Draft Audit Report Page 1 of 8
Draft Audit Report
Presented to
N S Automotive
On
August 10, 2015
By
Nisarg Shah Evaluation Agency
440 McMurchy Ave s,
Brampton, ON, L6Y 2N5
Draft Audit Report Page 2 of 8
Purpose:
To assess the effectiveness of Quality Management System of N S Automotive for
compliance with the requirements of ISO 9001:2008
Objective:
For the purpose of re-certification of ISO 9001:2008.
Scope:
All the departments were included in the audit and were audited on clauses of ISO
9001:2008
Auditee:
N S Automotive
61 Claireville Drive, Toronto,
ON, M9W 5Z7, Canada
(905)-123-4567
Client:
N S Automotive
61 Claireville Drive, Toronto,
ON, M9W 5Z7, Canada
(905)-123-4567
Auditor:
Nisarg Shah Evaluation Agency
440 McMurchy Ave s,
Brampton,
Canada, ON, L6Y 2N5
(647)-404-7150
Audit Date: 9th and 10th August, 2015
Audit Team:
1. Mr. Nisarg Shah – Audit Team Leader
2. Mr. Sanket Pandya – Audit Team Member
Draft Audit Report Page 3 of 8
FINDINGS:
Finding 1:
ISO 9001:2008 Clause: 8.3 Control of non-conforming product:
“The organization shall ensure that product which does not conform to product
requirements is identified and controlled to prevent its unintended use or delivery. A
documented procedure shall be established to define the controls and related
responsibilities and authorities for dealing with nonconforming product.”
Statement of finding: Control of non-conforming product not implemented as per
documented procedure according QSP 04
Observation 1: While auditing the control of non-conforming products on 10th Aug,
Between 10.30 to 11 in the morning, lead auditor found that there were 45 non-
conforming items in the quarantine area, out of these 6 items were not tagged by
a red tag.
Observation 2: The same date and time mentioned above, there were only 43
items in the NCR Log Form (QF 18), whereas physically there 45 items
Observation 3: On the same date and time, 3 non-conforming items in quarantine
area, there were no details found in Corrective Action Request Form (QF 10)
Draft Audit Report Page 4 of 8
Finding 2:
ISO 9001:2008 Clause: 7.6 Control of monitoring and measuring equipment
“Where necessary to ensure valid results, measuring equipment shall be calibrated or
verified, or both, at specified intervals, or prior to use, against measurement standards
traceable to international or national measurement standards; where no such standards
exist, the basis used for calibration or verification shall be recorded. In addition, the
organization shall assess and record the validity of the previous measuring results when
the equipment is found not to conform to requirements. The organization shall take
appropriate action on the equipment and any product affected.”
Statement of finding: Control of monitoring and measuring equipment not effective
Observation 1: When auditing the production shop floor on 9th August, between
2 to 3.30 pm, 2 of the measuring equipment, a digital vernier caliper (NSE17) and
a dial bore gauge (NSE21) found out of calibration and the instruments were still
used in production shop floor. Calibration was due for both the instruments on
20th July, 2015 i.e. 3 weeks ago.
Observation 2: The equipment ran out of calibration 3 weeks ago, and there is no
any action taken on the parts produced in these 3 weeks, or no any records
showing any action on the production taken was observed the same time.
Draft Audit Report Page 5 of 8
Finding 3
ISO 9001:2008 Clause: 7.4.1 Purchasing process
“The organization shall evaluate and select suppliers based on their ability to supply
product in accordance with the organization's requirements. Criteria for selection,
evaluation and re-evaluation shall be established. Records of the results of evaluations
