1
BMO GLOBAL METALS & MINING CONFERENCE
FEB 22-25, 2015
2
CAUTIONARY STATEMENT
Forward Looking Information
This Presentation contains “forward-looking information” and “forward looking statements” within the meaning of applicable Canadian and United States
securities legislation. Forward-looking information may include, but is not limited to, the anticipated production and developments in our operations in future
periods, information with respect to our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral
reserves and resources including the 2013 Valley of the Kings Mineral Resource estimate, realization of mineral reserve and resource estimates and timing of
development of our Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates,
capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of
approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of directors and
committees and adequacy of financial resources. Wherever possible, words such as “plans”, “expects”, “projects”, “assumes”, “budget”, “strategy”,
“scheduled”, “estimates”, “forecasts”, “anticipates”, “believes”, “intends”, “targets” and similar expressions or statements that certain actions, events or results
“may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been
used to identify forward-looking statements and information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute
forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any
statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or
performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and
unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking
information, including, without limitation, those risks identified in our Annual Information Form dated March 31, 2014 filed on SEDAR at www.sedar.com and
in the United States on Form 40-F through EDGAR at the SEC’s website at www.sec.gov. Forward-looking information is based on the expectations and
opinions of our management on the date the statements are made. The assumptions used in the preparation of such statements, although considered
reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result
of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place
undue reliance on forward-looking information.
National Instrument 43-101
Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical
reports (“Reports”) “Mineral Resources Update Technical Report” dated December 19, 2013 and “Feasibility Study and Technical Report on the Brucejack
Project, Stewart, BC” dated June 19, 2014. We have filed the Reports and Update under our profile at www.sedar.com. Technical and scientific information
not contained within the Reports for the Projects have been prepared under the supervision of Mr. Kenneth C. McNaughton, P.Eng. and Ian Chang, P.Eng.,
each of whom is an independent “qualified person” under NI 43-101.
This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Although these terms are recognized
and required by Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources
which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental,
permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no guarantee that all or any part of the mineral resource will be
converted into mineral reserves.
In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or
any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not
form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI 43-101. Investors are
cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.
Currency
Unless otherwise indicated, all dollar values herein are in Canadian $.
3
 High-grade
underground gold
project
 Commercial
production target
2017
 Located in British
Columbia, Canada
V A L U E T H R O U G H G O L D
4
BRUCEJACK PROJECT LOCATION
5
HIGH-GRADE GOLD RESERVES(1,2)
Valley of the Kings
West Zone
Category Tonnes
(mil)
Gold
(g/t)
Silver
(g/t)
Contained
Gold
(mil oz)
Silver
(mil oz)
Proven 1.4 7.2 383 0.3 17.4
Probable 1.5 6.5 181 0.3 8.6
Total P&P 2.9 6.9 279 0.6 26.0
Valley of the Kings Mineral Reserve Estimate – June 2014 West Zone Mineral Reserve Estimate – June 2014
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
(2) Base case metals prices of US$1,100/oz gold and US$17/oz silver
Category Tonnes
(mil)
Gold
(g/t)
Silver
(g/t)
Contained
Gold
(mil oz)
Silver
(mil oz)
Proven 2.1 15.6 12 1.1 0.8
Probable 11.5 15.7 10 5.8 3.9
Total P&P 13.6 15.7 11 6.9 4.6
6
ROBUST ECONOMICS IN ALL GOLD SCENARIOS
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
(2) NPV is discounted to July 2014.
Economic Results by Metal Price (1)
Low Case Base Case High Case
Gold / Silver Price
(US$/ounce)
$800 / $15 $1,100 / $17 $1,400 / $21
Internal Rate of
Return
20.3% (pre-tax)
16.5% (post-tax)
34.7% (pre-tax)
28.5% (post-tax)
47%(pre-tax)
38.7% (post-tax)
Net Cash Flow (US$)
$2.02 billion (pre-tax)
$1.34 billion (post-tax)
$4.16 billion (pre-tax)
$2.72 billion (post-tax)
$6.35 billion (pre-tax)
$4.13 billion (post-tax)
Net Present Value (2)
(5.0% discount) (US$)
$985 million (pre-tax)
$620 million (post-tax)
$2.25 billion (pre-tax)
$1.45 billion (post-tax)
$3.54 billion (pre-tax)
$2.28 billion (post-tax)
Payback (from start of
production period)
4.4 years (pre-tax)
4.5 years (post-tax)
2.7 years (pre-tax)
2.8 years (post-tax)
2.0 years (pre-tax)
2.1 years (post-tax)
Capex
(US$million)
$746.9 $746.9 $746.9
Exchange Rate
(US$:C$)
0.92 0.92 0.92
7
BRUCEJACK PROJECT PRODUCTION (1)
• Mine life of 18 years producing an estimated 7.27 million
ounces of gold
• Average annual production of 504,000 ounces of gold
over the first 8 years and 404,000 ounces of gold over
mine life
 Gold and silver recoveries of 96.7% and 90.0% over mine
