1. Contact Information
Charchalki, Bongaon
North24 Pargana
West Bengal-743235
India
+919474054765
pinakisarkar213@gmail.com
About me
I am Pinaki Sarkar fromWest
Bengal,presentlyI’mstaying with
my familyin Hyderabad ina
GermanbaseMNCcompany MW
HIGHTECHPROJECTS(I)PVT.LTD-
a companyof M+W Group as
‘Manager’in Survey department
since last42month.
I did myBachelor’sDegreefrom
Calcutta Universityandtook
NationalTradeCertificates on
Surveying,Draftsman,from
NationalCouncilfor Vocational
Training-MinistryofLabourand
Employment,GovernmentofIndia.
Always +think,hardwork,
honesty,loyal&dedication
towardsmywork are my
strength,andI can’t say‘NO‘ when
someoneaskme for help-maybe
this ismy weakness.
My ShortTermGoal(STG)is to get
jobin reputedcompanyin
abroad/India andLongTerm
Goal(LTG) is taking care of my
parents,my family&wantto see
their smileface forever.
Pinaki Sarkar
Manager-Survey
Summary
An accomplishedand well-qualifiedindividualwiththerightmindset,
Honesty,commitment&Adaptabilityto accomplishanyresponsibility
entrustedwithme, with determinationandgrit.
Gaineda wealthof experiences inSurveying,Planning,Construction&Site
Management,Coordination,andTeamManagement.Activelyworkedin
over7 prestigiousconstructionprojects withindefinedtime/cost
parameters.Ican confidentlysay thatI wouldbe an assetin any
Progressive organizationwhereteamworkandhonestyis of paramount
importance.
I haveStrongrelationshipmanagement,communicationskillswiththe
abilityto networkwith Project Members,Consultants andContractors
with consummateease.
I havethoroughknowledgeofandhandlingcapabilities ofall the
contemporarysurveyinstruments ofallmake andGlobalPositioning
Systemas wellas knowledgeofmanualcomputationoffield data.
Work Experience
Manager - Survey August 2011 – Present
MW HIGHTECH PROJECTS(I)PVT.LTD -
a companyof M+WGroup
P&G Dakshin Kohinoor Project (Since June2012)
Procter & GambleHome ProductsLtd.
Hyderabad,Telangana. India.
Type of Project-
Construction of IndustrialFacilitiesand Infrastructure.
Project Overview-
Procter & Gamble,the world'slargest consumergoodscompany,build
its largest manufacturingplantin the Indian sub-continentin
Hyderabad by investing 345 crore.
The plant,to be spread across170 acres atMahbubnagardistrict
including two big size storm waterpod,morethan 2kmbitumen road,
nearabout3.5km PQCroad and the Admin Block, MaterialYard / Hair
Care,F&HC Dry Laundry,Distribution Center,etc. Otherfacilities such
as Baby care,FEM care, Oralcare, Skin care,Distribution Centre,
Opportunity area,FutureAcquirablearea etc.shall be developed in
future.
2. Skills
Technical knowledge
technical knowledgeand
competencewith a logical
andpractical mind.
Communication skills
goodcommunication
skills,both writtenand
oralas the workrequires
interactionat all levels.
Relation maintaining
abilityto buildlasting
relationshipswithclients
andcolleagues.
Negotiation,
presentation and report
writing skills
abilityto do negation.
Havingpresentationand
reportwriting skills.
Analyses problems &
solution
abilityto analyses
problems inorderto
identify solutions.
Commercial awareness
commercialawareness
andability.
Take responsibility
abilityto take on high
levelsof responsibilityand
be enthusiasticand
motivated.
Documentation
abilityto maintaina
properdocumentationfor
projectrelateddocument
as wellas personal
documents.
Concentration
Attentionto detail,
especiallywhenusing
preciseinstruments.
Computer & modern
instrument Knowledge
Working knowledgeof
computerapplicationsfor
surveyingandmapping
with totalstation,auto
level,GPS etc.
Duty perform-
Controlpointsnetworksetup.
Contoursurvey forroad,structureconstruction and design
Site setup based on logistic plan.
Taken boundary pointcoordinates,measuresitearea and crosscheck
with given site plan drawing.
Established all buildings,roads,ponds,parking,footpathsasper
design.
Checking drawingsif clashing with otherservice like sewage,waterline,
stormwaterline, fire line beforeexecution and informto design team
to avoid any impact.
Excavation quantity calculate.
Maintain a coordination with Client,consultantand design team.
Calculating all foundations,column,boltscoordinateswiththehelp of
reference coordinates.
Handling all site survey workwith 3 teamonly.