and any necessary actions arising from the evaluation shall be maintained”
Statement of finding: Procedure for purchasing QSP 07 is not followed consistently
Observation 1: While observing the activities of purchase department on 10th
August, afternoon session, differing to the Quality Manual (Page 19) which states
that, “NS Automotive Ltd. evaluates and selects suppliers based on their ability
to supply product in accordance with the organization’s requirements.” One of the
raw material, High-Strength low alloy steel was purchased twice from “Sheet
metal works Ltd” which has not been evaluated by N S Automotive for their ability
to meet their requirement.
Observation 2: Also as mentioned in Quality Policy that the suppliers are re-
evaluated at least once in a year and the records are maintained in QF 07, while
observing the form, only five such records were found. After interviewing the
Purchase Manager, he confirmed that the re-evaluations are not conducted
regularly.
Draft Audit Report Page 6 of 8
Finding 4
ISO 9001:2008 Clause: 4.2.4 Control of Records
“The organization shall establish a documented procedure to define the controls needed
for the identification, storage, protection, retrieval, retention and disposition of records.
Records shall remain legible, readily identifiable and retrievable.”
Statement of finding: Control of records not followed consistently as per QSP 02
Observation 1: While auditing records on 10th August, 2015 between 9 to 10 am,
audit team member Mr. Pandya found that there were 2 forms (Customer
Material Log and Modification Approval) which were saved outside the folder
“Quality Forms” and were given folder name “QForms”, the records were not
readily identifiable and retrievable.
Observation 2: During the same time, Mr. Pandya also observed that QF02,
QF08, QF10 and QF13 were filled with pencil which contradicts from the QSP
02 which states all records should be either filled with pen or ink.
Observation 3: During audit of Production department during 9 to 10.30 pm on
9th August, audit team leader found that the purchase orders and information
are not retained for the retention period mentioned in QSP 02.
Draft Audit Report Page 7 of 8
Noteworthy Accomplishments:
5.5.1 Responsibility and authority
NS Automotive Ltd. has a semi-formal structure showing organization chart. All
employees are communicated of their responsibilities and authorities. All employees of N
S Automotive are well aware of their responsibilities and authority and have their authority
and responsibility matrix available in department.
6.2.2 Competence, training and awareness
NS Automotive Ltd. ensures that employees are competent to perform work affecting
conformity to product requirements. Where applicable, the provisions of training or other
actions are made to achieve the necessary competence. Personnel are aware of the
relevance and importance of their activities and how they contribute to the achievement
of the quality objectives.
Draft Audit Report Page 8 of 8
Corrective action request:
Corrective action request has been issued for the non-conformities and observations
described in this draft report. N S Automotive has agreed to respond to corrective action
request within 45 days from today’s date (10th August, 2015). Nisarg Shah Evaluation
Agency will revisit the facility of N S Automotive after 45 days to determine whether the
corrective actions have been implemented and effective. On satisfactory determination of
implementation and effectiveness of corrective actions implemented, Nisarg Shah
Evaluation Agency will consider the ISO 9001:2008 re-certification.
Lead Auditor: Nisarg Shah
Lead Auditor signature:__________________ Date: 10th August, 2015.