life
 Production rate of 2,700 tonnes per day
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
8
BRUCEJACK CAPITAL & OPERATING COSTS (1,2,3)
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
(2) Mine Site Capital Costs Include; mine site, mine site process, mine site utilities, mine site facilities, tailings facilities, mine
site temporary facilities and surface mobile equipment.
(3) Mining Operating Costs Include; LOM ore milled; if excluding the ore mined during preproduction, the estimated cost is
C$91.78/t.
Mining
$91.34
Processing
$19.69
General &
Admin
$30.87
Surface
Services &
Others $21.15
Mine
Underground
$179.5m
Mine Site
$210.8m
Offsite
Infrastructure
$89.1m
Indirect
Costs
$127.5m
Owner’s
Costs $71.0m
Contingency
$69.0m
Total Direct
Costs $479.4m
Total Indirect
Costs $267.5m
Operating Cost Summary
C$163.05 / tonne
Capital Cost Summary
US$746.9 million
9
LOW ALL-IN SUSTAINING CASH COSTS (1)
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014.
(2) Net of silver credits at Base Case silver price of $US17/ounce.
All-in Sustaining Cash Costs Per Ounce: US$448
(US$ million)
Total Cash Costs (2) $2,814.5
Reclamation Cost Accretion $27.5
Sustaining Capital Expenditure $320.6
TOTAL: $3,162.6
Brucejack Project All-In Sustaining Cash Costs
(Life of Mine)
10
KEY MILESTONES TO PRODUCTION
2017201620152014
Updated
Feasibility
Study
Anticipate Permits
Start
Construction
Transmission
Line Complete
Start
Commercial
Production
Underground
Infrastructure
Complete
Start Process Plant
/Mill Building
Construction
Commissioning
Detailed Engineering
Filed EAC
Application
& EIS
Production
Decision
11
AREA GEOLOGY
11
Cache
Creek
Ocean
~190 Ma Stikinia
TSX, NYSE:PVG
Brucejack
Snowfield
After Sillitoe (2010)
Mitchell
M&I Resources (2012):
34.8 M oz Au (0.61 g/t)
6,585 M lbs Cu (0.16%)
(Seabridge Gold)
Gossan Hill
Shore Zone
West ZoneVOK
M&I Resources (2013):
8.7 M oz Au (17.6 g/t)
Bridge Zone
King Tut Zone
(Teuton)
Snowfield
M&I Resources (2011):
25.9 M oz Au (0.59 g/t)
2,980 M lbs Cu (0.10%)
Iron Cap
M&I Resources (2012):
5.1 M oz Au (0.44 g/t)
1,674 M lbs Cu (0.21%)
(Seabridge Gold)
Kerr
M&I Resources (2012):
2.1 M oz Au (0.24 g/t)
2,741 M lbs Cu (0.46%)
(Seabridge Gold)
Sulphurets
M&I Resources (2012):
7.0 M oz Au (0.59 g/t)
1,717 M lbs Cu (0.21%)
(Seabridge Gold) Pretium claim boundary
M+Ind.(1)
16 Blbs Cu (0.17%)
85 Moz. Au (0.63 g/t)
397 Moz. Ag (2.96 g/t)
Inf.(1)
103 Blbs Cu (0.21%)
36 Moz. Au (0.45 g/t)
204 Moz. Ag (2.55 g/t)
Brucejack, Snowfield & KSM Combined Resources
(1) Combined KSM, Iron Cap, Snowfield, and Brucejack Mineral Resources and data on Seabridge Gold and Pretivm Websites, accessed 16 July 2014.
12
VALLEY OF THE KINGS: STOCKWORK
S
N
Cleo West Drift 615L West Raise
Domain 20
~0.5 m
13
MINING: YEAR 1
MINING: YEAR 5
14
LIFE OF MINE PLAN (18 YEAR)
Oblique view facing west
Valley of the Kings
West Zone
Portals
OpenOpen
15
EXPLORATION POTENTIAL AT DEPTH
10.93m @ 43.57 ppm
Au
0.5m @ 26.00 ppm
Au
N S
200m
<0.5
0.5-1.0
1.0-5.0
>20
5.0-20.0
Key (g/t Au)
(Assay intervals)
Fragmental
Volcanic Rocks
Polylithic
Conglomerate Volcanic
Flows
Volcaniclastic
Sediments
Volcanic Flows
5-10
10-20
>20
Key (g/t Au)
(Blocks)
(M&I + Inferred)
SU-627
Latite Dykes
SU-630
SU-628
SU-629
1.5m @ 19.05 ppm
Au
0.5m @
17.95 ppm
Au
5m @ 17.34 ppm
Au
1.5m @ 32.5 ppm Au
1m @ 11.35 ppm Au
0.5m @ 11.1 ppm Au
Section 426765E (500m wide)
16
LONGHOLE STOPING
 30 m level spacing
 Maximum of 45 m stope
lengths
 15 m widths
 Dilution Factors
– Primary Stopes: 7%
– Secondary Stopes: 15%
 Mining Recovery Factors
– Primary Stopes: 97.5%
– Secondary Stopes: 92.5%
 Average 12 stopes in the
mining and backfill cycle at
any time
17
SITE LAYOUT
Portals
Mill
Camp
Development Rock
Disposal Laydown &
Fuel Storage
Substation
West Zone
Portal
Truck Shop
18
PROJECT FLOW SHEET
19
 Gold and silver recoveries of
96.7% and 90.0% over mine life
 Gravity (43.3% LOM) and
flotation ( 53.4% LOM)
concentration
 Producing doré and gold/silver
concentrate
 Bulk sample processing with
single stage gravity and
flotation concentration yielded
gold recoveries averaging 98%
PROCESSING
Bulk sample gravity concentrate at Contact Mill, Montana
Bulk sample flotation concentrate at Contact Mill, Montana
20
PERMITTING PROCESS
Scope and
Process
determined
1st Public
Comment
Period
Application
Submitted
Application
evaluated for
completeness
Application
review, 2nd
Public
Comment
Period
Assessment
Report
Referral to
Ministers
January 2013
Five Open
Houses in
November
2013
(Submitted
June 20, 2014)
(Completed
July 24, 2014)
180-day review started
August 13, 2014
Project
Description
Filed
Project
Decision by
Ministers
(Decision 45 days)
 BC Environmental Assessment Office (EAO) manages it
 Federal review coordinated by Federal Environmental
Assessment Agency (CEAA) for relevant areas
 Provincial and Federal reviews are coordinated
For more information on assessment process: www.eao.gov.bc.ca/ea_process.html
(Anticipate
H1 2015)
21
COMMUNITY ENGAGEMENT
 Commercial relationships with local First
Nations during the exploration phase at
Brucejack have been mutually successful
 Examples of Brucejack Project contracts with
First Nation development corporations
include camp construction, access road
maintenance, waste rock disposal
 The proposed mine will provide
approximately 900 jobs during construction
and 500 jobs during operations
 We will continue to extend both commercial
contract and employment opportunities to
locals whenever possible
22
NEAREST FISH 20KM AWAY
CASCADE
BRUCEJACK
PROJECT
BRUCEJACK LAKE
(not fish habitat)
23
BRUCEJACK LAKE DEPOSITION
24
