SlideShare a Scribd company logo
1 of 4
1
RESUME OF
Mr S’bonginkosi Praise-God Sangweni
Email: sangwenisbonginkosi@gmail.com
Cell: 084 780 1543 / 076 225 7326
Address: 37 Earlsfield drive, Newlands west, Durban, 4037
Career Statement
Professional experience gained within varied portfolios, developmental and managerial
roles, mainly within the chemical plant manufacturing industry. As a capable and self-
motivated individual with 10 years of experience, an effective communicator with good
leadership abilities, I have trained for professional development and mentorship
intermediate and junior staff. I am able to use business systems such as SAP extensively,
manage projects, commit to technical excellence, and lead engineering teams, co-ordinate
continuous improvement projects using Lean Manufacturing and Six Sigma Tools. My most
recent portfolio was in supply chain management as a production planner/scheduler.
Personal details
ID no. 8506205393083
Date of Birth 20 June 1985
Gender Male
Languages English, IsiZulu,
Marital Status Single
Nationality South African
Drivers Licence Code 10
Professional skills
 Qualified & Experienced Chemical Engineer
 Project Management
 Planning & Coordination
 Waste Water Treatment Plants
 SAP Programmes
 Managerial / supervisory experience
 Analytical
 Organisational
 Adapting and Responding to Change
 Applying Expertise and Technology
 Adhering to Principles and Values
 Working with people
2
Tertiary Education
 National Diploma in Chemical engineering
 Baccalaureus Technologiae (BTech) in Chemical Engineering
 Currently completing Masters Business Administration (MBA) through UKZN/GSB
(thesis only outstanding, all course work completed).
General Education
Phoenix Technical High School (1999-2003)
EMPLOYMENTHISTORY
Position: Site Production Planner and Scheduler
Company: Dow Chemicals
Period: 2015 July till 2016 February
Scope of Work Done:
 Reviewing each regeneration of MRP and open work orders using knowledge of
product and process to provide smooth work load for each work center while
achieving the requirements of the Master Production Schedule.
 Providing input and promised delivery dates to customer service representatives
and Shipping departments to schedule customer orders.
 Acting as an interface to production, industrial engineering, purchasing, and other
internal areas to ensure smooth operation in a timely and cost effective manner.
 Closely monitoring open work orders to assure that the SAP work order file is
accurate, that work orders are completed on time, that cycle times are maximized,
and production capacity is managed to its full potential.
 Control inventory as required. Including the monitoring of discrepant material from
work cells to assure that it is quickly processed through the Material Review Board
for timely disposition.
 Coordinating the weekly generation of each work center’s production schedule.
 Monitoring production levels and create/change schedule to assure that inventory
objectives are maintained and production throughput times are minimized.
3
Roles Responsible: Site Activity Coordinator and Gate Keeper; Shut down
Coordinator; Technical Advisor for Waste water treatment plant
Company: Dow Chemicals
Period: 2012 till 2015 July
Scope of Work Done:
 Immediate Response Team leader
 Managing and Coordinating site activities – preparing safe work permits to ensure
contractors are able to work safely and in accordance to Dow policies.
 Act as an interface between site departments to ensure that all activities are
completed safely and comply to Company policies
 Scheduling and planning site maintenance activities to ensure the equipment is
available and safe to be repaired.
 Review and analyse equipment performance to ensure equipment reliability is
continuously improved.
 Plan and coordinate site shutdowns
 Lead, plan and coordinate maintenance turnarounds (shut down)
 Coordinate Activities in Waste water treatment plant and oversee the operation of
the waste water treatment plant to ensure our disposal stream is within municipal
specifications
 Lead site Lean management initiatives
Position: Shift Activity Coordinator
Company: Dow Chemicals
Period: 2011 till 2012
Scope of Work Done:
 Immediate Response Team leader
 Rescue team member
 Managing and Coordinating all shift activities
 Ensure shift compliance to safety and quality standards
 Operate Plant
 Manage shift team resources
Position: Warehouse Controller
Company: Dow Chemicals/Rohm and Haas
Period: 2009 February till 2011
Scope of Work Done:
 Load and Unload Trucks
 Logistics safety officer
 Fire and rescue team member
 Schedule Products to be dispatched
 Inventory Record Accuracy
4
Position: Process Controller
Company: Dow Chemicals/Rohm and Haas
Period: 2008 January till 2009 January
Scope of Work Done:
 Shift Safety officer
 Produce product
 Fire and rescue team member
 Updating standard operating procedures
 Performing environment health and safety (EHS) reviews
 Performing management of change
 Participate in Production plant shut downs
Position: Engineering Trainee
Company: Dow Chemicals/Rohm and Haas
Period: 2006 August till 2007 December
Scope of Work Done:
 Manage projects in waste water treatment plant
 Back up for waste water treatment plant operator – technical for the waste water
treatment plant
 Support Environment Health and Safety Manager
 Support site on inventory record analysis (IRA)
References
Prof. Theuns Pelser
Dean and Head of the Graduate School of Business Leadership in University of KwaZulu Natal,
031 260 1615
Dr M. Chetty
HOD Department of Chemical Engineering at Durban University of Technology,
031 373 2186
Mr T Mthethwa
Shift Activity Coordinator at Dow Chemicals New Germany
031 716 5960
Mr Dan Mbatha
Senior QC Laboratory Technician at Dow Chemicals New Germany
031 716 5960
Mr M Made
Maintenance Planner and Scheduler at Dow Chemicals New Germany
031 716 5960

