SlideShare a Scribd company logo
1 of 5
Download to read offline
Spotlight nr 2 by Paul van Dijk 23 oktober 2015
SPOTLIGHT
Fourth dredger TSHD Mahury will be
named after official ceremony at MTG
Dolphin Shipyard on 29th of October
A short official ceremony will take place at
MTG Dolphin Shipyard on 29th October for
the Name giving of 1 840m2 TSHD Mahury .
Officials from both Dutch companies ‒
Shipowner Dutch Dredging BV and Royal
IHC will be present, as well as the Dutch
Ambassador, Governor and Municipality
officials.
The ship is designed to maintain waterways,
sea and inland waterways, as well as to
participate in land reclamation. Dredging
depth bellow waterline is 30 meters and the
hopper capacity is 1 840 m3. The vessel is
equipped with the newest electronic system
for positioning, sounding and execution of
dredging work.
Designing and equipment of Mahury are
directed at the optimization of the crew,
reducing its number to 8 people.
Watch Mahury Naming Live:
http://www.dredgingtoday.com/2015/10/29/
live-stream-mahury-naming-ceremony/
1
Spotlight nr 2 by Paul van Dijk 23 oktober 2015
Information about the Yard
MTG-DOLPHIN PLC is established in
January 1991 as the first private
shipyard in Bulgaria. Today, it is still
family controlled business.
We count on motivated team of 700
professionals with considerable
experience in the industry, working for
satisfaction of our customers from all
over the world. We focus on the
individual approach for each client,
flexibility and experience, technical and
commercial reliability.
The Shipyard is home of our vision and
ideas, our ambition to perform better
and keep
our promises.
Production and resource capacity of the
yard contributes to construction of
vessels of up to 16 000 tons, and
repairs of vessels of up to 60 000 tons,
using two floating docks with carrying
capacity of 18 000 and 8 500 tons; 70
cranes with lifting capacity of 250kg to
80tons; 4 pier spaces, a line for
preliminary preparation of steel plates
and steel profiles, workshops and
platforms.
Having years of experience in
shiprepairs and shipbuilding, and its own
design team, MTG Dolphin undertakes
also conversion projects, including
modifications, jumbodising (lengthening
and widening of the vessel),
modernization of equipment and
accommodation, refurbishment,
upgrading of electrical and navigational
systems, etc.
2
Spotlight nr 2 by Paul van Dijk 23 oktober 2015
At the Yard are repaired on average 60
vessels per year with total DWT in
excess of 1 500 000 t.
From the beginning of shipbuilding
activity in 2006 until now, it has always
been challenge and passion for us.
Starting with small vessels, now we build
fully customized ships in conformity with
the ideas of the Client and Class
requirements. In the end of this month
( November) we will successfully deliver
to the Client our 15th vessel.
The Yard has its own Design department,
working with Tribon and CAD, as well as
own laboratory for nondestructive tests,
incl. Rh control and laser alignment.
There is 24/7 Yard security with CCTV
and access control; 24/7 agent services,
accommodation of supervisors and
superintendents in Yard s own
apartments, full equipped office and PPE
on site.
3
Spotlight nr 2 by Paul van Dijk 23 oktober 2015
Interesting project
For the last three years MTG Dolphin has
orientated to the construction of
specialized ships as a chance to keep its
competitiveness. This type of
shipbuilding is still not attractive for the
Far East market, which quickly gains
power, mostly due to the fact that this is
not a large-scale production, but it is
a matter of single orders. The market
niche is also attractive when challenging
the experts with greater complexity and
specificity of the projects.
As from 2013 MTG Dolphin builds
dredgers in cooperation and by order of
the Dutch company Royal IHC. These
have been, as they still are, the first
vessels of this kind built in Bulgaria.
Within this period we delivered one 1
500 m3 Trailing Suction Hopper Dredger,
one 750 m3 Grab Hopper Dredger, one
2 700 m3 Trailing Suction Hopper
Dredger Easy Dredge® and it the end of
October was the nice Name giving
ceremony for the fourth dredger.
4
Spotlight nr 2 by Paul van Dijk 23 oktober 2015
News and subcontractors
Looking ahead to future development,
we try constantly to improve the quality
of our services, enhancing the working
environment, the safety and the
motivation of our workers and
employees. We know that the human
factor is as much important as the good
equipment
This year MTG Dolphin expanded its
certified under ISO 9001:2008 quality
management system, successfully
passing certification under ISO 14001
and OHSAS 18001 by LRQA. https://www.youtube.com/
channel/UC9WxlG_7Lee75XGO6eDoLOg
5