THE NEXT 12 MONTHS:
2015
 In-fill underground drill
program
 Detailed engineering and
procurement
 Financing structure
 Anticipate receiving permits
 Production decision
 Start construction
 Start underground mine
development
25
HIGH-GRADE GOLD WITH SIZE
Data source: Companies
Valley of the Kings reserves based on Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
Kirkland Lake Mine
(Kirkland Lake)
Kensington
(Coeur)
Casa Berardi
(Hecla)
El Penon
(Yamana)
Red Lake
(Goldcorp)
Pogo Mine
(Sumitomo)
Valley of the Kings
Cerro Negro
(Goldcorp)Eleonore
(Goldcorp)
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Proven+ProbableGoldGrade(g/t)
Proven + Probable Gold Reserves (mm oz)
26
Silver
Standard,
13%
Institutions,
47%Zijin, 9%
Management,
3%
Retail, 28%
SHAREHOLDING & ANALYST COVERAGE
(1) As of Feb. 20, 2015; ownership calculated on an undiluted basis.
(2) As of Feb. 20, 2015. Source: IPREO, SEDI
(3) See News Release dated Jan. 16, 2015 & Jan. 21, 2015
Top Shareholders(2)
(% S/O)
Silver Standard Resources 13.07
Zijin Mining 9.68
Van Eck Associates 7.19
Liberty Metals & Mining 5.54
Aristeia Capital, LLC 5.19
Sun Valley Gold, LLC 2.73
Royce & Associates 2.19
Mackenzie Financial 2.13
Robert Quartermain 2.00
Sprott Asset Management 1.88
Franklin Advisors, Inc. 1.88
Analyst Coverage
CIBC Jeff Killeen
Citibank Alex Hacking
Cormark Securities Richard Gray
Cowen Securities Adam Graf
GMP Securities George Albino
H.C. Wainwright Jeff Wright
RBC Dan Rollins
Roth Capital Partners Joseph Reagor
Salman Partners Ash Guglani
Scotiabank Ovais Habib
Capital Structure(1)
Public Float 115.2
Silver Standard Shares 17.3
Total Issued & Outstanding Shares 132.5
Incentive Options 11.9
Total Fully Diluted Shares 144.4
Market Cap (at Feb. 18, 2015) C$1 billion
Working Capital (at Sept. 30, 2014) C$65 million
(shares in millions)
Gross Proceeds of Share Offering(3) C$99 million
27
CONTACT:
Phone: 604-558-1784
Fax: 604-558-4784
Toll-free: 1-877-558-1784
invest@pretivm.com
www.pretivm.com
HEAD OFFICE:
Pretium Resources Inc.
570 Granville St.
Suite 1600
Vancouver, BC
Canada V6C 3P1
COMMON SHARES:
TSX/NYSE:PVG
Issued: 132.5 million
Fully diluted: 144.4 million
52-week hi/low:
$9.43/$4.60
Market cap: $1.16 billion
(at Jan. 21, 2015)
Advancing a major high-grade gold project in Canada
27
28
CONTACT:
Phone: 604-558-1784
Fax: 604-558-4784
Toll-free: 1-877-558-1784
invest@pretivm.com
www.pretivm.com
HEAD OFFICE:
Pretium Resources Inc.
570 Granville St.
Suite 1600
Vancouver, BC
Canada V6C 3P1
COMMON SHARES:
TSX/NYSE:PVG
Issued: 132.5 million
Fully diluted: 144.4 million
52-week hi/low:
$9.43/$4.60
Market cap: $1 billion
(at Feb. 18, 2015)
Advancing a major high-grade gold project in Canada
28
29
APPENDIX: CASH FLOW: FIRST 10 YEARS
 Base Case ($1,100/oz Au; $17/oz Ag; C$/US$ 0.92)
 High Case ($1,400/oz Au; $21/oz Ag; C$/US$ 0.92)
Year 1 2 3 4 5 6 7 8 9 10
Operating Cash Flow
($ million)
270.5 341.4 394.5 354.7 390.3 412.9 411.0 408.3 327.4 346.4
Pre-tax Net Cash Flow
($ million)
193.7 310.3 366.2 336.9 367.5 392.1 384.4 392.6 308.8 329.1
Post-tax Net Cash Flow
($ million)
188.4 303.5 326.4 234.3 241.7 256.1 248.6 255.5 200.3 213.2
Year 1 2 3 4 5 6 7 8 9 10
Operating Cash Flow
($ million)
388.6 478.9 545.4 495.6 540.7 570.2 569.1 565.0 460.5 484.1
Pre-tax Net Cash Flow
($ million)
311.8 447.7 517.1 477.8 517.9 549.4 542.5 549.2 441.9 466.8
Post-tax Net Cash Flow
($ million)
304.1 421.2 363.3 316.1 338.4 357.2 350.3 356.2 285.9 301.7
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
30
APPENDIX: 2013 RESOURCE ESTIMATE
Valley of the Kings Mineral Resource estimate - December 2013(1),(4)
(Based on a cut-off grade of 5.0 grams of gold-equivalent/tonne(5))
Category
Tonnes
(millions)
Gold
(g/t)
Silver
(g/t)
Contained(3)
Gold
(million oz)
Silver
(million oz)
Measured 2.0 19.3 14.4 1.2 0.9
Indicated 13.4 17.4 14.3 7.5 6.1
M & I 15.3 17.6 14.3 8.7 7.0
Inferred(2) 5.9 25.6 20.6 4.9 3.9
(1) Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by
environmental, permitting, legal, marketing, or other relevant issues. The Mineral Resources in this news release were estimated using the Canadian Institute of Mining,
Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve
Definitions and adopted by CIM Council.
(2) The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Resources as
an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category.
(3) Contained metal figures and totals may differ due to rounding of figures.
(4) The Mineral Resource estimate stated in Table 1 is defined using 10 m by 10 m by 10 m blocks in the in Valley of the Kings.
(5) The gold equivalent value is defined as AuEq = Au + Ag/53.
(6) See Brucejack Project Mineral Resources Update Technical Report dated December 19, 2013.
 The updated Valley of the Kings Resource estimate announced in
December(6) added Measured gold Resources and increased gold grade:
31
APPENDIX: 2013 RESOURCE MODEL – VALLEY OF THE KINGS
5-10
10-20
20-60
>60
Key (g/t Au)
December 2013 Mineral Resource
Measured and Indicated Blocks >5g/t Au.
Blocks are 10m x 10m x 10m
100 m
N
32
APPENDIX: 2013 UNDERGROUND DRILLING
Fragmental
Volcanic Rocks
Polylithic
Conglomerate
Volcanic
Sediment
50 m
N
Completed Underground
Development
Completed Bulk Sample
Legend
>20
Key (g/t Au)
Assay intervals
5.0-20.0
2.5-5.0
Silicified
Conglomerate
Volcanic Flows
33
APPENDIX: EXPLORATION POTENTIAL EAST - WEST
200 m
N Valley of the Kings
Access Ramp
Bulk Sample
Development
Approximate surface
projection of December
2013 Measured & Indicated
resources
SU-498
0.5m @ 3,874 g/t Au
SU-526
1.16m @ 4,195 g/t Au
VU-136
0.5m @ 1,100 g/t Au
Brucejack Fault