More Related Content

What's hot (20)

2016 Graham Resume
2016 Graham Resume2016 Graham Resume
2016 Graham Resume
 
CONNIE SWEETEN RESUME
CONNIE SWEETEN RESUMECONNIE SWEETEN RESUME
CONNIE SWEETEN RESUME
 
KhuurmanCV2-1
KhuurmanCV2-1KhuurmanCV2-1
KhuurmanCV2-1
 
THOMAS_EDWARD_BRANTLEY_RESUME
THOMAS_EDWARD_BRANTLEY_RESUMETHOMAS_EDWARD_BRANTLEY_RESUME
THOMAS_EDWARD_BRANTLEY_RESUME
 
THOMAS_EDWARD_BRANTLEY_RESUME
THOMAS_EDWARD_BRANTLEY_RESUMETHOMAS_EDWARD_BRANTLEY_RESUME
THOMAS_EDWARD_BRANTLEY_RESUME
 
Jeff Resume1
Jeff Resume1Jeff Resume1
Jeff Resume1
 
Tim Swartz Resume
Tim Swartz ResumeTim Swartz Resume
Tim Swartz Resume
 
Jesus Gerardo Lopez Update CV
Jesus Gerardo Lopez Update CVJesus Gerardo Lopez Update CV
Jesus Gerardo Lopez Update CV
 
PROFILE THILAK new
PROFILE THILAK newPROFILE THILAK new
PROFILE THILAK new
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015
 
GVK- Resume
GVK- ResumeGVK- Resume
GVK- Resume
 
Joel Ramos Resume
Joel Ramos ResumeJoel Ramos Resume
Joel Ramos Resume
 
AlbertoSolisResume
AlbertoSolisResumeAlbertoSolisResume
AlbertoSolisResume
 
HeenanResume2016 R1
HeenanResume2016 R1HeenanResume2016 R1
HeenanResume2016 R1
 
CNarcisse_resume
CNarcisse_resumeCNarcisse_resume
CNarcisse_resume
 
Rajesh Kumar (1)
Rajesh Kumar (1)Rajesh Kumar (1)
Rajesh Kumar (1)
 
RESUME #1
RESUME #1RESUME #1
RESUME #1
 
Jose A Perez
Jose A PerezJose A Perez
Jose A Perez
 
ssembogga cv
ssembogga cvssembogga cv
ssembogga cv
 
CV S Larner 2016
CV S Larner 2016CV S Larner 2016
CV S Larner 2016
 

Viewers also liked

Riesgos de la información electrónica
Riesgos de la información electrónicaRiesgos de la información electrónica
Riesgos de la información electrónicasanlgp
 
10 diseña un cambio para un pueblo mejor
10 diseña un cambio para un pueblo mejor10 diseña un cambio para un pueblo mejor
10 diseña un cambio para un pueblo mejordec-admin
 
