Presented by:
Vladimir Vujović,
PMP
PMI Certification Preparation: PMP /
CAPM
- Project Integration
Management -
Project Management Institute, Inc. All rights
• Presenter
• Participants: profile, background,
expectations
• Session: structure, approach and benefits
Introduction to the
session
1. Integration
management
2. Scope management
3. Time management
4. Cost management
5. Quality management
6. Human resources
management
7. Communications
management
8. Risk management
Project Management Knowledge
Areas
PMI PMBOK 5th
• Coordination and balancing of all project
activities
• Responsibility: project manager
• Less detailed than other knowledge areas
• Very important segment of the PMP
examination
Project Integration
Management
1. Develop Project Charter
2. Develop Project Management
Plan
3. Direct and Manage Project
Work
4. Monitor and Control Project
Work
5. Perform Integrated Change
Control
6. Close Project or Phase
Project Integration Management
Processes:
Develop Project
Charter
Inputs
• Project statement of work
• Business case
• Agreements
• Enterprise
environmental factors
• Organizational process
assets
Tools and
Techniques
• Expert judgment
• Facilitation techniques
Outputs
• Project charter
Develop
Project
Charter
Develop
Project
Management
Plan
Direct and
Manage
Project Work
Monitor and
Control
Project
Work
Perform
Integrated
Change
Control
Close Project
or Phase
Develop Project Charter: Data
Flow
Develop
Project
charter
Develop
Project
management
plan
Collect
Requirement
s
Define Scope
Plan
Schedule
Managemen
t
Plan Cost
Manageme
nt
Plan Risk
Manageme
nt
Identify
stakeholder
s
Plan
Scope
Manageme
nt
Project Initiator
/ Sponsor
Enterprise
/
Organizatio
n
Project Integration
Management
• Project
charter
• Agreements
• Business
case
• Project SoW
• OP
A
• EE
F
Approved Project
charter
Start
Project!
Develop Project Management
Plan
Inputs
• Project charter
• Outputs from
other processes
• Enterprise
environmental factors
• Organizational process
assets
Tools and
Techniques
• Expert judgment
• Facilitation techniques
Outputs
• Project management plan
Develop
Project
Charter
Develop
Project
Management
Plan
Direct and
Manage
Project Work
Monitor and
Control
Project
Work
Perform
Integrated
Change
Control
Close Project
or Phase
Develop Project Management Plan: Data
Flow
Develop
Project
Management
Plan
Develo
p
Project
charter
Plan
Scope
Manageme
nt
Outputs from
Other
Processes
Enterprise
/
Organizatio
n
Project Integration
Management
• Project
charter
• OP
A
• EE
F
Control scope
Plan
Schedule
Managemen
t Control
Schedul
e
Plan Cost
Manageme
nt
Control Costs
Plan
Quality
Manageme
nt Plan HR
Manageme
nt
Plan Comm’s
Management
Control
Communi
c.
Plan Risk
Manageme
nt
Control Risks
Plan Procur.
Management
Control
Procurements
Close
Procurements
Plan Stahek.
Management
Ctrl. Stakeh.
Engagement
Direct and
manage
project
work
Monitor
and control
project
work
• Project management
plan
• Communications management
plan
• Cost management plan
• Human resource plan
• Procurement management plan
• Process improvement plan
• Quality management plan
• Requirements management plan
• Risk management plan
• Schedule management plan
• Scope management plan
• Stakeholder management plan
• Cost baseline
• Schedule baseline
• Scope baseline
• Project management plan
updates
Perform
Integrated
Change
Ctrl
Close
Project
or Phase
Direct and Manage Project
Work
Inputs
• Project management plan
• Approved change requests
• Enterprise
environmental factors
• Organizational process
assets
Tools and
Techniques
• Expert judgment
• Project
management
information system
• Meetings
Outputs
• Deliverables
• Work performance data
• Change requests
• Project management
plan updates
• Project documents updates
Develop
Project
Charter
Develop
Project
Management
Plan
Direct and
Manage
Project Work
Monitor and
Control
Project
Work
Perform
Integrated
Change
Control
Close Project
or Phase
Direct and Manage Project Work: Data
Flow
Direct and
Manage
Project
Work
Perform
Integr.
Chg.
Control
Enterprise
/
Organizatio
n
Project Integration
Management
• Approved
change
requests
• OP
A
• EE
F
Validate Scope
Control Scope
Control Schedule
Control Costs
Control
Communicatio
ns
Control Risks
Control
Procurement
s
Control
Stakeh.
Engagement
Control Quality
Develop
Project
Mgmt
Plan • Project
mgmt plan
updates
Project
Documents
• Project
management
plan
• Change
requests
• Project
documents
updates
• Deliverable
s
• Work performance
data
Monitor and Control Project
Work
Inputs
• Project management plan
• Schedule forecasts
• Cost forecasts
• Validated changes
• Work
performance
information
• Enterprise
environmental factors
• Organizational process
assets
Tools and
Techniques
• Expert judgment
• Analytical techniques
• Project management
