_CVMoh'd Gaweish_CV
Moh'd Gaweish_CV
 
PAUL RESUME (1)
PAUL RESUME (1)PAUL RESUME (1)
PAUL RESUME (1)
 
HABIB NEW
HABIB NEWHABIB NEW
HABIB NEW
 
Rolando Chico's Resume 022516
Rolando Chico's Resume 022516Rolando Chico's Resume 022516
Rolando Chico's Resume 022516
 
ckreddycv (1)
ckreddycv (1)ckreddycv (1)
ckreddycv (1)
 
Engr Adnan C.V
Engr Adnan C.VEngr Adnan C.V
Engr Adnan C.V
 
Ir. Unggang CV latest
Ir. Unggang CV latestIr. Unggang CV latest
Ir. Unggang CV latest
 
Eng.Ahmed-CV
Eng.Ahmed-CVEng.Ahmed-CV
Eng.Ahmed-CV
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
EHHResume062815
EHHResume062815EHHResume062815
EHHResume062815
 
Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.
 
Ashraf cv
Ashraf cvAshraf cv
Ashraf cv
 

Similar to FREDERICK DICHOSO ESCORIAL

Similar to FREDERICK DICHOSO ESCORIAL (20)

Engr Qamar R
Engr Qamar REngr Qamar R
Engr Qamar R
 
CURRICULUM VITAE f
CURRICULUM VITAE fCURRICULUM VITAE f
CURRICULUM VITAE f
 
Aldrin 2014
Aldrin 2014Aldrin 2014
Aldrin 2014
 
CV Eko Fuji SM
CV Eko Fuji SMCV Eko Fuji SM
CV Eko Fuji SM
 
bernie final cv update
bernie final cv updatebernie final cv update
bernie final cv update
 
CV. dedy
CV. dedyCV. dedy
CV. dedy
 
DAVE CATAQUIS RESUME
DAVE CATAQUIS RESUMEDAVE CATAQUIS RESUME
DAVE CATAQUIS RESUME
 
RAMESH_VOLTAS_CV
RAMESH_VOLTAS_CVRAMESH_VOLTAS_CV
RAMESH_VOLTAS_CV
 
Duane Slaney Resume Word Format
Duane Slaney Resume Word FormatDuane Slaney Resume Word Format
Duane Slaney Resume Word Format
 
abdallah_ghonaimat_CV
abdallah_ghonaimat_CVabdallah_ghonaimat_CV
abdallah_ghonaimat_CV
 
Resume. Oyagah Daniel
Resume. Oyagah DanielResume. Oyagah Daniel
Resume. Oyagah Daniel
 
FILTHER RIEOALEX
FILTHER RIEOALEXFILTHER RIEOALEX
FILTHER RIEOALEX
 
my_resume
my_resumemy_resume
my_resume
 
CV Inesh
CV IneshCV Inesh
CV Inesh
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
 
ResumeLorenzo
ResumeLorenzoResumeLorenzo
ResumeLorenzo
 
Resume 0001
Resume 0001Resume 0001
Resume 0001
 
CV15
CV15CV15
CV15
 
Govindaraj. K (1)
Govindaraj. K (1)Govindaraj. K (1)
Govindaraj. K (1)
 
Ali Roziki CV New 01
Ali Roziki CV New 01Ali Roziki CV New 01
Ali Roziki CV New 01
 