More Related Content

What's hot

Corporate Presentation July 3, 2014
Corporate Presentation July 3, 2014Corporate Presentation July 3, 2014
Corporate Presentation July 3, 2014PretiumR
 
Corporate Presentation Aug 22, 2014
Corporate Presentation Aug 22, 2014Corporate Presentation Aug 22, 2014
Corporate Presentation Aug 22, 2014PretiumR
 
Corportate Presentation Aug 12, 2014
Corportate Presentation Aug 12, 2014 Corportate Presentation Aug 12, 2014
Corportate Presentation Aug 12, 2014 PretiumR
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferencePretiumR
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferencePretiumR
 
BMO Conference Feb 28 2016
BMO Conference Feb 28 2016BMO Conference Feb 28 2016
BMO Conference Feb 28 2016PretiumR
 
Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014PretiumR
 
Technical session presentation toronto
Technical session presentation torontoTechnical session presentation toronto
Technical session presentation torontoPretiumR
 
Minerals north apr 2017 final
Minerals north apr 2017 finalMinerals north apr 2017 final
Minerals north apr 2017 finalPretiumR
 
Denver Gold Forum 2017
Denver Gold Forum 2017Denver Gold Forum 2017
Denver Gold Forum 2017PretiumR
 
Pretium a fund oct 25 2017
Pretium a fund oct 25 2017Pretium a fund oct 25 2017
Pretium a fund oct 25 2017PretiumR
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 finalPretiumR
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferencePretiumR
 
ASX20140515_Prominent_Hill_Analyst_Visit_Presentation
ASX20140515_Prominent_Hill_Analyst_Visit_PresentationASX20140515_Prominent_Hill_Analyst_Visit_Presentation
ASX20140515_Prominent_Hill_Analyst_Visit_PresentationDonna Louw
 
Hudbay's Annual And Special Meeting of Shareholders
Hudbay's Annual And Special Meeting of ShareholdersHudbay's Annual And Special Meeting of Shareholders
Hudbay's Annual And Special Meeting of ShareholdersHudbayMinerals
 

What's hot (15)

Corporate Presentation July 3, 2014
Corporate Presentation July 3, 2014Corporate Presentation July 3, 2014
Corporate Presentation July 3, 2014
 
Corporate Presentation Aug 22, 2014
Corporate Presentation Aug 22, 2014Corporate Presentation Aug 22, 2014
Corporate Presentation Aug 22, 2014
 
Corportate Presentation Aug 12, 2014
Corportate Presentation Aug 12, 2014 Corportate Presentation Aug 12, 2014
Corportate Presentation Aug 12, 2014
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor Conference
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
BMO Conference Feb 28 2016
BMO Conference Feb 28 2016BMO Conference Feb 28 2016
BMO Conference Feb 28 2016
 
Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014
 
Technical session presentation toronto
Technical session presentation torontoTechnical session presentation toronto
Technical session presentation toronto
 
Minerals north apr 2017 final
Minerals north apr 2017 finalMinerals north apr 2017 final
Minerals north apr 2017 final
 
Denver Gold Forum 2017
Denver Gold Forum 2017Denver Gold Forum 2017
Denver Gold Forum 2017
 
Pretium a fund oct 25 2017
Pretium a fund oct 25 2017Pretium a fund oct 25 2017
Pretium a fund oct 25 2017
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 final
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
ASX20140515_Prominent_Hill_Analyst_Visit_Presentation
ASX20140515_Prominent_Hill_Analyst_Visit_PresentationASX20140515_Prominent_Hill_Analyst_Visit_Presentation
ASX20140515_Prominent_Hill_Analyst_Visit_Presentation
 
Hudbay's Annual And Special Meeting of Shareholders
Hudbay's Annual And Special Meeting of ShareholdersHudbay's Annual And Special Meeting of Shareholders
Hudbay's Annual And Special Meeting of Shareholders
 

Viewers also liked

Fuel Savings for Mining
Fuel Savings for MiningFuel Savings for Mining
Fuel Savings for MiningTTech
 
Raventech & University of North West presentation - emperors - 9 nov 2016-...
Raventech & University of  North West   presentation - emperors - 9 nov 2016-...Raventech & University of  North West   presentation - emperors - 9 nov 2016-...
Raventech & University of North West presentation - emperors - 9 nov 2016-...John M Riggs
 
Iron Road - Central Eyre Iron Project Technical Presentation
Iron Road - Central Eyre Iron Project Technical PresentationIron Road - Central Eyre Iron Project Technical Presentation
Iron Road - Central Eyre Iron Project Technical PresentationIron_Road_Limited
 
Mine planning process A Madowe SAIMM paper
Mine planning process A Madowe SAIMM paperMine planning process A Madowe SAIMM paper
Mine planning process A Madowe SAIMM paperAlfred Madowe
 
Open pit mine geometry considerations
Open pit mine geometry considerationsOpen pit mine geometry considerations
Open pit mine geometry considerationsElmer Gomez Reyes
 
KARJER Mining Fleet Management System
KARJER Mining Fleet Management SystemKARJER Mining Fleet Management System
KARJER Mining Fleet Management Systembvintl
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall MiningVR M
 

Viewers also liked (9)

Fuel Savings for Mining
Fuel Savings for MiningFuel Savings for Mining
Fuel Savings for Mining
 
Rio Tinto Diamonds 2013
Rio Tinto Diamonds 2013Rio Tinto Diamonds 2013
Rio Tinto Diamonds 2013
 
Raventech & University of North West presentation - emperors - 9 nov 2016-...
Raventech & University of  North West   presentation - emperors - 9 nov 2016-...Raventech & University of  North West   presentation - emperors - 9 nov 2016-...
Raventech & University of North West presentation - emperors - 9 nov 2016-...
 
Iron Road - Central Eyre Iron Project Technical Presentation
Iron Road - Central Eyre Iron Project Technical PresentationIron Road - Central Eyre Iron Project Technical Presentation
Iron Road - Central Eyre Iron Project Technical Presentation
 
Mine planning process A Madowe SAIMM paper
Mine planning process A Madowe SAIMM paperMine planning process A Madowe SAIMM paper
Mine planning process A Madowe SAIMM paper
 
Open pit mine geometry considerations
Open pit mine geometry considerationsOpen pit mine geometry considerations
Open pit mine geometry considerations
 
KARJER Mining Fleet Management System
KARJER Mining Fleet Management SystemKARJER Mining Fleet Management System
KARJER Mining Fleet Management System
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall Mining
 
Surface mining planning and design of open pit mining
Surface mining planning and design of open pit miningSurface mining planning and design of open pit mining
Surface mining planning and design of open pit mining
 

Similar to BMO Capital Markets 24th Global Metals & Mining Conference Presentation

Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015PretiumR
 
Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015PretiumR
 
Corp presjuly3 2014
Corp presjuly3 2014Corp presjuly3 2014
Corp presjuly3 2014PretiumR
 
