 All projects require a quality control plan. Without a proper quality
control plan, quality control (QC) as well as quality assurance
(QA) processes are simply created by project teams along the
way, which often leads to disaster and chaos.
 To avoid such a situation later on in you project, it is strongly
recommended to have a fully documented and detailed quality
control plan in place for every project.
 Quality control plan documentation should clearly mention the
steps to be taken to control quality and resolve any quality issues
associated with the project at hand as well as detail the required
actions, such as quality checks, inspections, responsibilities, and
so forth that need to be taken at every stage of all the processes
involved, to ensure that outcomes meet project-specific
requirements and conform to industry standards.
 While it is a fact that there will be a few similar components in
all kinds of quality control plans, each project is unique in itself
and will include factors that rely on the accurate specifications
of that particular project.
 Nevertheless, there is no good reason to waste a huge amount
of time unnecessarily on every project at hand. With a great
company quality control (QC) plan template, project teams
could be provided with a consistent and clear approach to
creating project-related quality control plans that not only meet
the specific requirements, but adheres to the quality standards
of every project.
What Is a Quality Control Plan?
 Quality Control Plan (QCP) is a written set of activities and procedures
for delivering products that meet quality-specific goals.
 These procedures are aimed at fulfilling the requirements as
mentioned in manuals, contract documents and guidance.
What is the Objective of the Quality Control
Plan in a Project?
 The true purpose of a Quality Control Plan document is to predict
sources of substandard quality and describes ways to discover and
prevent them.
Creating a Quality Control Plan
Template
 The best thing about a Quality Control Plan (QC) plan template is
that it is reusable – which means, it can easily be modified and
adapted to every project – similar to a “fill-in-the-blanks” form.
 Obviously, every project team must develop a quality control plan,
specific to the project at hand.
 However, the company quality control plan template offers the
required guidance on things that need to be included in the plan.
Project Personnel to Involve in
Quality Control
 Who’s overseeing the project’s quality management team?
Each project must have a designated quality manager, who
will bear the overall responsibility to ensure the quality of the
project, along with several project superintendents, who will
have the responsibility to handle day-to-day site operations.
 Additionally, there should be foremen, inspection officers and
subcontractors, along with the project manager.
 When it is about managing, planning and implementing quality
specifications and standards within the project, an organisational
chart can help you figure out who will be in charge of what as well
as who will report to whom.
 This will additionally aid you in defining the quality-specific
responsibilities and roles of key professionals working on the
project.
Quality Control Processes
 The quality plan template should also document the requirements for
various quality processes that must be adapted to project
specifications.
 For instance, if the quality plan template says that key building
materials and products obtained on the worksite must be checked
prior to use, the project-specific, finished QC plan will precisely figure
out what materials and/or products needs to be inspected, and who
will complete those inspections.
 Likewise, if the quality control plan template states that it must involve
compliance assessments at all project milestones, the finished QC
plan will show the milestones that need to be inspected as well as the
professionals responsible for inspecting them.
Inspection Tests, Plans and
Correction of Deficiencies
 All construction projects require inspections at different stages of work.
In this case, the template will depict the acceptance criteria that must be
defined first, along with an inspection plan that must be developed to
make sure all requirements are fully met.
 The inspection plan will find out what needs to be inspected, when the
inspections will take place and who will be responsible for the same.
 Here, the template will show that the checklists for quality inspection
must be prepared –although it would be the project team that will decide
what specific items need to be included on the quality inspection
checklists of the finished plan for a particular project.
 The team will also figure out who will be responsible for following up on
fixing deficiencies, along with the responsibilities, roles and processes
for checking acceptance criteria against those fixes.
Creating a Comprehensive and
Consistent Quality Control Plan
 A well-defined quality control plan is important to ensure that quality
processes across the company are implemented appropriately on
every project undertaken.
 Creating a quality control (QC) plan template, which can easily be
adapted to every project may simplify the whole process while
ensuring uniformity across all tasks to be performed.
 Thankfully, you don’t need to begin from zero when it is about
creating a project quality plan.
 You can consider downloading a number of samples for different
specialties from a reliable online resource. Having said that, the
terrific combination is to combine your quality control plan with
quality management software that is particularly designed to address
various facets of QC plans, specific to the project, and streamline
activities related to quality control.
 A good quality management system has the potential to facilitate the
development of a project-based quality control plan in a uniform and
organised manner.
 For many projects, particularly in the field of construction, it can
support permit to work management as well as construction
commissioning software for better outcomes.
 Quality management software plays a pivotal role in executing
successful quality control (QC) plans, not just by automating the
standard QC processes, but also by acting as a critical management
tool to see ahead in time and track compliance with the QC plan.
To Conclude
 Having a uniform quality process across different projects is
only possible when your project team has clear guidance and
instructions to follow as well as the key software to make
everything more accurate, easier and faster.
Contact Details
https://www.global-cxm.com/commissioning/
Global Commissioning Management and Software Ltd
Unit 2, Chestfield Business Park, Whitstable, Kent, CT5 3JB
+441227649087, +447580017944
Social Media Connection

