Assessment Report
L&L Consulting Services
Assessment dates 05/10/2017 to 05/10/2017
Assessment location Pretoria (000)
Report Author Jean-Jacques Jaume
Assessment Standards ISO 9001:2015
Assessment Report.
Page 2 of 15
Table of contents
Executive Summary......................................................................................................................................................3
Assessment Participants ..............................................................................................................................................4
Status of actions from the previous assessment .........................................................................................................5
Assessment Findings ....................................................................................................................................................7
Our next steps............................................................................................................................................................10
Your next steps...........................................................................................................................................................11
Appendix: Your certification structure & on-going assessment programme ............................................................12
Assessment Report.
Page 3 of 15
Executive Summary
I would like to thank all the audit participants for their assistance and co-operation which enabled the
audit to run smoothly and to schedule.
Assessment objective, scope and criteria
The objective of the assessment was to conduct a surveillance assessment and look for positive
evidence to verify that elements of the scope of certification and the requirements of the management
standard are effectively addressed by the organization's management system; that the system is
demonstrating the ability to support the achievement of statutory, regulatory and contractual
requirements and the organization's specified objectives as applicable with regard to the scope of the
management standard; to confirm the ongoing achievement and applicability of the forward strategic
plan and where applicable to identify potential areas for improvement of the management system.
The scope of the assessment is the documented management system with relation to the requirements
of ISO 9001:2015 and the defined assessment plan provided in terms of locations and areas of the
system and organization to be assessed.
ISO 9001:2015
L&L Consulting Services management system documentation
NCR Summary
There have been no NCRs raised.
Definitions:
Nonconformity
Non-fulfilment of a requirement.
Major nonconformity
Nonconformity that affects the capability of the management system to achieve the intended results.
Nonconformities could be classified as major in the following circumstances:
- If there is a significant doubt that effective process control is in place, or that products or services will meet specified requirements;
- A number of minor nonconformities associated with the same requirement or issue could demonstrate a systemic failure and thus
constitute a major nonconformity.
Minor nonconformity
Nonconformity that does not affect the capability of the management system to achieve the intended results.
Opportunity for improvement
It is a statement of fact made by an assessor during an assessment, and substantiated by objective evidence, referring to a weakness or
potential deficiency in a management system which if not improved may lead to nonconformity in the future. We may provide generic
information about industrial best practices but no specific solution shall be provided as a part of an opportunity for improvement.
Observation
It is ONLY applicable for those schemes which prohibit the certification body to issue an opportunity for improvement.
It is a statement of fact made by the assessor referring to a weakness or potential deficiency in a management system which, if not
improved, may lead to a nonconformity in the future.
Assessment Report.
Page 4 of 15
Assessment Participants
Name Position
Opening
Meeting
Closing
Meeting
Interviewed
(processes)
L Robbertse Managing Director X X
Y Coetzer Quality Manager X X X
C Groenewald Workshop Manager X X X
P Dunckley
Procurement
Officer
X X X
T Langerak Technical Manager X X
Assessment Report.
Page 5 of 15
Status of actions from the previous assessment
Ref Area/Process Clause
1411576N1 Management of the Quality System 6.2.1
Scope FM 663493
Category Minor
Details: Quality objectives are vague and not achievable.
Objective
evidence:
In L&L/OBJ/FIN Financial Rev 00 dated 01 September 2016 objective 4 states
"the intent to achieve 100% debtors income"
When reviewing Debtor statements for June 2017 to October 2016 it was found
that for June and September 2016 this was not achieved.
As L&L has no control over debtor payments this objective is not achievable.
L&L/OBJ/WSIE Electrical and Instrumentation Rev 00 dated 01 September 2016
defined a very narrow window for nonconforming products, that if 1 unit in a 100
units did not conform they would not reach the objective.
Cause Review 01 departmental objectives were done hastily and not property evaluated
for effectiveness as Per Risk register L&L/REG/003. The objectives that could
have changed during the course of the 2015-2016 year were not reviewed for
2017, as a whole to see if it was in fact contributing to delivering data to measure
and achieve objectives. The objectives were previously not measured in detail and
therefore did not seem necessary to change them.
Correction /
containment
Review of Objectives.
Corrective
action
Proper planning of objectives to be done. New or revised objectives to be created,
distributed, communicated and measured for pre-emptive effectiveness. Planning
is being co ducted through the following planned document: Planning for the
revision of L&L Consulting Services (Ply) Ltd. Departmental Objectives NCR
NO:1411576N1- Scope FM 663493. Due to December working time constraints
the corrective action will only be completed in the first week of January 2017.
First meeting on the planning of objectives have been completed and the
continuous planning will commence 09/0112017.
The following objectives were updated:
- L&L/OBJ/FINANCE REV 01
- L&L/OBL/PC REV 00
- L&L/OBL/PO REV 02
- L&L/OBJ/WS REV 01
- L&L/OBJ/ASSEMBLY REV 02
Closed: Yes
Assessment Report.
Page 6 of 15
Ref Area/Process Clause
1411576N2 Sales, Procurement and Orders 8.5.1
Scope FM 663493
Category Minor
Details: All fields in the Procurement Tracking Sheet are not completed.
Objective
evidence:
While scrutinising the Glencore Purchase Order pack - PO No 4501444947 dated