FREDERICK DICHOSO ESCORIAL

  • 1. FREDERICK DICHOSO ESCORIAL Current Residence BUILDING # 28 AL SAHAD BIN ABBAS ST. NAJMA DOHA QATAR Mobile no: +97477577322/+97430791643 Origin Residence #132 SEBASTIAN St. SAN ANTONIO SAV 6 SAN ISIDRO PARANAQUE CITY Mobile no: +639159051321 Telephone No: 6595233 OBJECTIVES: Challenging entry in Engineering or any position related to electrical engineering field which will enhance my skills through challenging opportunity and career growth. PERSONAL INFORMATION: Date of Birth : April 01, 1983 Place of Birth : Temblique, Baggao, Cagayan Age : 31 Height : 5’ 5” Weight : 65 kgs Gender : Male Religion : Roman Catholic Civil Status : Married Languages Spoken : English, Tagalog, Ilocano Citizenship : Filipino EDUCATIONAL BACKGROUND: Tertiary Manuel L. Quezon University College of Engineering Bachelor of Science in Electrical Engineering 2000-2007 Secondary Baggao National High School Poblacion, Baggao, Cagayan 1996-2000 Elementary Baggao Central Elementary School Poblacion, Baggao, Cagayan 1990-1996
  • 2. SEMINARS ATTENDED: Mak-Ban Geothermal Power Plant August 2004 Quezon Power Plant Limited January 2007 Basic Safety Training  Personal Survival Techniques  Elementary First-Aid  Fire Prevention and Fire Fighting  Personal Safety and Social Responsibility October 10-19 2007 Confine Space Entry  Seminar for Confine Space Traning  February 24, 2014 CERTIFICATE:  Ministry of Municipality & Urban Planning Certificate
  • 3. OXYGEN PARK PROJECT WORK EXPERIENCE: COMPANY: Metrix Qatar WLL ADDRESS: 1st flr. Al Emadi Building D. Ring Road Doha Qatar TELEPHONE #: 44553311 P.O. Box # 31382 DURATION: April 18, 2013-Upto Present PROJECT SITE: Oxygen Park Project (Al Ryan Qatar Foundation Qatar) POSITION: Electrical Site Engineer DUTIES:  Supervising and Monitoring of all electrical works and check status of construction activities in the site.  Giving instructions to all Field Engineer and Foreman at the site.  Reviewing and verifying of Electrical plans for proper implementation at the site.  Progress Report, Megger Testing, and Functional Schedule.  Preparing for testing and commissioning.  Preparing for Inspection Work Request.  Monitoring for proper wiring installation.  Preparation of Material Submittal
  • 4. VIVA BAHRIYA TOWER 22 & 23 PROJECT WORK EXPERIENCE: COMPANY: Metrix Qatar WLL ADDRESS: 1st flr. Al Emadi Building D. Ring Road Doha Qatar TELEPHONE #: 44553311 P.O. Box # 31382 DURATION: July 18, 2012- April 17, 2013 PROJECT SITE: Viva Bahriya Tower 22 & 23 Project (The Pearl Qatar) POSITION: Electrical Site Engineer DUTIES:  Supervising and Monitoring of all electrical works and check status of construction activities in the site.  Giving instructions to all Field Engineer and Foreman at the site.  Reviewing and verifying of Electrical plans for proper implementation at the site.  Preparing for testing and commissioning.  Preparing for Inspection Work Request.  Monitoring for proper wiring installation. WORK EXPERIENCE: COMPANY: GIGATECH INC. ADDRESS: Blk. 2 lot 1 MON-EL SUBDIVISION PARANAQUE CITY TELEPHONE #: 8202593 DURATION: NOV. 03, 2010-July 2, 2012 PROJECT SITE: EAST SUPER BLOCK POSITION: PROJECT ELECTRICAL ENGR /ELETRICAL ESTIMATOR DUTIES:  Supervising and Monitoring of all electrical works and check status of construction activities in the site.  Coordinating to General Contractor and Sub-Contractor in all activities at the job site.
  • 5.  Giving instructions to all Field Engineer and Foreman at the site.  Attending the Construction Coordination Meeting, MEFPS Meeting, for the project status.  Reviewing and verifying of Electrical plans for proper implementation at the site.  Making Construction Schedule, Progress Report Megger Testing, and Functionality Test  Preparing for testing and commissioning.  Preparing for Inspection Work Request.  Monitoring for proper wiring installation. WORK EXPERIENCE: COMPANY: GIGATECH INC. ADDRESS: Blk. 2 lot 1 MON-EL SUBDIVISION PARANAQUE CITY TELEPHONE #: 8202593 DURATION: JUNE 15 2010 – NOV.02, 2010 PROJECT SITE: US EMBASSY POSITION: PROJECT ELECTRICAL ENGR /ELETRICAL ESTIMATOR DUTIES:  Supervising and Monitoring of all electrical works and check status of construction activities in the site.  Coordinating to General Contractor and Sub-Contractor in all activities at the job site.  Giving instructions to all Field Engineer and Foreman at the site.  Attending the Construction Coordination Meeting, MEFPS Meeting, for the project status.  Reviewing and verifying of Electrical plans for proper implementation at the site.  Making Construction Schedule, Progress Report, Megger Testing, and Functionality Test.  Preparing for testing and commissioning.  Preparing for Inspection Work Request.  Monitoring for proper wiring installation WORK EXPERIENCE: COMPANY: VOLTAGE ELECTRICAL CONTRACTOR CORP. ADDRESS: #5 Catherine St., Perpetual Village, Taguig, Metro Manila TELEPHONE No: 838-9090 to 95 DURATION: May 2008-May 10, 2009 POSITION: QA/QC Engineer PROJECT SITE: TWO SERENDRA PHASE 2B SECTION D&E DUTIES:  Supervising and Monitoring of all electrical works and check status of construction activities in the site.
  • 6.  Coordinating to General Contractor and Sub-Contractor in all activities at the job site.  Giving instructions to all Field Engineer and Foreman at the site.  Attending the Construction Coordination Meeting, MEFPS Meeting, for the project status.  Reviewing and verifying of Electrical plans for proper implementation at the site.  Making Construction Schedule, Progress Report, Megger Testing, and Functionality Test.  Preparing for testing and commissioning.  Preparing for Inspection Work Request.  Monitoring for proper wiring installation. CHARACTER REFERENCE: Engr. John Micheal S. Dasig Site Engineer Metrix Qatar Wll. Contact No: +97477127928 Engr. Alvin Barracao Site Engineer Metrix Qatar Wll. Contact No: +97477414743 Engr. Mark Ernani Tangalin Electrical Autocad Engineer Metrix Qatar Wll. Contact No: +97477795833