More Related Content

Similar to Reasons Why Every Project Needs a Quality Control Plan

PROJECT QUALITY KNOLEDGE AREA.ppt
PROJECT QUALITY KNOLEDGE    AREA.pptPROJECT QUALITY KNOLEDGE    AREA.ppt
PROJECT QUALITY KNOLEDGE AREA.pptRandolphRodrigues2
 
Final Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxFinal Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxGeorgeKabongah2
 
3&4. project scope management at project.ppt
3&4. project scope management at project.ppt3&4. project scope management at project.ppt
3&4. project scope management at project.pptGoharSaeed6
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)Dilawar Abbas
 
PROJECT QUALITY MANAGEMENT.pptx
PROJECT QUALITY MANAGEMENT.pptxPROJECT QUALITY MANAGEMENT.pptx
PROJECT QUALITY MANAGEMENT.pptxSuzyTharwat1
 
Project quality management
Project quality managementProject quality management
Project quality managementsyeda zoya mehdi
 
Pm project-control-compiled
Pm project-control-compiledPm project-control-compiled
Pm project-control-compiledArthur Wilson
 
Final Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxFinal Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxGeorgeKabongah2
 
www.FASTProjectPlans.comQuality Management Plan Template· .docx
www.FASTProjectPlans.comQuality Management Plan Template· .docxwww.FASTProjectPlans.comQuality Management Plan Template· .docx
www.FASTProjectPlans.comQuality Management Plan Template· .docxericbrooks84875
 
Quality management templates
Quality management templatesQuality management templates
Quality management templatesselinasimpson371
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality ManagementSAJJAD KHUDHUR ABBAS
 
Quality management review template
Quality management review templateQuality management review template
Quality management review templateselinasimpson2801
 
Project quality management
Project quality managementProject quality management
Project quality managementPmobytes
 
20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler Quality20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler QualityKumaran637735
 
Project quality management
Project quality managementProject quality management
Project quality managementPmobytes
 
Lecture10
Lecture10Lecture10
Lecture10soloeng
 

Similar to Reasons Why Every Project Needs a Quality Control Plan (20)

PROJECT QUALITY KNOLEDGE AREA.ppt
PROJECT QUALITY KNOLEDGE    AREA.pptPROJECT QUALITY KNOLEDGE    AREA.ppt
PROJECT QUALITY KNOLEDGE AREA.ppt
 
Final Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxFinal Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptx
 
3&4. project scope management at project.ppt
3&4. project scope management at project.ppt3&4. project scope management at project.ppt
3&4. project scope management at project.ppt
 
PMP_Project Quality Management
PMP_Project Quality ManagementPMP_Project Quality Management
PMP_Project Quality Management
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)
 
PROJECT QUALITY MANAGEMENT.pptx
PROJECT QUALITY MANAGEMENT.pptxPROJECT QUALITY MANAGEMENT.pptx
PROJECT QUALITY MANAGEMENT.pptx
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Pmb
PmbPmb
Pmb
 
Pm project-control-compiled
Pm project-control-compiledPm project-control-compiled
Pm project-control-compiled
 
Final Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxFinal Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptx
 
www.FASTProjectPlans.comQuality Management Plan Template· .docx
www.FASTProjectPlans.comQuality Management Plan Template· .docxwww.FASTProjectPlans.comQuality Management Plan Template· .docx
www.FASTProjectPlans.comQuality Management Plan Template· .docx
 