24 October 2014 All fields in the Procurement Tracking Sheet were not completed
making it difficult to see the status of goods ordered and delivered.
When looking at other work/order packs the same was found.
Cause The procurement tracking sheet (filled in by hand) is not part of the main
procurement process and aids as a tracking sheet for production meetings. The
form has been kept as a necessary. The Root cause for the form not being filled
in is due to a procurement process that is not as streamlined. Too many little
processes increases the risk for smaller tasks leading to bigger tasks not being
conformed to.
Correction /
containment
Planning of the streamlining and scrutinizing of the procurement process will be
conducted as part of the process audits scheduled for the first quarter of 2017,as
per audit schedule L&L/REG/008.
Corrective
action
The proposed finalization of the streamlining of the procurement process to be
completed by 13/01/2017. Any changes made to the process will be captured in
the revised procedures: L&L/QP/16 and L&L/QP/17 and will be revved up. The
change will be supportive of the root cause ensuring that there is enough time to
fill in the procurement tracking sheets if they are still required.
Procurement tracking sheet checked for completeness.
Closed: Yes
Assessment Report.
Page 7 of 15
Assessment Findings
The assessment was conducted on behalf of BSI by
Name Position
Jean-Jacques Jaume Team leader
Assessment conclusion and recommendation
The audit objectives have been achieved and the certificate scope remains appropriate. The audit team
concludes based on the results of this audit that L&L Consulting Services does fulfil the standards and
audit criteria identified within the audit report and it is deemed that the management system continues
to achieve its intended outcomes.
RECOMMENDED - The audited organization can be recommended for continued certification to the
above listed standards, and has been found in general compliance with the audit criteria as stated in the
above-mentioned audit plan.
Use of certification documents, mark / logo or report
The use of the BSI certification documents and mark / logo is effectively controlled.
Assessment Report.
Page 8 of 15
Findings
Assembly, Electrical and Instrumentation: 7.1.5, 7.1.6, 7.2, 7.3, 7.4, 8.1, 8.2, 8.4, 8.5.2:
The following documents and records were available:
- L&L/OBJ/ASSEMBLY Assembly and Testing Objectives Rev 02 dated 10 January 2017
- L&L/QP/01 Calibration Rev 01 dated 16 January 2017
- L&L/QD/019 Calibration and Verification Log Rev 0 dated 05 October 2017
- L&L/QD/019 Equipment Maintenance Log Rev 0
- L&L/QD/06 Assembly and Final Production Realisation - Electrical Rev 01 dated 12 September 2017
- Various Work Instructions for Assembly and Testing of products
- L&L Equipment Buffer Stock
Project No GWK17539 was scrutinised and the following documents and Records were available:
- Client Purchase Order No 4501601084 dated 26 September 2017
- I-17539-1 Workshop Stock Request dated 28 September 2017
- SP/QD/18 Quality Inspection Report for Product R1709/0275 dated 28 September 2017 (Doc No's
01585 and 01586)
- Job Card Completed Workshop Tracking Sheet (JC No's 01585 and 01586)
Job Assembled by Kobus van den Berg and the following documents and records were available:
- Workshop Training and Evaluation Schedule 2017 (Work Instruction 14 Glencore Repeater Box)
Finance:
The following documents and records were available:
- L&L/OBJ/FIN Financial Objectives Rev 01 dated 10 January 2017
- L&L/QP/23 Outsourced Procedure: Aveng Steel Fabrication Rev 00 dated 25 November 2016
- L&L/QP/17 Quoting and Orders Rev 01 dated 01 September 2016
- L&L/QP/13 Approved Suppliers List
- L&L/QP/SUP/01 Supplier Performance Chart for Period October 2016 to August 2017
- Various Supplier Corrective Actions Request
Assessment Report.
Page 9 of 15
Management of the Quality System:
The following documents and records were available:
Management Review
- L&L/QP/13 Management Review Rev 00 dated 01 September 2016
- Minutes and Attendance Register of Management Review dated 17 July 2017 was available
- Responsible people were identified for actions and due dates allocated
Internal Auditing
- L&L/REG/008 Internal Audit Program for 2017 Rev 0
- Internal Audit report conducted by L&L dated 15 August 2017 Kaizen SHEQ dated 25 and 16 July
2017 was scrutinised.
- NC raised were incorporated in L&L/REG/007 Corrective Action System
CAR 0071 and CAR 0065 was scrutinised and the following records were available:
- Actions were implemented and signed off
- Updated Procedure/Work instructions
System Documentation
- L&L/QMS/001 Quality Manual Rev 03 dated 01 August 2017
- L&L/QMS/002 Quality Policy Rev 00 dated 01 September 2016
- L&L/QMS/003 Scope Rev 00 dated 01 September 2016
- L&L/REG/005 Interested Parties Rev 00 dated 01 August 2017
Assessment Report.
Page 10 of 15
Our next steps
Next Visit Plan
Date Auditor Time Area/Process Clause
2018/10/02 09:00 Opening Meeting
09:15 Manufacturing and Powder Coating 7.1.5, 7.1.6, 7.2, 7.3,
7.4, 8.1, 8.2, 8.4,
8.5.2
11:00 Sales, Procurement and Orders 8.4.2, 8.4.3, 8.5.1
12:00 Lunch
13:00 Management of the Quality System 6.3, 8.2.4, 8.5.6, 4,
7.5.2, 7.5.3, 8.5.3
15:30 Report Preparation
16:00 Closing Meeting
Next visit objectives, scope and criteria
The objective of the assessment is to conduct a surveillance assessment and look for positive evidence
to verify that elements of the scope of certification and the requirements of the management standard
are effectively addressed by the organization's management system; that the system is demonstrating
the ability to support the achievement of statutory, regulatory and contractual requirements and the
organization's specified objectives as applicable with regard to the scope of the management standard;
to confirm the ongoing achievement and applicability of the forward strategic plan.
The scope of the assessment is the documented management system with relation to the requirements
of ISO 9001:2015 and the defined assessment plan provided in terms of locations and areas of the
system and organization to be assessed.
ISO 9001:2015
L&L Consulting Services management system documentation
Please note that BSI reserves the right to apply a charge equivalent to the full daily rate for
cancellation of the visit by the organization within 30 days of an agreed visit date. It is a
condition of Registration that a deputy management representative be nominated. It is
expected that the deputy would stand in should the management representative find
themselves unavailable to attend an agreed visit within 30 days of its conduct.