Uk Labour Party - September 2016 Analysis
Uk Labour Party - September 2016 AnalysisUk Labour Party - September 2016 Analysis
Uk Labour Party - September 2016 AnalysisJames Shier
 
latest resume & signature
latest resume & signaturelatest resume & signature
latest resume & signatureRahi Talukder
 
8 actividad 8 taller práctico 10 claves para la implementación de tendencias ...
8 actividad 8 taller práctico 10 claves para la implementación de tendencias ...8 actividad 8 taller práctico 10 claves para la implementación de tendencias ...
8 actividad 8 taller práctico 10 claves para la implementación de tendencias ...elena castaño u
 
Diagnóstico Intraempreendedorismo
Diagnóstico IntraempreendedorismoDiagnóstico Intraempreendedorismo
Diagnóstico IntraempreendedorismoEASE Brasil
 
GlobalWA Brochure
GlobalWA BrochureGlobalWA Brochure
GlobalWA BrochureSara Atalla
 

Viewers also liked (13)

Riesgos de la información electrónica
Riesgos de la información electrónicaRiesgos de la información electrónica
Riesgos de la información electrónica
 
Tecnología celular
Tecnología celular Tecnología celular
Tecnología celular
 
10 diseña un cambio para un pueblo mejor
10 diseña un cambio para un pueblo mejor10 diseña un cambio para un pueblo mejor
10 diseña un cambio para un pueblo mejor
 
Sistemas
SistemasSistemas
Sistemas
 
Cat construccion
Cat construccionCat construccion
Cat construccion
 
Uk Labour Party - September 2016 Analysis
Uk Labour Party - September 2016 AnalysisUk Labour Party - September 2016 Analysis
Uk Labour Party - September 2016 Analysis
 
panama1-en
panama1-enpanama1-en
panama1-en
 
ClairedeMortimer-MasterdegreeShowGSA
ClairedeMortimer-MasterdegreeShowGSAClairedeMortimer-MasterdegreeShowGSA
ClairedeMortimer-MasterdegreeShowGSA
 
latest resume & signature
latest resume & signaturelatest resume & signature
latest resume & signature
 
8 actividad 8 taller práctico 10 claves para la implementación de tendencias ...
8 actividad 8 taller práctico 10 claves para la implementación de tendencias ...8 actividad 8 taller práctico 10 claves para la implementación de tendencias ...
8 actividad 8 taller práctico 10 claves para la implementación de tendencias ...
 
Diagnóstico Intraempreendedorismo
Diagnóstico IntraempreendedorismoDiagnóstico Intraempreendedorismo
Diagnóstico Intraempreendedorismo
 
Unygift catalogo
Unygift  catalogoUnygift  catalogo
Unygift catalogo
 
GlobalWA Brochure
GlobalWA BrochureGlobalWA Brochure
GlobalWA Brochure
 

Similar to SANGWENI S Resume

JITENDRA P DHOLE RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE RESUME Updated 05042016JITENDRA DHOLE
 
Chad C Knupp Resume
Chad C Knupp ResumeChad C Knupp Resume
Chad C Knupp ResumeChad Knupp
 
Resume Juvena Naidoo
Resume Juvena NaidooResume Juvena Naidoo
Resume Juvena NaidooJuvena Naidoo
 
Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01Jose Antonio de Jesus
 
production engineer
production engineerproduction engineer
production engineershiva lingam
 
Jimmy Resume August 2016 (1)
Jimmy Resume August 2016 (1)Jimmy Resume August 2016 (1)
Jimmy Resume August 2016 (1)Jimmy Eppler
 
Steve Larson Resume 1720
Steve Larson Resume 1720Steve Larson Resume 1720
Steve Larson Resume 1720Steve Larson
 
Binay Kumar Sharma
Binay Kumar SharmaBinay Kumar Sharma
Binay Kumar SharmaBinay Sharma
 
CURRICULUM VITAE alex
CURRICULUM VITAE alexCURRICULUM VITAE alex
CURRICULUM VITAE alexAlex Graham
 