A fund presentation oct 25 2016
A fund presentation oct 25 2016A fund presentation oct 25 2016
A fund presentation oct 25 2016PretiumR
 
Pretivm european gold forum apr 2016
Pretivm   european gold forum apr 2016Pretivm   european gold forum apr 2016
Pretivm european gold forum apr 2016PretiumR
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCarling Gaze
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014PretiumR
 
Sprott conference 2016 corporate presentation
Sprott conference 2016 corporate presentationSprott conference 2016 corporate presentation
Sprott conference 2016 corporate presentationPretiumR
 
Corp Presentation October 2014
Corp Presentation October 2014Corp Presentation October 2014
Corp Presentation October 2014PretiumR
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014PretiumR
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014PretiumR
 
Corporate Presentation Sept 5, 2014
Corporate Presentation Sept 5, 2014Corporate Presentation Sept 5, 2014
Corporate Presentation Sept 5, 2014PretiumR
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014PretiumR
 
Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)PretiumR
 
ROTH PRESENTATION
ROTH PRESENTATIONROTH PRESENTATION
ROTH PRESENTATIONPretiumR
 
Casey Research 2015 Summit
Casey Research 2015 SummitCasey Research 2015 Summit
Casey Research 2015 SummitPretiumR
 
Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015PretiumR
 
Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015PretiumR
 
Corporate Presentation December 2015
Corporate Presentation December 2015Corporate Presentation December 2015
Corporate Presentation December 2015PretiumR
 
Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014PretiumR
 

Similar to BMO Capital Markets 24th Global Metals & Mining Conference Presentation (20)

Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
 
Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015
 
Corp presjuly3 2014
Corp presjuly3 2014Corp presjuly3 2014
Corp presjuly3 2014
 
A fund presentation oct 25 2016
A fund presentation oct 25 2016A fund presentation oct 25 2016
A fund presentation oct 25 2016
 
Pretivm european gold forum apr 2016
Pretivm   european gold forum apr 2016Pretivm   european gold forum apr 2016
Pretivm european gold forum apr 2016
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor Conference
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014
 
Sprott conference 2016 corporate presentation
Sprott conference 2016 corporate presentationSprott conference 2016 corporate presentation
Sprott conference 2016 corporate presentation
 
Corp Presentation October 2014
Corp Presentation October 2014Corp Presentation October 2014
Corp Presentation October 2014
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014
 
Corporate Presentation Sept 5, 2014
Corporate Presentation Sept 5, 2014Corporate Presentation Sept 5, 2014
Corporate Presentation Sept 5, 2014
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014
 
Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)
 
ROTH PRESENTATION
ROTH PRESENTATIONROTH PRESENTATION
ROTH PRESENTATION
 
Casey Research 2015 Summit
Casey Research 2015 SummitCasey Research 2015 Summit
Casey Research 2015 Summit
 
Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015
 
Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015
 
Corporate Presentation December 2015
Corporate Presentation December 2015Corporate Presentation December 2015
Corporate Presentation December 2015
 
Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014
 

More from PretiumR

AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019PretiumR
 
Pretivm Investors Day Presentation
Pretivm Investors Day PresentationPretivm Investors Day Presentation
Pretivm Investors Day PresentationPretiumR
 
31st Annual ROTH Conference 2019
31st Annual ROTH Conference 201931st Annual ROTH Conference 2019
31st Annual ROTH Conference 2019PretiumR
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferencePretiumR
 
Pretium resources q1 2018 conference call may 11 , 2018
Pretium resources   q1 2018 conference call may 11 , 2018Pretium resources   q1 2018 conference call may 11 , 2018
Pretium resources q1 2018 conference call may 11 , 2018PretiumR
 
Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018PretiumR
 
Fourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference CallFourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference CallPretiumR
 
Bmo conf feb26-2018
Bmo conf feb26-2018Bmo conf feb26-2018
Bmo conf feb26-2018PretiumR
 
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets ConferenceRamping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets ConferencePretiumR
 
Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018PretiumR
 
Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018PretiumR
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferencePretiumR
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...PretiumR
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretiumR
 
Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)PretiumR
 
Pretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretiumR
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017PretiumR
 
Pvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentationPvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentationPretiumR
 
29th Annual ROTH Conference 2017
29th Annual ROTH Conference 201729th Annual ROTH Conference 2017
29th Annual ROTH Conference 2017PretiumR
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferencePretiumR
 

More from PretiumR (20)

AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019
 
Pretivm Investors Day Presentation
Pretivm Investors Day PresentationPretivm Investors Day Presentation
Pretivm Investors Day Presentation
 
31st Annual ROTH Conference 2019
31st Annual ROTH Conference 201931st Annual ROTH Conference 2019
31st Annual ROTH Conference 2019
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining Conference
 
Pretium resources q1 2018 conference call may 11 , 2018
Pretium resources   q1 2018 conference call may 11 , 2018Pretium resources   q1 2018 conference call may 11 , 2018
Pretium resources q1 2018 conference call may 11 , 2018
 
Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018
 
Fourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference CallFourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference Call
 
Bmo conf feb26-2018
Bmo conf feb26-2018Bmo conf feb26-2018
Bmo conf feb26-2018
 
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets ConferenceRamping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
 
Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018
 
Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 final
 
Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)
 
Pretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-web
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017
 
Pvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentationPvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentation
 
29th Annual ROTH Conference 2017
29th Annual ROTH Conference 201729th Annual ROTH Conference 2017
29th Annual ROTH Conference 2017
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 

Recently uploaded

LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORNLITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORNtntlai16
 
"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXRMegan Campos
 
Using AI to boost productivity for developers
Using AI to boost productivity for developersUsing AI to boost productivity for developers
Using AI to boost productivity for developersTeri Eyenike
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalFabian de Rijk
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lodhisaajjda
 
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...ZurliaSoop
 
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfSOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfMahamudul Hasan
 
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptxBEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptxthusosetemere
 
History of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth deathHistory of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth deathphntsoaki
 
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. Mumbai
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. MumbaiCall Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. Mumbai
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. MumbaiPriya Reddy
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoKayode Fayemi
 
ECOLOGY OF FISHES.pptx full presentation
ECOLOGY OF FISHES.pptx full presentationECOLOGY OF FISHES.pptx full presentation
ECOLOGY OF FISHES.pptx full presentationFahadFazal7
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESfuthumetsaneliswa
 
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityUnlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityHung Le
 
Introduction to Artificial intelligence.
Introduction to Artificial intelligence.Introduction to Artificial intelligence.
Introduction to Artificial intelligence.thamaeteboho94
 
Ready Set Go Children Sermon about Mark 16:15-20
Ready Set Go Children Sermon about Mark 16:15-20Ready Set Go Children Sermon about Mark 16:15-20
Ready Set Go Children Sermon about Mark 16:15-20rejz122017
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfSkillCertProExams
 

Recently uploaded (20)

LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORNLITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
 
"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR
 
Using AI to boost productivity for developers
Using AI to boost productivity for developersUsing AI to boost productivity for developers
Using AI to boost productivity for developers
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of Drupal
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.
 