Assessment Report.
Page 11 of 15
Your next steps
NCR close out process
Corrective actions with respect to nonconformities raised at the last assessment have been reviewed
and found to be effectively implemented.
No new nonconformities were identified during the assessment. Enhanced detail relating to the overall
assessment findings is contained within subsequent sections of the report.
How to contact customer service
'Just for Customers' is the website that we are pleased to offer our clients following successful
registration, designed to support you in maximising the benefits of your BSI registration - please go to
www.bsigroup.com/j4c to register. When registering for the first time you will need your client reference
number and your certificate number (47620374/FM 663493).
Should you wish to speak with BSI in relation to your registration, please contact our Customer
Engagement and Planning:
BSI Group South Africa (Pty) Ltd
210 Amarand Avenue
Regus Business Park
Menlyn Maine, Waterkloof Ext 2
Pretoria 0181
South Africa
Tel: +27 (0)12 443 6422
E-mail (for corrective action plans): bsi.za@bsigroup.com
Assessment Report.
Page 12 of 15
Appendix: Your certification structure & on-going
assessment programme
Scope of Certification
FM 663493 (ISO 9001:2015)
Instrumentation assembly, electrical, AS i field bus assembly and powder coating processes.
Assessed location(s)
The audit has been performed at Permanent Locations.
Pretoria / FM 663493 (ISO 9001:2015)
Location reference 0047620374-000
Address L&L Consulting Services
378 Bronbergvlei Estate
Graham Road
Zwavelpoort
Pretoria
0081
South Africa
Visit type Continuing assessment (surveillance)
Assessment reference 8679975
Assessment dates 05/10/2017
Audit Plan (Revision Date) 01/02/2018
Deviation from Audit Plan No
No. of Full Time Equivalent
Employees
23
Total No. of Effective
Employees at the site
21
Scope of activities at the site Main Certificate Scope applies.
Assessment duration 1 day(s)
Assessment Report.
Page 13 of 15
Changes in the organization since last assessment
There is no significant change of the organization structure and key personnel involved in the audited
management system.
No change in relation to the audited organization’s activities, products or services covered by the scope
of certification was identified.
There was no change to the reference or normative documents which is related to the scope of
certification.
Shift Details
The shifts are identical in terms of process outputs and as a result it has been determined that the
effectiveness of all shifts can be seen from outputs records and coverage within the normal assessment
times.
Assessment Report.
Page 14 of 15
Certification assessment program
Certificate Number - FM 663493
Location reference - 0047620374-000
Audit1 Audit2 Audit3 Audit4 Audit5
Business
area/Location
Date (mm/yy): 17/11/2
016
28/11/2
016
10/2017 10/2018 10/2019
Duration (days): 1 2 1 1 2
Opening Meeting X X X X X
Managing Director Interview X X
Management of the Quality System X X X X
Finance X X X
Sales, Procurement and Orders X X X
Assembly, Electrical and Instrumentation X X X
Manufacturing and Powder Coating X X X
Report Preparation X X X X X
Closing Meeting X X X X X
Expected outcomes for accredited certification
What accredited certification to ISO 9001 means
ISO 9001:2015 specifies requirements for a quality management system when an organization: needs to
demonstrate its ability to consistently provide products and services that meet customer and applicable
statutory and regulatory requirements; and aims to enhance customer satisfaction through the effective
application of the system, including processes for improvement of the system and the assurance of
conformity to customer and applicable statutory and regulatory requirements.
What accredited certification to ISO 9001 does not mean
1) It is important to recognize that ISO 9001 defines the requirements for an organization’s quality
management system, not for its products and services. Accredited certification to ISO 9001 should
provide confidence in the organization’s ability to “consistently provide product that meets customer and
applicable statutory and regulatory requirements”. It does not necessarily ensure that the organization
will always achieve 100% product conformity, though this should of course be a permanent goal.
2) ISO 9001 accredited certification does not imply that the organization is providing a superior Product
or service, or that the product or service itself is certified as meeting the requirements of an ISO (or any
other) standard or specification.
Assessment Report.
Page 15 of 15
Notes
This report and related documents are prepared for and only for BSI’s client and for no other purpose. As such,
BSI does not accept or assume any responsibility (legal or otherwise) or accept any liability for or in connection
with any other purpose for which the Report may be used, or to any other person to whom the Report is shown or
in to whose hands it may come, and no other persons shall be entitled to rely on the Report. If you wish to
distribute copies of this report external to your organisation, then all pages must be included.
BSI, its staff and agents shall keep confidential all information relating to your organisation and shall not disclose
any such information to any third party, except that in the public domain or required by law or relevant
accreditation bodies. BSI staff, agents and accreditation bodies have signed individual confidentiality undertakings
and will only receive confidential information on a 'need to know' basis.
This audit was conducted on-site through document reviews, interviews and observation of activities. The audit
method used was based on sampling the organization’s activities and it was aimed to evaluate the fulfilment of the
audited requirements of the relevant management system standard or other normative document and confirm the
conformity and effectiveness of the management system and its continued relevance and applicability for the
scope of certification.
As this audit was based on a sample of the organization’s activities, the findings reported do not imply to include
all issues within the system.
Regulatory compliance
BSI conditions of contract for this visit require that BSI be informed of all relevant regulatory non-compliance or
incidents that require notification to any regulatory authority. Acceptance of this report by the client signifies that
all such issues have been disclosed as part of the assessment process and agreement that any such non-
compliance or incidents occurring after this visit will be notified to the BSI client manager as soon as practical after
the event.