CV-Sherif Rady- Mngr-Nestle Jan-2016
CV-Sherif Rady- Mngr-Nestle Jan-2016CV-Sherif Rady- Mngr-Nestle Jan-2016
CV-Sherif Rady- Mngr-Nestle Jan-2016Sherif Rady
 
Resume_Kevin Cady_2016
Resume_Kevin Cady_2016Resume_Kevin Cady_2016
Resume_Kevin Cady_2016KC Cady
 
JAMES MACDONALD Resume. April 2015
JAMES MACDONALD Resume. April 2015JAMES MACDONALD Resume. April 2015
JAMES MACDONALD Resume. April 2015James MacDonald
 

Similar to SANGWENI S Resume (20)

JITENDRA P DHOLE RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE RESUME Updated 05042016
 
jason-fulcher-cv
jason-fulcher-cvjason-fulcher-cv
jason-fulcher-cv
 
Chad C Knupp Resume
Chad C Knupp ResumeChad C Knupp Resume
Chad C Knupp Resume
 
Resume Juvena Naidoo
Resume Juvena NaidooResume Juvena Naidoo
Resume Juvena Naidoo
 
My CV
My CVMy CV
My CV
 
Robert-Calderon (1)
Robert-Calderon (1)Robert-Calderon (1)
Robert-Calderon (1)
 
Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01
 
Resume JR
Resume JRResume JR
Resume JR
 
production engineer
production engineerproduction engineer
production engineer
 
Jimmy Resume August 2016 (1)
Jimmy Resume August 2016 (1)Jimmy Resume August 2016 (1)
Jimmy Resume August 2016 (1)
 
Steve Larson Resume 1720
Steve Larson Resume 1720Steve Larson Resume 1720
Steve Larson Resume 1720
 
Binay Kumar Sharma
Binay Kumar SharmaBinay Kumar Sharma
Binay Kumar Sharma
 
CURRICULUM VITAE alex
CURRICULUM VITAE alexCURRICULUM VITAE alex
CURRICULUM VITAE alex
 
CV-Sherif Rady- Mngr-Nestle Jan-2016
CV-Sherif Rady- Mngr-Nestle Jan-2016CV-Sherif Rady- Mngr-Nestle Jan-2016
CV-Sherif Rady- Mngr-Nestle Jan-2016
 
Gerald_Schwartzmeyer2016
Gerald_Schwartzmeyer2016Gerald_Schwartzmeyer2016
Gerald_Schwartzmeyer2016
 
Resume_Kevin Cady_2016
Resume_Kevin Cady_2016Resume_Kevin Cady_2016
Resume_Kevin Cady_2016
 
Charles Findlay (3)
Charles Findlay (3)Charles Findlay (3)
Charles Findlay (3)
 
Bhanu Tiwari resume OA&Scm
Bhanu Tiwari resume OA&ScmBhanu Tiwari resume OA&Scm
Bhanu Tiwari resume OA&Scm
 
JAMES MACDONALD Resume. April 2015
JAMES MACDONALD Resume. April 2015JAMES MACDONALD Resume. April 2015
JAMES MACDONALD Resume. April 2015
 