More Related Content

What's hot

Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)Kiran Walimbe
 
TTH,NABL Accredited, Material Testing Laboratory ,Lucknow
TTH,NABL Accredited, Material Testing Laboratory ,LucknowTTH,NABL Accredited, Material Testing Laboratory ,Lucknow
TTH,NABL Accredited, Material Testing Laboratory ,LucknowTelford Test House
 
The iso 17025 accreditation process
The iso 17025 accreditation processThe iso 17025 accreditation process
The iso 17025 accreditation processPat Kilbane
 
Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6DANANG WID
 
Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors Kiran Walimbe
 
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Kiran Walimbe
 
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China Soils FAO-GSP
 
QMS Audit (updated)
QMS Audit (updated)QMS Audit (updated)
QMS Audit (updated)Pat Kilbane
 
Industrial Training Lean, Process audits VDA 6.3, Quality Circle & Kaizen cul...
Industrial Training Lean, Process audits VDA 6.3, Quality Circle & Kaizen cul...Industrial Training Lean, Process audits VDA 6.3, Quality Circle & Kaizen cul...
Industrial Training Lean, Process audits VDA 6.3, Quality Circle & Kaizen cul...Kiran Walimbe
 
Pkqa iso 17025 requirements
Pkqa iso 17025 requirementsPkqa iso 17025 requirements
Pkqa iso 17025 requirementsPat Kilbane
 
Qualifications Statement
Qualifications StatementQualifications Statement
Qualifications StatementJLuckhart
 
2 mcs cert process
2 mcs cert process2 mcs cert process
2 mcs cert processedge7557
 
Application of lean kaizen to drilling services department in design and qual...
Application of lean kaizen to drilling services department in design and qual...Application of lean kaizen to drilling services department in design and qual...
Application of lean kaizen to drilling services department in design and qual...Abdulkadir Tekin
 
1st technical dinner meeting
1st technical dinner meeting1st technical dinner meeting
1st technical dinner meetingfatimah-h
 
Iso ts-implementation-webinar5-17-05
Iso ts-implementation-webinar5-17-05Iso ts-implementation-webinar5-17-05
Iso ts-implementation-webinar5-17-05Omnex Inc.
 

What's hot (19)

Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)
 
TTH,NABL Accredited, Material Testing Laboratory ,Lucknow
TTH,NABL Accredited, Material Testing Laboratory ,LucknowTTH,NABL Accredited, Material Testing Laboratory ,Lucknow
TTH,NABL Accredited, Material Testing Laboratory ,Lucknow
 
The iso 17025 accreditation process
The iso 17025 accreditation processThe iso 17025 accreditation process
The iso 17025 accreditation process
 
Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6
 
Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors
 
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Process auditing as per VDA 6.3
Process auditing as per VDA 6.3
 
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China
 
10 CFR 830 Subpart A
10 CFR 830 Subpart A10 CFR 830 Subpart A
10 CFR 830 Subpart A
 
QMS Audit (updated)
QMS Audit (updated)QMS Audit (updated)
QMS Audit (updated)
 
Iso 17020 iqms implementation steps lakshy rev00-240914
Iso 17020 iqms  implementation steps lakshy rev00-240914Iso 17020 iqms  implementation steps lakshy rev00-240914
Iso 17020 iqms implementation steps lakshy rev00-240914
 
Industrial Training Lean, Process audits VDA 6.3, Quality Circle & Kaizen cul...
Industrial Training Lean, Process audits VDA 6.3, Quality Circle & Kaizen cul...Industrial Training Lean, Process audits VDA 6.3, Quality Circle & Kaizen cul...
Industrial Training Lean, Process audits VDA 6.3, Quality Circle & Kaizen cul...
 
Pkqa iso 17025 requirements
Pkqa iso 17025 requirementsPkqa iso 17025 requirements
Pkqa iso 17025 requirements
 
Qualifications Statement
Qualifications StatementQualifications Statement
Qualifications Statement
 
CV (1)
CV (1)CV (1)
CV (1)
 
2 mcs cert process
2 mcs cert process2 mcs cert process
2 mcs cert process
 
Application of lean kaizen to drilling services department in design and qual...
Application of lean kaizen to drilling services department in design and qual...Application of lean kaizen to drilling services department in design and qual...
Application of lean kaizen to drilling services department in design and qual...
 
1st technical dinner meeting
1st technical dinner meeting1st technical dinner meeting
1st technical dinner meeting
 
CV JAVED
CV JAVEDCV JAVED
CV JAVED
 
Iso ts-implementation-webinar5-17-05
Iso ts-implementation-webinar5-17-05Iso ts-implementation-webinar5-17-05
Iso ts-implementation-webinar5-17-05
 

Similar to Draft Audit Report_Nisarg

1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDITSCOTT SITTNER
 
PR_Summary of the supplier audit at chemetall company _ 17.05 .017
PR_Summary of the supplier  audit at chemetall company _ 17.05 .017PR_Summary of the supplier  audit at chemetall company _ 17.05 .017
PR_Summary of the supplier audit at chemetall company _ 17.05 .017Masud Rana
 