More Related Content

What's hot

Iso 9001:2015 Documented Information Guidance
Iso 9001:2015 Documented Information GuidanceIso 9001:2015 Documented Information Guidance
Iso 9001:2015 Documented Information GuidanceMohammad Elshahat
 
Internal Audit Checklist__For ISO 9001_2015_.pdf
Internal Audit Checklist__For ISO 9001_2015_.pdfInternal Audit Checklist__For ISO 9001_2015_.pdf
Internal Audit Checklist__For ISO 9001_2015_.pdfNagarajPatil57
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation Govind Ramu
 
Key changes to ISO 9001:2015 and 7 steps of 7Epsilon
Key changes to ISO 9001:2015 and 7 steps of 7EpsilonKey changes to ISO 9001:2015 and 7 steps of 7Epsilon
Key changes to ISO 9001:2015 and 7 steps of 7EpsilonMeghana Ransing
 
ISO 9001:2015 What Are the Main Changes?
ISO 9001:2015 What Are the Main Changes?ISO 9001:2015 What Are the Main Changes?
ISO 9001:2015 What Are the Main Changes?PECB
 
ISO Certifications
ISO CertificationsISO Certifications
ISO CertificationsAnupam Kumar
 
Iso 9001 2015 documented information guidlines
Iso 9001 2015 documented information guidlinesIso 9001 2015 documented information guidlines
Iso 9001 2015 documented information guidlinesRajeesh Thumpayil
 
Philippe Andrianne : « Le bourgeon de cassis, l’adaptogène de la gemmothérapie »
Philippe Andrianne : « Le bourgeon de cassis, l’adaptogène de la gemmothérapie »Philippe Andrianne : « Le bourgeon de cassis, l’adaptogène de la gemmothérapie »
Philippe Andrianne : « Le bourgeon de cassis, l’adaptogène de la gemmothérapie »Académies de Naturopathie
 
AS9100 Auditor Training Presentation Kit
AS9100 Auditor Training Presentation KitAS9100 Auditor Training Presentation Kit
AS9100 Auditor Training Presentation KitGlobal Manager Group
 
ISO 9001, 14001, 45001 (IMS) basics training material
ISO 9001, 14001, 45001 (IMS) basics training materialISO 9001, 14001, 45001 (IMS) basics training material
ISO 9001, 14001, 45001 (IMS) basics training materialRanganathanR9
 
ISO 14001 Leadership & Planning Elements
ISO 14001 Leadership & Planning  ElementsISO 14001 Leadership & Planning  Elements
ISO 14001 Leadership & Planning ElementsTeam Web Africa
 

What's hot (20)

ISO 14001:2015 Documentation ppt
ISO 14001:2015 Documentation pptISO 14001:2015 Documentation ppt
ISO 14001:2015 Documentation ppt
 
Presentation_Final_1
Presentation_Final_1Presentation_Final_1
Presentation_Final_1
 
Iso 9001:2015 Documented Information Guidance
Iso 9001:2015 Documented Information GuidanceIso 9001:2015 Documented Information Guidance
Iso 9001:2015 Documented Information Guidance
 
Internal Audit Checklist__For ISO 9001_2015_.pdf
Internal Audit Checklist__For ISO 9001_2015_.pdfInternal Audit Checklist__For ISO 9001_2015_.pdf
Internal Audit Checklist__For ISO 9001_2015_.pdf
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation
 
ISO 9001
ISO 9001ISO 9001
ISO 9001
 
Introduction to iso 9001
Introduction to iso 9001 Introduction to iso 9001
Introduction to iso 9001
 
Key changes to ISO 9001:2015 and 7 steps of 7Epsilon
Key changes to ISO 9001:2015 and 7 steps of 7EpsilonKey changes to ISO 9001:2015 and 7 steps of 7Epsilon
Key changes to ISO 9001:2015 and 7 steps of 7Epsilon
 
ISO 9001:2015 What Are the Main Changes?
ISO 9001:2015 What Are the Main Changes?ISO 9001:2015 What Are the Main Changes?
ISO 9001:2015 What Are the Main Changes?
 
Introduction to ISO 9001:2015
Introduction to ISO 9001:2015Introduction to ISO 9001:2015
Introduction to ISO 9001:2015
 
ISO 14000
ISO 14000ISO 14000
ISO 14000
 
Internal audit day 1
Internal audit day 1Internal audit day 1
Internal audit day 1
 
ISO 14001-2015 .ppt
ISO 14001-2015  .pptISO 14001-2015  .ppt
ISO 14001-2015 .ppt
 
ISO Certifications
ISO CertificationsISO Certifications
ISO Certifications
 
Iso 9001 2015 documented information guidlines
Iso 9001 2015 documented information guidlinesIso 9001 2015 documented information guidlines
Iso 9001 2015 documented information guidlines
 
Calibration management system
Calibration management systemCalibration management system
Calibration management system
 
