SlideShare a Scribd company logo
1 of 37
Download to read offline
1
CORPORATE PRESENTATION
Aug 12, 2014
2
CAUTIONARY STATEMENT
Forward Looking Information
This Presentation contains “forward-looking information” and “forward looking statements” within the meaning of applicable Canadian and United States
securities legislation. Forward-looking information may include, but is not limited to, the anticipated production and developments in our operations in future
periods, information with respect to our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral
reserves and resources including the 2013 Valley of the Kings Mineral Resource estimate, realization of mineral reserve and resource estimates and timing of
development of our Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates,
capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of
approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of directors and
committees and adequacy of financial resources. Wherever possible, words such as “plans”, “expects”, “projects”, “assumes”, “budget”, “strategy”,
“scheduled”, “estimates”, “forecasts”, “anticipates”, “believes”, “intends”, “targets” and similar expressions or statements that certain actions, events or results
“may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been
used to identify forward-looking statements and information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute
forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any
statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or
performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and
unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking
information, including, without limitation, those risks identified in our Annual Information Form dated March 31, 2014 filed on SEDAR at www.sedar.com and
in the United States on Form 40-F through EDGAR at the SEC’s website at www.sec.gov. Forward-looking information is based on the expectations and
opinions of our management on the date the statements are made. The assumptions used in the preparation of such statements, although considered
reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result
of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place
undue reliance on forward-looking information.
National Instrument 43-101
Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical
reports (“Reports”) “Mineral Resources Update Technical Report” dated December 19, 2013 and “Feasibility Study and Technical Report on the Brucejack
Project, Stewart, BC” dated June 19, 2014. We have filed the Reports and Update under our profile at www.sedar.com. Technical and scientific information
not contained within the Reports for the Projects have been prepared under the supervision of Mr. Kenneth C. McNaughton, P.Eng. and Ian Chang, P.Eng.,
each of whom is an independent “qualified person” under NI 43-101.
This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Although these terms are recognized
and required by Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources
which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental,
permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no guarantee that all or any part of the mineral resource will be
converted into mineral reserves.
In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or
any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not
form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI 43-101. Investors are
cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.
Currency
Unless otherwise indicated, all dollar values herein are in Canadian $.
3
 High-grade
underground gold
project
 Commercial
production target
2017
 Located in British
Columbia, Canada
V A L U E T H R O U G H G O L D
4
BRUCEJACK PROJECT LOCATION
5
HIGH-GRADE GOLD RESERVES(1,2)
Valley of the Kings
West Zone
Category Tonnes
(mil)
Gold
(g/t)
Silver
(g/t)
Contained
Gold
(mil oz)
Silver
(mil oz)
Proven 1.4 7.2 383 0.3 17.4
Probable 1.5 6.5 181 0.3 8.6
Total P&P 2.9 6.9 279 0.6 26.0
Valley of the Kings Mineral Reserve Estimate – June 2014 West Zone Mineral Reserve Estimate – June 2014
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
(2) Base case metals prices of US$1,100/oz gold and US$17/oz silver
Category Tonnes
(mil)
Gold
(g/t)
Silver
(g/t)
Contained
Gold
(mil oz)
Silver
(mil oz)
Proven 2.1 15.6 12 1.1 0.8
Probable 11.5 15.7 10 5.8 3.9
Total P&P 13.6 15.7 11 6.9 4.6
6
BRUCEJACK PROJECT ECONOMICS
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
(2) NPV is discounted to July 2014.
June 2014 Feasibility Study (1)
Economic Results by Metal Price
Low Case Base Case High Case
Gold / Silver Price
(US$/ounce)
$800 / $15 $1,100 / $17 $1,400 / $21
Capex
(US$million)
$746.9 $746.9 $746.9
Net Cash Flow (US$)
$2.02 billion (pre-tax)
$1.34 billion (post-tax)
$4.16 billion (pre-tax)
$2.72 billion (post-tax)
$6.35 billion (pre-tax)
$4.13 billion (post-tax)
Net Present Value (2)
(5.0% discount) (US$)
$985 million (pre-tax)
$620 million (post-tax)
$2.25 billion (pre-tax)
$1.45 billion (post-tax)
$3.54 billion (pre-tax)
$2.28 billion (post-tax)
Internal Rate of
Return
20.3% (pre-tax)
16.5% (post-tax)
34.7% (pre-tax)
28.5% (post-tax)
47%(pre-tax)
38.7% (post-tax)
Payback (from start of
production period)
4.4 years (pre-tax)
4.5 years (post-tax)
2.7 years (pre-tax)
2.8 years (post-tax)