information system
• Meetings
Outputs
• Change requests
• Work performance reports
• Project management plan
updates
• Project documents updates
Develop
Project
Charter
Develop
Project
Management
Plan
Direct and
Manage
Project Work
Monitor and
Control
Project
Work
Perform
Integrated
Change
Control
Close Project
or Phase
• Work
performance
information
Monitor and Control Project Work: Data
Flow
Monitor and
Control
Project
Work
Perform
Integr. Chg.
Control
Enterprise /
Organization
Project Integration
Management
• Change requests
• Work performance
reports
• OP
A
• EE
F
Manage
Project
Team
Manage
Communicatio
ns
Control Risks
Control
Procurement
s
Develop
Project
Mgmt
Plan • Project
mgmt plan
updates
Project
Documents
• Project
management
plan
• Project
documents
updates
Validate Scope
Control Scope
Control
Communicatio
ns
Control Risks
Control
Procurement
s
Control
Stakeh.
Engagement
Control Schedule
Control Costs
Control Quality
• Schedule
forecasts
• Cost
forecasts
• Validated
changes
• Work performance
reports
Perform Integrated Change
Conrol
Inputs
• Project management plan
• Work performance reports
• Change requests
• Enterprise
environmental factors
• Organizational process
assets
Tools and
Techniques
• Expert judgment
• Meetings
• Change control tools
Outputs
• Approved change requests
• Change log
• Project management
plan updates
• Project documents updates
Develop
Project
Charter
Develop
Project
Management
Plan
Direct and
Manage
Project Work
Monitor and
Control
Project
Work
Perform
Integrated
Change
Control
Close Project
or Phase
Perform Integrated Change Control: Data
Flow
Perform
Integrated
Change
Control
Monitor and
Control
Project
Work
Validat
e
Scope
Enterprise
/
Organizatio
n
Project Integration
Management
• OP
A
• EE
F
Control scope
Control
Schedul
e
Control Costs
Perform
Qual.
Assurance
Contro
l
Qualit
y
Manage
Project
Team
Control
Communi
c.
Control Risks
Plan
Procur.
Manageme
nt Conduct
Procurements
Ctrl. Stakeh.
Engagement
Develop
Project
Manag.
Plan
Direct and
Manage
Project
Work
• Project
management
plan
Mng. Stakeh.
Engagement
Control
Procurements
Contro
l
Qualit
y
Control
Procurement
s
Mng.
Stakeh.
Engageme
nt
Project
Document
s
• Project
management plan
updates
• Change requests
• Work
performance
reports
• Change
requests
• Project
documents
updates
• Change
log
• Approved
change
requests
• Change
requests
Close Project or
Phase
Inputs
• Project management plan
• Accepted deliverables
• Organizational process
assets
Tools and
Techniques
• Expert judgment
• Analytical techniques
• Meetings
Outputs
• Final product, service
or result transition
• Organizational process
assets updates
Develop
Project
Charter
Develop
Project
Management
Plan
Direct and
Manage
Project Work
Monitor and
Control
Project
Work
Perform
Integrated
Change
Control
Close Project
or Phase
Close Project or Phase: Data
Flow
Close Project
or Phase
Develop
Project
management
plan
Validate Scope
Customer
Enterprise
/
Organizatio
n
Project Integration
Management
• Project
management plan
• Accepted
deliverable
s
• OP
A
• OPA
updates
• Final product,
service or result
transition
• The Project charter is:
A. Developed before the project statement of work, and after the
project management plan.
B. Developed after the project statement of work and before the
project management plan
C. Developed before the contract and after the project management
plan
D. Developed before the project and before the project management
plan
Sample question
#1
• The Project charter is:
A. Developed before the project statement of work, and after the
project management plan.
B. Developed after the project statement of work and before the
project
management plan
C. Developed before the contract and after the project management
plan
D. Developed before the project and before the project management
plan
Sample question
#1
• A project is plagued by changes to the project charter.
Who has the primary responsibility to decide if these
changes are necessary?
A. The project manager
B. The project team
C. The sponsor
D. The stakeholders
Sample question
#2
• A project is plagued by changes to the project charter.
Who has the primary responsibility to decide if these
changes are necessary?
A. The project manager
B. The project team
C. The sponsor
D. The
stakeholders
Sample question
#2
• During project executing, the project manager determines
that a change is needed to material purchased for the
project. The project manager calls a meeting of the team to
plan how to make the change. This is an example of:
A. Management by objectives
B. Lack of a change management plan
C. Good team relations
D. Lack of a clear work breakdown structure
Sample question
#3
• During project executing, the project manager determines
that a change is needed to material purchased for the