Philippe Andrianne : « Le bourgeon de cassis, l’adaptogène de la gemmothérapie »
Philippe Andrianne : « Le bourgeon de cassis, l’adaptogène de la gemmothérapie »Philippe Andrianne : « Le bourgeon de cassis, l’adaptogène de la gemmothérapie »
Philippe Andrianne : « Le bourgeon de cassis, l’adaptogène de la gemmothérapie »
 
AS9100 Auditor Training Presentation Kit
AS9100 Auditor Training Presentation KitAS9100 Auditor Training Presentation Kit
AS9100 Auditor Training Presentation Kit
 
ISO 9001, 14001, 45001 (IMS) basics training material
ISO 9001, 14001, 45001 (IMS) basics training materialISO 9001, 14001, 45001 (IMS) basics training material
ISO 9001, 14001, 45001 (IMS) basics training material
 
ISO 14001 Leadership & Planning Elements
ISO 14001 Leadership & Planning  ElementsISO 14001 Leadership & Planning  Elements
ISO 14001 Leadership & Planning Elements
 

Similar to Audit report October 2017

ISO 9001 2015 DIS 9.0 performance 1-04-15
ISO 9001 2015 DIS 9.0 performance 1-04-15ISO 9001 2015 DIS 9.0 performance 1-04-15
ISO 9001 2015 DIS 9.0 performance 1-04-15Colin Gray
 
Audit Quality Control
Audit Quality ControlAudit Quality Control
Audit Quality ControlAnh Ho
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptGeorgeKabongah2
 
Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdf
Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdfPractical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdf
Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdfAbhishekPareek64
 
Creative Performance Audit
Creative Performance AuditCreative Performance Audit
Creative Performance AuditHumanology
 
Creative Performance Audit
Creative Performance AuditCreative Performance Audit
Creative Performance AuditHumanology
 
Priority Based Budgeting - How to respond to Downturn and Austerity
Priority Based Budgeting - How to respond to Downturn and AusterityPriority Based Budgeting - How to respond to Downturn and Austerity
Priority Based Budgeting - How to respond to Downturn and AusterityMalcolm Anthony
 
Audit Reports Communicating Assurance Engagement Results.pdf
Audit Reports Communicating Assurance Engagement Results.pdfAudit Reports Communicating Assurance Engagement Results.pdf
Audit Reports Communicating Assurance Engagement Results.pdfSimar Neasy
 
EEM Operations high level slide 2018_v1.pptx
EEM Operations high level slide 2018_v1.pptxEEM Operations high level slide 2018_v1.pptx
EEM Operations high level slide 2018_v1.pptxBoris Berovic
 
Techno excel ao cs stage1
Techno excel   ao cs stage1Techno excel   ao cs stage1
Techno excel ao cs stage1divya
 
Strategic Performance Management System
Strategic  Performance Management SystemStrategic  Performance Management System
Strategic Performance Management Systemjo bitonio
 
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDITSCOTT SITTNER
 
Internal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish DwivediInternal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish DwivediEr. Manish Dwivedi
 
Audit report writing 5
Audit report writing 5Audit report writing 5
Audit report writing 5DJones68
 

Similar to Audit report October 2017 (20)

ISO 9001 2015 DIS 9.0 performance 1-04-15
ISO 9001 2015 DIS 9.0 performance 1-04-15ISO 9001 2015 DIS 9.0 performance 1-04-15
ISO 9001 2015 DIS 9.0 performance 1-04-15
 
Audit process tonatiuh lozada
Audit process tonatiuh lozadaAudit process tonatiuh lozada
Audit process tonatiuh lozada
 
Audit Quality Control
Audit Quality ControlAudit Quality Control
Audit Quality Control
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdf
Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdfPractical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdf
Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdf
 
Basic Audit
Basic AuditBasic Audit
Basic Audit
 
Creative Performance Audit
Creative Performance AuditCreative Performance Audit
Creative Performance Audit
 
Creative Performance Audit
Creative Performance AuditCreative Performance Audit
Creative Performance Audit
 
Priority Based Budgeting - How to respond to Downturn and Austerity
Priority Based Budgeting - How to respond to Downturn and AusterityPriority Based Budgeting - How to respond to Downturn and Austerity
Priority Based Budgeting - How to respond to Downturn and Austerity
 
Auditing.pdf
Auditing.pdfAuditing.pdf
Auditing.pdf
 
Qsm guidelines
Qsm guidelinesQsm guidelines
Qsm guidelines
 
Audit Reports Communicating Assurance Engagement Results.pdf
Audit Reports Communicating Assurance Engagement Results.pdfAudit Reports Communicating Assurance Engagement Results.pdf
Audit Reports Communicating Assurance Engagement Results.pdf
 
Audit ratings guide
Audit ratings guideAudit ratings guide
Audit ratings guide
 
EEM Operations high level slide 2018_v1.pptx
EEM Operations high level slide 2018_v1.pptxEEM Operations high level slide 2018_v1.pptx
EEM Operations high level slide 2018_v1.pptx
 
Techno excel ao cs stage1
Techno excel   ao cs stage1Techno excel   ao cs stage1
Techno excel ao cs stage1
 
Strategic Performance Management System
Strategic  Performance Management SystemStrategic  Performance Management System
Strategic Performance Management System
 
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
 
Internal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish DwivediInternal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish Dwivedi
 
Audit report writing 5
Audit report writing 5Audit report writing 5
Audit report writing 5
 
How to Navigate the Audit Process
How to Navigate the Audit ProcessHow to Navigate the Audit Process
How to Navigate the Audit Process
 

Recently uploaded

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 

Recently uploaded (20)