2.0 years (pre-tax)
2.1 years (post-tax)
Exchange Rate
(US$:C$)
0.92 0.92 0.92
7
BRUCEJACK PROJECT PRODUCTION (1)
• Mine life of 18 years producing an estimated 7.27 million
ounces of gold
• Average annual production of 504,000 ounces of gold
over the first 8 years and 404,000 ounces of gold over
mine life
 Gold and silver recoveries of 96.7% and 90.0% over mine
life
 Production rate of 2,700 tonnes per day
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
8
BRUCEJACK CAPITAL COSTS
June 2014 Feasibility Study (1)
Capital Cost Summary
(US$ million)
Mine underground 179.5
Mine site (2) 210.8
Offsite Infrastructure 89.1
Total Direct Costs 479.4
Indirect Costs 127.5
Owner’s Costs 71.0
Contingency 69.0
Total Capital Cost 746.9
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
(2) Includes mine site, mine site process, mine site utilities, mine site facilities, tailings facilities, mine site temporary facilities
and surface mobile equipment.
9
BRUCEJACK OPERATING COSTS
June 2014 Feasibility Study (1)
Operating Costs Summary
(C$/tonne)
Mining 91.34 (2)
Processing 19.69
General & Administrative 30.87
Surface Services and Others 21.15
Total Operating Cost 163.05
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
(2) LOM ore milled; if excluding the ore mined during preproduction, the estimated cost is C$91.78/t.
10
COST: HIGH-GRADE ADVANTAGE
June 2014 Feasibility Study (1)
All-In Sustaining Cash Costs Life of Mine
(US$ million)
Total Cash Costs (2) 2,814.5
Reclamation Cost Accretion 27.5
Sustaining Capital Expenditure 320.6
All-in Sustaining Cash Costs 3,162.6
Gold Sales 7,067
All-in Sustaining Cash Costs
per Ounce
US$448/ounce
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014.
(2) Net of silver credits at Base Case silver price of $US17/ounce.
11
BRUCEJACK UNDERGROUND
12
VALLEY OF THE KINGS: STOCKWORK
S
N
Cleo West Drift 615L West Raise
Domain 20
~0.5 m
13
MINING: YEAR 1
14
MINING: YEAR 2
15
MINING: YEAR 3
16
MINING: YEAR 4
17
MINING: YEAR 5
18
LIFE OF MINE PLAN
Oblique view facing west
Valley of the Kings
West Zone
Portals
19
MINING METRICS (1)
 30 m level spacing
 Maximum of 45 m stope
lengths
 15 m widths
 Dilution Factors
– Primary Stopes: 7%
– Secondary Stopes: 15%
 Mining Recovery Factors
– Primary Stopes: 97.5%
– Secondary Stopes: 92.5%
 Average 12 stopes in the
mining and backfill cycle at
any time
(1) See Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
20
SITE LAYOUT
Portals
Mill
Camp
Development Rock
Disposal Laydown &
Fuel Storage
Substation
West Zone
Portal
Truck Shop
21
PROJECT FLOW SHEET
22
 Gravity and flotation
concentration
 Producing gold/silver
concentrate and doré
 Bulk sample processing with
single stage gravity and
flotation concentration yielded
gold recoveries averaging 98%
PROCESSING
23
PERMITTING PROCESS
Scope and
Process
determined
1st Public
Comment
Period
Application
Submitted
Application
evaluated for
completeness
Application
review, 2nd
Public
Comment
Period
Assessment
Report
Referral to
Ministers
January 2013
Five Open
Houses in
November
2013
(Submitted
June 20, 2014)
(Completed by
July 25, 2014)
(Review stage 180 days)
Project
Description
Filed
Project
Decision by
Ministers
(Decision 45 days)
 BC Environmental Assessment Office (EAO) manages it
 Federal review coordinated by Federal Environmental
Assessment Agency (CEAA) for relevant areas
 Provincial and Federal reviews are coordinated
For more information on assessment process: www.eao.gov.bc.ca/ea_process.html
(Anticipate
H1 2015)
24
COMMUNITY ENGAGEMENT
 Commercial relationships with local First
Nations during the exploration phase at
Brucejack have been mutually successful
 Examples of Brucejack Project contracts with
First Nation development corporations
include camp construction, access road
maintenance, waste rock disposal
 The proposed mine will provide
approximately 800 jobs during construction
and 500 jobs during operations
 We will continue to extend both commercial
contract and employment opportunities to
locals whenever possible
25
NEAREST FISH 20KM AWAY
CASCADE
BRUCEJACK
PROJECT
BRUCEJACK LAKE
(not fish habitat)
26
FINANCING THE BRUCEJACK PROJECT
 Various proposals in addition to equity have been
brought to us, including: royalty, forward sale, high-
yield debt, convertible notes, gold-linked bonds, project
debt, streaming
 All options will be considered to maximize return
 Anticipate financing plan to be finalized in Q4
27
THE NEXT 12 MONTHS:
2014/H2
 File Environmental Assessment
Certificate application
 Updated Feasibility Study
 In-fill drill program
 Plan and implement underground
exploration program
 Plan for excavation of additional 1,000
tonnes of high-grade ore
 Potential production of additional 1,000
tonnes of high-grade ore
2015/H1
 Anticipate receiving permits
 Start construction
28
HIGH-GRADE GOLD WITH SIZE
Data source: Companies
Valley of the Kings reserves based on Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
Kirkland Lake Mine
(Kirkland Lake)
Kensington
(Coeur)
Casa Berardi
(Hecla)
El Penon
(Yamana)
Red Lake
(Goldcorp)
Pogo Mine
(Sumitomo)
Valley of the Kings
Cerro Negro
(Goldcorp)Eleonore
(Goldcorp)
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Proven+ProbableGoldGrade(g/t)
Proven + Probable Gold Reserves (mm oz)
29
PRETIVM MANAGEMENT
Robert Quartermain, B.Sc., M.Sc., P.Geo, D.Sc.
President & Chief Executive Officer,
