SlideShare a Scribd company logo
1 of 39
Download to read offline
1 
CORPORATE PRESENTATION 
September 2014
2 
CAUTIONARYSTATEMENT 
Forward Looking Information 
This Presentation contains “forward-looking information” and “forward looking statements” within the meaning of applicable Canadian and United States securities legislation. Forward-looking information may include, but is not limited to, the anticipated production and developments in our operations in future periods, information with respect to our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral reserves and resources including the 2013 Valley of the Kings Mineral Resource estimate, realization of mineral reserve and resource estimates and timing of development of our BrucejackProject, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the BrucejackProject, timing and receipt of approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of directors and committees and adequacy of financial resources. Wherever possible, words such as “plans”, “expects”, “projects”, “assumes”, “budget”, “strategy”, “scheduled”, “estimates”, “forecasts”, “anticipates”, “believes”, “intends”, “targets” and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been used to identify forward-looking statements and information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, those risks identified in our Annual Information Form dated March 31, 2014 filed on SEDAR at www.sedar.com and in the United States on Form 40-F through EDGAR at the SEC’s website at www.sec.gov. Forward-looking information is based on theexpectations and opinions of our management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. 
National Instrument 43-101 
Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical reports (“Reports”) “Mineral Resources Update Technical Report” dated December 19, 2013 and “Feasibility Study and TechnicalReport on the BrucejackProject, Stewart, BC” dated June 19, 2014. We have filed the Reports and Update under our profile at www.sedar.com. Technicaland scientific information not contained within the Reports for the Projects have been prepared under the supervision of Mr. Kenneth C. McNaughton, P.Eng. and Ian Chang, P.Eng., each of whom is an independent “qualified person” under NI 43-101. 
This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Althoughthese terms are recognized and required by Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no guarantee that all or anypart of the mineral resource will be converted into mineral reserves. 
In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferredmineral resources may not form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Assessment as definedunder NI 43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. 
Currency 
Unless otherwise indicated, all dollar values herein are in Canadian $.
3 
 
High-grade underground gold project 
 
Commercial production target 2017 
 
Located in British Columbia, Canada 
VALUE THROUGH GOLD
4 
BRUCEJACKPROJECTLOCATION
5 
HIGH-GRADEGOLDRESERVES(1,2) 
Valley of the Kings 
West Zone 
Category 
Tonnes(mil) 
Gold(g/t) 
Silver(g/t) 
Contained 
Gold(mil oz) 
Silver(mil oz) 
Proven 
1.4 
7.2 
383 
0.3 
17.4 
Probable 
1.5 
6.5 
181 
0.3 
8.6 
TotalP&P 
2.9 
6.9 
279 
0.6 
26.0 
Valley of the Kings Mineral Reserve Estimate –June 2014 
West Zone Mineral Reserve Estimate –June 2014 
(1) 
Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014 
(2) 
Base case metals prices of US$1,100/ozgold and US$17/ozsilver 
Category 
Tonnes(mil) 
Gold(g/t) 
Silver(g/t) 
Contained 
Gold(mil oz) 
Silver(mil oz) 
Proven 
2.1 
15.6 
12 
1.1 
0.8 
Probable 
11.5 
15.7 
10 
5.8 
3.9 
TotalP&P 
13.6 
15.7 
11 
6.9 
4.6
6 
BRUCEJACKPROJECTECONOMICS 
(1) 
Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014 
(2) 
NPV is discounted to July 2014. 
June 2014 Feasibility Study (1) Economic Results by Metal Price 
Low Case 
Base Case 
High Case 
Gold / Silver Price (US$/ounce) 
$800 / $15 
$1,100 / $17 
$1,400 / $21 
Capex 
(US$million) 
$746.9 
$746.9 
$746.9 
Net Cash Flow (US$) 
$2.02 billion (pre-tax) 
$1.34 billion (post-tax) 
$4.16 billion (pre-tax) 
$2.72 billion (post-tax) 
$6.35 billion (pre-tax) 
$4.13 billion (post-tax) 
Net Present Value (2) 
(5.0% discount) (US$) 
$985 million (pre-tax) 
$620 million (post-tax) 
$2.25 billion (pre-tax) 
$1.45 billion (post-tax) 
$3.54 billion (pre-tax) 
$2.28 billion (post-tax) 
Internal Rate of Return 
20.3% (pre-tax) 
16.5% (post-tax) 
34.7% (pre-tax) 
28.5% (post-tax) 
47%(pre-tax) 
38.7% (post-tax) 
Payback (from start of production period) 
4.4 years (pre-tax) 
4.5 years (post-tax) 
2.7 years (pre-tax) 
2.8 years (post-tax) 
2.0 years (pre-tax) 
2.1 years (post-tax) 
Exchange Rate (US$:C$) 
0.92 
0.92 
0.92
7 
BRUCEJACKPROJECTPRODUCTION(1) 
• 
Minelifeof18yearsproducinganestimated7.27millionouncesofgold 
• 
Averageannualproductionof504,000ouncesofgoldoverthefirst8yearsand404,000ouncesofgoldoverminelife 
 
Gold and silver recoveries of 96.7% and 90.0% over mine life 
 
Production rate of 2,700 tonnes per day 
(1) 
Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014
8 
BRUCEJACKCAPITAL& OPERATINGCOSTS 
Capital Cost Summary 
(US$ million) 
Mine underground 
179.5 
Mine site (2) 
210.8 
Offsite Infrastructure 
89.1 
Total Direct Costs 
479.4 
Indirect Costs 
127.5 
Owner’s Costs 
71.0 
Contingency 
69.0 
Total Capital Cost 
746.9 
(1) 
Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014 
(2) 
Includes mine site, mine site process, mine site utilities, mine site facilities, tailings facilities, mine site temporary facilities and surface mobile equipment. 
(3) 
LOM ore milled; if excluding the ore mined during preproduction, the estimated cost is C$91.78/t. 
Operating Costs Summary 
(C$/tonne) 
Mining 
91.34 (3) 
Processing 
19.69 
General & Administrative 
30.87 
Surface Services and Others 
21.15 
Total Operating Cost 
163.05 
June 2014 Feasibility Study (1)
9 
LOWALL-INSUSTAININGCASHCOSTS 
June 2014 Feasibility Study (1) 
All-In Sustaining Cash Costs Life of Mine 
(US$ million) 
Total Cash Costs (2) 
2,814.5 
Reclamation Cost Accretion 
27.5 
Sustaining Capital Expenditure 
320.6 
All-in Sustaining Cash Costs 
3,162.6 
Gold Sales 
7,067 
All-in Sustaining Cash Costsper Ounce 
US$448/ounce 
(1) 
Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014. 
(2) 
Net of silver credits at Base Case silver price of $US17/ounce.
10 
CASHFLOW: FIRST10 YEARS 
 
Base Case ($1,100/ozAu; $17/ozAg; C$/US$ 0.92) 
 