project. The project manager calls a meeting of the team to
plan how to make the change. This is an example of:
A. Management by objectives
B. Lack of a change management plan
C. Good team relations
D. Lack of a clear work breakdown
structure
Sample question
#3
• When it comes to changes, the project manager's
attention is BEST given to:
A. Making changes
B. Tracking and recording changes
C. Informing the sponsor of changes
D. Preventing unnecessary changes
Sample question
#4
• When it comes to changes, the project manager's
attention is BEST given to:
A. Making changes
B. Tracking and recording changes
C. Informing the sponsor of changes
D. Preventing unnecessary changes
Sample question
#4
• Project management plan updates are NOT an
output of:
A. Perform Integrated Change Control
B. Develop Project Plan
C. Direct and Manage Project Execution
D. Close Project or Phase
Sample question
#5
• Project management plan updates are NOT an
output of:
A. Perform Integrated Change Control
B. Develop Project Plan
C. Direct and Manage Project
Execution
D. Close Project or Phase
Sample question
#5
• An output of the Close Project or Phase process is the
creation of:
A. Project archives
B. A project charter
C. A project management plan
D. A risk analysis plan
Sample question
#6
• An output of the Close Project or Phase process is the
creation of:
A. Project archives
B. A project charter
C. A project management
plan
D. A risk analysis plan
Sample question
#6
• If you are creating a single document to guide project
execution, monitoring and control and closure, you are
creating:
A. The execution plan
B. The project management plan
C. The integration plan
D. The project framework
Sample question
#7
• If you are creating a single document to guide project
execution, monitoring and control and closure, you are
creating:
A. The execution plan
B. The project management plan
C. The integration plan
D. The project
framework
Sample question
#7
• A project management plan should be realistic in order to be used
to manage the project. Which of the following is the BEST
method to achieve a realistic project management plan?
A. Sponsor creates the project management plan based on input from the
project manager
B. Functional manager creates the project management plan based on
input from the project manager
C. Project manager creates the project management plan based on input
from
senior management
D. Project manager creates the project management plan based on input
from the team
Sample question
#8
• A project management plan should be realistic in order to be used
to manage the project. Which of the following is the BEST
method to achieve a realistic project management plan?
A. Sponsor creates the project management plan based on input from the
project manager
B. Functional manager creates the project management plan based on
input from the project manager
C. Project manager creates the project management plan based on input
from
senior management
D. Project manager creates the project management plan based on input
from the team
Sample question
#8
• A defect in the product was brought to the project
manager's attention and now the project team is engaged
in repairing it. Which project management process would
be the most applicable to this?
A. Perform Integrated Change Control
B. Monitor and Control Project Work
C. Direct and Manage Project Execution
D. Close Project or Phase
Sample question
#9
• A defect in the product was brought to the project
manager's attention and now the project team is engaged
in repairing it. Which project management process would
be the most applicable to this?
A. Perform Integrated Change Control
B. Monitor and Control Project Work
C. Direct and Manage Project Execution
D. Close Project or
Phase
Sample question
#9
• Which of the following BEST describes the project
manager's role as an integrator?
A. Help team members become familiar with the project
B. Put all the pieces of a project into a cohesive whole
C. Put all the pieces of a project into a program
D. Get all team members together into a cohesive whole
Sample question
#10
• Which of the following BEST describes the project
manager's role as an integrator?
A. Help team members become familiar with the project
B. Put all the pieces of a project into a cohesive whole
C. Put all the pieces of a project into a program
D. Get all team members together into a cohesive
whole
Sample question
#10
• Theory vs Reality
• Studying resources
• Preparation for the testing day
• The test itself: stress, time & energy
management
Tips &
Tricks
Vladimir VUJOVIĆ,
PMP SAP Project
Manager Delhaize
Serbia
E-mail:
vladimir.vujovic@gmail.com
Sources used:
PMBOK Guide, 5th Edition
Rita Mulcahy’s PMP Exam Prep, 8th
Edition
Good
Luck!