Director
Joseph Ovsenek, B.A. Sc., P.Eng., LLB
Executive Vice President & Chief Development Officer,
Director
Ken McNaughton, M.A. Sc., P.Eng.
Vice President & Chief Exploration Officer
Ian I Chang, M.A. Sc., P.Eng.
Vice President, Project Development
Michelle Romero, B.A., M.L.S.
Vice President, Corporate Relations
Kevin Torpy, B.Sc.
Director, Operations
Warwick Board, Ph.D., P.Geo.
Chief Geologist
Max Holtby, B.Sc., P. Geo.
Director, Permitting
James A Currie, P.Eng.
Vice President & Chief Operating Officer
Peter de Visser, CA
Chief Financial Officer
30
SHAREHOLDING & ANALYST COVERAGE
(1) As of July 29, 2014; ownership calculated on an undiluted basis.
(2) As of June 18, 2014. Source: IPREO, SEDI
(3) See News Release dated July 29, 2014
Top Shareholders(2)
(shares in millions)
Silver Standard Resources 18.986
Liberty Metals & Mining 6.850
Royce & Associates 5.546
Aristeia Capital, LLC 4.655
Sun Valley Gold, LLC 4.361
Robert Quartermain 2.808
Franklin Advisors, Inc. 2.749
Norges Bank Investment
TD Asset Management
2.457
1.959
Sprott Asset Management 1.854
Weiss Asset Management 1.837
Analyst Coverage
BMO John Hayes
CIBC Jeff Killeen
Citibank Alex Hacking
Cormark Securities Richard Gray
Cowen Securities Adam Graf
GMP Securities George Albino
H.C. Wainwright Jeff Wright
RBC Dan Rollins
Roth Capital Partners Joseph Reagor
Salman Partners Ash Guglani
Scotiabank Ovais Habib
Capital Structure(1)
Public Float 97.8
Silver Standard Shares 17.5
Total Issued & Outstanding Shares 115.3
Incentive Options 10.4
Total Fully Diluted Shares 125.7
Market Cap (at Aug. 12, 2014) C$909 million
Working Capital (at June 30, 2014) C$22.7 million
(shares in millions)
Silver
Standard,
18 %
Institutions,
49%
Management,
4%
Retail,
29%
Gross Proceeds of Share Offering(3) US$49.5 million
31
APPENDIX: 2013 RESOURCE ESTIMATE
Valley of the Kings Mineral Resource estimate - December 2013(1),(4)
(Based on a cut-off grade of 5.0 grams of gold-equivalent/tonne(5))
Category
Tonnes
(millions)
Gold
(g/t)
Silver
(g/t)
Contained(3)
Gold
(million oz)
Silver
(million oz)
Measured 2.0 19.3 14.4 1.2 0.9
Indicated 13.4 17.4 14.3 7.5 6.1
M & I 15.3 17.6 14.3 8.7 7.0
Inferred(2) 5.9 25.6 20.6 4.9 3.9
(1) Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by
environmental, permitting, legal, marketing, or other relevant issues. The Mineral Resources in this news release were estimated using the Canadian Institute of Mining,
Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve
Definitions and adopted by CIM Council.
(2) The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Resources as
an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category.
(3) Contained metal figures and totals may differ due to rounding of figures.
(4) The Mineral Resource estimate stated in Table 1 is defined using 10 m by 10 m by 10 m blocks in the in Valley of the Kings.
(5) The gold equivalent value is defined as AuEq = Au + Ag/53.
(6) See Brucejack Project Mineral Resources Update Technical Report dated December 19, 2013.
 The updated Valley of the Kings Resource estimate announced in
December(6) added Measured gold Resources and increased gold grade:
32
APPENDIX: 2013 RESOURCE MODEL – VALLEY OF THE KINGS
5-10
10-20
20-60
>60
Key (g/t Au)
December 2013 Mineral Resource
Measured and Indicated Blocks >5g/t Au.
Blocks are 10m x 10m x 10m
100 m
N
33
APPENDIX: 2013 UNDERGROUND DRILLING
Fragmental
Volcanic Rocks
Polylithic
Conglomerate
Volcanic
Sediment
50 m
N
Completed Underground
Development
Completed Bulk Sample
Legend
>20
Key (g/t Au)
Assay intervals
5.0-20.0
2.5-5.0
Silicified
Conglomerate
Volcanic Flows
34
APPENDIX: VALLEY OF THE KINGS M+I RESOURCE
Northing
(± 25 m)
M+I Gold*
(Oz.)
6258225 138,175
6258175 412,508
6258125 853,632
6258075 342,402
6258025 2,161,727
6257975 2,434,390
6257925 1,126,442
6257875 643,503
6257825 410,615
6257775 87,687
*Dec. 2013 M+I Mineral
Resource; ≥5.0 g/t Au.
1.20 1.87 1.53 2.28 1.17 0.52 0.52
M+I Au*
(Moz.)
Surface projection of December 2013 Mineral Resource estimate, with total ounces per 100 m Easting and 50 m Northing strips
35
10.93m @ 43.57 ppm Au
0.5m @ 26.00 ppm Au
N
2014 SURFACE DRILLING: PLAN VIEW
<0.5
0.5-1.0
1.0-5.0
>20
5.0-20.0
Key (g/t Au)
Assay intervals
200m
Existing Underground
Development
SU-627
Latite Dykes
(projected from 1345m)
Latite Dykes
(projected from 1345m)
SU-628
SU-629
1.5m @ 19.05 ppm Au
0.5m @
17.95 ppm Au
SU-630
5m @ 17.34 ppm Au
1.5m @ 32.5 ppm Au
1m @ 11.35 ppm Au
0.5m @ 11.1 ppm Au
36
10.93m @ 43.57 ppm Au
0.5m @ 26.00 ppm Au
N S
426765E: 500M WIDE SECTION
200m
<0.5
0.5-1.0
1.0-5.0
>20
5.0-20.0
Key (g/t Au)
(Assay intervals)
Fragmental
Volcanic Rocks
Polylithic
Conglomerate Volcanic
Flows
Volcaniclastic
Sediments
Volcanic Flows
5-10
10-20
>20
Key (g/t Au)
(Blocks)
(M&I + Inferred)
SU-627
Latite Dykes
SU-630
SU-628
SU-629
1.5m @ 19.05 ppm Au
0.5m @
17.95 ppm Au
5m @ 17.34 ppm Au
1.5m @ 32.5 ppm Au
1m @ 11.35 ppm Au
0.5m @ 11.1 ppm Au
37
CONTACT:
Phone: 604-558-1784
Fax: 604-558-4784
Toll-free: 1-877-558-1784
invest@pretivm.com
www.pretivm.com
HEAD OFFICE:
Pretium Resources Inc.
570 Granville St.
Suite 1600
Vancouver, BC
Canada V6C 3P1
COMMON SHARES:
TSX/NYSE:PVG
Issued: 115.3 million
Fully diluted: 125.7 million
52-week hi/low:
$10.67/$2.83
Market cap: $909 million
(at Aug. 12, 2014)
Advancing a major high-grade gold project in Canada
37