Quality management templates
Quality management templatesQuality management templates
Quality management templates
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
Quality management review template
Quality management review templateQuality management review template
Quality management review template
 
Quality management forms
Quality management formsQuality management forms
Quality management forms
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Pm audit and assessment approach final
Pm audit and assessment approach   finalPm audit and assessment approach   final
Pm audit and assessment approach final
 
20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler Quality20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler Quality
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Lecture10
Lecture10Lecture10
Lecture10
 

More from Olivia Wilson

Is a permit to work a safe system of work?
Is a permit to work a safe system of work?Is a permit to work a safe system of work?
Is a permit to work a safe system of work?Olivia Wilson
 
Is a permit to work a safe system of work.pptx
Is a permit to work a safe system of work.pptxIs a permit to work a safe system of work.pptx
Is a permit to work a safe system of work.pptxOlivia Wilson
 
Salient Features of Gecko Permits - Gecko Software
Salient Features of Gecko Permits - Gecko SoftwareSalient Features of Gecko Permits - Gecko Software
Salient Features of Gecko Permits - Gecko SoftwareOlivia Wilson
 
Why Commissioning Authority Should Complete Commissioning Checklists?
Why Commissioning Authority Should Complete Commissioning Checklists?Why Commissioning Authority Should Complete Commissioning Checklists?
Why Commissioning Authority Should Complete Commissioning Checklists?Olivia Wilson
 
Benefits of Permit-to-Work Software – Gecko Software
Benefits of Permit-to-Work Software – Gecko SoftwareBenefits of Permit-to-Work Software – Gecko Software
Benefits of Permit-to-Work Software – Gecko SoftwareOlivia Wilson
 
Best Practice Commissioning Factors - Gecko Software
Best Practice Commissioning Factors - Gecko SoftwareBest Practice Commissioning Factors - Gecko Software
Best Practice Commissioning Factors - Gecko SoftwareOlivia Wilson
 
An Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdfAn Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdfOlivia Wilson
 
4 Key Advantages a Digitised Permit to Work System
4 Key Advantages a Digitised Permit to Work System 4 Key Advantages a Digitised Permit to Work System
4 Key Advantages a Digitised Permit to Work System Olivia Wilson
 
9 Tips to Improve Construction Site Inspection Checklists
9 Tips to Improve Construction Site Inspection Checklists9 Tips to Improve Construction Site Inspection Checklists
9 Tips to Improve Construction Site Inspection ChecklistsOlivia Wilson
 
How to Navigate the Commissioning Process: From Planning to Post-Construction
How to Navigate the Commissioning Process: From Planning to Post-ConstructionHow to Navigate the Commissioning Process: From Planning to Post-Construction
How to Navigate the Commissioning Process: From Planning to Post-ConstructionOlivia Wilson
 
How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...Olivia Wilson
 
Commissioning Management Software and its Importance.pdf
Commissioning Management Software and its Importance.pdfCommissioning Management Software and its Importance.pdf
Commissioning Management Software and its Importance.pdfOlivia Wilson
 
Commissioning Management Software and its Importance.pptx
Commissioning Management Software and its Importance.pptxCommissioning Management Software and its Importance.pptx
Commissioning Management Software and its Importance.pptxOlivia Wilson
 
5 Common Misconceptions about Commissioning
5 Common Misconceptions about Commissioning5 Common Misconceptions about Commissioning
5 Common Misconceptions about CommissioningOlivia Wilson
 
5 Common Misconceptions about Commissioning
5 Common Misconceptions about Commissioning5 Common Misconceptions about Commissioning
5 Common Misconceptions about CommissioningOlivia Wilson
 
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANTWHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANTOlivia Wilson
 
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANTWHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANTOlivia Wilson
 
Importance of Permit to Work System
Importance of Permit to Work SystemImportance of Permit to Work System
Importance of Permit to Work SystemOlivia Wilson
 
Importance of Permit to Work System
Importance of Permit to Work SystemImportance of Permit to Work System
Importance of Permit to Work SystemOlivia Wilson
 
BEST COMMISSIONING MANAGEMENT SERVICES IN UK
BEST COMMISSIONING MANAGEMENT SERVICES IN UKBEST COMMISSIONING MANAGEMENT SERVICES IN UK
BEST COMMISSIONING MANAGEMENT SERVICES IN UKOlivia Wilson
 

More from Olivia Wilson (20)

Is a permit to work a safe system of work?
Is a permit to work a safe system of work?Is a permit to work a safe system of work?
Is a permit to work a safe system of work?
 