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - IntroductionISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - IntroductionKanriConsulting
 
Audit report October 2017
Audit report October 2017Audit report October 2017
Audit report October 2017Yvette Coetzer
 
NS Automotive QSP
NS Automotive QSPNS Automotive QSP
NS Automotive QSPNisarg Shah
 
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...Shashi Kumar
 
idoc.pub_iatf-auditor-guidepdf.pdf
idoc.pub_iatf-auditor-guidepdf.pdfidoc.pub_iatf-auditor-guidepdf.pdf
idoc.pub_iatf-auditor-guidepdf.pdfUlhasKavathekar
 
209422504 process-audit-check-list
209422504 process-audit-check-list209422504 process-audit-check-list
209422504 process-audit-check-listUsama Waly
 
SAEP-1151_inspection requirement.PDF
SAEP-1151_inspection requirement.PDFSAEP-1151_inspection requirement.PDF
SAEP-1151_inspection requirement.PDFMohammedZiauddin25
 
Substantive Procedures - AUDITING STUDY NOTES
Substantive Procedures - AUDITING STUDY NOTES Substantive Procedures - AUDITING STUDY NOTES
Substantive Procedures - AUDITING STUDY NOTES MUHAMMAD HUZAIFA CHAUDHARY
 
Gdot new product evaluation presentation quarterly meeting 090313 acec meeting
Gdot new product evaluation presentation quarterly meeting 090313 acec meetingGdot new product evaluation presentation quarterly meeting 090313 acec meeting
Gdot new product evaluation presentation quarterly meeting 090313 acec meetingBrennanRoney
 
Upgrade iso 9001 2000 to 2008 version
Upgrade  iso 9001 2000 to 2008 versionUpgrade  iso 9001 2000 to 2008 version
Upgrade iso 9001 2000 to 2008 versionIsidro Sid Calayag
 
Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safetymanik980318
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptxxego1
 
Improving the Conduct of Compulsory Auditing on the Basis of International Au...
Improving the Conduct of Compulsory Auditing on the Basis of International Au...Improving the Conduct of Compulsory Auditing on the Basis of International Au...
Improving the Conduct of Compulsory Auditing on the Basis of International Au...ijtsrd
 
Quality management system trainingcourse.pptx
Quality management system trainingcourse.pptxQuality management system trainingcourse.pptx
Quality management system trainingcourse.pptxMahmoud Sanad
 

Similar to Draft Audit Report_Nisarg (20)

1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
 
PR_Summary of the supplier audit at chemetall company _ 17.05 .017
PR_Summary of the supplier  audit at chemetall company _ 17.05 .017PR_Summary of the supplier  audit at chemetall company _ 17.05 .017
PR_Summary of the supplier audit at chemetall company _ 17.05 .017
 
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - IntroductionISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
 
Audit report October 2017
Audit report October 2017Audit report October 2017
Audit report October 2017
 
Aplac tc 006
Aplac tc 006Aplac tc 006
Aplac tc 006
 
NS Automotive QSP
NS Automotive QSPNS Automotive QSP
NS Automotive QSP
 
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
 
Iatf 16949 training
Iatf 16949 trainingIatf 16949 training
Iatf 16949 training
 
idoc.pub_iatf-auditor-guidepdf.pdf
idoc.pub_iatf-auditor-guidepdf.pdfidoc.pub_iatf-auditor-guidepdf.pdf
idoc.pub_iatf-auditor-guidepdf.pdf
 
209422504 process-audit-check-list
209422504 process-audit-check-list209422504 process-audit-check-list
209422504 process-audit-check-list
 
SAEP-1151_inspection requirement.PDF
SAEP-1151_inspection requirement.PDFSAEP-1151_inspection requirement.PDF
SAEP-1151_inspection requirement.PDF
 
Substantive Procedures - AUDITING STUDY NOTES
Substantive Procedures - AUDITING STUDY NOTES Substantive Procedures - AUDITING STUDY NOTES
Substantive Procedures - AUDITING STUDY NOTES
 