More Related Content

What's hot

Independent Maritime _low resolution
Independent Maritime _low resolutionIndependent Maritime _low resolution
Independent Maritime _low resolution
Marco Pastorino
 
focus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globefocus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globe
Klaus Gohra
 

What's hot (20)

Italy, Maritime Market 2015
Italy, Maritime Market 2015Italy, Maritime Market 2015
Italy, Maritime Market 2015
 
Independent Maritime _low resolution
Independent Maritime _low resolutionIndependent Maritime _low resolution
Independent Maritime _low resolution
 
Norway_Johan sverdrup, report 2015
Norway_Johan sverdrup, report 2015Norway_Johan sverdrup, report 2015
Norway_Johan sverdrup, report 2015
 
SAL Company Brochure
SAL Company BrochureSAL Company Brochure
SAL Company Brochure
 
NBR.PDF
NBR.PDFNBR.PDF
NBR.PDF
 
What can we learn from new cruise ship orders?
What can we learn from new cruise ship orders?What can we learn from new cruise ship orders?
What can we learn from new cruise ship orders?
 
Vietnam_maritime market snapshot, Seminar 10.5.2017
Vietnam_maritime market snapshot, Seminar 10.5.2017Vietnam_maritime market snapshot, Seminar 10.5.2017
Vietnam_maritime market snapshot, Seminar 10.5.2017
 
Windvn profile
Windvn profileWindvn profile
Windvn profile
 
Mauritius Ports Authority (MPA) – Mrs Nomita Seebaluck, Assistant Commercial ...
Mauritius Ports Authority (MPA) – Mrs Nomita Seebaluck, Assistant Commercial ...Mauritius Ports Authority (MPA) – Mrs Nomita Seebaluck, Assistant Commercial ...
Mauritius Ports Authority (MPA) – Mrs Nomita Seebaluck, Assistant Commercial ...
 
Italy_Maritime Offshore market
Italy_Maritime Offshore marketItaly_Maritime Offshore market
Italy_Maritime Offshore market
 
Porto De Caio: The new gateway to trade in Africa
Porto De Caio: The new gateway to trade in AfricaPorto De Caio: The new gateway to trade in Africa
Porto De Caio: The new gateway to trade in Africa
 
SPLASH EverSea
SPLASH EverSeaSPLASH EverSea
SPLASH EverSea
 
Norway_Aker Solutions_Maritime Business Day seminar 2015
Norway_Aker Solutions_Maritime Business Day seminar 2015Norway_Aker Solutions_Maritime Business Day seminar 2015
Norway_Aker Solutions_Maritime Business Day seminar 2015
 
German-Finnish maritime co-operation, joint development of next-generation te...
German-Finnish maritime co-operation, joint development of next-generation te...German-Finnish maritime co-operation, joint development of next-generation te...
German-Finnish maritime co-operation, joint development of next-generation te...
 
Spain_Maritime business, seminar 2016
Spain_Maritime business, seminar 2016Spain_Maritime business, seminar 2016
Spain_Maritime business, seminar 2016
 
Brazil maritime industry and ports
Brazil maritime industry and portsBrazil maritime industry and ports
Brazil maritime industry and ports
 
Namport overview
Namport overviewNamport overview
Namport overview
 
focus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globefocus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globe
 
Project cargo presentation 2014 - 1
Project cargo presentation   2014 - 1Project cargo presentation   2014 - 1
Project cargo presentation 2014 - 1
 
Challenges and requirements on modern short sea operations in the Baltic Sea ...
Challenges and requirements on modern short sea operations in the Baltic Sea ...Challenges and requirements on modern short sea operations in the Baltic Sea ...
Challenges and requirements on modern short sea operations in the Baltic Sea ...
 

Viewers also liked

Vi troede, Mays havde glemt det meste
Vi troede, Mays havde glemt det mesteVi troede, Mays havde glemt det meste
Vi troede, Mays havde glemt det meste
Evelina Gold
 

Viewers also liked (16)

อัจฉริยะนักวิทย์
อัจฉริยะนักวิทย์อัจฉริยะนักวิทย์
อัจฉริยะนักวิทย์
 
Il lungo inverno dell'Università
Il lungo inverno dell'UniversitàIl lungo inverno dell'Università
Il lungo inverno dell'Università
 
Выставка работ для деда мороза
Выставка работ для деда морозаВыставка работ для деда мороза
Выставка работ для деда мороза
 
Vi troede, Mays havde glemt det meste
Vi troede, Mays havde glemt det mesteVi troede, Mays havde glemt det meste
Vi troede, Mays havde glemt det meste
 
Power presentación de aplicaciones web.
Power presentación de aplicaciones web.Power presentación de aplicaciones web.
Power presentación de aplicaciones web.
 