High Case ($1,400/ozAu; $21/ozAg; C$/US$ 0.92) 
Year 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
Operating Cash Flow($ million) 
270.5 
341.4 
394.5 
354.7 
390.3 
412.9 
411.0 
408.3 
327.4 
346.4 
Pre-tax Net Cash Flow($ million) 
193.7 
310.3 
366.2 
336.9 
367.5 
392.1 
384.4 
392.6 
308.8 
329.1 
Post-tax Net Cash Flow ($ million) 
188.4 
303.5 
326.4 
234.3 
241.7 
256.1 
248.6 
255.5 
200.3 
213.2 
Year 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
Operating Cash Flow($ million) 
388.6 
478.9 
545.4 
495.6 
540.7 
570.2 
569.1 
565.0 
460.5 
484.1 
Pre-tax Net Cash Flow($ million) 
311.8 
447.7 
517.1 
477.8 
517.9 
549.4 
542.5 
549.2 
441.9 
466.8 
Post-tax Net Cash Flow ($ million) 
304.1 
421.2 
363.3 
316.1 
338.4 
357.2 
350.3 
356.2 
285.9 
301.7 
(1) 
Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014
11 
PROJECTSCHEDULE 
2014201520162017PRE-CONSTRUCTION ACTIVITIESQ3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4EA & PermitsDetailed EngineeringProcurement for Major EquipmentSTAGE 1 - EARLY CONSTRUCTION WORKSurface Construction - Phase IConstruct CampRoad UpgradesTransmission Line Stage 1STAGE 2 - FULL PROJECT EXECUTIONMill Building ConstructionProcess Plant ConstructionSAG & Ball Mill InstallationTransmission Line Completed & EnergizedUNDERGROUNDLateral DevelopmentRaise DevelopmentUnderground InfrastructurePROJECT COMPLETIONCommissioningStart Commercial Production 
(1) 
Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014
12 
BRUCEJACKUNDERGROUND
13 
VALLEYOFTHEKINGS: STOCKWORK 
S 
N 
Cleo 
West Drift 
615L West Raise 
Domain 20 
~0.5 m
14 
MINING: YEAR1
15 
MINING: YEAR2
16 
MINING: YEAR3
17 
MINING: YEAR4
18 
MINING: YEAR5
19 
LIFEOFMINEPLAN 
Oblique view facing west 
Valley of the Kings 
West Zone 
Portals
20 
LONGHOLESTOPING 
 
30 m level spacing 
 
Maximum of 45 m stope lengths 
 
15 m widths 
 
Dilution Factors 
– 
Primary Stopes: 7% 
– 
Secondary Stopes: 15% 
 
Mining Recovery Factors 
– 
Primary Stopes: 97.5% 
– 
Secondary Stopes: 92.5% 
 
Average 12 stopes in the mining and backfill cycle at any time
21 
SITELAYOUT 
Portals 
Mill 
Camp 
Development Rock 
Disposal 
Laydown & 
Fuel Storage 
Substation 
West Zone 
Portal 
Truck Shop
22 
PROJECTFLOWSHEET
23 
 
Gold and silver recoveries of 96.7% and 90.0% over mine life 
 
Gravity (43.3% LOM) and flotation ( 53.4% LOM) concentration 
 
Producing doréand gold/silver concentrate 
 
Bulk sample processing with single stage gravity and flotation concentration yielded gold recoveries averaging 98% 
PROCESSING 
Bulk sample gravity concentrate at Contact Mill, Montana 
Bulk sample flotation concentrate at Contact Mill, Montana
24 
PERMITTINGPROCESS 
Scope and Process determined 
1stPublic Comment Period 
Application Submitted 
Application evaluated for completeness 
Application review, 2ndPublic Comment Period 
Assessment Report 
Referral to Ministers 
January 2013 
Five Open Houses in 
November 2013 
(Submitted June 20, 2014) 
(Completed 
July 24, 2014) 
180-day review started August 13, 2014 
Project Description Filed 
Project Decision by Ministers 
(Decision 45 days) 
 
BC Environmental Assessment Office (EAO) manages it 
 
Federal review coordinated by Federal Environmental Assessment Agency (CEAA) for relevant areas 
 
Provincial and Federal reviews are coordinated 
For more information on assessment process: www.eao.gov.bc.ca/ea_process.html 
(Anticipate H1 2015)
25 
COMMUNITYENGAGEMENT 
 
Commercial relationships with local First Nations during the exploration phase at Brucejack have been mutually successful 
 
Examples of Brucejack Project contracts with First Nation development corporations include camp construction, access road maintenance, waste rock disposal 
 
The proposed mine will provide approximately 800 jobs during construction and 500 jobs during operations 
 
We will continue to extend both commercial contract and employment opportunities to locals whenever possible
26 
NEARESTFISH20KMAWAY 
CASCADE 
BRUCEJACK PROJECT 
BRUCEJACK LAKE 
(not fish habitat)
27 
BRUCEJACKLAKEDEPOSITION
28 
FINANCINGTHEBRUCEJACKPROJECT 
 
Various proposals in addition to equity have been brought to us, including: forward sale, high-yield debt, convertible notes, gold-linked bonds, project debt, streaming, royalty 
 
All options will be considered to maximize return 
 
Anticipate financing plan to be finalized in Q4
29 
THENEXT12 MONTHS: 
2014/H2 
 
Updated Feasibility Study 
 
Filed Environmental Assessment Certificate application and EnvironmentalImpact Study 
 