Is a permit to work a safe system of work.pptx
Is a permit to work a safe system of work.pptxIs a permit to work a safe system of work.pptx
Is a permit to work a safe system of work.pptx
 
Salient Features of Gecko Permits - Gecko Software
Salient Features of Gecko Permits - Gecko SoftwareSalient Features of Gecko Permits - Gecko Software
Salient Features of Gecko Permits - Gecko Software
 
Why Commissioning Authority Should Complete Commissioning Checklists?
Why Commissioning Authority Should Complete Commissioning Checklists?Why Commissioning Authority Should Complete Commissioning Checklists?
Why Commissioning Authority Should Complete Commissioning Checklists?
 
Benefits of Permit-to-Work Software – Gecko Software
Benefits of Permit-to-Work Software – Gecko SoftwareBenefits of Permit-to-Work Software – Gecko Software
Benefits of Permit-to-Work Software – Gecko Software
 
Best Practice Commissioning Factors - Gecko Software
Best Practice Commissioning Factors - Gecko SoftwareBest Practice Commissioning Factors - Gecko Software
Best Practice Commissioning Factors - Gecko Software
 
An Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdfAn Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdf
 
4 Key Advantages a Digitised Permit to Work System
4 Key Advantages a Digitised Permit to Work System 4 Key Advantages a Digitised Permit to Work System
4 Key Advantages a Digitised Permit to Work System
 
9 Tips to Improve Construction Site Inspection Checklists
9 Tips to Improve Construction Site Inspection Checklists9 Tips to Improve Construction Site Inspection Checklists
9 Tips to Improve Construction Site Inspection Checklists
 
How to Navigate the Commissioning Process: From Planning to Post-Construction
How to Navigate the Commissioning Process: From Planning to Post-ConstructionHow to Navigate the Commissioning Process: From Planning to Post-Construction
How to Navigate the Commissioning Process: From Planning to Post-Construction
 
How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...
 
Commissioning Management Software and its Importance.pdf
Commissioning Management Software and its Importance.pdfCommissioning Management Software and its Importance.pdf
Commissioning Management Software and its Importance.pdf
 
Commissioning Management Software and its Importance.pptx
Commissioning Management Software and its Importance.pptxCommissioning Management Software and its Importance.pptx
Commissioning Management Software and its Importance.pptx
 
5 Common Misconceptions about Commissioning
5 Common Misconceptions about Commissioning5 Common Misconceptions about Commissioning
5 Common Misconceptions about Commissioning
 
5 Common Misconceptions about Commissioning
5 Common Misconceptions about Commissioning5 Common Misconceptions about Commissioning
5 Common Misconceptions about Commissioning
 
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANTWHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
 
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANTWHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
 
Importance of Permit to Work System
Importance of Permit to Work SystemImportance of Permit to Work System
Importance of Permit to Work System
 
Importance of Permit to Work System
Importance of Permit to Work SystemImportance of Permit to Work System
Importance of Permit to Work System
 
BEST COMMISSIONING MANAGEMENT SERVICES IN UK
BEST COMMISSIONING MANAGEMENT SERVICES IN UKBEST COMMISSIONING MANAGEMENT SERVICES IN UK
BEST COMMISSIONING MANAGEMENT SERVICES IN UK
 

Recently uploaded

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Reasons Why Every Project Needs a Quality Control Plan