Gdot new product evaluation presentation quarterly meeting 090313 acec meeting
Gdot new product evaluation presentation quarterly meeting 090313 acec meetingGdot new product evaluation presentation quarterly meeting 090313 acec meeting
Gdot new product evaluation presentation quarterly meeting 090313 acec meeting
 
Upgrade iso 9001 2000 to 2008 version
Upgrade  iso 9001 2000 to 2008 versionUpgrade  iso 9001 2000 to 2008 version
Upgrade iso 9001 2000 to 2008 version
 
Quality oepm junio2011
Quality  oepm junio2011Quality  oepm junio2011
Quality oepm junio2011
 
Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safety
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptx
 
Qsm guidelines
Qsm guidelinesQsm guidelines
Qsm guidelines
 
Improving the Conduct of Compulsory Auditing on the Basis of International Au...
Improving the Conduct of Compulsory Auditing on the Basis of International Au...Improving the Conduct of Compulsory Auditing on the Basis of International Au...
Improving the Conduct of Compulsory Auditing on the Basis of International Au...
 
Quality management system trainingcourse.pptx
Quality management system trainingcourse.pptxQuality management system trainingcourse.pptx
Quality management system trainingcourse.pptx
 

Draft Audit Report_Nisarg

  • 1. Draft Audit Report Page 1 of 8 Draft Audit Report Presented to N S Automotive On August 10, 2015 By Nisarg Shah Evaluation Agency 440 McMurchy Ave s, Brampton, ON, L6Y 2N5
  • 2. Draft Audit Report Page 2 of 8 Purpose: To assess the effectiveness of Quality Management System of N S Automotive for compliance with the requirements of ISO 9001:2008 Objective: For the purpose of re-certification of ISO 9001:2008. Scope: All the departments were included in the audit and were audited on clauses of ISO 9001:2008 Auditee: N S Automotive 61 Claireville Drive, Toronto, ON, M9W 5Z7, Canada (905)-123-4567 Client: N S Automotive 61 Claireville Drive, Toronto, ON, M9W 5Z7, Canada (905)-123-4567 Auditor: Nisarg Shah Evaluation Agency 440 McMurchy Ave s, Brampton, Canada, ON, L6Y 2N5 (647)-404-7150 Audit Date: 9th and 10th August, 2015 Audit Team: 1. Mr. Nisarg Shah – Audit Team Leader 2. Mr. Sanket Pandya – Audit Team Member
  • 3. Draft Audit Report Page 3 of 8 FINDINGS: Finding 1: ISO 9001:2008 Clause: 8.3 Control of non-conforming product: “The organization shall ensure that product which does not conform to product requirements is identified and controlled to prevent its unintended use or delivery. A documented procedure shall be established to define the controls and related responsibilities and authorities for dealing with nonconforming product.” Statement of finding: Control of non-conforming product not implemented as per documented procedure according QSP 04 Observation 1: While auditing the control of non-conforming products on 10th Aug, Between 10.30 to 11 in the morning, lead auditor found that there were 45 non- conforming items in the quarantine area, out of these 6 items were not tagged by a red tag. Observation 2: The same date and time mentioned above, there were only 43 items in the NCR Log Form (QF 18), whereas physically there 45 items Observation 3: On the same date and time, 3 non-conforming items in quarantine area, there were no details found in Corrective Action Request Form (QF 10)
  • 4. Draft Audit Report Page 4 of 8 Finding 2: ISO 9001:2008 Clause: 7.6 Control of monitoring and measuring equipment “Where necessary to ensure valid results, measuring equipment shall be calibrated or verified, or both, at specified intervals, or prior to use, against measurement standards traceable to international or national measurement standards; where no such standards exist, the basis used for calibration or verification shall be recorded. In addition, the organization shall assess and record the validity of the previous measuring results when the equipment is found not to conform to requirements. The organization shall take appropriate action on the equipment and any product affected.” Statement of finding: Control of monitoring and measuring equipment not effective Observation 1: When auditing the production shop floor on 9th August, between 2 to 3.30 pm, 2 of the measuring equipment, a digital vernier caliper (NSE17) and a dial bore gauge (NSE21) found out of calibration and the instruments were still used in production shop floor. Calibration was due for both the instruments on 20th July, 2015 i.e. 3 weeks ago. Observation 2: The equipment ran out of calibration 3 weeks ago, and there is no any action taken on the parts produced in these 3 weeks, or no any records showing any action on the production taken was observed the same time.