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 

Audit report October 2017

  • 1. Page 1 of 15 Assessment Report L&L Consulting Services Assessment dates 05/10/2017 to 05/10/2017 Assessment location Pretoria (000) Report Author Jean-Jacques Jaume Assessment Standards ISO 9001:2015
  • 2. Assessment Report. Page 2 of 15 Table of contents Executive Summary......................................................................................................................................................3 Assessment Participants ..............................................................................................................................................4 Status of actions from the previous assessment .........................................................................................................5 Assessment Findings ....................................................................................................................................................7 Our next steps............................................................................................................................................................10 Your next steps...........................................................................................................................................................11 Appendix: Your certification structure & on-going assessment programme ............................................................12
  • 3. Assessment Report. Page 3 of 15 Executive Summary I would like to thank all the audit participants for their assistance and co-operation which enabled the audit to run smoothly and to schedule. Assessment objective, scope and criteria The objective of the assessment was to conduct a surveillance assessment and look for positive evidence to verify that elements of the scope of certification and the requirements of the management standard are effectively addressed by the organization's management system; that the system is demonstrating the ability to support the achievement of statutory, regulatory and contractual requirements and the organization's specified objectives as applicable with regard to the scope of the management standard; to confirm the ongoing achievement and applicability of the forward strategic plan and where applicable to identify potential areas for improvement of the management system. The scope of the assessment is the documented management system with relation to the requirements of ISO 9001:2015 and the defined assessment plan provided in terms of locations and areas of the system and organization to be assessed. ISO 9001:2015 L&L Consulting Services management system documentation NCR Summary There have been no NCRs raised. Definitions: Nonconformity Non-fulfilment of a requirement. Major nonconformity Nonconformity that affects the capability of the management system to achieve the intended results. Nonconformities could be classified as major in the following circumstances: - If there is a significant doubt that effective process control is in place, or that products or services will meet specified requirements; - A number of minor nonconformities associated with the same requirement or issue could demonstrate a systemic failure and thus constitute a major nonconformity. Minor nonconformity Nonconformity that does not affect the capability of the management system to achieve the intended results. Opportunity for improvement It is a statement of fact made by an assessor during an assessment, and substantiated by objective evidence, referring to a weakness or potential deficiency in a management system which if not improved may lead to nonconformity in the future. We may provide generic information about industrial best practices but no specific solution shall be provided as a part of an opportunity for improvement. Observation It is ONLY applicable for those schemes which prohibit the certification body to issue an opportunity for improvement. It is a statement of fact made by the assessor referring to a weakness or potential deficiency in a management system which, if not improved, may lead to a nonconformity in the future.
  • 4. Assessment Report. Page 4 of 15 Assessment Participants Name Position Opening Meeting Closing Meeting Interviewed (processes) L Robbertse Managing Director X X Y Coetzer Quality Manager X X X C Groenewald Workshop Manager X X X P Dunckley Procurement Officer X X X T Langerak Technical Manager X X
  • 5. Assessment Report. Page 5 of 15 Status of actions from the previous assessment Ref Area/Process Clause 1411576N1 Management of the Quality System 6.2.1 Scope FM 663493 Category Minor Details: Quality objectives are vague and not achievable. Objective evidence: In L&L/OBJ/FIN Financial Rev 00 dated 01 September 2016 objective 4 states "the intent to achieve 100% debtors income" When reviewing Debtor statements for June 2017 to October 2016 it was found that for June and September 2016 this was not achieved. As L&L has no control over debtor payments this objective is not achievable. L&L/OBJ/WSIE Electrical and Instrumentation Rev 00 dated 01 September 2016 defined a very narrow window for nonconforming products, that if 1 unit in a 100 units did not conform they would not reach the objective. Cause Review 01 departmental objectives were done hastily and not property evaluated for effectiveness as Per Risk register L&L/REG/003. The objectives that could have changed during the course of the 2015-2016 year were not reviewed for 2017, as a whole to see if it was in fact contributing to delivering data to measure and achieve objectives. The objectives were previously not measured in detail and therefore did not seem necessary to change them. Correction / containment Review of Objectives. Corrective action Proper planning of objectives to be done. New or revised objectives to be created, distributed, communicated and measured for pre-emptive effectiveness. Planning is being co ducted through the following planned document: Planning for the revision of L&L Consulting Services (Ply) Ltd. Departmental Objectives NCR NO:1411576N1- Scope FM 663493. Due to December working time constraints the corrective action will only be completed in the first week of January 2017. First meeting on the planning of objectives have been completed and the continuous planning will commence 09/0112017. The following objectives were updated: - L&L/OBJ/FINANCE REV 01 - L&L/OBL/PC REV 00 - L&L/OBL/PO REV 02 - L&L/OBJ/WS REV 01 - L&L/OBJ/ASSEMBLY REV 02 Closed: Yes