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
 
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
 
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfSOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
 
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptxBEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
 
History of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth deathHistory of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth death
 
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. Mumbai
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. MumbaiCall Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. Mumbai
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. Mumbai
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
 
ECOLOGY OF FISHES.pptx full presentation
ECOLOGY OF FISHES.pptx full presentationECOLOGY OF FISHES.pptx full presentation
ECOLOGY OF FISHES.pptx full presentation
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
 
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait Cityin kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
 
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityUnlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
 
Introduction to Artificial intelligence.
Introduction to Artificial intelligence.Introduction to Artificial intelligence.
Introduction to Artificial intelligence.
 
Ready Set Go Children Sermon about Mark 16:15-20
Ready Set Go Children Sermon about Mark 16:15-20Ready Set Go Children Sermon about Mark 16:15-20
Ready Set Go Children Sermon about Mark 16:15-20
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
ICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdfICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdf
 

BMO Capital Markets 24th Global Metals & Mining Conference Presentation

  • 1. 1 BMO GLOBAL METALS & MINING CONFERENCE FEB 22-25, 2015
  • 2. 2 CAUTIONARY STATEMENT Forward Looking Information This Presentation contains “forward-looking information” and “forward looking statements” within the meaning of applicable Canadian and United States securities legislation. Forward-looking information may include, but is not limited to, the anticipated production and developments in our operations in future periods, information with respect to our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral reserves and resources including the 2013 Valley of the Kings Mineral Resource estimate, realization of mineral reserve and resource estimates and timing of development of our Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of directors and committees and adequacy of financial resources. Wherever possible, words such as “plans”, “expects”, “projects”, “assumes”, “budget”, “strategy”, “scheduled”, “estimates”, “forecasts”, “anticipates”, “believes”, “intends”, “targets” and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been used to identify forward-looking statements and information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, those risks identified in our Annual Information Form dated March 31, 2014 filed on SEDAR at www.sedar.com and in the United States on Form 40-F through EDGAR at the SEC’s website at www.sec.gov. Forward-looking information is based on the expectations and opinions of our management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. National Instrument 43-101 Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical reports (“Reports”) “Mineral Resources Update Technical Report” dated December 19, 2013 and “Feasibility Study and Technical Report on the Brucejack Project, Stewart, BC” dated June 19, 2014. We have filed the Reports and Update under our profile at www.sedar.com. Technical and scientific information not contained within the Reports for the Projects have been prepared under the supervision of Mr. Kenneth C. McNaughton, P.Eng. and Ian Chang, P.Eng., each of whom is an independent “qualified person” under NI 43-101. This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Although these terms are recognized and required by Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no guarantee that all or any part of the mineral resource will be converted into mineral reserves. In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI 43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. Currency Unless otherwise indicated, all dollar values herein are in Canadian $.
  • 3. 3  High-grade underground gold project  Commercial production target 2017  Located in British Columbia, Canada V A L U E T H R O U G H G O L D
  • 5. 5 HIGH-GRADE GOLD RESERVES(1,2) Valley of the Kings West Zone Category Tonnes (mil) Gold (g/t) Silver (g/t) Contained Gold (mil oz) Silver (mil oz) Proven 1.4 7.2 383 0.3 17.4 Probable 1.5 6.5 181 0.3 8.6 Total P&P 2.9 6.9 279 0.6 26.0 Valley of the Kings Mineral Reserve Estimate – June 2014 West Zone Mineral Reserve Estimate – June 2014 (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014 (2) Base case metals prices of US$1,100/oz gold and US$17/oz silver Category Tonnes (mil) Gold (g/t) Silver (g/t) Contained Gold (mil oz) Silver (mil oz) Proven 2.1 15.6 12 1.1 0.8 Probable 11.5 15.7 10 5.8 3.9 Total P&P 13.6 15.7 11 6.9 4.6
  • 6. 6 ROBUST ECONOMICS IN ALL GOLD SCENARIOS (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014 (2) NPV is discounted to July 2014. Economic Results by Metal Price (1) Low Case Base Case High Case Gold / Silver Price (US$/ounce) $800 / $15 $1,100 / $17 $1,400 / $21 Internal Rate of Return 20.3% (pre-tax) 16.5% (post-tax) 34.7% (pre-tax) 28.5% (post-tax) 47%(pre-tax) 38.7% (post-tax) Net Cash Flow (US$) $2.02 billion (pre-tax) $1.34 billion (post-tax) $4.16 billion (pre-tax) $2.72 billion (post-tax) $6.35 billion (pre-tax) $4.13 billion (post-tax) Net Present Value (2) (5.0% discount) (US$) $985 million (pre-tax) $620 million (post-tax) $2.25 billion (pre-tax) $1.45 billion (post-tax) $3.54 billion (pre-tax) $2.28 billion (post-tax) Payback (from start of production period) 4.4 years (pre-tax) 4.5 years (post-tax) 2.7 years (pre-tax) 2.8 years (post-tax) 2.0 years (pre-tax) 2.1 years (post-tax) Capex (US$million) $746.9 $746.9 $746.9 Exchange Rate (US$:C$) 0.92 0.92 0.92