  • 5. Draft Audit Report Page 5 of 8 Finding 3 ISO 9001:2008 Clause: 7.4.1 Purchasing process “The organization shall evaluate and select suppliers based on their ability to supply product in accordance with the organization's requirements. Criteria for selection, evaluation and re-evaluation shall be established. Records of the results of evaluations and any necessary actions arising from the evaluation shall be maintained” Statement of finding: Procedure for purchasing QSP 07 is not followed consistently Observation 1: While observing the activities of purchase department on 10th August, afternoon session, differing to the Quality Manual (Page 19) which states that, “NS Automotive Ltd. evaluates and selects suppliers based on their ability to supply product in accordance with the organization’s requirements.” One of the raw material, High-Strength low alloy steel was purchased twice from “Sheet metal works Ltd” which has not been evaluated by N S Automotive for their ability to meet their requirement. Observation 2: Also as mentioned in Quality Policy that the suppliers are re- evaluated at least once in a year and the records are maintained in QF 07, while observing the form, only five such records were found. After interviewing the Purchase Manager, he confirmed that the re-evaluations are not conducted regularly.
  • 6. Draft Audit Report Page 6 of 8 Finding 4 ISO 9001:2008 Clause: 4.2.4 Control of Records “The organization shall establish a documented procedure to define the controls needed for the identification, storage, protection, retrieval, retention and disposition of records. Records shall remain legible, readily identifiable and retrievable.” Statement of finding: Control of records not followed consistently as per QSP 02 Observation 1: While auditing records on 10th August, 2015 between 9 to 10 am, audit team member Mr. Pandya found that there were 2 forms (Customer Material Log and Modification Approval) which were saved outside the folder “Quality Forms” and were given folder name “QForms”, the records were not readily identifiable and retrievable. Observation 2: During the same time, Mr. Pandya also observed that QF02, QF08, QF10 and QF13 were filled with pencil which contradicts from the QSP 02 which states all records should be either filled with pen or ink. Observation 3: During audit of Production department during 9 to 10.30 pm on 9th August, audit team leader found that the purchase orders and information are not retained for the retention period mentioned in QSP 02.
  • 7. Draft Audit Report Page 7 of 8 Noteworthy Accomplishments: 5.5.1 Responsibility and authority NS Automotive Ltd. has a semi-formal structure showing organization chart. All employees are communicated of their responsibilities and authorities. All employees of N S Automotive are well aware of their responsibilities and authority and have their authority and responsibility matrix available in department. 6.2.2 Competence, training and awareness NS Automotive Ltd. ensures that employees are competent to perform work affecting conformity to product requirements. Where applicable, the provisions of training or other actions are made to achieve the necessary competence. Personnel are aware of the relevance and importance of their activities and how they contribute to the achievement of the quality objectives.
  • 8. Draft Audit Report Page 8 of 8 Corrective action request: Corrective action request has been issued for the non-conformities and observations described in this draft report. N S Automotive has agreed to respond to corrective action request within 45 days from today’s date (10th August, 2015). Nisarg Shah Evaluation Agency will revisit the facility of N S Automotive after 45 days to determine whether the corrective actions have been implemented and effective. On satisfactory determination of implementation and effectiveness of corrective actions implemented, Nisarg Shah Evaluation Agency will consider the ISO 9001:2008 re-certification. Lead Auditor: Nisarg Shah Lead Auditor signature:__________________ Date: 10th August, 2015.