More Related Content

What's hot

Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014
PretiumR
 
Corporate Presentation June 2011
Corporate Presentation June 2011Corporate Presentation June 2011
Corporate Presentation June 2011
PretiumR
 

What's hot (17)

CIBC Whistler Conference Presentation Jan 23, 2015
CIBC Whistler Conference Presentation Jan 23, 2015CIBC Whistler Conference Presentation Jan 23, 2015
CIBC Whistler Conference Presentation Jan 23, 2015
 
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationBMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
 
2015 Precious Metals Summit
2015 Precious Metals Summit2015 Precious Metals Summit
2015 Precious Metals Summit
 
BMO Conference Feb 28 2016
BMO Conference Feb 28 2016BMO Conference Feb 28 2016
BMO Conference Feb 28 2016
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014
 
Corp Presentation October 2014
Corp Presentation October 2014Corp Presentation October 2014
Corp Presentation October 2014
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor Conference
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014
 
Corporate Presentation June 2011
Corporate Presentation June 2011Corporate Presentation June 2011
Corporate Presentation June 2011
 
CIBC Mining Royalty Sector 2013 Conference
 CIBC Mining Royalty Sector 2013 Conference  CIBC Mining Royalty Sector 2013 Conference
CIBC Mining Royalty Sector 2013 Conference
 
2013 Bank of America Merrill Lynch Global Metals, Mining & Steel Conference
2013 Bank of America Merrill Lynch Global Metals, Mining & Steel Conference2013 Bank of America Merrill Lynch Global Metals, Mining & Steel Conference
2013 Bank of America Merrill Lynch Global Metals, Mining & Steel Conference
 
Hudbay's Annual and Special Meeting of Shareholders
Hudbay's Annual and Special Meeting of ShareholdersHudbay's Annual and Special Meeting of Shareholders
Hudbay's Annual and Special Meeting of Shareholders
 
Hudbay's Annual And Special Meeting of Shareholders
Hudbay's Annual And Special Meeting of ShareholdersHudbay's Annual And Special Meeting of Shareholders
Hudbay's Annual And Special Meeting of Shareholders
 
RBC Capital Markets' Global Mining & Materials Conference
RBC Capital Markets' Global Mining & Materials Conference RBC Capital Markets' Global Mining & Materials Conference
RBC Capital Markets' Global Mining & Materials Conference
 
Second Quarter 2012 Conference Call
Second Quarter 2012 Conference CallSecond Quarter 2012 Conference Call
Second Quarter 2012 Conference Call
 
Troilus Gold Corp. - Corporate Presentation - April 14, 2020
Troilus Gold Corp. - Corporate Presentation - April 14, 2020Troilus Gold Corp. - Corporate Presentation - April 14, 2020
Troilus Gold Corp. - Corporate Presentation - April 14, 2020
 

Viewers also liked

Pretivm Corporate Presentation June 2012
Pretivm Corporate Presentation June 2012Pretivm Corporate Presentation June 2012
Pretivm Corporate Presentation June 2012
PretiumR
 
June 6, Corporate Presentation
June 6, Corporate PresentationJune 6, Corporate Presentation
June 6, Corporate Presentation
PretiumR
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
PretiumR
 
Corporate presentation november 2013
Corporate presentation november 2013Corporate presentation november 2013
Corporate presentation november 2013
PretiumR
 
September 9 2013 corp web
September 9 2013 corp webSeptember 9 2013 corp web
September 9 2013 corp web
PretiumR
 
July presentation web
July presentation webJuly presentation web
July presentation web
PretiumR
 
Pretivm february presentation 2 web
Pretivm february presentation 2 webPretivm february presentation 2 web
Pretivm february presentation 2 web
PretiumR
 
Pretivm november 2011 web
Pretivm november 2011 webPretivm november 2011 web
Pretivm november 2011 web
PretiumR
 
January 2012 presentation_january_8_handouts
January 2012 presentation_january_8_handoutsJanuary 2012 presentation_january_8_handouts
January 2012 presentation_january_8_handouts
PretiumR
 
Pretivm June Presentation
Pretivm June PresentationPretivm June Presentation
Pretivm June Presentation
PretiumR
 
July presentation handouts
July presentation handoutsJuly presentation handouts
July presentation handouts
PretiumR
 
Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014
PretiumR
 

Viewers also liked (20)