  • 6. Assessment Report. Page 6 of 15 Ref Area/Process Clause 1411576N2 Sales, Procurement and Orders 8.5.1 Scope FM 663493 Category Minor Details: All fields in the Procurement Tracking Sheet are not completed. Objective evidence: While scrutinising the Glencore Purchase Order pack - PO No 4501444947 dated 24 October 2014 All fields in the Procurement Tracking Sheet were not completed making it difficult to see the status of goods ordered and delivered. When looking at other work/order packs the same was found. Cause The procurement tracking sheet (filled in by hand) is not part of the main procurement process and aids as a tracking sheet for production meetings. The form has been kept as a necessary. The Root cause for the form not being filled in is due to a procurement process that is not as streamlined. Too many little processes increases the risk for smaller tasks leading to bigger tasks not being conformed to. Correction / containment Planning of the streamlining and scrutinizing of the procurement process will be conducted as part of the process audits scheduled for the first quarter of 2017,as per audit schedule L&L/REG/008. Corrective action The proposed finalization of the streamlining of the procurement process to be completed by 13/01/2017. Any changes made to the process will be captured in the revised procedures: L&L/QP/16 and L&L/QP/17 and will be revved up. The change will be supportive of the root cause ensuring that there is enough time to fill in the procurement tracking sheets if they are still required. Procurement tracking sheet checked for completeness. Closed: Yes
  • 7. Assessment Report. Page 7 of 15 Assessment Findings The assessment was conducted on behalf of BSI by Name Position Jean-Jacques Jaume Team leader Assessment conclusion and recommendation The audit objectives have been achieved and the certificate scope remains appropriate. The audit team concludes based on the results of this audit that L&L Consulting Services does fulfil the standards and audit criteria identified within the audit report and it is deemed that the management system continues to achieve its intended outcomes. RECOMMENDED - The audited organization can be recommended for continued certification to the above listed standards, and has been found in general compliance with the audit criteria as stated in the above-mentioned audit plan. Use of certification documents, mark / logo or report The use of the BSI certification documents and mark / logo is effectively controlled.
  • 8. Assessment Report. Page 8 of 15 Findings Assembly, Electrical and Instrumentation: 7.1.5, 7.1.6, 7.2, 7.3, 7.4, 8.1, 8.2, 8.4, 8.5.2: The following documents and records were available: - L&L/OBJ/ASSEMBLY Assembly and Testing Objectives Rev 02 dated 10 January 2017 - L&L/QP/01 Calibration Rev 01 dated 16 January 2017 - L&L/QD/019 Calibration and Verification Log Rev 0 dated 05 October 2017 - L&L/QD/019 Equipment Maintenance Log Rev 0 - L&L/QD/06 Assembly and Final Production Realisation - Electrical Rev 01 dated 12 September 2017 - Various Work Instructions for Assembly and Testing of products - L&L Equipment Buffer Stock Project No GWK17539 was scrutinised and the following documents and Records were available: - Client Purchase Order No 4501601084 dated 26 September 2017 - I-17539-1 Workshop Stock Request dated 28 September 2017 - SP/QD/18 Quality Inspection Report for Product R1709/0275 dated 28 September 2017 (Doc No's 01585 and 01586) - Job Card Completed Workshop Tracking Sheet (JC No's 01585 and 01586) Job Assembled by Kobus van den Berg and the following documents and records were available: - Workshop Training and Evaluation Schedule 2017 (Work Instruction 14 Glencore Repeater Box) Finance: The following documents and records were available: - L&L/OBJ/FIN Financial Objectives Rev 01 dated 10 January 2017 - L&L/QP/23 Outsourced Procedure: Aveng Steel Fabrication Rev 00 dated 25 November 2016 - L&L/QP/17 Quoting and Orders Rev 01 dated 01 September 2016 - L&L/QP/13 Approved Suppliers List - L&L/QP/SUP/01 Supplier Performance Chart for Period October 2016 to August 2017 - Various Supplier Corrective Actions Request
  • 9. Assessment Report. Page 9 of 15 Management of the Quality System: The following documents and records were available: Management Review - L&L/QP/13 Management Review Rev 00 dated 01 September 2016 - Minutes and Attendance Register of Management Review dated 17 July 2017 was available - Responsible people were identified for actions and due dates allocated Internal Auditing - L&L/REG/008 Internal Audit Program for 2017 Rev 0 - Internal Audit report conducted by L&L dated 15 August 2017 Kaizen SHEQ dated 25 and 16 July 2017 was scrutinised. - NC raised were incorporated in L&L/REG/007 Corrective Action System CAR 0071 and CAR 0065 was scrutinised and the following records were available: - Actions were implemented and signed off - Updated Procedure/Work instructions System Documentation - L&L/QMS/001 Quality Manual Rev 03 dated 01 August 2017 - L&L/QMS/002 Quality Policy Rev 00 dated 01 September 2016 - L&L/QMS/003 Scope Rev 00 dated 01 September 2016 - L&L/REG/005 Interested Parties Rev 00 dated 01 August 2017
  • 10. Assessment Report. Page 10 of 15 Our next steps Next Visit Plan Date Auditor Time Area/Process Clause 2018/10/02 09:00 Opening Meeting 09:15 Manufacturing and Powder Coating 7.1.5, 7.1.6, 7.2, 7.3, 7.4, 8.1, 8.2, 8.4, 8.5.2 11:00 Sales, Procurement and Orders 8.4.2, 8.4.3, 8.5.1 12:00 Lunch 13:00 Management of the Quality System 6.3, 8.2.4, 8.5.6, 4, 7.5.2, 7.5.3, 8.5.3 15:30 Report Preparation 16:00 Closing Meeting Next visit objectives, scope and criteria The objective of the assessment is to conduct a surveillance assessment and look for positive evidence to verify that elements of the scope of certification and the requirements of the management standard are effectively addressed by the organization's management system; that the system is demonstrating the ability to support the achievement of statutory, regulatory and contractual requirements and the organization's specified objectives as applicable with regard to the scope of the management standard; to confirm the ongoing achievement and applicability of the forward strategic plan. The scope of the assessment is the documented management system with relation to the requirements of ISO 9001:2015 and the defined assessment plan provided in terms of locations and areas of the system and organization to be assessed. ISO 9001:2015 L&L Consulting Services management system documentation Please note that BSI reserves the right to apply a charge equivalent to the full daily rate for cancellation of the visit by the organization within 30 days of an agreed visit date. It is a condition of Registration that a deputy management representative be nominated. It is expected that the deputy would stand in should the management representative find themselves unavailable to attend an agreed visit within 30 days of its conduct.