Taken jointmeasurement record with client, consultantand maintain as
properdocumentforbilling.
Taken as built data and preparedrawing forfinalsubmission to client.
Adviceto site engineer, supervisorand monitor themto followthe
construction asper design.
Michelin’s tyre manufacturing plant (August 2011-May2012)
Michelin India Tamilnadu TyresPvt. Ltd.
Chennai,Tamilnadu.India.
Type of Project-
Construction of IndustrialFacilitiesand Infrastructure.
Project Overview-
French tyre majorMichelin's manufacturingfacility north of Chennai,
with a total capacity of 4.5 lakh tonnesradialtyres is likely to be the
group'slargestin the world.
The location of the project50 km north of Chennaiat Thervoy Kandigai
in Thiruvallur district
Spread overan area of 290 acres
Direct Employmentof 1,500
To manufactureRadialTruck/Bustyres.Chennai.
Duty perform-
Controlpointsnetworksetup.
Contoursurvey forroad,structureconstruction and design
Excavation quantity calculate.
Site setup based on logistic plan.
Taken boundary pointcoordinates,measuresitearea and crosscheck
with given site plan drawing.
Established all buildings,roads,ponds,parking,footpathsasper
design.
Handling all site survey workwith 12 survey team only.
Maintain a coordination with Client,consultantand design team.
3. Knowledge
Topographic surveying
measurestheelevationof
pointsona particular
piece of land,and presents
them ascontourlines ona
plot
Control surveying
thesesurveysestablish
reference pointson
vertical orhorizontal
plain. To establishour
ownpositionat thestart
of future surveys.
Construction Surveying
the calculatedor proposed
positionofan objectis
marked/stake out/lay
out/settingoutonthe
ground,eithertemporarily
or permanentlywitha
suitablecoordinatesystem
selectedfor the project.
Monitoring and
Deformation Surveying
To determineof a
structure orobject’s
settlementorshape
change,the three-
dimensionalpositionsof
specific pointson this
objectare determined.
After observedaperiodof
time samepointsare re-
measuredandcomparison
betweenthetwo setsof
positions.
Leveling
eitherfinds the elevation
of a givenpointor
establishapointat a given
elevation.
As-built surveying
for record,completion
evaluationandpayment
purposesthis survey
carried outduringor
immediatelyaftera
constructionproject.
Surveyor June2010 – August 2011
LEIGHTON WELSPUN CONTRACTORS
PVT.LTD
Ramanujan IT City Project
Tata Realty InfrastructureLtd (TRIL)
Chennai, Tamil Nadu,India.
Type of Project-
Construction of Residential& Commercial/Office.
Project Overview-
The overall projectconsistsof two phases.Theinitial completed phase
hasa total built up area of over478,000 sqm.in approximately 25.27
acres of land.The site splits into two distinct operationalzones.23.77
acres of Processing Zoneconsisting six IT Blocks of 1876,673 sq.ft.and
1.5 acre of Non Processing Zoneconsisting of 110 Service Apartments
and a Convention Centreto seat1,500 delegatestotalling in area
2,932,531sq.
Duty perform-
Taking accuratemeasurementsof sitesand premises.
Controlling execution of work.
Preparesite layout& surveying work.
Develop criteria forsurvey methodsand procedures.
Train assistantsand helpers,and directtheir workin such activities as
performing surveys.
Helping the site teamin preparing workprocedure.
Surveyor June2008 – May 2010
ALPINE SAMSUNG HCC (JV)
Airport Metro Express Line (AMEL) C-1
Project
Delhi Metro Rail Corporation Ltd.
2, Jain MandirMarg,ConnaughtPlace,Delhi- 110001.
Type of Project-
Construction of Residential& Commercial/Office.
Project Overview-
The AMEL C1 projectincludes thedesign and construction of two
underground stations( TheNew Delhi and Shivaji Stadiumstation ,both
242m length)and two singletracktunnelsbetween New Delhi Station
and Talkatora Garden.
The alignmentlength of the projectAMEL C1 is 3861m. 242 m of this
section were built using the Top Down Method.2209 m were built by
using TBM tunneling and 1410 m were built using BottomUp Method.
In theCut & Coversections,tunnelboxeswith dividing wall were
4. Education, Training &
Certification
Bachelor of Arts - 2003
NahataJogendraNath
MondalSmriti
Mahavidyalaya,
Universityof Calcutta,
Higher Secondary - 2000
BongaonHighSchool,
West BengalCouncilof
HigherSecondary
Education(WBCHSE),
Secondary - 1997
Sree Palli PriyanathHigh
School,
West BengalBoardof
SecondaryEducation
(WBBSE),
Draftsman - 2004
TollygungeIndustrial
TrainingInstitute,
NTC,Ministryof Labour
andEmployment-
GovernmentofIndia.