Pretivm Corporate Presentation June 2012
Pretivm Corporate Presentation June 2012Pretivm Corporate Presentation June 2012
Pretivm Corporate Presentation June 2012
 
Corporate Presentation Sept 5, 2014
Corporate Presentation Sept 5, 2014Corporate Presentation Sept 5, 2014
Corporate Presentation Sept 5, 2014
 
Pretivm european gold forum apr 2016
Pretivm   european gold forum apr 2016Pretivm   european gold forum apr 2016
Pretivm european gold forum apr 2016
 
June 6, Corporate Presentation
June 6, Corporate PresentationJune 6, Corporate Presentation
June 6, Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)
 
Corporate presentation november 2013
Corporate presentation november 2013Corporate presentation november 2013
Corporate presentation november 2013
 
September 9 2013 corp web
September 9 2013 corp webSeptember 9 2013 corp web
September 9 2013 corp web
 
July presentation web
July presentation webJuly presentation web
July presentation web
 
Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015
 
Pretivm february presentation 2 web
Pretivm february presentation 2 webPretivm february presentation 2 web
Pretivm february presentation 2 web
 
December Presentation
December PresentationDecember Presentation
December Presentation
 
June 2012 Presentation
June 2012 PresentationJune 2012 Presentation
June 2012 Presentation
 
Pretivm november 2011 web
Pretivm november 2011 webPretivm november 2011 web
Pretivm november 2011 web
 
Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015
 
January 2012 presentation_january_8_handouts
January 2012 presentation_january_8_handoutsJanuary 2012 presentation_january_8_handouts
January 2012 presentation_january_8_handouts
 
Pretivm June Presentation
Pretivm June PresentationPretivm June Presentation
Pretivm June Presentation
 
July presentation handouts
July presentation handoutsJuly presentation handouts
July presentation handouts
 
Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014
 
Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015
 

Similar to Corportate Presentation Aug 12, 2014

Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
PretiumR
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014
PretiumR
 
Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014
PretiumR
 

Similar to Corportate Presentation Aug 12, 2014 (14)

Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor Conference
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014
 
Sprott conference 2016 corporate presentation
Sprott conference 2016 corporate presentationSprott conference 2016 corporate presentation
Sprott conference 2016 corporate presentation
 
A fund presentation oct 25 2016
A fund presentation oct 25 2016A fund presentation oct 25 2016
A fund presentation oct 25 2016
 
Casey Research 2015 Summit
Casey Research 2015 SummitCasey Research 2015 Summit
Casey Research 2015 Summit
 
Corporate Presentation December 2015
Corporate Presentation December 2015Corporate Presentation December 2015
Corporate Presentation December 2015
 
ROTH PRESENTATION
ROTH PRESENTATIONROTH PRESENTATION
ROTH PRESENTATION
 
Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014
 
Denver gold-forum-2016
Denver gold-forum-2016Denver gold-forum-2016
Denver gold-forum-2016
 
Cibc whister jan 25 2017
Cibc whister jan 25 2017Cibc whister jan 25 2017
Cibc whister jan 25 2017
 
Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016
 
Pvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentationPvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentation
 

More from PretiumR

More from PretiumR (20)

AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019
 
Pretivm Investors Day Presentation
Pretivm Investors Day PresentationPretivm Investors Day Presentation
Pretivm Investors Day Presentation
 
31st Annual ROTH Conference 2019
31st Annual ROTH Conference 201931st Annual ROTH Conference 2019
31st Annual ROTH Conference 2019
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining Conference
 
Pretium resources q1 2018 conference call may 11 , 2018
Pretium resources   q1 2018 conference call may 11 , 2018Pretium resources   q1 2018 conference call may 11 , 2018
Pretium resources q1 2018 conference call may 11 , 2018
 
Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018
 
Fourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference CallFourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference Call
 
Bmo conf feb26-2018
Bmo conf feb26-2018Bmo conf feb26-2018
Bmo conf feb26-2018
 
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets ConferenceRamping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
 
Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018
 
Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
 
Pretium a fund oct 25 2017
Pretium a fund oct 25 2017Pretium a fund oct 25 2017
Pretium a fund oct 25 2017
 
Denver Gold Forum 2017
Denver Gold Forum 2017Denver Gold Forum 2017
Denver Gold Forum 2017
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 final
 
Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)
 
Pretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-web
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 final
 

Recently uploaded

Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
David Celestin
 
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
ZurliaSoop
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
Kayode Fayemi
 

Recently uploaded (20)

AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
Introduction to Artificial intelligence.
Introduction to Artificial intelligence.Introduction to Artificial intelligence.
Introduction to Artificial intelligence.
 
History of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth deathHistory of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth death
 
Ready Set Go Children Sermon about Mark 16:15-20
Ready Set Go Children Sermon about Mark 16:15-20Ready Set Go Children Sermon about Mark 16:15-20
Ready Set Go Children Sermon about Mark 16:15-20
 
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfSOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
 
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptxBEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
 
Dreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIIDreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio III
 
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of Drupal
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatment
 
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
 
Lions New Portal from Narsimha Raju Dichpally 320D.pptx
Lions New Portal from Narsimha Raju Dichpally 320D.pptxLions New Portal from Narsimha Raju Dichpally 320D.pptx
Lions New Portal from Narsimha Raju Dichpally 320D.pptx
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Bailey
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORNLITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
 
Zone Chairperson Role and Responsibilities New updated.pptx
Zone Chairperson Role and Responsibilities New updated.pptxZone Chairperson Role and Responsibilities New updated.pptx
Zone Chairperson Role and Responsibilities New updated.pptx
 