In-fill drill program underway 
 
Retain EPCM contractor 
 
Basic and detailed engineering 
 
Financing plan 
 
Potential production of additional 1,000 tonnesof high-grade ore 
2015/H1 
 
Anticipate receiving permits 
 
Production decision 
 
Start construction
30 
HIGH-GRADEGOLDWITHSIZE 
Data source: Companies 
Valley of the Kings reserves based on Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014 
Kirkland LakeMine(Kirkland Lake) 
Kensington(Coeur) 
Casa Berardi(Hecla) 
El Penon(Yamana) 
Red Lake(Goldcorp) 
Pogo Mine(Sumitomo) 
Valley of the Kings 
Cerro Negro(Goldcorp) 
Eleonore(Goldcorp) 
0.0 
2.0 
4.0 
6.0 
8.0 
10.0 
12.0 
14.0 
16.0 
0.0 
1.0 
2.0 
3.0 
4.0 
5.0 
6.0 
7.0 
8.0 
Proven + Probable Gold Grade (g/t) 
Proven + Probable Gold Reserves (mm oz)
31 
PRETIVMMANAGEMENT 
Robert Quartermain, B.Sc., M.Sc., P.Geo, D.Sc. 
President & Chief Executive Officer, 
Director 
Joseph Ovsenek, B.A. Sc., P.Eng., LLB 
Executive Vice President & Chief Development Officer, 
Director 
Ken McNaughton, M.A. Sc., P.Eng. 
Vice President & Chief Exploration Officer 
Ian I Chang, M.A. Sc., P.Eng. 
Vice President, Project Development 
Michelle Romero, B.A., M.L.S. 
Vice President, Corporate Relations 
Kevin Torpy, B.Sc. 
Director, Operations 
Warwick Board, Ph.D., P.Geo. 
Chief Geologist 
Max Holtby, B.Sc., P. Geo. 
Director, Permitting 
James A Currie,P.Eng. 
Vice President & Chief Operating Officer 
Peter de Visser, CA 
Chief Financial Officer
32 
SHAREHOLDING& ANALYSTCOVERAGE 
(1) 
As of Aug 15, 2014; ownership calculated on an undiluted basis. 
(2) 
As of Sept 5, 2014. Source: IPREO, SEDI 
(3) 
See News Releases dated July 29, 2014 & Aug 15, 2014 
Top Shareholders(2) 
(sharesin millions) 
SilverStandard Resources 
17.320 
LibertyMetals & Mining 
7.346 
AristeiaCapital, LLC 
5.322 
Royce & Associates 
4.551 
Sun Valley Gold, LLC 
3.361 
Robert Quartermain 
2.783 
Franklin Advisors, Inc. 
2.469 
NorgesBank Investment 
TD Asset Management 
2.457 
1.931 
SprottAsset Management 
1.851 
WeissAssetManagement 
1.837 
Analyst Coverage 
BMO 
John Hayes 
CIBC 
JeffKilleen 
Citibank 
AlexHacking 
CormarkSecurities 
RichardGray 
Cowen Securities 
AdamGraf 
GMP Securities 
George Albino 
H.C. Wainwright 
Jeff Wright 
RBC 
Dan Rollins 
Roth Capital Partners 
Joseph Reagor 
SalmanPartners 
Ash Guglani 
Scotiabank 
OvaisHabib 
Capital Structure(1) 
PublicFloat 
99.5 
Silver Standard Shares 
17.3 
Total Issued& Outstanding Shares 
116.8 
Incentive Options 
10.4 
Total Fully Diluted Shares 
127.2 
Market Cap(atSept. 5, 2014) 
C$847 million 
Working Capital (at June30, 2014) 
C$22.7 million 
(shares in millions) 
Silver Standard, 15 % 
Institutions, 52% 
Management, 4% 
Retail, 30% 
Gross Proceeds of Share Offering(3) 
US$60.5 million
33 
APPENDIX: 2013 RESOURCEESTIMATE 
ValleyoftheKingsMineralResourceestimate-December2013(1),(4) 
(Basedonacut-offgradeof5.0gramsofgold-equivalent/tonne(5)) 
Category 
Tonnes 
(millions) 
Gold 
(g/t) 
Silver 
(g/t) 
Contained(3) 
Gold 
(million oz) 
Silver 
(million oz) 
Measured 
2.0 
19.3 
14.4 
1.2 
0.9 
Indicated 
13.4 
17.4 
14.3 
7.5 
6.1 
M & I 
15.3 
17.6 
14.3 
8.7 
7.0 
Inferred(2) 
5.9 
25.6 
20.6 
4.9 
3.9 
(1)MineralResourceswhicharenotMineralReservesdonothavedemonstratedeconomicviability.TheestimateofMineralResourcesmaybemateriallyaffectedbyenvironmental,permitting,legal,marketing,orotherrelevantissues.TheMineralResourcesinthisnewsreleasewereestimatedusingtheCanadianInstituteofMining, MetallurgyandPetroleum(CIM),CIMStandardsonMineralResourcesandReserves,DefinitionsandGuidelinespreparedbytheCIMStandingCommitteeonReserveDefinitionsandadoptedbyCIMCouncil. 
(2)ThequantityandgradeofreportedInferredresourcesinthisestimationareuncertaininnatureandtherehasbeeninsufficientexplorationtodefinetheseInferredResourcesasanIndicatedorMeasuredMineralResourceanditisuncertainiffurtherexplorationwillresultinupgradingthemtoanIndicatedorMeasuredMineralResourcecategory. 
(3)Containedmetalfiguresandtotalsmaydifferduetoroundingoffigures. 
(4)TheMineralResourceestimatestatedinTable1isdefinedusing10mby10mby10mblocksintheinValleyoftheKings. 
(5)ThegoldequivalentvalueisdefinedasAuEq=Au+Ag/53. 
(6)SeeBrucejackProjectMineralResourcesUpdateTechnicalReportdatedDecember19,2013. 
 
The updated Valley of the Kings Resource estimate announced in December(6)added Measured gold Resources and increased gold grade:
34 
APPENDIX: 2013 RESOURCEMODEL–VALLEYOFTHEKINGS 
5-10 
10-20 
20-60 
>60 
Key (g/t Au) 
December 2013 Mineral Resource 
Measured and Indicated Blocks >5g/t Au. 
Blocks are 10m x 10m x 10m 
100 m 
N
35 
APPENDIX: 2013 UNDERGROUNDDRILLING 
Fragmental 
Volcanic Rocks 
Polylithic 
Conglomerate 
Volcanic 
Sediment 
50 m 
N 
Completed Underground Development 
Completed Bulk Sample 
Legend 
>20 
Key (g/t Au) 
Assay intervals 
5.0-20.0 
2.5-5.0 
Silicified 
Conglomerate 
Volcanic Flows
36 
APPENDIX: VALLEYOFTHEKINGSM+I RESOURCE 
Northing 
(±25 m) 
M+I Gold* 
(Oz.) 
6258225 
138,175 
6258175 
412,508 
6258125 
853,632 
6258075 
342,402 
6258025 
2,161,727 
6257975 
2,434,390 
6257925 
1,126,442 
6257875 
643,503 
6257825 
410,615 
6257775 
87,687 
*Dec. 2013 M+I Mineral Resource; ≥5.0 g/t Au. 
1.20 
1.87 
1.53 
2.28 
1.17 
0.52 
0.52 
M+I Au* (Moz.) 
Surface projection of December 2013 Mineral Resource estimate, withtotal ounces per 100 m Easting and 50 m Northing strips
37 
EXPLORATIONPOTENTIALEAST-WEST 
200 m 
N 
Valley of the Kings Access Ramp 
Bulk Sample Development 
Approximate surface projection of December 2013 Measured & Indicated resources 
SU-498 
0.5m @ 3,874 g/t Au 
SU-526 
1.16m @ 4,195 g/t Au 
VU-136 
0.5m @ 1,100 g/t Au 
Brucejack Fault
38 
EXPLORATIONPOTENTIALATDEPTH 
10.93m @ 43.57 ppm Au 
0.5m @ 26.00 ppm Au 
N 
S 
200m 
<0.5 
0.5-1.0 
1.0-5.0 
>20 
5.0-20.0 
Key (g/t Au) 
(Assay intervals) 
Fragmental 
Volcanic Rocks 
Polylithic 
Conglomerate 
Volcanic 
Flows 
Volcaniclastic 
Sediments 
Volcanic Flows 
5-10 
10-20 
>20 
Key (g/t Au) 
(Blocks) 
(M&I + Inferred) 
SU-627 
LatiteDykes 
SU-630 
SU-628 
SU-629 
1.5m @ 19.05 ppm Au 
0.5m @ 
17.95 ppm Au 
5m @ 17.34 ppm Au 
1.5m @ 32.5 ppm Au 
1m @ 11.35 ppm Au 
0.5m @ 11.1 ppm Au 
Section 426765E(500m wide)
39 
CONTACT: 
Phone: 604-558-1784 
Fax: 604-558-4784 
Toll-free: 1-877-558-1784 
invest@pretivm.com 
www.pretivm.com 
HEAD OFFICE: 
Pretium Resources Inc. 
570 Granville St. 
Suite 1600 
Vancouver, BC 
Canada V6C 3P1 
COMMON SHARES: 
TSX/NYSE:PVG 
Issued: 116.8 million 
Fully diluted: 127.2 million 
52-week hi/low: $9.43/$2.83 
Market cap: $847 million 
(at Sept. 5, 2014) 
Advancing a major high-grade gold project in Canada 
39