More Related Content

Similar to pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758.pptx

DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project ManagementRasan Samarasinghe
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagementDhamo daran
 
Project Cycle Management WG5.ppt
Project Cycle Management WG5.pptProject Cycle Management WG5.ppt
Project Cycle Management WG5.pptMdFarhanShahriar3
 
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docxRAJU852744
 
CSCP Project Management Procedures
CSCP Project Management ProceduresCSCP Project Management Procedures
CSCP Project Management ProceduresKaleb Mulat
 
Kick-Off Meeting Template for Project Management
Kick-Off Meeting Template for Project ManagementKick-Off Meeting Template for Project Management
Kick-Off Meeting Template for Project Managementzjcin
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principlestltiede
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration ManagementMartin Sillaots
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
Fundamentalsof PM.pptx
Fundamentalsof PM.pptxFundamentalsof PM.pptx
Fundamentalsof PM.pptxagathamarlinee
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management Yesica Adicondro
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project ManagementInam Khosa
 
PM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gPM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gSatyanarayana Gande
 

Similar to pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758.pptx (20)

Project managment 3
Project managment 3Project managment 3
Project managment 3
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagement
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Project Cycle Management WG5.ppt
Project Cycle Management WG5.pptProject Cycle Management WG5.ppt
Project Cycle Management WG5.ppt
 
Pm training day 2
Pm training   day 2Pm training   day 2
Pm training day 2
 
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
 
CSCP Project Management Procedures
CSCP Project Management ProceduresCSCP Project Management Procedures
CSCP Project Management Procedures
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Kick-Off Meeting Template for Project Management
Kick-Off Meeting Template for Project ManagementKick-Off Meeting Template for Project Management
Kick-Off Meeting Template for Project Management
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
04 project integration management
04 project integration management04 project integration management
04 project integration management
 
Making of Stakeholders Delight
Making of Stakeholders DelightMaking of Stakeholders Delight
Making of Stakeholders Delight
 
Making of Stakeholders Delight
Making of Stakeholders Delight Making of Stakeholders Delight
Making of Stakeholders Delight
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Fundamentalsof PM.pptx
Fundamentalsof PM.pptxFundamentalsof PM.pptx
Fundamentalsof PM.pptx
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
 
PM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gPM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya g
 

Recently uploaded

Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 

Recently uploaded (20)

Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
Green Banking
Green Banking Green Banking
Green Banking
 