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait Cityin kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
 
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. Mumbai
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. MumbaiCall Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. Mumbai
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. Mumbai
 

Corportate Presentation Aug 12, 2014

  • 2. 2 CAUTIONARY STATEMENT Forward Looking Information This Presentation contains “forward-looking information” and “forward looking statements” within the meaning of applicable Canadian and United States securities legislation. Forward-looking information may include, but is not limited to, the anticipated production and developments in our operations in future periods, information with respect to our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral reserves and resources including the 2013 Valley of the Kings Mineral Resource estimate, realization of mineral reserve and resource estimates and timing of development of our Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of directors and committees and adequacy of financial resources. Wherever possible, words such as “plans”, “expects”, “projects”, “assumes”, “budget”, “strategy”, “scheduled”, “estimates”, “forecasts”, “anticipates”, “believes”, “intends”, “targets” and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been used to identify forward-looking statements and information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, those risks identified in our Annual Information Form dated March 31, 2014 filed on SEDAR at www.sedar.com and in the United States on Form 40-F through EDGAR at the SEC’s website at www.sec.gov. Forward-looking information is based on the expectations and opinions of our management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. National Instrument 43-101 Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical reports (“Reports”) “Mineral Resources Update Technical Report” dated December 19, 2013 and “Feasibility Study and Technical Report on the Brucejack Project, Stewart, BC” dated June 19, 2014. We have filed the Reports and Update under our profile at www.sedar.com. Technical and scientific information not contained within the Reports for the Projects have been prepared under the supervision of Mr. Kenneth C. McNaughton, P.Eng. and Ian Chang, P.Eng., each of whom is an independent “qualified person” under NI 43-101. This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Although these terms are recognized and required by Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no guarantee that all or any part of the mineral resource will be converted into mineral reserves. In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI 43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. Currency Unless otherwise indicated, all dollar values herein are in Canadian $.
  • 3. 3  High-grade underground gold project  Commercial production target 2017  Located in British Columbia, Canada V A L U E T H R O U G H G O L D
  • 5. 5 HIGH-GRADE GOLD RESERVES(1,2) Valley of the Kings West Zone Category Tonnes (mil) Gold (g/t) Silver (g/t) Contained Gold (mil oz) Silver (mil oz) Proven 1.4 7.2 383 0.3 17.4 Probable 1.5 6.5 181 0.3 8.6 Total P&P 2.9 6.9 279 0.6 26.0 Valley of the Kings Mineral Reserve Estimate – June 2014 West Zone Mineral Reserve Estimate – June 2014 (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014 (2) Base case metals prices of US$1,100/oz gold and US$17/oz silver Category Tonnes (mil) Gold (g/t) Silver (g/t) Contained Gold (mil oz) Silver (mil oz) Proven 2.1 15.6 12 1.1 0.8 Probable 11.5 15.7 10 5.8 3.9 Total P&P 13.6 15.7 11 6.9 4.6
  • 6. 6 BRUCEJACK PROJECT ECONOMICS (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014 (2) NPV is discounted to July 2014. June 2014 Feasibility Study (1) Economic Results by Metal Price Low Case Base Case High Case Gold / Silver Price (US$/ounce) $800 / $15 $1,100 / $17 $1,400 / $21 Capex (US$million) $746.9 $746.9 $746.9 Net Cash Flow (US$) $2.02 billion (pre-tax) $1.34 billion (post-tax) $4.16 billion (pre-tax) $2.72 billion (post-tax) $6.35 billion (pre-tax) $4.13 billion (post-tax) Net Present Value (2) (5.0% discount) (US$) $985 million (pre-tax) $620 million (post-tax) $2.25 billion (pre-tax) $1.45 billion (post-tax) $3.54 billion (pre-tax) $2.28 billion (post-tax) Internal Rate of Return 20.3% (pre-tax) 16.5% (post-tax) 34.7% (pre-tax) 28.5% (post-tax) 47%(pre-tax) 38.7% (post-tax) Payback (from start of production period) 4.4 years (pre-tax) 4.5 years (post-tax) 2.7 years (pre-tax) 2.8 years (post-tax) 2.0 years (pre-tax) 2.1 years (post-tax) Exchange Rate (US$:C$) 0.92 0.92 0.92
  • 7. 7 BRUCEJACK PROJECT PRODUCTION (1) • Mine life of 18 years producing an estimated 7.27 million ounces of gold • Average annual production of 504,000 ounces of gold over the first 8 years and 404,000 ounces of gold over mine life  Gold and silver recoveries of 96.7% and 90.0% over mine life  Production rate of 2,700 tonnes per day (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
