6S Project
As A 6S ProjectLeaderandManager of Delta,Engine,Rotor,Case,LandingGear,TestCell,Event.
I leda crewof 15 througha 6S eventat The Technical OperationsCenter,Delta'smainworldwide hubin
AtlantaGA. It includedDepartments283, 284, 287, 288, 289, engine androtor,and 310 case shops,as
well assmall andlarge testcell areas.
Developedexpandedsquarefootage fornew in-sourcingcustomerbusiness
•Assigned,coordinated,andimplementednew trackingsystem
•Revisedshoplayoutof fabrication,storage,disposal,andtransportationof products
•Won the DepartmentAwardof Excellence for288 Rotor Shop
•Improveddepartmentscoresof efficiencyandproductivity
•Distributedexcesstoolingandequipmenttootherdepartments,resultingintensof thousandsof
dollarssavings
•Created13,926 square footage fromwithinexistingcompanyfootprint
CompliedData,forReports,photographedbefore andafterpicturesforpowerpointpresentation
PresentedPowerPointPresentationof 6sProjectto Directorof Technical OperationsatMorningStaff
Meeting.
The 6s ProjectwasRecognizedasa great Success.Improvedscoresof efficiencyandproductivityforall
shopswere achieved.288Rotor Shopwon the DepartmentAwardof Excellence,andIreceived
accommodationletters.

More Related Content

What's hot

Stork Technical Service Business Presentation
Stork Technical Service Business PresentationStork Technical Service Business Presentation
Stork Technical Service Business Presentationevert72
 
Integrated Precision Motion Control Linear Stages
Integrated Precision Motion Control Linear StagesIntegrated Precision Motion Control Linear Stages
Integrated Precision Motion Control Linear Stageskensington labs
 
Introducing imaging energy may2015 (1)
Introducing imaging energy may2015 (1)Introducing imaging energy may2015 (1)
Introducing imaging energy may2015 (1)imagingenergy
 
Taking Caterpillar to Market
Taking Caterpillar to MarketTaking Caterpillar to Market
Taking Caterpillar to Marketfinance5
 

What's hot (7)

Stork Gears official presentation
Stork Gears official presentationStork Gears official presentation
Stork Gears official presentation
 
360 Facility Life Cycle-Weitz_Print
360 Facility Life Cycle-Weitz_Print360 Facility Life Cycle-Weitz_Print
360 Facility Life Cycle-Weitz_Print
 
Stork Technical Service Business Presentation
Stork Technical Service Business PresentationStork Technical Service Business Presentation
Stork Technical Service Business Presentation
 
Integrated Precision Motion Control Linear Stages
Integrated Precision Motion Control Linear StagesIntegrated Precision Motion Control Linear Stages
Integrated Precision Motion Control Linear Stages
 
Introducing imaging energy may2015 (1)
Introducing imaging energy may2015 (1)Introducing imaging energy may2015 (1)
Introducing imaging energy may2015 (1)
 
EOS Pivot Tables
EOS Pivot TablesEOS Pivot Tables
EOS Pivot Tables
 
Taking Caterpillar to Market
Taking Caterpillar to MarketTaking Caterpillar to Market
Taking Caterpillar to Market
 

Similar to 6S Project

Collaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the FutureCollaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the FutureARC Advisory Group
 
Paul brayman chronological
Paul brayman chronologicalPaul brayman chronological
Paul brayman chronologicalPaul Brayman
 
John smith 7.22.2015 1
John smith 7.22.2015 1John smith 7.22.2015 1
John smith 7.22.2015 1John M. Smith
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015Worksoft
 
Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Genpact Ltd
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTONGary Shelton
 
Agilis_CorporateBrochure
Agilis_CorporateBrochureAgilis_CorporateBrochure
Agilis_CorporateBrochureBrett Stoia
 