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
 
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 

pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758.pptx

  • 1. Presented by: Vladimir Vujović, PMP PMI Certification Preparation: PMP / CAPM - Project Integration Management - Project Management Institute, Inc. All rights
  • 2. • Presenter • Participants: profile, background, expectations • Session: structure, approach and benefits Introduction to the session
  • 3. 1. Integration management 2. Scope management 3. Time management 4. Cost management 5. Quality management 6. Human resources management 7. Communications management 8. Risk management Project Management Knowledge Areas PMI PMBOK 5th
  • 4. • Coordination and balancing of all project activities • Responsibility: project manager • Less detailed than other knowledge areas • Very important segment of the PMP examination Project Integration Management
  • 5. 1. Develop Project Charter 2. Develop Project Management Plan 3. Direct and Manage Project Work 4. Monitor and Control Project Work 5. Perform Integrated Change Control 6. Close Project or Phase Project Integration Management Processes:
  • 6. Develop Project Charter Inputs • Project statement of work • Business case • Agreements • Enterprise environmental factors • Organizational process assets Tools and Techniques • Expert judgment • Facilitation techniques Outputs • Project charter Develop Project Charter Develop Project Management Plan Direct and Manage Project Work Monitor and Control Project Work Perform Integrated Change Control Close Project or Phase
  • 7. Develop Project Charter: Data Flow Develop Project charter Develop Project management plan Collect Requirement s Define Scope Plan Schedule Managemen t Plan Cost Manageme nt Plan Risk Manageme nt Identify stakeholder s Plan Scope Manageme nt Project Initiator / Sponsor Enterprise / Organizatio n Project Integration Management • Project charter • Agreements • Business case • Project SoW • OP A • EE F Approved Project charter Start Project!
  • 8. Develop Project Management Plan Inputs • Project charter • Outputs from other processes • Enterprise environmental factors • Organizational process assets Tools and Techniques • Expert judgment • Facilitation techniques Outputs • Project management plan Develop Project Charter Develop Project Management Plan Direct and Manage Project Work Monitor and Control Project Work Perform Integrated Change Control Close Project or Phase
  • 9. Develop Project Management Plan: Data Flow Develop Project Management Plan Develo p Project charter Plan Scope Manageme nt Outputs from Other Processes Enterprise / Organizatio n Project Integration Management • Project charter • OP A • EE F Control scope Plan Schedule Managemen t Control Schedul e Plan Cost Manageme nt Control Costs Plan Quality Manageme nt Plan HR Manageme nt Plan Comm’s Management Control Communi c. Plan Risk Manageme nt Control Risks Plan Procur. Management Control Procurements Close Procurements Plan Stahek. Management Ctrl. Stakeh. Engagement Direct and manage project work Monitor and control project work • Project management plan • Communications management plan • Cost management plan • Human resource plan • Procurement management plan • Process improvement plan • Quality management plan • Requirements management plan • Risk management plan • Schedule management plan • Scope management plan • Stakeholder management plan • Cost baseline • Schedule baseline • Scope baseline • Project management plan updates Perform Integrated Change Ctrl Close Project or Phase
  • 10. Direct and Manage Project Work Inputs • Project management plan • Approved change requests • Enterprise environmental factors • Organizational process assets Tools and Techniques • Expert judgment • Project management information system • Meetings Outputs • Deliverables • Work performance data • Change requests • Project management plan updates • Project documents updates Develop Project Charter Develop Project Management Plan Direct and Manage Project Work Monitor and Control Project Work Perform Integrated Change Control Close Project or Phase
  • 11. Direct and Manage Project Work: Data Flow Direct and Manage Project Work Perform Integr. Chg. Control Enterprise / Organizatio n Project Integration Management • Approved change requests • OP A • EE F Validate Scope Control Scope Control Schedule Control Costs Control Communicatio ns Control Risks Control Procurement s Control Stakeh. Engagement Control Quality Develop Project Mgmt Plan • Project mgmt plan updates Project Documents • Project management plan • Change requests • Project documents updates • Deliverable s • Work performance data