  • 11. Assessment Report. Page 11 of 15 Your next steps NCR close out process Corrective actions with respect to nonconformities raised at the last assessment have been reviewed and found to be effectively implemented. No new nonconformities were identified during the assessment. Enhanced detail relating to the overall assessment findings is contained within subsequent sections of the report. How to contact customer service 'Just for Customers' is the website that we are pleased to offer our clients following successful registration, designed to support you in maximising the benefits of your BSI registration - please go to www.bsigroup.com/j4c to register. When registering for the first time you will need your client reference number and your certificate number (47620374/FM 663493). Should you wish to speak with BSI in relation to your registration, please contact our Customer Engagement and Planning: BSI Group South Africa (Pty) Ltd 210 Amarand Avenue Regus Business Park Menlyn Maine, Waterkloof Ext 2 Pretoria 0181 South Africa Tel: +27 (0)12 443 6422 E-mail (for corrective action plans): bsi.za@bsigroup.com
  • 12. Assessment Report. Page 12 of 15 Appendix: Your certification structure & on-going assessment programme Scope of Certification FM 663493 (ISO 9001:2015) Instrumentation assembly, electrical, AS i field bus assembly and powder coating processes. Assessed location(s) The audit has been performed at Permanent Locations. Pretoria / FM 663493 (ISO 9001:2015) Location reference 0047620374-000 Address L&L Consulting Services 378 Bronbergvlei Estate Graham Road Zwavelpoort Pretoria 0081 South Africa Visit type Continuing assessment (surveillance) Assessment reference 8679975 Assessment dates 05/10/2017 Audit Plan (Revision Date) 01/02/2018 Deviation from Audit Plan No No. of Full Time Equivalent Employees 23 Total No. of Effective Employees at the site 21 Scope of activities at the site Main Certificate Scope applies. Assessment duration 1 day(s)
  • 13. Assessment Report. Page 13 of 15 Changes in the organization since last assessment There is no significant change of the organization structure and key personnel involved in the audited management system. No change in relation to the audited organization’s activities, products or services covered by the scope of certification was identified. There was no change to the reference or normative documents which is related to the scope of certification. Shift Details The shifts are identical in terms of process outputs and as a result it has been determined that the effectiveness of all shifts can be seen from outputs records and coverage within the normal assessment times.
  • 14. Assessment Report. Page 14 of 15 Certification assessment program Certificate Number - FM 663493 Location reference - 0047620374-000 Audit1 Audit2 Audit3 Audit4 Audit5 Business area/Location Date (mm/yy): 17/11/2 016 28/11/2 016 10/2017 10/2018 10/2019 Duration (days): 1 2 1 1 2 Opening Meeting X X X X X Managing Director Interview X X Management of the Quality System X X X X Finance X X X Sales, Procurement and Orders X X X Assembly, Electrical and Instrumentation X X X Manufacturing and Powder Coating X X X Report Preparation X X X X X Closing Meeting X X X X X Expected outcomes for accredited certification What accredited certification to ISO 9001 means ISO 9001:2015 specifies requirements for a quality management system when an organization: needs to demonstrate its ability to consistently provide products and services that meet customer and applicable statutory and regulatory requirements; and aims to enhance customer satisfaction through the effective application of the system, including processes for improvement of the system and the assurance of conformity to customer and applicable statutory and regulatory requirements. What accredited certification to ISO 9001 does not mean 1) It is important to recognize that ISO 9001 defines the requirements for an organization’s quality management system, not for its products and services. Accredited certification to ISO 9001 should provide confidence in the organization’s ability to “consistently provide product that meets customer and applicable statutory and regulatory requirements”. It does not necessarily ensure that the organization will always achieve 100% product conformity, though this should of course be a permanent goal. 2) ISO 9001 accredited certification does not imply that the organization is providing a superior Product or service, or that the product or service itself is certified as meeting the requirements of an ISO (or any other) standard or specification.
  • 15. Assessment Report. Page 15 of 15 Notes This report and related documents are prepared for and only for BSI’s client and for no other purpose. As such, BSI does not accept or assume any responsibility (legal or otherwise) or accept any liability for or in connection with any other purpose for which the Report may be used, or to any other person to whom the Report is shown or in to whose hands it may come, and no other persons shall be entitled to rely on the Report. If you wish to distribute copies of this report external to your organisation, then all pages must be included. BSI, its staff and agents shall keep confidential all information relating to your organisation and shall not disclose any such information to any third party, except that in the public domain or required by law or relevant accreditation bodies. BSI staff, agents and accreditation bodies have signed individual confidentiality undertakings and will only receive confidential information on a 'need to know' basis. This audit was conducted on-site through document reviews, interviews and observation of activities. The audit method used was based on sampling the organization’s activities and it was aimed to evaluate the fulfilment of the audited requirements of the relevant management system standard or other normative document and confirm the conformity and effectiveness of the management system and its continued relevance and applicability for the scope of certification. As this audit was based on a sample of the organization’s activities, the findings reported do not imply to include all issues within the system. Regulatory compliance BSI conditions of contract for this visit require that BSI be informed of all relevant regulatory non-compliance or incidents that require notification to any regulatory authority. Acceptance of this report by the client signifies that all such issues have been disclosed as part of the assessment process and agreement that any such non- compliance or incidents occurring after this visit will be notified to the BSI client manager as soon as practical after the event.