Ahmed Fadul CV
Ahmed Fadul CVAhmed Fadul CV
Ahmed Fadul CV
 
Tra assenze e refusi, A Napoli la primavera CRUI parte male
Tra assenze e refusi, A Napoli la primavera CRUI parte maleTra assenze e refusi, A Napoli la primavera CRUI parte male
Tra assenze e refusi, A Napoli la primavera CRUI parte male
 
2016-CV-En-MichelVT_New-Layout
2016-CV-En-MichelVT_New-Layout2016-CV-En-MichelVT_New-Layout
2016-CV-En-MichelVT_New-Layout
 
ประวัติย่อของเอกภพ
ประวัติย่อของเอกภพประวัติย่อของเอกภพ
ประวัติย่อของเอกภพ
 
Applying Digital Isolators in Motor Control
Applying Digital Isolators in Motor ControlApplying Digital Isolators in Motor Control
Applying Digital Isolators in Motor Control
 
Università in declino. Un Rapporto sugli atenei italiani da Nord a Sud
Università in declino. Un Rapporto sugli atenei italiani da Nord a SudUniversità in declino. Un Rapporto sugli atenei italiani da Nord a Sud
Università in declino. Un Rapporto sugli atenei italiani da Nord a Sud
 
310312608 cartilla jose
310312608 cartilla jose310312608 cartilla jose
310312608 cartilla jose
 
Hobbys
HobbysHobbys
Hobbys
 
IFAC 2014, Design of Power Steering Systems for Heavy-Duty Long-Haul Vehicles
IFAC 2014, Design of Power Steering Systems for Heavy-Duty Long-Haul VehiclesIFAC 2014, Design of Power Steering Systems for Heavy-Duty Long-Haul Vehicles
IFAC 2014, Design of Power Steering Systems for Heavy-Duty Long-Haul Vehicles
 
Kiev MRI sales
Kiev MRI salesKiev MRI sales
Kiev MRI sales
 
Pipeline integrity documentation
Pipeline integrity documentationPipeline integrity documentation
Pipeline integrity documentation
 

Similar to Spotlight2 MTG D

Port Evo. Port experience doc.2016
Port Evo. Port experience doc.2016Port Evo. Port experience doc.2016
Port Evo. Port experience doc.2016
James Sutcliffe
 
Viking_Grace_ENG_web
Viking_Grace_ENG_webViking_Grace_ENG_web
Viking_Grace_ENG_web
Marko Mannila
 

Similar to Spotlight2 MTG D (20)

Srn1844
Srn1844Srn1844
Srn1844
 
Dragados Offshore - Industry Europe
Dragados Offshore - Industry EuropeDragados Offshore - Industry Europe
Dragados Offshore - Industry Europe
 
WORLD CARGO NEWS
WORLD CARGO NEWS WORLD CARGO NEWS
WORLD CARGO NEWS
 
Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals
 
Shipyard Begej Company Profile
Shipyard Begej Company ProfileShipyard Begej Company Profile
Shipyard Begej Company Profile
 
Port Evo. Port experience doc.2016
Port Evo. Port experience doc.2016Port Evo. Port experience doc.2016
Port Evo. Port experience doc.2016
 
Wagenborg times 3
Wagenborg times 3Wagenborg times 3
Wagenborg times 3
 
Colombo dockyard plc profile double spread updated final
Colombo dockyard plc profile   double spread updated finalColombo dockyard plc profile   double spread updated final
Colombo dockyard plc profile double spread updated final
 
Port of Durban Monitor eNewsletter - September 2016 Edition
Port of Durban Monitor eNewsletter - September 2016 EditionPort of Durban Monitor eNewsletter - September 2016 Edition
Port of Durban Monitor eNewsletter - September 2016 Edition
 
Mozambique
MozambiqueMozambique
Mozambique
 
Spotlight 1Astander
Spotlight 1AstanderSpotlight 1Astander
Spotlight 1Astander
 
Dragados Offshore: energía interior
Dragados Offshore: energía interiorDragados Offshore: energía interior
Dragados Offshore: energía interior
 
Delivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston LinksDelivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston Links
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
 
TSI Wales Linkdin
TSI Wales LinkdinTSI Wales Linkdin
TSI Wales Linkdin
 
Eurohull LTD presentation
Eurohull LTD presentationEurohull LTD presentation
Eurohull LTD presentation
 
UHL Offering
UHL OfferingUHL Offering
UHL Offering
 
Compositeworks technical revolution
Compositeworks  technical revolution Compositeworks  technical revolution
Compositeworks technical revolution
 