Surveying - 2007
HowrahHomesIndustrial
TrainingInstitute,
NTC,Ministryof Labour
andEmployment-
GovernmentofIndia.
CAD 2D Drafting - 2007
KolkataAdvanced
TrainingInstitute,
DGET,MinistryofLabour
andEmployment-
GovernmentofIndia.
GPS - 2015
NationalAtlasAnd
ThematicMapping
Organization,
RDT,Departmentof
science andTechnology-
GovernmentofIndia.
constructed.
Duty perform-
Controlling execution of work.
Taking accuratemeasurementsof sitesand premises.
Preparesite layout& surveying work.
Develop criteria forsurvey methodsand procedures.
Helping the site teamin preparing workprocedure.
Assistant Surveyor April2008 – June 2008
PATI–BEL (J.V)
Kerala State Transport Project (KSTP 1)
AynivilayilKarupa Bhavan ,H.No 442
Peringanad Road Adoor691523
Pathananamthitta Dist. Kerala.
Type of Project-
Construction of Road&infrastructure.
Project Overview-
PATI-BEL(JV) hasawarded forrehabilitation &up-gradation works for
KSTPI –
Link 1 Taikkod-Kottarakkara (46.022 Km),Link2/3 Kottarakkara-
Chengannur(44.430 Km),Link 72 Taikkod-NH47 (12.600 Km),Link 73
Alappuzha-Chenganasserry (24.140Km)
Total length of roads - 127.19 km.There are 8no. bridges,9no.foot
bridgesand 214no. culverts including slab, box & pipe type werein this
phase.
Duty perform-
Markcenter lines, pavementmarking.
Checking of Layout, Stockpilequantity.
Horizontal& vertical Controlstablished.
Preparesite layout& surveying work.
Develop criteria forsurvey methodsand procedures.
PostConstruction Survey .
Helping the site teamin preparing workprocedure.
Jr. Surveyor September2007 – March 2008
RBM–TANTIA (JV)
Mizoram State Roads Project: Phase II
P.PGuite Building,Falkland Road,
Zemabawk,Aizawl796017
Mizoram,India.
Type of Project-
Construction of Roads.
5. Awards
Best Employ of the yea
2012
AwardedbyMW High-
tech Projects(I)PVT.LTD
Excellentworkmanshipin
Surveying
Environment Health &
Safety (EHS) 2014
AwardedbyEHS
department,MWHigh-
tech Projects(I)PVT.LTD
Excellentworkmanshipin
EHS.
Portfotfolio
http://www.facebook.com/pinaki
sarkar213
https://plus.google.com/u/0/
https://www.linkedin.com/hp/?d
nr=vko3uolNSvgtIf-
OPLWmIg_NSu_x4MnOtOC&trk=n
av_responsive_tab_home
https://twitter.com/pinakisarka2
13
https://www.youtube.com/user/p
inakisarkar213
Passport No. G9693095
+919474054765
Project Overview-
RBM-TANTIA(JV) hasawarded to improvementand Up gradation of
fourstretchesof roadswith a totaldistanceof about123 km.
Buangpui-Lungleisection of Aizawl-Thenzawl-LungleiRoad including
onebridge (67.943km),Construction of AizawlBypassRoad including
fourbridges(13.5km), Rehabilitation and Maintenanceof two roads
covering M6: Zobawk –Haulawng Road (30km) and M16:Selesih-
ThuampuiRoad (12km).
The scopeof worksbroadly includesthewidening of existing
carriageway with geometricimprovement,rehabilitation and
strengthening of pavement,construction of bridgesand culverts,slope
protection works,junctionsand othermiscellaneousworks.
Duty perform-
Markcenter lines, pavementmarking.
Checking of Layout,Stockpilequantity.
Horizontal& vertical Controlstablished.
Preparesite layout& surveying work.
Assistant Surveyor Auguest2004 – May 2005
MS Survey
Indo-Bangladesh Border Fencing & Road Project, Meghalaya
Umkiang, Jaintia Hills
Meghalaya,India.
Type of Project-
Construction of Roadsand fencing.
Project Overview-
Indo Bangla BorderFencing & Roadswokin Meghalaya.
Duty perform-
Markcenter line forfencing & road.
Checking of Layoutof fencing and roads.
AssistSurveyorto all survey related work.
PostConstruction Survey.
I hereby,declare thatthe abovementioned detailsarethattrue and correct
to the bestof my knowledgeand belief.
Signature
Date:15th March,2015
Place: Hyderabad Pinaki Sarkar