More Related Content

What's hot

BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferencePretiumR
 
2017 PDAC Convention
2017 PDAC Convention 2017 PDAC Convention
2017 PDAC Convention NOVAGOLD
 
Corporate Presentation December 2015
Corporate Presentation December 2015Corporate Presentation December 2015
Corporate Presentation December 2015PretiumR
 
Minerals north apr 2017 final
Minerals north apr 2017 finalMinerals north apr 2017 final
Minerals north apr 2017 finalPretiumR
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 finalPretiumR
 
NOVAGOLD 2015 Year-End Financials & Project Update
NOVAGOLD 2015 Year-End Financials & Project UpdateNOVAGOLD 2015 Year-End Financials & Project Update
NOVAGOLD 2015 Year-End Financials & Project UpdateNOVAGOLD
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretiumR
 
Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015PretiumR
 
Q3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateQ3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateNOVAGOLD
 
Vancouver Investment Resource Conference 2017
Vancouver Investment Resource Conference 2017Vancouver Investment Resource Conference 2017
Vancouver Investment Resource Conference 2017NOVAGOLD
 
Ssri corp. pres._-_051517
Ssri corp. pres._-_051517Ssri corp. pres._-_051517
Ssri corp. pres._-_051517SilverStandard
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferencePretiumR
 

What's hot (13)

BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
2017 PDAC Convention
2017 PDAC Convention 2017 PDAC Convention
2017 PDAC Convention
 
Corporate Presentation December 2015
Corporate Presentation December 2015Corporate Presentation December 2015
Corporate Presentation December 2015
 
Minerals north apr 2017 final
Minerals north apr 2017 finalMinerals north apr 2017 final
Minerals north apr 2017 final
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 final
 
NOVAGOLD 2015 Year-End Financials & Project Update
NOVAGOLD 2015 Year-End Financials & Project UpdateNOVAGOLD 2015 Year-End Financials & Project Update
NOVAGOLD 2015 Year-End Financials & Project Update
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 final
 
Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015
 
Scotiabank dec42017
Scotiabank dec42017Scotiabank dec42017
Scotiabank dec42017
 
Q3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateQ3-2016 Financials & Project Update
Q3-2016 Financials & Project Update
 
Vancouver Investment Resource Conference 2017
Vancouver Investment Resource Conference 2017Vancouver Investment Resource Conference 2017
Vancouver Investment Resource Conference 2017
 
Ssri corp. pres._-_051517
Ssri corp. pres._-_051517Ssri corp. pres._-_051517
Ssri corp. pres._-_051517
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
 

Viewers also liked

European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015PretiumR
 
Corp presjuly3 2014
Corp presjuly3 2014Corp presjuly3 2014
Corp presjuly3 2014PretiumR
 
European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015PretiumR
 
Pretivm march 2013 web
Pretivm march 2013 webPretivm march 2013 web
Pretivm march 2013 webPretiumR
 
July presentation web
July presentation webJuly presentation web
July presentation webPretiumR
 
March presentation march 9
March presentation  march 9March presentation  march 9
March presentation march 9PretiumR
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationPretiumR
 
January 2012 presentation_january_8_handouts
January 2012 presentation_january_8_handoutsJanuary 2012 presentation_january_8_handouts
January 2012 presentation_january_8_handoutsPretiumR
 
Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014PretiumR
 
Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015PretiumR
 
September 9 2013 corp web
September 9 2013 corp webSeptember 9 2013 corp web
September 9 2013 corp webPretiumR
 
Pretivm november 2011 web
Pretivm november 2011 webPretivm november 2011 web
Pretivm november 2011 webPretiumR
 
Pretivm June Presentation
Pretivm June PresentationPretivm June Presentation
Pretivm June PresentationPretiumR
 
June 6, Corporate Presentation
June 6, Corporate PresentationJune 6, Corporate Presentation
June 6, Corporate PresentationPretiumR
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014PretiumR
 
Corportate Presentation Aug 12, 2014
Corportate Presentation Aug 12, 2014 Corportate Presentation Aug 12, 2014
Corportate Presentation Aug 12, 2014 PretiumR
 
Pretivm september presentation
Pretivm september presentationPretivm september presentation
Pretivm september presentationPretiumR
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferencePretiumR
 
Pretivm corporate february 2013 jjo
Pretivm corporate february 2013 jjoPretivm corporate february 2013 jjo
Pretivm corporate february 2013 jjoPretiumR
 
January 2013 presentation raq january 14 roth capital
January 2013 presentation raq january 14 roth capitalJanuary 2013 presentation raq january 14 roth capital
January 2013 presentation raq january 14 roth capitalPretiumR
 

Viewers also liked (20)

European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015
 
Corp presjuly3 2014
Corp presjuly3 2014Corp presjuly3 2014
Corp presjuly3 2014
 
European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015
 
Pretivm march 2013 web
Pretivm march 2013 webPretivm march 2013 web
Pretivm march 2013 web
 
July presentation web
July presentation webJuly presentation web
July presentation web
 
March presentation march 9
March presentation  march 9March presentation  march 9
March presentation march 9
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
January 2012 presentation_january_8_handouts
January 2012 presentation_january_8_handoutsJanuary 2012 presentation_january_8_handouts
January 2012 presentation_january_8_handouts
 
Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014
 
Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015
 
September 9 2013 corp web
September 9 2013 corp webSeptember 9 2013 corp web
September 9 2013 corp web
 
Pretivm november 2011 web
Pretivm november 2011 webPretivm november 2011 web
Pretivm november 2011 web
 
Pretivm June Presentation
Pretivm June PresentationPretivm June Presentation
Pretivm June Presentation
 
June 6, Corporate Presentation
June 6, Corporate PresentationJune 6, Corporate Presentation
June 6, Corporate Presentation
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014
 
Corportate Presentation Aug 12, 2014
Corportate Presentation Aug 12, 2014 Corportate Presentation Aug 12, 2014
Corportate Presentation Aug 12, 2014
 