  • 12. Monitor and Control Project Work Inputs • Project management plan • Schedule forecasts • Cost forecasts • Validated changes • Work performance information • Enterprise environmental factors • Organizational process assets Tools and Techniques • Expert judgment • Analytical techniques • Project management information system • Meetings Outputs • Change requests • Work performance reports • Project management plan updates • Project documents updates Develop Project Charter Develop Project Management Plan Direct and Manage Project Work Monitor and Control Project Work Perform Integrated Change Control Close Project or Phase
  • 13. • Work performance information Monitor and Control Project Work: Data Flow Monitor and Control Project Work Perform Integr. Chg. Control Enterprise / Organization Project Integration Management • Change requests • Work performance reports • OP A • EE F Manage Project Team Manage Communicatio ns Control Risks Control Procurement s Develop Project Mgmt Plan • Project mgmt plan updates Project Documents • Project management plan • Project documents updates Validate Scope Control Scope Control Communicatio ns Control Risks Control Procurement s Control Stakeh. Engagement Control Schedule Control Costs Control Quality • Schedule forecasts • Cost forecasts • Validated changes • Work performance reports
  • 14. Perform Integrated Change Conrol Inputs • Project management plan • Work performance reports • Change requests • Enterprise environmental factors • Organizational process assets Tools and Techniques • Expert judgment • Meetings • Change control tools Outputs • Approved change requests • Change log • Project management plan updates • Project documents updates Develop Project Charter Develop Project Management Plan Direct and Manage Project Work Monitor and Control Project Work Perform Integrated Change Control Close Project or Phase
  • 15. Perform Integrated Change Control: Data Flow Perform Integrated Change Control Monitor and Control Project Work Validat e Scope Enterprise / Organizatio n Project Integration Management • OP A • EE F Control scope Control Schedul e Control Costs Perform Qual. Assurance Contro l Qualit y Manage Project Team Control Communi c. Control Risks Plan Procur. Manageme nt Conduct Procurements Ctrl. Stakeh. Engagement Develop Project Manag. Plan Direct and Manage Project Work • Project management plan Mng. Stakeh. Engagement Control Procurements Contro l Qualit y Control Procurement s Mng. Stakeh. Engageme nt Project Document s • Project management plan updates • Change requests • Work performance reports • Change requests • Project documents updates • Change log • Approved change requests • Change requests
  • 16. Close Project or Phase Inputs • Project management plan • Accepted deliverables • Organizational process assets Tools and Techniques • Expert judgment • Analytical techniques • Meetings Outputs • Final product, service or result transition • Organizational process assets updates Develop Project Charter Develop Project Management Plan Direct and Manage Project Work Monitor and Control Project Work Perform Integrated Change Control Close Project or Phase
  • 17. Close Project or Phase: Data Flow Close Project or Phase Develop Project management plan Validate Scope Customer Enterprise / Organizatio n Project Integration Management • Project management plan • Accepted deliverable s • OP A • OPA updates • Final product, service or result transition
  • 18. • The Project charter is: A. Developed before the project statement of work, and after the project management plan. B. Developed after the project statement of work and before the project management plan C. Developed before the contract and after the project management plan D. Developed before the project and before the project management plan Sample question #1
  • 19. • The Project charter is: A. Developed before the project statement of work, and after the project management plan. B. Developed after the project statement of work and before the project management plan C. Developed before the contract and after the project management plan D. Developed before the project and before the project management plan Sample question #1
  • 20. • A project is plagued by changes to the project charter. Who has the primary responsibility to decide if these changes are necessary? A. The project manager B. The project team C. The sponsor D. The stakeholders Sample question #2
  • 21. • A project is plagued by changes to the project charter. Who has the primary responsibility to decide if these changes are necessary? A. The project manager B. The project team C. The sponsor D. The stakeholders Sample question #2
  • 22. • During project executing, the project manager determines that a change is needed to material purchased for the project. The project manager calls a meeting of the team to plan how to make the change. This is an example of: A. Management by objectives B. Lack of a change management plan C. Good team relations D. Lack of a clear work breakdown structure Sample question #3