  • 7. 7 BRUCEJACK PROJECT PRODUCTION (1) • Mine life of 18 years producing an estimated 7.27 million ounces of gold • Average annual production of 504,000 ounces of gold over the first 8 years and 404,000 ounces of gold over mine life  Gold and silver recoveries of 96.7% and 90.0% over mine life  Production rate of 2,700 tonnes per day (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
  • 8. 8 BRUCEJACK CAPITAL & OPERATING COSTS (1,2,3) (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014 (2) Mine Site Capital Costs Include; mine site, mine site process, mine site utilities, mine site facilities, tailings facilities, mine site temporary facilities and surface mobile equipment. (3) Mining Operating Costs Include; LOM ore milled; if excluding the ore mined during preproduction, the estimated cost is C$91.78/t. Mining $91.34 Processing $19.69 General & Admin $30.87 Surface Services & Others $21.15 Mine Underground $179.5m Mine Site $210.8m Offsite Infrastructure $89.1m Indirect Costs $127.5m Owner’s Costs $71.0m Contingency $69.0m Total Direct Costs $479.4m Total Indirect Costs $267.5m Operating Cost Summary C$163.05 / tonne Capital Cost Summary US$746.9 million
  • 9. 9 LOW ALL-IN SUSTAINING CASH COSTS (1) (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014. (2) Net of silver credits at Base Case silver price of $US17/ounce. All-in Sustaining Cash Costs Per Ounce: US$448 (US$ million) Total Cash Costs (2) $2,814.5 Reclamation Cost Accretion $27.5 Sustaining Capital Expenditure $320.6 TOTAL: $3,162.6 Brucejack Project All-In Sustaining Cash Costs (Life of Mine)
  • 10. 10 KEY MILESTONES TO PRODUCTION 2017201620152014 Updated Feasibility Study Anticipate Permits Start Construction Transmission Line Complete Start Commercial Production Underground Infrastructure Complete Start Process Plant /Mill Building Construction Commissioning Detailed Engineering Filed EAC Application & EIS Production Decision
  • 11. 11 AREA GEOLOGY 11 Cache Creek Ocean ~190 Ma Stikinia TSX, NYSE:PVG Brucejack Snowfield After Sillitoe (2010) Mitchell M&I Resources (2012): 34.8 M oz Au (0.61 g/t) 6,585 M lbs Cu (0.16%) (Seabridge Gold) Gossan Hill Shore Zone West ZoneVOK M&I Resources (2013): 8.7 M oz Au (17.6 g/t) Bridge Zone King Tut Zone (Teuton) Snowfield M&I Resources (2011): 25.9 M oz Au (0.59 g/t) 2,980 M lbs Cu (0.10%) Iron Cap M&I Resources (2012): 5.1 M oz Au (0.44 g/t) 1,674 M lbs Cu (0.21%) (Seabridge Gold) Kerr M&I Resources (2012): 2.1 M oz Au (0.24 g/t) 2,741 M lbs Cu (0.46%) (Seabridge Gold) Sulphurets M&I Resources (2012): 7.0 M oz Au (0.59 g/t) 1,717 M lbs Cu (0.21%) (Seabridge Gold) Pretium claim boundary M+Ind.(1) 16 Blbs Cu (0.17%) 85 Moz. Au (0.63 g/t) 397 Moz. Ag (2.96 g/t) Inf.(1) 103 Blbs Cu (0.21%) 36 Moz. Au (0.45 g/t) 204 Moz. Ag (2.55 g/t) Brucejack, Snowfield & KSM Combined Resources (1) Combined KSM, Iron Cap, Snowfield, and Brucejack Mineral Resources and data on Seabridge Gold and Pretivm Websites, accessed 16 July 2014.
  • 12. 12 VALLEY OF THE KINGS: STOCKWORK S N Cleo West Drift 615L West Raise Domain 20 ~0.5 m
  • 14. 14 LIFE OF MINE PLAN (18 YEAR) Oblique view facing west Valley of the Kings West Zone Portals OpenOpen
  • 15. 15 EXPLORATION POTENTIAL AT DEPTH 10.93m @ 43.57 ppm Au 0.5m @ 26.00 ppm Au N S 200m <0.5 0.5-1.0 1.0-5.0 >20 5.0-20.0 Key (g/t Au) (Assay intervals) Fragmental Volcanic Rocks Polylithic Conglomerate Volcanic Flows Volcaniclastic Sediments Volcanic Flows 5-10 10-20 >20 Key (g/t Au) (Blocks) (M&I + Inferred) SU-627 Latite Dykes SU-630 SU-628 SU-629 1.5m @ 19.05 ppm Au 0.5m @ 17.95 ppm Au 5m @ 17.34 ppm Au 1.5m @ 32.5 ppm Au 1m @ 11.35 ppm Au 0.5m @ 11.1 ppm Au Section 426765E (500m wide)
  • 16. 16 LONGHOLE STOPING  30 m level spacing  Maximum of 45 m stope lengths  15 m widths  Dilution Factors – Primary Stopes: 7% – Secondary Stopes: 15%  Mining Recovery Factors – Primary Stopes: 97.5% – Secondary Stopes: 92.5%  Average 12 stopes in the mining and backfill cycle at any time
  • 17. 17 SITE LAYOUT Portals Mill Camp Development Rock Disposal Laydown & Fuel Storage Substation West Zone Portal Truck Shop
  • 19. 19  Gold and silver recoveries of 96.7% and 90.0% over mine life  Gravity (43.3% LOM) and flotation ( 53.4% LOM) concentration  Producing doré and gold/silver concentrate  Bulk sample processing with single stage gravity and flotation concentration yielded gold recoveries averaging 98% PROCESSING Bulk sample gravity concentrate at Contact Mill, Montana Bulk sample flotation concentrate at Contact Mill, Montana
  • 20. 20 PERMITTING PROCESS Scope and Process determined 1st Public Comment Period Application Submitted Application evaluated for completeness Application review, 2nd Public Comment Period Assessment Report Referral to Ministers January 2013 Five Open Houses in November 2013 (Submitted June 20, 2014) (Completed July 24, 2014) 180-day review started August 13, 2014 Project Description Filed Project Decision by Ministers (Decision 45 days)  BC Environmental Assessment Office (EAO) manages it  Federal review coordinated by Federal Environmental Assessment Agency (CEAA) for relevant areas  Provincial and Federal reviews are coordinated For more information on assessment process: www.eao.gov.bc.ca/ea_process.html (Anticipate H1 2015)
  • 21. 21 COMMUNITY ENGAGEMENT  Commercial relationships with local First Nations during the exploration phase at Brucejack have been mutually successful  Examples of Brucejack Project contracts with First Nation development corporations include camp construction, access road maintenance, waste rock disposal  The proposed mine will provide approximately 900 jobs during construction and 500 jobs during operations  We will continue to extend both commercial contract and employment opportunities to locals whenever possible