Resume_DEPM1
Resume_DEPM1Resume_DEPM1
Resume_DEPM1
 

SANGWENI S Resume

  • 1. 1 RESUME OF Mr S’bonginkosi Praise-God Sangweni Email: sangwenisbonginkosi@gmail.com Cell: 084 780 1543 / 076 225 7326 Address: 37 Earlsfield drive, Newlands west, Durban, 4037 Career Statement Professional experience gained within varied portfolios, developmental and managerial roles, mainly within the chemical plant manufacturing industry. As a capable and self- motivated individual with 10 years of experience, an effective communicator with good leadership abilities, I have trained for professional development and mentorship intermediate and junior staff. I am able to use business systems such as SAP extensively, manage projects, commit to technical excellence, and lead engineering teams, co-ordinate continuous improvement projects using Lean Manufacturing and Six Sigma Tools. My most recent portfolio was in supply chain management as a production planner/scheduler. Personal details ID no. 8506205393083 Date of Birth 20 June 1985 Gender Male Languages English, IsiZulu, Marital Status Single Nationality South African Drivers Licence Code 10 Professional skills  Qualified & Experienced Chemical Engineer  Project Management  Planning & Coordination  Waste Water Treatment Plants  SAP Programmes  Managerial / supervisory experience  Analytical  Organisational  Adapting and Responding to Change  Applying Expertise and Technology  Adhering to Principles and Values  Working with people
  • 2. 2 Tertiary Education  National Diploma in Chemical engineering  Baccalaureus Technologiae (BTech) in Chemical Engineering  Currently completing Masters Business Administration (MBA) through UKZN/GSB (thesis only outstanding, all course work completed). General Education Phoenix Technical High School (1999-2003) EMPLOYMENTHISTORY Position: Site Production Planner and Scheduler Company: Dow Chemicals Period: 2015 July till 2016 February Scope of Work Done:  Reviewing each regeneration of MRP and open work orders using knowledge of product and process to provide smooth work load for each work center while achieving the requirements of the Master Production Schedule.  Providing input and promised delivery dates to customer service representatives and Shipping departments to schedule customer orders.  Acting as an interface to production, industrial engineering, purchasing, and other internal areas to ensure smooth operation in a timely and cost effective manner.  Closely monitoring open work orders to assure that the SAP work order file is accurate, that work orders are completed on time, that cycle times are maximized, and production capacity is managed to its full potential.  Control inventory as required. Including the monitoring of discrepant material from work cells to assure that it is quickly processed through the Material Review Board for timely disposition.  Coordinating the weekly generation of each work center’s production schedule.  Monitoring production levels and create/change schedule to assure that inventory objectives are maintained and production throughput times are minimized.
  • 3. 3 Roles Responsible: Site Activity Coordinator and Gate Keeper; Shut down Coordinator; Technical Advisor for Waste water treatment plant Company: Dow Chemicals Period: 2012 till 2015 July Scope of Work Done:  Immediate Response Team leader  Managing and Coordinating site activities – preparing safe work permits to ensure contractors are able to work safely and in accordance to Dow policies.  Act as an interface between site departments to ensure that all activities are completed safely and comply to Company policies  Scheduling and planning site maintenance activities to ensure the equipment is available and safe to be repaired.  Review and analyse equipment performance to ensure equipment reliability is continuously improved.  Plan and coordinate site shutdowns  Lead, plan and coordinate maintenance turnarounds (shut down)  Coordinate Activities in Waste water treatment plant and oversee the operation of the waste water treatment plant to ensure our disposal stream is within municipal specifications  Lead site Lean management initiatives Position: Shift Activity Coordinator Company: Dow Chemicals Period: 2011 till 2012 Scope of Work Done:  Immediate Response Team leader  Rescue team member  Managing and Coordinating all shift activities  Ensure shift compliance to safety and quality standards  Operate Plant  Manage shift team resources Position: Warehouse Controller Company: Dow Chemicals/Rohm and Haas Period: 2009 February till 2011 Scope of Work Done:  Load and Unload Trucks  Logistics safety officer  Fire and rescue team member  Schedule Products to be dispatched  Inventory Record Accuracy
  • 4. 4 Position: Process Controller Company: Dow Chemicals/Rohm and Haas Period: 2008 January till 2009 January Scope of Work Done:  Shift Safety officer  Produce product  Fire and rescue team member  Updating standard operating procedures  Performing environment health and safety (EHS) reviews  Performing management of change  Participate in Production plant shut downs Position: Engineering Trainee Company: Dow Chemicals/Rohm and Haas Period: 2006 August till 2007 December Scope of Work Done:  Manage projects in waste water treatment plant  Back up for waste water treatment plant operator – technical for the waste water treatment plant  Support Environment Health and Safety Manager  Support site on inventory record analysis (IRA) References Prof. Theuns Pelser Dean and Head of the Graduate School of Business Leadership in University of KwaZulu Natal, 031 260 1615 Dr M. Chetty HOD Department of Chemical Engineering at Durban University of Technology, 031 373 2186 Mr T Mthethwa Shift Activity Coordinator at Dow Chemicals New Germany 031 716 5960 Mr Dan Mbatha Senior QC Laboratory Technician at Dow Chemicals New Germany 031 716 5960 Mr M Made Maintenance Planner and Scheduler at Dow Chemicals New Germany 031 716 5960