Pretivm september presentation
Pretivm september presentationPretivm september presentation
Pretivm september presentation
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor Conference
 
Pretivm corporate february 2013 jjo
Pretivm corporate february 2013 jjoPretivm corporate february 2013 jjo
Pretivm corporate february 2013 jjo
 
January 2013 presentation raq january 14 roth capital
January 2013 presentation raq january 14 roth capitalJanuary 2013 presentation raq january 14 roth capital
January 2013 presentation raq january 14 roth capital
 

Similar to Corporate Presentation Sept 5, 2014

Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015PretiumR
 
Corporate Presentation Aug 22, 2014
Corporate Presentation Aug 22, 2014Corporate Presentation Aug 22, 2014
Corporate Presentation Aug 22, 2014PretiumR
 
Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015PretiumR
 
CIBC Whistler Conference Presentation Jan 23, 2015
CIBC Whistler Conference Presentation Jan 23, 2015CIBC Whistler Conference Presentation Jan 23, 2015
CIBC Whistler Conference Presentation Jan 23, 2015PretiumR
 
Corporate Presentation July 3, 2014
Corporate Presentation July 3, 2014Corporate Presentation July 3, 2014
Corporate Presentation July 3, 2014PretiumR
 
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationBMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationPretiumR
 
Sprott-Stansberry 2015 Natural Resource Symposium
Sprott-Stansberry 2015 Natural Resource SymposiumSprott-Stansberry 2015 Natural Resource Symposium
Sprott-Stansberry 2015 Natural Resource SymposiumPretiumR
 
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015PretiumR
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferencePretiumR
 
BMO Conference Feb 28 2016
BMO Conference Feb 28 2016BMO Conference Feb 28 2016
BMO Conference Feb 28 2016PretiumR
 
Corporate Presentation November 2014
Corporate Presentation November 2014Corporate Presentation November 2014
Corporate Presentation November 2014PretiumR
 
2015 Precious Metals Summit
2015 Precious Metals Summit2015 Precious Metals Summit
2015 Precious Metals SummitPretiumR
 
Pvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentationPvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentationPretiumR
 
Sprott conference 2016 corporate presentation
Sprott conference 2016 corporate presentationSprott conference 2016 corporate presentation
Sprott conference 2016 corporate presentationPretiumR
 
Corporate presentationdec2 2013_v001_k3mvcn
Corporate presentationdec2 2013_v001_k3mvcnCorporate presentationdec2 2013_v001_k3mvcn
Corporate presentationdec2 2013_v001_k3mvcnPretiumR
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceCarling Gaze
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferencePretiumR
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference Carling Gaze
 
A fund presentation oct 25 2016
A fund presentation oct 25 2016A fund presentation oct 25 2016
A fund presentation oct 25 2016PretiumR
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017PretiumR
 

Similar to Corporate Presentation Sept 5, 2014 (20)

Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015
 
Corporate Presentation Aug 22, 2014
Corporate Presentation Aug 22, 2014Corporate Presentation Aug 22, 2014
Corporate Presentation Aug 22, 2014
 
Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015
 
CIBC Whistler Conference Presentation Jan 23, 2015
CIBC Whistler Conference Presentation Jan 23, 2015CIBC Whistler Conference Presentation Jan 23, 2015
CIBC Whistler Conference Presentation Jan 23, 2015
 
Corporate Presentation July 3, 2014
Corporate Presentation July 3, 2014Corporate Presentation July 3, 2014
Corporate Presentation July 3, 2014
 
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationBMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
 
Sprott-Stansberry 2015 Natural Resource Symposium
Sprott-Stansberry 2015 Natural Resource SymposiumSprott-Stansberry 2015 Natural Resource Symposium
Sprott-Stansberry 2015 Natural Resource Symposium
 
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
BMO Conference Feb 28 2016
BMO Conference Feb 28 2016BMO Conference Feb 28 2016
BMO Conference Feb 28 2016
 
Corporate Presentation November 2014
Corporate Presentation November 2014Corporate Presentation November 2014
Corporate Presentation November 2014
 
2015 Precious Metals Summit
2015 Precious Metals Summit2015 Precious Metals Summit
2015 Precious Metals Summit
 
Pvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentationPvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentation
 
Sprott conference 2016 corporate presentation
Sprott conference 2016 corporate presentationSprott conference 2016 corporate presentation
Sprott conference 2016 corporate presentation
 
Corporate presentationdec2 2013_v001_k3mvcn
Corporate presentationdec2 2013_v001_k3mvcnCorporate presentationdec2 2013_v001_k3mvcn
Corporate presentationdec2 2013_v001_k3mvcn
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
A fund presentation oct 25 2016
A fund presentation oct 25 2016A fund presentation oct 25 2016
A fund presentation oct 25 2016
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017
 

More from PretiumR

AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019PretiumR
 
Pretivm Investors Day Presentation
Pretivm Investors Day PresentationPretivm Investors Day Presentation
Pretivm Investors Day PresentationPretiumR
 
31st Annual ROTH Conference 2019
31st Annual ROTH Conference 201931st Annual ROTH Conference 2019
31st Annual ROTH Conference 2019PretiumR
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferencePretiumR
 
Pretium resources q1 2018 conference call may 11 , 2018
Pretium resources   q1 2018 conference call may 11 , 2018Pretium resources   q1 2018 conference call may 11 , 2018
Pretium resources q1 2018 conference call may 11 , 2018PretiumR
 
Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018PretiumR
 
Fourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference CallFourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference CallPretiumR
 
Bmo conf feb26-2018
Bmo conf feb26-2018Bmo conf feb26-2018
Bmo conf feb26-2018PretiumR
 
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets ConferenceRamping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets ConferencePretiumR
 
Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018PretiumR
 
Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018PretiumR
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...PretiumR
 
Pretium a fund oct 25 2017
Pretium a fund oct 25 2017Pretium a fund oct 25 2017
Pretium a fund oct 25 2017PretiumR
 
Denver Gold Forum 2017
Denver Gold Forum 2017Denver Gold Forum 2017
Denver Gold Forum 2017PretiumR
 
Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)PretiumR
 
Pretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretiumR
 
Cibc whister jan 25 2017
Cibc whister jan 25 2017Cibc whister jan 25 2017
Cibc whister jan 25 2017PretiumR
 
Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016PretiumR
 
Denver gold-forum-2016
Denver gold-forum-2016Denver gold-forum-2016
Denver gold-forum-2016PretiumR
 

More from PretiumR (19)

AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019
 
Pretivm Investors Day Presentation
Pretivm Investors Day PresentationPretivm Investors Day Presentation
Pretivm Investors Day Presentation
 
31st Annual ROTH Conference 2019
31st Annual ROTH Conference 201931st Annual ROTH Conference 2019
31st Annual ROTH Conference 2019
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining Conference
 