  • 23. • During project executing, the project manager determines that a change is needed to material purchased for the project. The project manager calls a meeting of the team to plan how to make the change. This is an example of: A. Management by objectives B. Lack of a change management plan C. Good team relations D. Lack of a clear work breakdown structure Sample question #3
  • 24. • When it comes to changes, the project manager's attention is BEST given to: A. Making changes B. Tracking and recording changes C. Informing the sponsor of changes D. Preventing unnecessary changes Sample question #4
  • 25. • When it comes to changes, the project manager's attention is BEST given to: A. Making changes B. Tracking and recording changes C. Informing the sponsor of changes D. Preventing unnecessary changes Sample question #4
  • 26. • Project management plan updates are NOT an output of: A. Perform Integrated Change Control B. Develop Project Plan C. Direct and Manage Project Execution D. Close Project or Phase Sample question #5
  • 27. • Project management plan updates are NOT an output of: A. Perform Integrated Change Control B. Develop Project Plan C. Direct and Manage Project Execution D. Close Project or Phase Sample question #5
  • 28. • An output of the Close Project or Phase process is the creation of: A. Project archives B. A project charter C. A project management plan D. A risk analysis plan Sample question #6
  • 29. • An output of the Close Project or Phase process is the creation of: A. Project archives B. A project charter C. A project management plan D. A risk analysis plan Sample question #6
  • 30. • If you are creating a single document to guide project execution, monitoring and control and closure, you are creating: A. The execution plan B. The project management plan C. The integration plan D. The project framework Sample question #7
  • 31. • If you are creating a single document to guide project execution, monitoring and control and closure, you are creating: A. The execution plan B. The project management plan C. The integration plan D. The project framework Sample question #7
  • 32. • A project management plan should be realistic in order to be used to manage the project. Which of the following is the BEST method to achieve a realistic project management plan? A. Sponsor creates the project management plan based on input from the project manager B. Functional manager creates the project management plan based on input from the project manager C. Project manager creates the project management plan based on input from senior management D. Project manager creates the project management plan based on input from the team Sample question #8
  • 33. • A project management plan should be realistic in order to be used to manage the project. Which of the following is the BEST method to achieve a realistic project management plan? A. Sponsor creates the project management plan based on input from the project manager B. Functional manager creates the project management plan based on input from the project manager C. Project manager creates the project management plan based on input from senior management D. Project manager creates the project management plan based on input from the team Sample question #8
  • 34. • A defect in the product was brought to the project manager's attention and now the project team is engaged in repairing it. Which project management process would be the most applicable to this? A. Perform Integrated Change Control B. Monitor and Control Project Work C. Direct and Manage Project Execution D. Close Project or Phase Sample question #9
  • 35. • A defect in the product was brought to the project manager's attention and now the project team is engaged in repairing it. Which project management process would be the most applicable to this? A. Perform Integrated Change Control B. Monitor and Control Project Work C. Direct and Manage Project Execution D. Close Project or Phase Sample question #9
  • 36. • Which of the following BEST describes the project manager's role as an integrator? A. Help team members become familiar with the project B. Put all the pieces of a project into a cohesive whole C. Put all the pieces of a project into a program D. Get all team members together into a cohesive whole Sample question #10
  • 37. • Which of the following BEST describes the project manager's role as an integrator? A. Help team members become familiar with the project B. Put all the pieces of a project into a cohesive whole C. Put all the pieces of a project into a program D. Get all team members together into a cohesive whole Sample question #10
  • 38. • Theory vs Reality • Studying resources • Preparation for the testing day • The test itself: stress, time & energy management Tips & Tricks
  • 39. Vladimir VUJOVIĆ, PMP SAP Project Manager Delhaize Serbia E-mail: vladimir.vujovic@gmail.com Sources used: PMBOK Guide, 5th Edition Rita Mulcahy’s PMP Exam Prep, 8th Edition Good Luck!