  • 8. 8 BRUCEJACK CAPITAL COSTS June 2014 Feasibility Study (1) Capital Cost Summary (US$ million) Mine underground 179.5 Mine site (2) 210.8 Offsite Infrastructure 89.1 Total Direct Costs 479.4 Indirect Costs 127.5 Owner’s Costs 71.0 Contingency 69.0 Total Capital Cost 746.9 (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014 (2) Includes mine site, mine site process, mine site utilities, mine site facilities, tailings facilities, mine site temporary facilities and surface mobile equipment.
  • 9. 9 BRUCEJACK OPERATING COSTS June 2014 Feasibility Study (1) Operating Costs Summary (C$/tonne) Mining 91.34 (2) Processing 19.69 General & Administrative 30.87 Surface Services and Others 21.15 Total Operating Cost 163.05 (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014 (2) LOM ore milled; if excluding the ore mined during preproduction, the estimated cost is C$91.78/t.
  • 10. 10 COST: HIGH-GRADE ADVANTAGE June 2014 Feasibility Study (1) All-In Sustaining Cash Costs Life of Mine (US$ million) Total Cash Costs (2) 2,814.5 Reclamation Cost Accretion 27.5 Sustaining Capital Expenditure 320.6 All-in Sustaining Cash Costs 3,162.6 Gold Sales 7,067 All-in Sustaining Cash Costs per Ounce US$448/ounce (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014. (2) Net of silver credits at Base Case silver price of $US17/ounce.
  • 12. 12 VALLEY OF THE KINGS: STOCKWORK S N Cleo West Drift 615L West Raise Domain 20 ~0.5 m
  • 18. 18 LIFE OF MINE PLAN Oblique view facing west Valley of the Kings West Zone Portals
  • 19. 19 MINING METRICS (1)  30 m level spacing  Maximum of 45 m stope lengths  15 m widths  Dilution Factors – Primary Stopes: 7% – Secondary Stopes: 15%  Mining Recovery Factors – Primary Stopes: 97.5% – Secondary Stopes: 92.5%  Average 12 stopes in the mining and backfill cycle at any time (1) See Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
  • 20. 20 SITE LAYOUT Portals Mill Camp Development Rock Disposal Laydown & Fuel Storage Substation West Zone Portal Truck Shop
  • 22. 22  Gravity and flotation concentration  Producing gold/silver concentrate and doré  Bulk sample processing with single stage gravity and flotation concentration yielded gold recoveries averaging 98% PROCESSING
  • 23. 23 PERMITTING PROCESS Scope and Process determined 1st Public Comment Period Application Submitted Application evaluated for completeness Application review, 2nd Public Comment Period Assessment Report Referral to Ministers January 2013 Five Open Houses in November 2013 (Submitted June 20, 2014) (Completed by July 25, 2014) (Review stage 180 days) Project Description Filed Project Decision by Ministers (Decision 45 days)  BC Environmental Assessment Office (EAO) manages it  Federal review coordinated by Federal Environmental Assessment Agency (CEAA) for relevant areas  Provincial and Federal reviews are coordinated For more information on assessment process: www.eao.gov.bc.ca/ea_process.html (Anticipate H1 2015)
  • 24. 24 COMMUNITY ENGAGEMENT  Commercial relationships with local First Nations during the exploration phase at Brucejack have been mutually successful  Examples of Brucejack Project contracts with First Nation development corporations include camp construction, access road maintenance, waste rock disposal  The proposed mine will provide approximately 800 jobs during construction and 500 jobs during operations  We will continue to extend both commercial contract and employment opportunities to locals whenever possible
  • 25. 25 NEAREST FISH 20KM AWAY CASCADE BRUCEJACK PROJECT BRUCEJACK LAKE (not fish habitat)
  • 26. 26 FINANCING THE BRUCEJACK PROJECT  Various proposals in addition to equity have been brought to us, including: royalty, forward sale, high- yield debt, convertible notes, gold-linked bonds, project debt, streaming  All options will be considered to maximize return  Anticipate financing plan to be finalized in Q4
  • 27. 27 THE NEXT 12 MONTHS: 2014/H2  File Environmental Assessment Certificate application  Updated Feasibility Study  In-fill drill program  Plan and implement underground exploration program  Plan for excavation of additional 1,000 tonnes of high-grade ore  Potential production of additional 1,000 tonnes of high-grade ore 2015/H1  Anticipate receiving permits  Start construction
  • 28. 28 HIGH-GRADE GOLD WITH SIZE Data source: Companies Valley of the Kings reserves based on Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014 Kirkland Lake Mine (Kirkland Lake) Kensington (Coeur) Casa Berardi (Hecla) El Penon (Yamana) Red Lake (Goldcorp) Pogo Mine (Sumitomo) Valley of the Kings Cerro Negro (Goldcorp)Eleonore (Goldcorp) 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Proven+ProbableGoldGrade(g/t) Proven + Probable Gold Reserves (mm oz)