Pretium resources q1 2018 conference call may 11 , 2018
Pretium resources   q1 2018 conference call may 11 , 2018Pretium resources   q1 2018 conference call may 11 , 2018
Pretium resources q1 2018 conference call may 11 , 2018
 
Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018
 
Fourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference CallFourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference Call
 
Bmo conf feb26-2018
Bmo conf feb26-2018Bmo conf feb26-2018
Bmo conf feb26-2018
 
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets ConferenceRamping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
 
Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018
 
Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
 
Pretium a fund oct 25 2017
Pretium a fund oct 25 2017Pretium a fund oct 25 2017
Pretium a fund oct 25 2017
 
Denver Gold Forum 2017
Denver Gold Forum 2017Denver Gold Forum 2017
Denver Gold Forum 2017
 
Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)
 
Pretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-web
 
Cibc whister jan 25 2017
Cibc whister jan 25 2017Cibc whister jan 25 2017
Cibc whister jan 25 2017
 
Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016
 
Denver gold-forum-2016
Denver gold-forum-2016Denver gold-forum-2016
Denver gold-forum-2016
 

Recently uploaded

PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.KathleenAnnCordero2
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comsaastr
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸mathanramanathan2005
 
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxAnne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxnoorehahmad
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxaryanv1753
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationNathan Young
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...marjmae69
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxJohnree4
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGYpruthirajnayak525
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...漢銘 謝
 
Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Escort Service
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSebastiano Panichella
 

Recently uploaded (20)

PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸
 
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxAnne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptx
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism Presentation
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
 
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptx
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
 
Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
 

Corporate Presentation Sept 5, 2014

  • 1. 1 CORPORATE PRESENTATION September 2014
  • 2. 2 CAUTIONARYSTATEMENT Forward Looking Information This Presentation contains “forward-looking information” and “forward looking statements” within the meaning of applicable Canadian and United States securities legislation. Forward-looking information may include, but is not limited to, the anticipated production and developments in our operations in future periods, information with respect to our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral reserves and resources including the 2013 Valley of the Kings Mineral Resource estimate, realization of mineral reserve and resource estimates and timing of development of our BrucejackProject, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the BrucejackProject, timing and receipt of approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of directors and committees and adequacy of financial resources. Wherever possible, words such as “plans”, “expects”, “projects”, “assumes”, “budget”, “strategy”, “scheduled”, “estimates”, “forecasts”, “anticipates”, “believes”, “intends”, “targets” and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been used to identify forward-looking statements and information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, those risks identified in our Annual Information Form dated March 31, 2014 filed on SEDAR at www.sedar.com and in the United States on Form 40-F through EDGAR at the SEC’s website at www.sec.gov. Forward-looking information is based on theexpectations and opinions of our management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. National Instrument 43-101 Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical reports (“Reports”) “Mineral Resources Update Technical Report” dated December 19, 2013 and “Feasibility Study and TechnicalReport on the BrucejackProject, Stewart, BC” dated June 19, 2014. We have filed the Reports and Update under our profile at www.sedar.com. Technicaland scientific information not contained within the Reports for the Projects have been prepared under the supervision of Mr. Kenneth C. McNaughton, P.Eng. and Ian Chang, P.Eng., each of whom is an independent “qualified person” under NI 43-101. This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Althoughthese terms are recognized and required by Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no guarantee that all or anypart of the mineral resource will be converted into mineral reserves. In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferredmineral resources may not form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Assessment as definedunder NI 43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. Currency Unless otherwise indicated, all dollar values herein are in Canadian $.
  • 3. 3  High-grade underground gold project  Commercial production target 2017  Located in British Columbia, Canada VALUE THROUGH GOLD
  • 5. 5 HIGH-GRADEGOLDRESERVES(1,2) Valley of the Kings West Zone Category Tonnes(mil) Gold(g/t) Silver(g/t) Contained Gold(mil oz) Silver(mil oz) Proven 1.4 7.2 383 0.3 17.4 Probable 1.5 6.5 181 0.3 8.6 TotalP&P 2.9 6.9 279 0.6 26.0 Valley of the Kings Mineral Reserve Estimate –June 2014 West Zone Mineral Reserve Estimate –June 2014 (1) Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014 (2) Base case metals prices of US$1,100/ozgold and US$17/ozsilver Category Tonnes(mil) Gold(g/t) Silver(g/t) Contained Gold(mil oz) Silver(mil oz) Proven 2.1 15.6 12 1.1 0.8 Probable 11.5 15.7 10 5.8 3.9 TotalP&P 13.6 15.7 11 6.9 4.6
  • 6. 6 BRUCEJACKPROJECTECONOMICS (1) Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014 (2) NPV is discounted to July 2014. June 2014 Feasibility Study (1) Economic Results by Metal Price Low Case Base Case High Case Gold / Silver Price (US$/ounce) $800 / $15 $1,100 / $17 $1,400 / $21 Capex (US$million) $746.9 $746.9 $746.9 Net Cash Flow (US$) $2.02 billion (pre-tax) $1.34 billion (post-tax) $4.16 billion (pre-tax) $2.72 billion (post-tax) $6.35 billion (pre-tax) $4.13 billion (post-tax) Net Present Value (2) (5.0% discount) (US$) $985 million (pre-tax) $620 million (post-tax) $2.25 billion (pre-tax) $1.45 billion (post-tax) $3.54 billion (pre-tax) $2.28 billion (post-tax) Internal Rate of Return 20.3% (pre-tax) 16.5% (post-tax) 34.7% (pre-tax) 28.5% (post-tax) 47%(pre-tax) 38.7% (post-tax) Payback (from start of production period) 4.4 years (pre-tax) 4.5 years (post-tax) 2.7 years (pre-tax) 2.8 years (post-tax) 2.0 years (pre-tax) 2.1 years (post-tax) Exchange Rate (US$:C$) 0.92 0.92 0.92
  • 7. 7 BRUCEJACKPROJECTPRODUCTION(1) • Minelifeof18yearsproducinganestimated7.27millionouncesofgold • Averageannualproductionof504,000ouncesofgoldoverthefirst8yearsand404,000ouncesofgoldoverminelife  Gold and silver recoveries of 96.7% and 90.0% over mine life  Production rate of 2,700 tonnes per day (1) Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014
  • 8. 8 BRUCEJACKCAPITAL& OPERATINGCOSTS Capital Cost Summary (US$ million) Mine underground 179.5 Mine site (2) 210.8 Offsite Infrastructure 89.1 Total Direct Costs 479.4 Indirect Costs 127.5 Owner’s Costs 71.0 Contingency 69.0 Total Capital Cost 746.9 (1) Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014 (2) Includes mine site, mine site process, mine site utilities, mine site facilities, tailings facilities, mine site temporary facilities and surface mobile equipment. (3) LOM ore milled; if excluding the ore mined during preproduction, the estimated cost is C$91.78/t. Operating Costs Summary (C$/tonne) Mining 91.34 (3) Processing 19.69 General & Administrative 30.87 Surface Services and Others 21.15 Total Operating Cost 163.05 June 2014 Feasibility Study (1)
  • 9. 9 LOWALL-INSUSTAININGCASHCOSTS June 2014 Feasibility Study (1) All-In Sustaining Cash Costs Life of Mine (US$ million) Total Cash Costs (2) 2,814.5 Reclamation Cost Accretion 27.5 Sustaining Capital Expenditure 320.6 All-in Sustaining Cash Costs 3,162.6 Gold Sales 7,067 All-in Sustaining Cash Costsper Ounce US$448/ounce (1) Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014. (2) Net of silver credits at Base Case silver price of $US17/ounce.
  • 10. 10 CASHFLOW: FIRST10 YEARS  Base Case ($1,100/ozAu; $17/ozAg; C$/US$ 0.92)  High Case ($1,400/ozAu; $21/ozAg; C$/US$ 0.92) Year 1 2 3 4 5 6 7 8 9 10 Operating Cash Flow($ million) 270.5 341.4 394.5 354.7 390.3 412.9 411.0 408.3 327.4 346.4 Pre-tax Net Cash Flow($ million) 193.7 310.3 366.2 336.9 367.5 392.1 384.4 392.6 308.8 329.1 Post-tax Net Cash Flow ($ million) 188.4 303.5 326.4 234.3 241.7 256.1 248.6 255.5 200.3 213.2 Year 1 2 3 4 5 6 7 8 9 10 Operating Cash Flow($ million) 388.6 478.9 545.4 495.6 540.7 570.2 569.1 565.0 460.5 484.1 Pre-tax Net Cash Flow($ million) 311.8 447.7 517.1 477.8 517.9 549.4 542.5 549.2 441.9 466.8 Post-tax Net Cash Flow ($ million) 304.1 421.2 363.3 316.1 338.4 357.2 350.3 356.2 285.9 301.7 (1) Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014
  • 11. 11 PROJECTSCHEDULE 2014201520162017PRE-CONSTRUCTION ACTIVITIESQ3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4EA & PermitsDetailed EngineeringProcurement for Major EquipmentSTAGE 1 - EARLY CONSTRUCTION WORKSurface Construction - Phase IConstruct CampRoad UpgradesTransmission Line Stage 1STAGE 2 - FULL PROJECT EXECUTIONMill Building ConstructionProcess Plant ConstructionSAG & Ball Mill InstallationTransmission Line Completed & EnergizedUNDERGROUNDLateral DevelopmentRaise DevelopmentUnderground InfrastructurePROJECT COMPLETIONCommissioningStart Commercial Production (1) Source: Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014
  • 13. 13 VALLEYOFTHEKINGS: STOCKWORK S N Cleo West Drift 615L West Raise Domain 20 ~0.5 m
  • 19. 19 LIFEOFMINEPLAN Oblique view facing west Valley of the Kings West Zone Portals
  • 20. 20 LONGHOLESTOPING  30 m level spacing  Maximum of 45 m stope lengths  15 m widths  Dilution Factors – Primary Stopes: 7% – Secondary Stopes: 15%  Mining Recovery Factors – Primary Stopes: 97.5% – Secondary Stopes: 92.5%  Average 12 stopes in the mining and backfill cycle at any time
  • 21. 21 SITELAYOUT Portals Mill Camp Development Rock Disposal Laydown & Fuel Storage Substation West Zone Portal Truck Shop