  • 22. 22 NEAREST FISH 20KM AWAY CASCADE BRUCEJACK PROJECT BRUCEJACK LAKE (not fish habitat)
  • 24. 24 THE NEXT 12 MONTHS: 2015  In-fill underground drill program  Detailed engineering and procurement  Financing structure  Anticipate receiving permits  Production decision  Start construction  Start underground mine development
  • 25. 25 HIGH-GRADE GOLD WITH SIZE Data source: Companies Valley of the Kings reserves based on Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014 Kirkland Lake Mine (Kirkland Lake) Kensington (Coeur) Casa Berardi (Hecla) El Penon (Yamana) Red Lake (Goldcorp) Pogo Mine (Sumitomo) Valley of the Kings Cerro Negro (Goldcorp)Eleonore (Goldcorp) 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Proven+ProbableGoldGrade(g/t) Proven + Probable Gold Reserves (mm oz)
  • 26. 26 Silver Standard, 13% Institutions, 47%Zijin, 9% Management, 3% Retail, 28% SHAREHOLDING & ANALYST COVERAGE (1) As of Feb. 20, 2015; ownership calculated on an undiluted basis. (2) As of Feb. 20, 2015. Source: IPREO, SEDI (3) See News Release dated Jan. 16, 2015 & Jan. 21, 2015 Top Shareholders(2) (% S/O) Silver Standard Resources 13.07 Zijin Mining 9.68 Van Eck Associates 7.19 Liberty Metals & Mining 5.54 Aristeia Capital, LLC 5.19 Sun Valley Gold, LLC 2.73 Royce & Associates 2.19 Mackenzie Financial 2.13 Robert Quartermain 2.00 Sprott Asset Management 1.88 Franklin Advisors, Inc. 1.88 Analyst Coverage CIBC Jeff Killeen Citibank Alex Hacking Cormark Securities Richard Gray Cowen Securities Adam Graf GMP Securities George Albino H.C. Wainwright Jeff Wright RBC Dan Rollins Roth Capital Partners Joseph Reagor Salman Partners Ash Guglani Scotiabank Ovais Habib Capital Structure(1) Public Float 115.2 Silver Standard Shares 17.3 Total Issued & Outstanding Shares 132.5 Incentive Options 11.9 Total Fully Diluted Shares 144.4 Market Cap (at Feb. 18, 2015) C$1 billion Working Capital (at Sept. 30, 2014) C$65 million (shares in millions) Gross Proceeds of Share Offering(3) C$99 million
  • 27. 27 CONTACT: Phone: 604-558-1784 Fax: 604-558-4784 Toll-free: 1-877-558-1784 invest@pretivm.com www.pretivm.com HEAD OFFICE: Pretium Resources Inc. 570 Granville St. Suite 1600 Vancouver, BC Canada V6C 3P1 COMMON SHARES: TSX/NYSE:PVG Issued: 132.5 million Fully diluted: 144.4 million 52-week hi/low: $9.43/$4.60 Market cap: $1.16 billion (at Jan. 21, 2015) Advancing a major high-grade gold project in Canada 27
  • 28. 28 CONTACT: Phone: 604-558-1784 Fax: 604-558-4784 Toll-free: 1-877-558-1784 invest@pretivm.com www.pretivm.com HEAD OFFICE: Pretium Resources Inc. 570 Granville St. Suite 1600 Vancouver, BC Canada V6C 3P1 COMMON SHARES: TSX/NYSE:PVG Issued: 132.5 million Fully diluted: 144.4 million 52-week hi/low: $9.43/$4.60 Market cap: $1 billion (at Feb. 18, 2015) Advancing a major high-grade gold project in Canada 28
  • 29. 29 APPENDIX: CASH FLOW: FIRST 10 YEARS  Base Case ($1,100/oz Au; $17/oz Ag; C$/US$ 0.92)  High Case ($1,400/oz Au; $21/oz Ag; C$/US$ 0.92) Year 1 2 3 4 5 6 7 8 9 10 Operating Cash Flow ($ million) 270.5 341.4 394.5 354.7 390.3 412.9 411.0 408.3 327.4 346.4 Pre-tax Net Cash Flow ($ million) 193.7 310.3 366.2 336.9 367.5 392.1 384.4 392.6 308.8 329.1 Post-tax Net Cash Flow ($ million) 188.4 303.5 326.4 234.3 241.7 256.1 248.6 255.5 200.3 213.2 Year 1 2 3 4 5 6 7 8 9 10 Operating Cash Flow ($ million) 388.6 478.9 545.4 495.6 540.7 570.2 569.1 565.0 460.5 484.1 Pre-tax Net Cash Flow ($ million) 311.8 447.7 517.1 477.8 517.9 549.4 542.5 549.2 441.9 466.8 Post-tax Net Cash Flow ($ million) 304.1 421.2 363.3 316.1 338.4 357.2 350.3 356.2 285.9 301.7 (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
  • 30. 30 APPENDIX: 2013 RESOURCE ESTIMATE Valley of the Kings Mineral Resource estimate - December 2013(1),(4) (Based on a cut-off grade of 5.0 grams of gold-equivalent/tonne(5)) Category Tonnes (millions) Gold (g/t) Silver (g/t) Contained(3) Gold (million oz) Silver (million oz) Measured 2.0 19.3 14.4 1.2 0.9 Indicated 13.4 17.4 14.3 7.5 6.1 M & I 15.3 17.6 14.3 8.7 7.0 Inferred(2) 5.9 25.6 20.6 4.9 3.9 (1) Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, marketing, or other relevant issues. The Mineral Resources in this news release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council. (2) The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Resources as an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category. (3) Contained metal figures and totals may differ due to rounding of figures. (4) The Mineral Resource estimate stated in Table 1 is defined using 10 m by 10 m by 10 m blocks in the in Valley of the Kings. (5) The gold equivalent value is defined as AuEq = Au + Ag/53. (6) See Brucejack Project Mineral Resources Update Technical Report dated December 19, 2013.  The updated Valley of the Kings Resource estimate announced in December(6) added Measured gold Resources and increased gold grade:
  • 31. 31 APPENDIX: 2013 RESOURCE MODEL – VALLEY OF THE KINGS 5-10 10-20 20-60 >60 Key (g/t Au) December 2013 Mineral Resource Measured and Indicated Blocks >5g/t Au. Blocks are 10m x 10m x 10m 100 m N
  • 32. 32 APPENDIX: 2013 UNDERGROUND DRILLING Fragmental Volcanic Rocks Polylithic Conglomerate Volcanic Sediment 50 m N Completed Underground Development Completed Bulk Sample Legend >20 Key (g/t Au) Assay intervals 5.0-20.0 2.5-5.0 Silicified Conglomerate Volcanic Flows
  • 33. 33 APPENDIX: EXPLORATION POTENTIAL EAST - WEST 200 m N Valley of the Kings Access Ramp Bulk Sample Development Approximate surface projection of December 2013 Measured & Indicated resources SU-498 0.5m @ 3,874 g/t Au SU-526 1.16m @ 4,195 g/t Au VU-136 0.5m @ 1,100 g/t Au Brucejack Fault