  • 29. 29 PRETIVM MANAGEMENT Robert Quartermain, B.Sc., M.Sc., P.Geo, D.Sc. President & Chief Executive Officer, Director Joseph Ovsenek, B.A. Sc., P.Eng., LLB Executive Vice President & Chief Development Officer, Director Ken McNaughton, M.A. Sc., P.Eng. Vice President & Chief Exploration Officer Ian I Chang, M.A. Sc., P.Eng. Vice President, Project Development Michelle Romero, B.A., M.L.S. Vice President, Corporate Relations Kevin Torpy, B.Sc. Director, Operations Warwick Board, Ph.D., P.Geo. Chief Geologist Max Holtby, B.Sc., P. Geo. Director, Permitting James A Currie, P.Eng. Vice President & Chief Operating Officer Peter de Visser, CA Chief Financial Officer
  • 30. 30 SHAREHOLDING & ANALYST COVERAGE (1) As of July 29, 2014; ownership calculated on an undiluted basis. (2) As of June 18, 2014. Source: IPREO, SEDI (3) See News Release dated July 29, 2014 Top Shareholders(2) (shares in millions) Silver Standard Resources 18.986 Liberty Metals & Mining 6.850 Royce & Associates 5.546 Aristeia Capital, LLC 4.655 Sun Valley Gold, LLC 4.361 Robert Quartermain 2.808 Franklin Advisors, Inc. 2.749 Norges Bank Investment TD Asset Management 2.457 1.959 Sprott Asset Management 1.854 Weiss Asset Management 1.837 Analyst Coverage BMO John Hayes CIBC Jeff Killeen Citibank Alex Hacking Cormark Securities Richard Gray Cowen Securities Adam Graf GMP Securities George Albino H.C. Wainwright Jeff Wright RBC Dan Rollins Roth Capital Partners Joseph Reagor Salman Partners Ash Guglani Scotiabank Ovais Habib Capital Structure(1) Public Float 97.8 Silver Standard Shares 17.5 Total Issued & Outstanding Shares 115.3 Incentive Options 10.4 Total Fully Diluted Shares 125.7 Market Cap (at Aug. 12, 2014) C$909 million Working Capital (at June 30, 2014) C$22.7 million (shares in millions) Silver Standard, 18 % Institutions, 49% Management, 4% Retail, 29% Gross Proceeds of Share Offering(3) US$49.5 million
  • 31. 31 APPENDIX: 2013 RESOURCE ESTIMATE Valley of the Kings Mineral Resource estimate - December 2013(1),(4) (Based on a cut-off grade of 5.0 grams of gold-equivalent/tonne(5)) Category Tonnes (millions) Gold (g/t) Silver (g/t) Contained(3) Gold (million oz) Silver (million oz) Measured 2.0 19.3 14.4 1.2 0.9 Indicated 13.4 17.4 14.3 7.5 6.1 M & I 15.3 17.6 14.3 8.7 7.0 Inferred(2) 5.9 25.6 20.6 4.9 3.9 (1) Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, marketing, or other relevant issues. The Mineral Resources in this news release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council. (2) The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Resources as an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category. (3) Contained metal figures and totals may differ due to rounding of figures. (4) The Mineral Resource estimate stated in Table 1 is defined using 10 m by 10 m by 10 m blocks in the in Valley of the Kings. (5) The gold equivalent value is defined as AuEq = Au + Ag/53. (6) See Brucejack Project Mineral Resources Update Technical Report dated December 19, 2013.  The updated Valley of the Kings Resource estimate announced in December(6) added Measured gold Resources and increased gold grade:
  • 32. 32 APPENDIX: 2013 RESOURCE MODEL – VALLEY OF THE KINGS 5-10 10-20 20-60 >60 Key (g/t Au) December 2013 Mineral Resource Measured and Indicated Blocks >5g/t Au. Blocks are 10m x 10m x 10m 100 m N
  • 33. 33 APPENDIX: 2013 UNDERGROUND DRILLING Fragmental Volcanic Rocks Polylithic Conglomerate Volcanic Sediment 50 m N Completed Underground Development Completed Bulk Sample Legend >20 Key (g/t Au) Assay intervals 5.0-20.0 2.5-5.0 Silicified Conglomerate Volcanic Flows
  • 34. 34 APPENDIX: VALLEY OF THE KINGS M+I RESOURCE Northing (± 25 m) M+I Gold* (Oz.) 6258225 138,175 6258175 412,508 6258125 853,632 6258075 342,402 6258025 2,161,727 6257975 2,434,390 6257925 1,126,442 6257875 643,503 6257825 410,615 6257775 87,687 *Dec. 2013 M+I Mineral Resource; ≥5.0 g/t Au. 1.20 1.87 1.53 2.28 1.17 0.52 0.52 M+I Au* (Moz.) Surface projection of December 2013 Mineral Resource estimate, with total ounces per 100 m Easting and 50 m Northing strips
  • 35. 35 10.93m @ 43.57 ppm Au 0.5m @ 26.00 ppm Au N 2014 SURFACE DRILLING: PLAN VIEW <0.5 0.5-1.0 1.0-5.0 >20 5.0-20.0 Key (g/t Au) Assay intervals 200m Existing Underground Development SU-627 Latite Dykes (projected from 1345m) Latite Dykes (projected from 1345m) SU-628 SU-629 1.5m @ 19.05 ppm Au 0.5m @ 17.95 ppm Au SU-630 5m @ 17.34 ppm Au 1.5m @ 32.5 ppm Au 1m @ 11.35 ppm Au 0.5m @ 11.1 ppm Au
  • 36. 36 10.93m @ 43.57 ppm Au 0.5m @ 26.00 ppm Au N S 426765E: 500M WIDE SECTION 200m <0.5 0.5-1.0 1.0-5.0 >20 5.0-20.0 Key (g/t Au) (Assay intervals) Fragmental Volcanic Rocks Polylithic Conglomerate Volcanic Flows Volcaniclastic Sediments Volcanic Flows 5-10 10-20 >20 Key (g/t Au) (Blocks) (M&I + Inferred) SU-627 Latite Dykes SU-630 SU-628 SU-629 1.5m @ 19.05 ppm Au 0.5m @ 17.95 ppm Au 5m @ 17.34 ppm Au 1.5m @ 32.5 ppm Au 1m @ 11.35 ppm Au 0.5m @ 11.1 ppm Au
  • 37. 37 CONTACT: Phone: 604-558-1784 Fax: 604-558-4784 Toll-free: 1-877-558-1784 invest@pretivm.com www.pretivm.com HEAD OFFICE: Pretium Resources Inc. 570 Granville St. Suite 1600 Vancouver, BC Canada V6C 3P1 COMMON SHARES: TSX/NYSE:PVG Issued: 115.3 million Fully diluted: 125.7 million 52-week hi/low: $10.67/$2.83 Market cap: $909 million (at Aug. 12, 2014) Advancing a major high-grade gold project in Canada 37