  • 23. 23  Gold and silver recoveries of 96.7% and 90.0% over mine life  Gravity (43.3% LOM) and flotation ( 53.4% LOM) concentration  Producing doréand gold/silver concentrate  Bulk sample processing with single stage gravity and flotation concentration yielded gold recoveries averaging 98% PROCESSING Bulk sample gravity concentrate at Contact Mill, Montana Bulk sample flotation concentrate at Contact Mill, Montana
  • 24. 24 PERMITTINGPROCESS Scope and Process determined 1stPublic Comment Period Application Submitted Application evaluated for completeness Application review, 2ndPublic Comment Period Assessment Report Referral to Ministers January 2013 Five Open Houses in November 2013 (Submitted June 20, 2014) (Completed July 24, 2014) 180-day review started August 13, 2014 Project Description Filed Project Decision by Ministers (Decision 45 days)  BC Environmental Assessment Office (EAO) manages it  Federal review coordinated by Federal Environmental Assessment Agency (CEAA) for relevant areas  Provincial and Federal reviews are coordinated For more information on assessment process: www.eao.gov.bc.ca/ea_process.html (Anticipate H1 2015)
  • 25. 25 COMMUNITYENGAGEMENT  Commercial relationships with local First Nations during the exploration phase at Brucejack have been mutually successful  Examples of Brucejack Project contracts with First Nation development corporations include camp construction, access road maintenance, waste rock disposal  The proposed mine will provide approximately 800 jobs during construction and 500 jobs during operations  We will continue to extend both commercial contract and employment opportunities to locals whenever possible
  • 26. 26 NEARESTFISH20KMAWAY CASCADE BRUCEJACK PROJECT BRUCEJACK LAKE (not fish habitat)
  • 28. 28 FINANCINGTHEBRUCEJACKPROJECT  Various proposals in addition to equity have been brought to us, including: forward sale, high-yield debt, convertible notes, gold-linked bonds, project debt, streaming, royalty  All options will be considered to maximize return  Anticipate financing plan to be finalized in Q4
  • 29. 29 THENEXT12 MONTHS: 2014/H2  Updated Feasibility Study  Filed Environmental Assessment Certificate application and EnvironmentalImpact Study  In-fill drill program underway  Retain EPCM contractor  Basic and detailed engineering  Financing plan  Potential production of additional 1,000 tonnesof high-grade ore 2015/H1  Anticipate receiving permits  Production decision  Start construction
  • 30. 30 HIGH-GRADEGOLDWITHSIZE Data source: Companies Valley of the Kings reserves based on Feasibility Study and Technical Report Update on the BrucejackProject, dated June 19, 2014 Kirkland LakeMine(Kirkland Lake) Kensington(Coeur) Casa Berardi(Hecla) El Penon(Yamana) Red Lake(Goldcorp) Pogo Mine(Sumitomo) Valley of the Kings Cerro Negro(Goldcorp) Eleonore(Goldcorp) 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Proven + Probable Gold Grade (g/t) Proven + Probable Gold Reserves (mm oz)
  • 31. 31 PRETIVMMANAGEMENT Robert Quartermain, B.Sc., M.Sc., P.Geo, D.Sc. President & Chief Executive Officer, Director Joseph Ovsenek, B.A. Sc., P.Eng., LLB Executive Vice President & Chief Development Officer, Director Ken McNaughton, M.A. Sc., P.Eng. Vice President & Chief Exploration Officer Ian I Chang, M.A. Sc., P.Eng. Vice President, Project Development Michelle Romero, B.A., M.L.S. Vice President, Corporate Relations Kevin Torpy, B.Sc. Director, Operations Warwick Board, Ph.D., P.Geo. Chief Geologist Max Holtby, B.Sc., P. Geo. Director, Permitting James A Currie,P.Eng. Vice President & Chief Operating Officer Peter de Visser, CA Chief Financial Officer
  • 32. 32 SHAREHOLDING& ANALYSTCOVERAGE (1) As of Aug 15, 2014; ownership calculated on an undiluted basis. (2) As of Sept 5, 2014. Source: IPREO, SEDI (3) See News Releases dated July 29, 2014 & Aug 15, 2014 Top Shareholders(2) (sharesin millions) SilverStandard Resources 17.320 LibertyMetals & Mining 7.346 AristeiaCapital, LLC 5.322 Royce & Associates 4.551 Sun Valley Gold, LLC 3.361 Robert Quartermain 2.783 Franklin Advisors, Inc. 2.469 NorgesBank Investment TD Asset Management 2.457 1.931 SprottAsset Management 1.851 WeissAssetManagement 1.837 Analyst Coverage BMO John Hayes CIBC JeffKilleen Citibank AlexHacking CormarkSecurities RichardGray Cowen Securities AdamGraf GMP Securities George Albino H.C. Wainwright Jeff Wright RBC Dan Rollins Roth Capital Partners Joseph Reagor SalmanPartners Ash Guglani Scotiabank OvaisHabib Capital Structure(1) PublicFloat 99.5 Silver Standard Shares 17.3 Total Issued& Outstanding Shares 116.8 Incentive Options 10.4 Total Fully Diluted Shares 127.2 Market Cap(atSept. 5, 2014) C$847 million Working Capital (at June30, 2014) C$22.7 million (shares in millions) Silver Standard, 15 % Institutions, 52% Management, 4% Retail, 30% Gross Proceeds of Share Offering(3) US$60.5 million
  • 33. 33 APPENDIX: 2013 RESOURCEESTIMATE ValleyoftheKingsMineralResourceestimate-December2013(1),(4) (Basedonacut-offgradeof5.0gramsofgold-equivalent/tonne(5)) Category Tonnes (millions) Gold (g/t) Silver (g/t) Contained(3) Gold (million oz) Silver (million oz) Measured 2.0 19.3 14.4 1.2 0.9 Indicated 13.4 17.4 14.3 7.5 6.1 M & I 15.3 17.6 14.3 8.7 7.0 Inferred(2) 5.9 25.6 20.6 4.9 3.9 (1)MineralResourceswhicharenotMineralReservesdonothavedemonstratedeconomicviability.TheestimateofMineralResourcesmaybemateriallyaffectedbyenvironmental,permitting,legal,marketing,orotherrelevantissues.TheMineralResourcesinthisnewsreleasewereestimatedusingtheCanadianInstituteofMining, MetallurgyandPetroleum(CIM),CIMStandardsonMineralResourcesandReserves,DefinitionsandGuidelinespreparedbytheCIMStandingCommitteeonReserveDefinitionsandadoptedbyCIMCouncil. (2)ThequantityandgradeofreportedInferredresourcesinthisestimationareuncertaininnatureandtherehasbeeninsufficientexplorationtodefinetheseInferredResourcesasanIndicatedorMeasuredMineralResourceanditisuncertainiffurtherexplorationwillresultinupgradingthemtoanIndicatedorMeasuredMineralResourcecategory. (3)Containedmetalfiguresandtotalsmaydifferduetoroundingoffigures. (4)TheMineralResourceestimatestatedinTable1isdefinedusing10mby10mby10mblocksintheinValleyoftheKings. (5)ThegoldequivalentvalueisdefinedasAuEq=Au+Ag/53. (6)SeeBrucejackProjectMineralResourcesUpdateTechnicalReportdatedDecember19,2013.  The updated Valley of the Kings Resource estimate announced in December(6)added Measured gold Resources and increased gold grade:
  • 34. 34 APPENDIX: 2013 RESOURCEMODEL–VALLEYOFTHEKINGS 5-10 10-20 20-60 >60 Key (g/t Au) December 2013 Mineral Resource Measured and Indicated Blocks >5g/t Au. Blocks are 10m x 10m x 10m 100 m N
  • 35. 35 APPENDIX: 2013 UNDERGROUNDDRILLING Fragmental Volcanic Rocks Polylithic Conglomerate Volcanic Sediment 50 m N Completed Underground Development Completed Bulk Sample Legend >20 Key (g/t Au) Assay intervals 5.0-20.0 2.5-5.0 Silicified Conglomerate Volcanic Flows
  • 36. 36 APPENDIX: VALLEYOFTHEKINGSM+I RESOURCE Northing (±25 m) M+I Gold* (Oz.) 6258225 138,175 6258175 412,508 6258125 853,632 6258075 342,402 6258025 2,161,727 6257975 2,434,390 6257925 1,126,442 6257875 643,503 6257825 410,615 6257775 87,687 *Dec. 2013 M+I Mineral Resource; ≥5.0 g/t Au. 1.20 1.87 1.53 2.28 1.17 0.52 0.52 M+I Au* (Moz.) Surface projection of December 2013 Mineral Resource estimate, withtotal ounces per 100 m Easting and 50 m Northing strips
  • 37. 37 EXPLORATIONPOTENTIALEAST-WEST 200 m N Valley of the Kings Access Ramp Bulk Sample Development Approximate surface projection of December 2013 Measured & Indicated resources SU-498 0.5m @ 3,874 g/t Au SU-526 1.16m @ 4,195 g/t Au VU-136 0.5m @ 1,100 g/t Au Brucejack Fault
  • 38. 38 EXPLORATIONPOTENTIALATDEPTH 10.93m @ 43.57 ppm Au 0.5m @ 26.00 ppm Au N S 200m <0.5 0.5-1.0 1.0-5.0 >20 5.0-20.0 Key (g/t Au) (Assay intervals) Fragmental Volcanic Rocks Polylithic Conglomerate Volcanic Flows Volcaniclastic Sediments Volcanic Flows 5-10 10-20 >20 Key (g/t Au) (Blocks) (M&I + Inferred) SU-627 LatiteDykes SU-630 SU-628 SU-629 1.5m @ 19.05 ppm Au 0.5m @ 17.95 ppm Au 5m @ 17.34 ppm Au 1.5m @ 32.5 ppm Au 1m @ 11.35 ppm Au 0.5m @ 11.1 ppm Au Section 426765E(500m wide)
  • 39. 39 CONTACT: Phone: 604-558-1784 Fax: 604-558-4784 Toll-free: 1-877-558-1784 invest@pretivm.com www.pretivm.com HEAD OFFICE: Pretium Resources Inc. 570 Granville St. Suite 1600 Vancouver, BC Canada V6C 3P1 COMMON SHARES: TSX/NYSE:PVG Issued: 116.8 million Fully diluted: 127.2 million 52-week hi/low: $9.43/$2.83 Market cap: $847 million (at Sept. 5, 2014) Advancing a major high-grade gold project in Canada 39