  • 1. Reasons Why Every Project Needs a Quality Control Plan
  • 2.  All projects require a quality control plan. Without a proper quality control plan, quality control (QC) as well as quality assurance (QA) processes are simply created by project teams along the way, which often leads to disaster and chaos.  To avoid such a situation later on in you project, it is strongly recommended to have a fully documented and detailed quality control plan in place for every project.  Quality control plan documentation should clearly mention the steps to be taken to control quality and resolve any quality issues associated with the project at hand as well as detail the required actions, such as quality checks, inspections, responsibilities, and so forth that need to be taken at every stage of all the processes involved, to ensure that outcomes meet project-specific requirements and conform to industry standards.
  • 3.  While it is a fact that there will be a few similar components in all kinds of quality control plans, each project is unique in itself and will include factors that rely on the accurate specifications of that particular project.  Nevertheless, there is no good reason to waste a huge amount of time unnecessarily on every project at hand. With a great company quality control (QC) plan template, project teams could be provided with a consistent and clear approach to creating project-related quality control plans that not only meet the specific requirements, but adheres to the quality standards of every project.
  • 4. What Is a Quality Control Plan?  Quality Control Plan (QCP) is a written set of activities and procedures for delivering products that meet quality-specific goals.  These procedures are aimed at fulfilling the requirements as mentioned in manuals, contract documents and guidance. What is the Objective of the Quality Control Plan in a Project?  The true purpose of a Quality Control Plan document is to predict sources of substandard quality and describes ways to discover and prevent them.
  • 5. Creating a Quality Control Plan Template  The best thing about a Quality Control Plan (QC) plan template is that it is reusable – which means, it can easily be modified and adapted to every project – similar to a “fill-in-the-blanks” form.  Obviously, every project team must develop a quality control plan, specific to the project at hand.  However, the company quality control plan template offers the required guidance on things that need to be included in the plan.
  • 6. Project Personnel to Involve in Quality Control  Who’s overseeing the project’s quality management team? Each project must have a designated quality manager, who will bear the overall responsibility to ensure the quality of the project, along with several project superintendents, who will have the responsibility to handle day-to-day site operations.
  • 7.  Additionally, there should be foremen, inspection officers and subcontractors, along with the project manager.  When it is about managing, planning and implementing quality specifications and standards within the project, an organisational chart can help you figure out who will be in charge of what as well as who will report to whom.  This will additionally aid you in defining the quality-specific responsibilities and roles of key professionals working on the project.
  • 8. Quality Control Processes  The quality plan template should also document the requirements for various quality processes that must be adapted to project specifications.  For instance, if the quality plan template says that key building materials and products obtained on the worksite must be checked prior to use, the project-specific, finished QC plan will precisely figure out what materials and/or products needs to be inspected, and who will complete those inspections.  Likewise, if the quality control plan template states that it must involve compliance assessments at all project milestones, the finished QC plan will show the milestones that need to be inspected as well as the professionals responsible for inspecting them.
  • 9. Inspection Tests, Plans and Correction of Deficiencies  All construction projects require inspections at different stages of work. In this case, the template will depict the acceptance criteria that must be defined first, along with an inspection plan that must be developed to make sure all requirements are fully met.  The inspection plan will find out what needs to be inspected, when the inspections will take place and who will be responsible for the same.  Here, the template will show that the checklists for quality inspection must be prepared –although it would be the project team that will decide what specific items need to be included on the quality inspection checklists of the finished plan for a particular project.  The team will also figure out who will be responsible for following up on fixing deficiencies, along with the responsibilities, roles and processes for checking acceptance criteria against those fixes.
  • 10. Creating a Comprehensive and Consistent Quality Control Plan  A well-defined quality control plan is important to ensure that quality processes across the company are implemented appropriately on every project undertaken.  Creating a quality control (QC) plan template, which can easily be adapted to every project may simplify the whole process while ensuring uniformity across all tasks to be performed.  Thankfully, you don’t need to begin from zero when it is about creating a project quality plan.
  • 11.  You can consider downloading a number of samples for different specialties from a reliable online resource. Having said that, the terrific combination is to combine your quality control plan with quality management software that is particularly designed to address various facets of QC plans, specific to the project, and streamline activities related to quality control.  A good quality management system has the potential to facilitate the development of a project-based quality control plan in a uniform and organised manner.  For many projects, particularly in the field of construction, it can support permit to work management as well as construction commissioning software for better outcomes.  Quality management software plays a pivotal role in executing successful quality control (QC) plans, not just by automating the standard QC processes, but also by acting as a critical management tool to see ahead in time and track compliance with the QC plan.
  • 12. To Conclude  Having a uniform quality process across different projects is only possible when your project team has clear guidance and instructions to follow as well as the key software to make everything more accurate, easier and faster.
  • 13. Contact Details https://www.global-cxm.com/commissioning/ Global Commissioning Management and Software Ltd Unit 2, Chestfield Business Park, Whitstable, Kent, CT5 3JB +441227649087, +447580017944 Social Media Connection