Viking_Grace_ENG_web
Viking_Grace_ENG_webViking_Grace_ENG_web
Viking_Grace_ENG_web
 
Development at Port Louis Harbour
Development at Port Louis HarbourDevelopment at Port Louis Harbour
Development at Port Louis Harbour
 

Spotlight2 MTG D

  • 1. Spotlight nr 2 by Paul van Dijk 23 oktober 2015 SPOTLIGHT Fourth dredger TSHD Mahury will be named after official ceremony at MTG Dolphin Shipyard on 29th of October A short official ceremony will take place at MTG Dolphin Shipyard on 29th October for the Name giving of 1 840m2 TSHD Mahury . Officials from both Dutch companies ‒ Shipowner Dutch Dredging BV and Royal IHC will be present, as well as the Dutch Ambassador, Governor and Municipality officials. The ship is designed to maintain waterways, sea and inland waterways, as well as to participate in land reclamation. Dredging depth bellow waterline is 30 meters and the hopper capacity is 1 840 m3. The vessel is equipped with the newest electronic system for positioning, sounding and execution of dredging work. Designing and equipment of Mahury are directed at the optimization of the crew, reducing its number to 8 people. Watch Mahury Naming Live: http://www.dredgingtoday.com/2015/10/29/ live-stream-mahury-naming-ceremony/ 1
  • 2. Spotlight nr 2 by Paul van Dijk 23 oktober 2015 Information about the Yard MTG-DOLPHIN PLC is established in January 1991 as the first private shipyard in Bulgaria. Today, it is still family controlled business. We count on motivated team of 700 professionals with considerable experience in the industry, working for satisfaction of our customers from all over the world. We focus on the individual approach for each client, flexibility and experience, technical and commercial reliability. The Shipyard is home of our vision and ideas, our ambition to perform better and keep our promises. Production and resource capacity of the yard contributes to construction of vessels of up to 16 000 tons, and repairs of vessels of up to 60 000 tons, using two floating docks with carrying capacity of 18 000 and 8 500 tons; 70 cranes with lifting capacity of 250kg to 80tons; 4 pier spaces, a line for preliminary preparation of steel plates and steel profiles, workshops and platforms. Having years of experience in shiprepairs and shipbuilding, and its own design team, MTG Dolphin undertakes also conversion projects, including modifications, jumbodising (lengthening and widening of the vessel), modernization of equipment and accommodation, refurbishment, upgrading of electrical and navigational systems, etc. 2
  • 3. Spotlight nr 2 by Paul van Dijk 23 oktober 2015 At the Yard are repaired on average 60 vessels per year with total DWT in excess of 1 500 000 t. From the beginning of shipbuilding activity in 2006 until now, it has always been challenge and passion for us. Starting with small vessels, now we build fully customized ships in conformity with the ideas of the Client and Class requirements. In the end of this month ( November) we will successfully deliver to the Client our 15th vessel. The Yard has its own Design department, working with Tribon and CAD, as well as own laboratory for nondestructive tests, incl. Rh control and laser alignment. There is 24/7 Yard security with CCTV and access control; 24/7 agent services, accommodation of supervisors and superintendents in Yard s own apartments, full equipped office and PPE on site. 3
  • 4. Spotlight nr 2 by Paul van Dijk 23 oktober 2015 Interesting project For the last three years MTG Dolphin has orientated to the construction of specialized ships as a chance to keep its competitiveness. This type of shipbuilding is still not attractive for the Far East market, which quickly gains power, mostly due to the fact that this is not a large-scale production, but it is a matter of single orders. The market niche is also attractive when challenging the experts with greater complexity and specificity of the projects. As from 2013 MTG Dolphin builds dredgers in cooperation and by order of the Dutch company Royal IHC. These have been, as they still are, the first vessels of this kind built in Bulgaria. Within this period we delivered one 1 500 m3 Trailing Suction Hopper Dredger, one 750 m3 Grab Hopper Dredger, one 2 700 m3 Trailing Suction Hopper Dredger Easy Dredge® and it the end of October was the nice Name giving ceremony for the fourth dredger. 4
  • 5. Spotlight nr 2 by Paul van Dijk 23 oktober 2015 News and subcontractors Looking ahead to future development, we try constantly to improve the quality of our services, enhancing the working environment, the safety and the motivation of our workers and employees. We know that the human factor is as much important as the good equipment This year MTG Dolphin expanded its certified under ISO 9001:2008 quality management system, successfully passing certification under ISO 14001 and OHSAS 18001 by LRQA. https://www.youtube.com/ channel/UC9WxlG_7Lee75XGO6eDoLOg 5