5 Steps to Get Precise SAP Impact-Based Testing
5 Steps to Get Precise SAP Impact-Based Testing5 Steps to Get Precise SAP Impact-Based Testing
5 Steps to Get Precise SAP Impact-Based TestingTurnKey Solutions
 
Maintenance Manager - CV
Maintenance Manager - CVMaintenance Manager - CV
Maintenance Manager - CVSrinivas Ch
 
David Boland Oct 15 2016
David Boland Oct 15 2016David Boland Oct 15 2016
David Boland Oct 15 2016David Boland
 
Steam power plant cycle design
Steam power plant cycle designSteam power plant cycle design
Steam power plant cycle designValentine Moroz
 

Similar to 6S Project (20)

Chattigar-Resume
Chattigar-ResumeChattigar-Resume
Chattigar-Resume
 
Collaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the FutureCollaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the Future
 
Cloud Technology Manager1a
Cloud Technology Manager1aCloud Technology Manager1a
Cloud Technology Manager1a
 
Paul brayman chronological
Paul brayman chronologicalPaul brayman chronological
Paul brayman chronological
 
John smith 7.22.2015 1
John smith 7.22.2015 1John smith 7.22.2015 1
John smith 7.22.2015 1
 
R. Venkatraman-Resume
R. Venkatraman-ResumeR. Venkatraman-Resume
R. Venkatraman-Resume
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
Precinmac
PrecinmacPrecinmac
Precinmac
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
 
Resume-manufacturing-1
Resume-manufacturing-1Resume-manufacturing-1
Resume-manufacturing-1
 
Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTON
 
Agilis_CorporateBrochure
Agilis_CorporateBrochureAgilis_CorporateBrochure
Agilis_CorporateBrochure
 
Caterpillar Summer Internship report
Caterpillar Summer Internship reportCaterpillar Summer Internship report
Caterpillar Summer Internship report
 
5 Steps to Get Precise SAP Impact-Based Testing
5 Steps to Get Precise SAP Impact-Based Testing5 Steps to Get Precise SAP Impact-Based Testing
5 Steps to Get Precise SAP Impact-Based Testing
 
Machine toolindustry en
Machine toolindustry enMachine toolindustry en
Machine toolindustry en
 
Maintenance Manager - CV
Maintenance Manager - CVMaintenance Manager - CV
Maintenance Manager - CV
 
jim. resume2015
jim. resume2015jim. resume2015
jim. resume2015
 
David Boland Oct 15 2016
David Boland Oct 15 2016David Boland Oct 15 2016
David Boland Oct 15 2016
 
Steam power plant cycle design
Steam power plant cycle designSteam power plant cycle design
Steam power plant cycle design
 

6S Project

  • 1. 6S Project As A 6S ProjectLeaderandManager of Delta,Engine,Rotor,Case,LandingGear,TestCell,Event. I leda crewof 15 througha 6S eventat The Technical OperationsCenter,Delta'smainworldwide hubin AtlantaGA. It includedDepartments283, 284, 287, 288, 289, engine androtor,and 310 case shops,as well assmall andlarge testcell areas. Developedexpandedsquarefootage fornew in-sourcingcustomerbusiness •Assigned,coordinated,andimplementednew trackingsystem •Revisedshoplayoutof fabrication,storage,disposal,andtransportationof products •Won the DepartmentAwardof Excellence for288 Rotor Shop •Improveddepartmentscoresof efficiencyandproductivity •Distributedexcesstoolingandequipmenttootherdepartments,resultingintensof thousandsof dollarssavings •Created13,926 square footage fromwithinexistingcompanyfootprint CompliedData,forReports,photographedbefore andafterpicturesforpowerpointpresentation PresentedPowerPointPresentationof 6sProjectto Directorof Technical OperationsatMorningStaff Meeting. The 6s ProjectwasRecognizedasa great Success.Improvedscoresof efficiencyandproductivityforall shopswere achieved.288Rotor Shopwon the DepartmentAwardof Excellence,andIreceived accommodationletters.