2. Problem faced Before this Rolling M/C –
Rolling of 3 mtr length & 2mm thickness is not possible in house.
We were to depended on out-sources.
Delivery time & Transportation cost as per not our control.
Rolling quality was not also satisfactory.
It was very difficult to maintain production schedule and Cost.
3. Total Days to making New Rolling Machine – 42 days.
Total Cost to making New rolling Machine – 26354.
Total Manpower used – 3 person .
4. Financial Saving -
1.We have been quoted for same Applications about –
14.5 lacs and 8.0 lacs.
2.We have been quoted for Refurnishing Job for machine
was about – 1.71 Lacs.
3. Total Machine Cost – 26354.
5. Machine Specification –
1. Total Machine Length – 4000 mm.
2. Roller Length – 3400 mm.
3. Sheet Bending capacity – 1 mm to 4 mm.
4. Machine Structure Height – 500 mm.
5. Machine Width Top & Bottom – 650 & 700 mm.
6. Pedestal Size – S 517.
7. Gear Motor rating – 1 HP, 50 Hz, 230 VAC.
8. Gear Size -40/1.
6. List of Items -
1. Used Three MS Pipes for made Three Rollers from ESL scrap.
2. Used MS Angles and MS sheet for making Machine’s structure &
covers from ESl scrap.
3. From Outside Scrap We utilized MS Round Bar to make Roller
shaft of Gear motor and Stud for Roller Manual operation.
4. Used Old Gear & Gear Motor for Roller Forward & Reverse
Operation from ESl.
5.Used MS 15 mm sheet to make Roller Machine Assembly from ESL
scrap.
6. Purchased New Pedestals, Bearings & Casting Round Bar for
Machine.
7. How to Made All Machine Parts In house of Esl -
1. Cutting MS pipes on Hexo Machine to making Three Roller.
2. Cutting Round Bar on Hexo Machine & Manual Weld it in
Roller to making Roller shaft.
3. Cutting MS Angles on Cutter machine & Manual Weld as
per our design to making structure.
4. Use Lath machine for made stud , Supporting small Roller
and Roller Assembly.
12. Merits of Rolling Machine –
Delivery time and Quality can be handled as per our requirements.
Save Transportation & Vendor Manufacturing Charges.
V- Rolling facility available in our Machine so We can save our
manufacturing time.
Daily production of tank availibity. (15 min per tank).
Manual & Semi Automatic Operations.
Quality improvement of Tank.
14. Sr.N
o
Vendor
Name
Type of
System
Rate
per Kg
Weig
ht
Tran
s.
Char
ges
Cost Source Quali
ty
Job
Time
qty Total
Cost
1 Urja
Engineer
500 LPD
GI 3.5 90 400 355 Out source Average 7 Days 10 3550
2 Urja
Engineer 500 LPD
SS 3.5 32 400 152 Out source Average 7 Days 10 1520
3 Urja
Engineer 300 lpd
GI 3.5 52 400 222 Out source Average 7 Days 10 2220
4 ESL 500 LPD
GI In house 90 0 - In house Good
15
min.(Per
tank)
- -
5 ESL 500 LPD
SS In house 32 0 - In house Good
15
min.(Per
tank)
- -
6 ESL 300 lpd
GI In house 52 0 - In house Good
15
min.(Per
tank)
- -